A General Requirements:  A6 Installation of isolation valves serving mains or branch piping to fire fighting equipment or any firewater system shall meet the requirements of SAES -B-017. SAES-S-040, Para. 5.7.3  A5 Each pressure control valve shall be provided with an upstream and downstream manual isolation valves, designated "locked open". SAES-B-017, Para. 14 .4.2 Isolation valves between the hydrant and fire water main, if provided, shall be buried in accordance with SAES-S-040. SAES-B-017, Para. 7.2.2 g  A2  A3 Each utility line shall be provided with an isolation valve just upstream of  the specified hose connector at the termination. SAES-L-310, Para. 19.8  A4 Installation of Fire Wat er Isolat i on Valves SAIC-L-2056 25-May-05 SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004) SAUDI ARA MCO INSPE CTION CHE CKL IS SAIC NUMBER DATE APPROVED QR NUMBER MECH- PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER MH's SP ENT TRAVEL TIME QUANTITY INSP. SCHEDULED INSPECTION DATE & TIME PASS FAIL CONTRACTOR INSPECTION LEVEL WORK PERMIT REQUIRED? SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER SAUDI ARAMCO USE ONLY SAUDI ARAMCO INSPECTION LEVEL ITEM No.  ACCEPTANCE CRITERIA REFERENCE N/A RE-INSP DATE ACTUAL INSPECTION DATE & TIME EC / PMCC / MCC NO. PLANT NO. A branch piping of a raw/firewater combined distribution system, serving firewater systems of a building or a facility is connected upstream of the isolation valve of the raw water supply piping. SAES-S-040, Para. 5.5.1 7  A7 Isolation valves between the hydrant and fire water main, if provided, shall be buried SAES-B-017, Para 7.2.2  A8 Underground pipin g, valves, and fitting s shall be exter nally protected again st corrosion pe r SAES-X-600. SAES-B-017, Para 7.3.4  A9  Th e sp ra y sy st em sh al l be cons id er ed t o st ar t at t he in le t fl an ge of t h e isolation valve connecting t o the distribution piping. The spray system shall consist of an isolation valve, a strainer, actuation valve, and spray system piping. SAES-B-017, Para 10 .5.1  A10 Isolation and actuation valves shall be accessible from grade and shall otherwise meet the access requirements of SAES-B-054 SAES-B-017, Para 10 .5.2  A11  Th e en t ir e sp r ay sy st em do wnstream of t he iso la t io n va lv e sh al l be capable of being drained by low point drains SAES-B-017, Para 10 .5.4  A12  Th e d el u ge sy st em sh al l be cons id er ed to star t at t he in le t fl an ge of t h e isolation valve connecting to the distribution piping SAES-B-017, Para 11 .6.1  A13  Th e sy stem shall consist of an isola t io n valve, de lu ge valve, pi pi ng , and deluge heads. SAES-B-017, Para 11 .6.2  A14 Deluge valves may be manually operable except as specified in Section. SAES-B-017, Para 11 .7.1  A15 Sectionalizing valve handwheels shall be accessible from deck level and located at a convenient operating height, hand wheels or other extension shall not obstruct walk ways or equipment access ways. SAES-B-009, Para 4.8 .6.7 Steel body valves shall be used for above ground firewater system block valves to avoid failure due to fire, and AG to be equipped with position indicator or showing full open and close positions. SAES-L-008 Para 8.2  A1 Page 1 of 2

Upload: philipyap

Post on 02-Apr-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

7/27/2019 SAIC-L-2056 Rev 0

http://slidepdf.com/reader/full/saic-l-2056-rev-0 1/2

A General Requirements:

 A6

Installation of isolation valves serving mains or branch piping to fire

fighting equipment or any firewater system shall meet the requirements

of SAES-B-017.

SAES-S-040,

Para. 5.7.3

 A5Each pressure control valve shall be provided with an upstream and

downstream manual isolation valves, designated "locked open".

SAES-B-017,

Para. 14.4.2

Isolation valves between the hydrant and fire water main, if provided,

shall be buried in accordance with SAES-S-040.

SAES-B-017,

Para. 7.2.2 g A2

 A3Each utility line shall be provided with an isolation valve just upstream of 

the specified hose connector at the termination.

SAES-L-310,

Para. 19.8

 A4

Installation of Fire Water Isolation Valves SAIC-L-2056 25-May-05

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

MECH-

PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER

MH's SP ENT TRAVEL TIMQUANTITY INSP.SCHEDULED INSPECTION DATE & TIME

PASS FAIL

CONTRACTOR INSPECTION LEVEL

WORK PERMIT REQUISAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

SAUDI ARAMCO USE ONLY

SAUDI ARAMCO INSPECTION LEVEL

ITEM

No. ACCEPTANCE CRITERIA REFERENCE N/A RE-INSP DA

ACTUAL INSPECTION DATE & TIME

EC / PMCC / MCC NO.

PLANT NO.

A branch piping of a raw/firewater combined distribution system, serving

firewater systems of a building or a facility is connected upstream of the

isolation valve of the raw water supply piping.

SAES-S-040,

Para. 5.5.17

 A7Isolation valves between the hydrant and fire water main, if provided,

shall be buried

SAES-B-017,

Para 7.2.2

 A8Underground piping, valves, and fittings shall be externally protected

against corrosion per SAES-X-600.

SAES-B-017,

Para 7.3.4

 A9

 The spray system shall be considered to start at the inlet flange of the

isolation valve connecting to the distribution piping. The spray system

shall consist of an isolation valve, a strainer, actuation valve, and spray

system piping.

SAES-B-017,

Para 10.5.1

 A10Isolation and actuation valves shall be accessible from grade and shall

otherwise meet the access requirements of SAES-B-054

SAES-B-017,

Para 10.5.2

 A11 The entire spray system downstream of the isolation valve shall be

capable of being drained by low point drains

SAES-B-017,

Para 10.5.4

 A12 The deluge system shall be considered to start at the inlet flange of the

isolation valve connecting to the distribution piping

SAES-B-017,

Para 11.6.1

 A13 The system shall consist of an isolation valve, deluge valve, piping, and

deluge heads.

SAES-B-017,

Para 11.6.2

 A14 Deluge valves may be manually operable except as specified in Section.SAES-B-017,

Para 11.7.1

 A15

Sectionalizing valve handwheels shall be accessible from deck level and

located at a convenient operating height, hand wheels or other extension

shall not obstruct walk ways or equipment access ways.

SAES-B-009,

Para 4.8.6.7

Steel body valves shall be used for above ground firewater system block

valves to avoid failure due to fire, and AG to be equipped with position

indicator or showing full open and close positions.

SAES-L-008

Para 8.2 A1

Page 1 of 2

7/27/2019 SAIC-L-2056 Rev 0

http://slidepdf.com/reader/full/saic-l-2056-rev-0 2/2

*Person Responsible for Completion of Quality Work / Test Y =YES N =NO F =FA

Name, Organization,

Initials and Date:

 T&I Witnessed QC Record Reviewed Work Verified

Name, Sign and Date:

Quality Record Approved:

QC Inspector PID Representative

Name, Initials and Date:

Performed Inspection Work / Rework May Proceed

Name, Initials and Date:

 T&I Witnessed QC Record Reviewed Work Verified

 T&I Witnessed QC Record Reviewed Work Verified

Proponent and Others

Name, Initials and Date:

Contractor / Third-Party Saudi AramcoConstruction Representative* PMT Representative

Work is Complete and Ready for Inspection:

Name, Initials and Date:

PASS FAIL N/A RE-INSP DAITEM

No. ACCEPTANCE CRITERIA REFERENCE

2. SAES-B-009, Fire Protection and Safety Requirements for Offshore Production Facilities, (30 J anuary, 2002)

PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR

0 0 25-May-05 MECH-

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

QC Superviso r 

4. SAES-S-040, Saudi Aramco Water Systems, 31 December 2003

 A17Buried sectionalizing valves in FW system shall be provided with

indicator posts.

SAES-L-008

Para 7.7

SAES-B-017,

Para 9.2 A20

Block valves shall be provided in piping to isolate line failures for

repair,and assure flow of FW to all risk areas in case of failure in fire.

 A19Gate valves are used above ground, they shall be installed so that the

stems are horizontal.

Flanged valves shall be provided at the ends of Fire Water loops tosectionalizing/Flushing upon completion of construction and at intervals.

 A18Chain wheel operation shall not be installed on emergency isolation

valves.

SAES-B-009,

Para 4.8.6.2

 A16

REMARKS:

REFERENCE DOCUMENTS:

SAES-B-017,

Para 12.4c