  • 7/27/2019 SAIC-L-2118 Rev 0

    1/1

    Name, Initials and Date:T&I Witnessed QC Record Reviewed

    Name, Organization,

    Initials and Date:

    T&I Witnessed QC Record Reviewed

    Work Verified

    QC Inspector PID Representative

    QC Record Reviewed

    Performed Inspection Work / Rework May Proceed

    Work is Complete and Ready for Inspection:

    ACCEPTANCE CRITERIA REFERENCE N/A

    WORK PERMIT REQUI

    PASS FAIL

    EC / PMCC / MCC NO.LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER

    EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE

    SAUDI ARAMCO INSPECTION LEVEL

    ITEM

    No.

    CONTRACTOR INSPECTION LEVEL

    QC Supervisor Proponent and Others

    Contractor / Third-Party

    REMARKS:

    Name, Initials and Date:

    Name, Initials and Date:

    T&I Witnessed

    Name, Initials and Date:

    RE-INSP DA

    A. General:

    A4

    Name, Sign and Date:

    Quality Record Approved: Work Verified

    Construction Representative* PMT RepresentativeWork Verified

    SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

    SAUDI ARAMCO USE ONLYMH's SP ENT TRAVEL TIMQUANTITY INSP.SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME

    PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR

    PLANT NO.

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    Inspection of Culvert Crossing SAIC-L-2118 25-May-05 MECH.

    SYSTEM ID.

    REFERENCE DOCUMENTS:

    Saudi Aramco

    1. SAES-L-460, Pipeline Crossings Under Roads and Railroads, (30 September, 2003)

    2. SAES-B-064, Onshore and Nearshore Pipeline Safety, (30 J anuary, 2002)

    Transition from pipeline spacing within corridors and that stipulated at

    box culverts shall be made within the road or railroad right-of-way.

    SAES-B-064

    Para. 10.13

    Y =YES N =NO F =FA*Person Responsible for Completion of Quality Work / Test

    The minimum spacing between any pipe and the overhead or side

    portion of the culvert structure shall be 1.5 pipe diameters, but in no case

    less than 1 meter.

    SAES-B-064

    Para. 10.12

    A5

    A1

    The culvert length or bridge width does exceed 20 times the clearance

    between the top of the highest pipeline in a culvert and the ceiling of the

    culvert, or from the top of a pipeline to the bottom of the bridge beams.

    SAES-L-460

    Para. 6.3

    A2Box culverts are not used in areas where moving sand can bury the

    pipeline unless the pipeline is coated in accordance with SAES-H-002.

    SAES-L-460

    Para. 6.4

    A3

    The minimum spacing between any two pipes when pipelines cross

    under roads or railroads through box culverts shall be twice the diameter

    of the larger pipe.

    SAES-B-064

    Para. 10.12