C4A heavy duty moisture-proof disc shall be fitted between the greasedflange face and the cover. The disc shall have a diameter equivalent tothe inside diameter of the bolt holes.
04-SAMSS-035Para. 12.2
SAUDI ARAMCO USE ONLYWORK PERMIT REQUIR
CONTRACTOR INSPECTION LEVELSAUDI ARAMCO INSPECTION LEVEL
ACTUAL INSPECTION DATE & TIME
EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER
ITEMNo.
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
MH's SP ENT TRAVEL TIMEQUANTITY INSP.SCHEDULED INSPECTION DATE & TIME
LAYOUT DRAWING NUMBER
PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.
CONTRACTOR / SUBCONTRACTOR
St or ag e and Pr es er vat ion of Mat er ial s o f Wel l Head Pi pi ng SA IS-L -2084 25-May -05 PIPING -
Pipe shall not be rolled or dropped off trucks.SAES-L-450,
Para. 8.6
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIS SAIC NUMBER DATE APPROVED QR NUMBER
PROJ ECT TITLE WBS / BI / J O NUMBER
C3 The raised face portion of the flange and the ring joint groove shall becovered with a heavy grease, (see Attachment 1).
04-SAMSS-035Para. 12.2
C. Storage, Handling and Preservation of Valves
C1
Valve end flanges shall be fitted with plywood covers. The coverdiameter shall be the same as the outside diameter of the flange andshall be at least 10 mm thick for valves up to NPS 10 inch and 12 mmthick for valves NP S 12 inch and larger.
C2
The cover shall be attached by machine bolts with a nut and washerfitted on the inside of the flange. There shall be four (4) bolts on valvesup to NPS 10 inch nominal size and eight (8) bolts on valves NPS 12
inch and larger. The bolts diameter shall not be less than ½ the size of the flange bolt hole.
04-SAMSS-035Para. 12.2
04-SAMSS-035Para. 12.2
A6Internally coated pipe shall be handled from the outside diameter (O.D.),
only.
02-SAMSS-011,Para. 10
B1 Fittings and Flanges must be packaged in steel-banded wooden cratesor secured to skids.
02-SAMSS-011,Para. 10
A7When a length of pipe is cut from a longer joint of pipe, all vendormarkings and other identifying information shall be transferred to eachlength of pipe.
SAES-L-450,Para. 8.8
A5Pipe stacking shall be made in a manner which will not damage the pipeor the coating.
SAES-L-450,Para. 8.3
A. Pipe Stor age, Hand li ng an d Pres ervation
A2End bevel protectors shall remain on pipes and fittings while in storage,protectors shall not damage internal or external coating.
SAES-L-450,Para. 8.4
A4
Pipe handling procedure and equipment is approved by the SaudiAramco PMT, and is available.
SAES-L-450,Para. 8.1
A3Slings for lifting pipe shall be nylon or similar material to prevent damageto the pipe surface. Wire rope slings shall not be used.
SAES-L-450,Para. 8.5
A1
B. Storage, Handling and Preservation of fitti ngs & Flanges
B2Fittings and Flanges must be protected from mechanical damage.Welding ends must be protected with suitable wood, plastic, or metalcovers, (see Attachment 1).
C5 The ends of threaded and socket weld end valves shall be protected withtight fitting plastic caps.
04-SAMSS-035Para. 12.3
SAES-L-450,Para. 8.7
Page 1 of 3
7/27/2019 SAIC-L-2084 Rev 0
http://slidepdf.com/reader/full/saic-l-2084-rev-0 2/3
*Person Responsible for Completion of Quality Work / Test Y =YES N =NO F =FAILED
T&I Witnessed QC Record Reviewed
Name, Sign and Date:Quality Record Approved:
Name, Organization,Initials and Date:
T&I Witnessed QC Record Reviewed
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIS SAIC NUMBER DATE APPROVED QR NUMBER
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
St or ag e and Pr es er vat ion of Mat er ial s o f Wel l Head Pi pi ng SA IS-L -2084 25-May -05 PIPING -
REFERENCE DOCUMENTS:
ITEMNo.
ACCEPTANCE CRITERIA
ATTACHMENTS:1. FIGURE 1 - Flanged Valves; FIGURE 2 - Weld End Valves
Work VerifiedQC Supervisor Proponent and Others
Contractor / Thir d-Party
Work VerifiedQC Inspector
REFERENCE
3. 04-SAMSS-035, General Requirements for Valves, 31 J uly, 2001
REMARKS:
PASS FAIL N/A RE-INSP DATE
1. SAES-L-450, Construction of On-Land and Near-Shore Pipelines, 30 September, 20033. 02-SAMSS-011, Forged Steel Weld Neck Flanges for Low and Intermediate Temperature Service, 28 J anuary, 2004
PID Representative
Construction Representative*
Name, Initials and Date:Work is Complete and Ready for Inspection:
Name, Initials and Date:
Name, Initials and Date:Performed Inspection Work / Rework May Proceed
Name, Initials and Date:
Work Verified
Saudi A ramcoPMT Representative
T&I Witnessed QC Record Reviewed
Page 2 of 3
7/27/2019 SAIC-L-2084 Rev 0
http://slidepdf.com/reader/full/saic-l-2084-rev-0 3/3
At tachment 1
St or ag e and Pr es er vat ion of Mat er ial s o f Wel l Head Pi pi ng SA IS-L -2084 25-May -05 PIPING -
SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLIS SAIC NUMBER DATE APPROVED QR NUMBER
Page 3 of 3