  • 7/28/2019 SAIC-B-2001 Rev 0

    1/2

    A7

    The procedure application for intumescent material specified the

    minimum wet thickness that will yield the required dry thickness. (API

    PUBL 2218, Para. 7.3.3.1)

    SAES-B-006,

    Para. 5.2 & 8.2.3

    *Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FA

    REMARKS:

    QC Supervisor Proponent and Others

    Name, Sign and Date:

    Quality Record Approved:Name, Organization,

    Initials and Date:

    T&I Witnessed QC Record Reviewed Work Verified

    T&I Witnessed QC Record Reviewed Work Verified

    Name, Initials and Date:

    Performed Inspection Work / Rework May Proceed

    Name, Initials and Date:

    QC Record Reviewed Work Veri fied

    QC Inspector PID Representative

    Name, Initials and Date:

    Work is Complete and Ready for Inspection:

    Name, Initials and Date:

    T&I Witnessed

    Contractor / Third-Party Saudi AramcoConstruction Representative* PMT Representative

    1. SAES-B-006, Fireproofing for Plants, (30 June, 2003)2. API PUBL 2212, Fireproofing Practices in Petroleum and Petrochemical Processing Plants, (08/01/1999)

    ACTUAL INSPECTION DATE & TIME

    SAUDI ARAMCO USE ONLYSAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

    EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER

    SAUDI ARAMCO INSPECTION LEVEL

    ITEM

    No.ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DA

    MH's SPENT TRAVEL TIMQUANTITY INSP.

    WORK PERMIT REQUI

    SCHEDULED INSPECTION DATE & TIME

    CONTRACTOR INSPECTION LEVEL

    LAYOUT DRAWING NUMBER

    PLANT NO.EQUIPMENT ID NUMBER S EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.

    CONTRACTOR / SUBCONTRACTOR

    Review Procedure for Application of Proprietary

    Fireproofing (incl. Intumescent Epoxy Mastics and

    Lightweight Concretes)

    SAIC-B-2001 25-May-05 MECH-

    The procedure indicates the requirement for application personnel to be

    trained and certified by the material manufacturer.

    SAES-B-006,

    Para. 8.2.2

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    PROJECT TITLE WBS / BI / JO NUMBER

    General Requirements

    A3

    A9The procedure shall provide details in the manner of applying the

    required top-coating approved by the fireproofing manufacturer.

    SAES-B-006,

    Para. 8.6.4

    A8

    A5

    A6The application procedure includes the required surface preparation ofsteel surface to be covered with intumescent or other proprietary

    fireproofing materials.

    SAES-B-006,

    Para. 8.4

    A4

    The procedure details the manufacturer's guidelines and

    requirements regarding ambient temperature, storage temperature,

    materials, proportioning, and mixing.

    SAES-B-006,

    Para. 8.2.3

    The procedure detailed the top coating requirements and the manner of

    application when required.

    SAES-B-006,

    Para. 8.6.4

    The application procedure contains Quality control procedures and hold

    points for inspection of surface preparation and reinforcement.

    SAES-B-006,

    Para. 8.2.4

    A

    REFERENCE DOCUMENTS:

    A1

    Proprietary fireproofing was approved by the Chief Fire Prevention

    Engineer.

    Notes:

    a. Qualifying documentation of the fireproofing material is

    submitted to the Chief Fire Prevention Engineer for approval.

    b. Refer toAppendix 1 for a list of proprietary fireproofing

    materials that have been accepted for various applications

    and used in Saudi Aramco facilities.

    SAES-B-006,

    Para. 8.2.1

    A2

    An application procedure approved by the fireproofing

    manufacturer is submitted to Inspection Department (manager) for

    approval.

    SAES-B-006,

    Para. 8.2.1

    Page 1 of 2

  • 7/28/2019 SAIC-B-2001 Rev 0

    2/2