s.m.asghar brochure - for atomic energy comission
TRANSCRIPT
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
1/116
AN ISO 9001 2000 CERTIFIED COMPANY
FOR PAKISTAN ATOMIC ENERGY COMMISSION
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
2/116
PROUDLY AN ISO 9001:2000
CERTIFIED COMPANY
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
3/116
For The Kind Attention Of:
Mr. Shaukat Ali
Manager Contracts
PAKISTAN ATOMIC ENERGY COMISSION FOUNDATION
P.O.BOX # 216, HANNA ROADG-8/3, ADJACENT NORI HOSPITALIslamabad
CELL # : 0300-4293987
PTCL # : 051-9263298
FAX # : 051-2253045
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
4/116
COMPANIES PROFILE
COMPANY NAME : M/s S.M.Asghar (Pvt) Limited
An ISO 9001:2000 Certified Company
COMPLETE ADDRESS : 908-910, 9
th
Floor, Chapal
Plaza, Hasrat Mohani Road
Off I.I.Chundrigar Road
Karachi.
CORPORATE STATUS OF FIRM : PRIVATE LIMITED.
TELEPHONE NO : 00+ 92+213-2468091 -5
FAX NO : 00+92+213-2468096.
FIRMS CUSTOM HOUSE LICENCE NO : 714. (Copy Enclosed).
DATE OF REGISTRATION WITH : 30-03-1980.
CUSTOMS
E- MAIL ADDRESS : [email protected]
E- MAIL ADDRESS : [email protected]
Web- Page : http://www.smasghar.com.pk
DATE OF ISSUE OF LICENCE : 30-03-1980.
NUMBER OF STAFF EMPLOYED : 20.
YEAR OF ESTABLISHMENT : 1980.
mailto:[email protected]:[email protected]:[email protected]:[email protected]://www.smasghar.com.pk/http://www.smasghar.com.pk/http://www.smasghar.com.pk/mailto:[email protected]:[email protected] -
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
5/116
SYED KHALID JAMAL CHIEF EXECUTIVE
SYED SAJID JAMAL DIRECTOR PROJECTS & COMM DIVISION
SYED MOHAMMAD ALI KHALID GENNERAL MANAGER
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
6/116
PEOPLE BEHIND THE COMPANY
SYED KHALID JAMAL : CHIEF EXECUTIVE.
SYED SAJID JAMAL : DIRECTOR PROJECTS & COMM DIV
SYED MOHAMMAD ALI KHALID : GENERAL MANAGER
MOHAMMAD ANWER : HEAD OF PORT OPERATIONS.
MOHAMMAD FAYYAZ KHAN : INCHARGE EXPORT DIVISION
MOHD SHARIF KHAN : HEAD OF CUSTOMS DIVISION.
S.IMDAD ALI.ZAIDI : HEAD OF PORT QASIM DIV.
MOHD SALEEM : ASST PORT OPERATION.
MOHD JAVED : ASST PORT OPERATION.
QAZI KHURSHID AHMED : HEAD OF AIRPORT DIV.
SALEEM NOOR : ASST. AIRPORT OPERATIONS
AFTAB AHMED : CO-ORDINATOR SHIPPING COMPANY
SAEED KHAN : HEAD OF COMPUTER DIVISION
DILSHAD A. SIDDIQUI. : MANAGER FINANCE
ASIF KHAN : ASST. MANAGER FINANCE
ATIA FASIAL : ASST. OFFICE CO-ORDINATOR
SYED ADNAN ALI : INCHARGE GD PREPARATION (BY AIR)
ASAD ABBAS : ASST.BILLINGS & ACCOUNTS
MOHSIN KHAN : FIELD OFFICER.
SADDAM HUSSAIN : FIELD OFFICER.
SULEMAN : OFFICE PEON.
USMAN GHANI : OFFICE PEON.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
7/116
SECTION 1 : INTRODUCTION
SECTION 2 : SCOPE OF WORK
SECTION 3 : DOCUMENTATION
REQUIREMENTS
SECTION 4 : PROJECT REFERENCES
SECTION 5 : PICUTRE GALLARY
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
8/116
We are pleased to inform you that by the Grace of Al l m ighty
Al lah, current ly w e are Handl ing Projects for valu ing m ore or
less US $ 1.2 Bill io n Do llars.
You wil l appreciates that in al l of the Projects mentioned
below we have taken var ious Exempt ions & benef i ts of
various SROs from Customer to Customer& on Project to Project Basis.
With our backgrou nd exper ience, M/s. S.M.Asghar (Pvt) Lim itedhas successfu l ly completed al l the major & Prest ig ious
Projects of National Importance as well asInternat ional Importanc e.
We on meri t got the benef i t of var ious Concessionary
SROs & Exemptions to our valued Customer to theirEnt ire sat is fact ion & witho ut any prob lems and dif f icu l ty .
Our team of professionals si ts with the Customer pr ior
to the star t of the Project /Pro jects & developed systems
and a general f lexibi l i ty of approach tai lored to our
Cl ients m ost Complex of requirements.
We bel ieve that our Professional approach to our
Client is unparal leled by any com petitors .
Few of the recent Projects & Customer References
are given below, for whom we have claimed the various SROs& Exempt ions to our valued Customer to their ent i re
sat is fact ion.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
9/116
MOL MAKORI GAS FIELD
SRO: 678(I)/2004, DT: 07-08-2004
Petrosin Ravi
SRO: 678(I)/2004, DT: 07-08-2004
SHELL GAS
SRO: 678(I)/2004, DT: 07-08-2004
SHV ENERGY PAKISTANVarious Equipments & Material Including Break Bulk LPG Mixture
SRO: 678(I)/2004, DT: 07-08-2004
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
10/116
Expans ion o f Plant : RAVI GAS
SRO: 678(I)/2004, DT: 07-08-2004
WEATHERFORD DRILLING
SRO: 678(I)/2004, DT: 07-08-2004
Petrosin Engineer ing(One of the Largest Private Sector Project US $ 700 Million Dollars)
SRO: 678(I)/2004, DT: 07-08-2004
TRANSASIA REFINERY LTD (Re-Location )(One of the Largest Private Sector Project US $ 700 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
11/116
INDUS REFINERY LTD (Re-Location )(Another Largest Private Sector Project US $ 650 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESALINATION & POWER PROJECT at DHA Karachi(Total Cost of the Project US $ 160 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at KarachiEXPANSION PROJECT & NEW GANTRY CRANE
(Total Cost of the Project US $ 400 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
MIRANI HYDRO POWER DAM PROJECT(The Project Cost US $ 80 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
12/116
SATPARA HYDRO POWER DAM PROJECT(The Project Cost US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
MANGLA RA ISING HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
MANGLA RA ISING HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
GOMAL ZAM HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
13/116
DUBER KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
KHAN KHWAR HYDRO POWER DAM PROJECT(The Project Cost US $ 100 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I(The Project Cost US $ 45 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II(The Project Cost US $ 20 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
14/116
PROGAS LPG STORAGE & HANDLING TERMIANAL(Private Sector Project US $ 50 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
FUAJI OIL TERMINAL & HANDL ING JETTY FAICILITIES(The Second Expansion Phase Project US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
PETROSIN ENGINEERING (Pvt) LTD
QADIRPUR 600 MMSOFD EXPANSION PROJECT
(The Project Cost US $ 6 Million Dollars)SRO: 678(I)/2004, DT: 07-08-2004
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
15/116
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITED
PACKAGE 8C-1, ATC COMPLEX AND FCR BUILDING FOR NEW BENAZIR
BHUTTO INTERNATIONAL A IRPORT PROJECT, ISLAMABAD
(The Project Cost US $ 14 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITED
PACKAGE 01 OF AZAD JAMMU & KASHMIR URBAN DEVELOPMENT
PROGRAM FOR ERRA
(The Project Cost US $ 300 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
ALSTOM PAK ISTAN L IMITED
FUAJ I FERTILIZER COMPANY ENERGY LIMITED (FFCEL)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY
FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.
(The Project Cost US $ 20 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
16/116
ALSTOM PAK ISTAN L IMITED
ZHORLU WIND POWER ( Heavy Trans formers)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY
FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.
SRO: 575(I)/2006, DT: 05-06-2006
FUAJ I FERTILIZER COMPANY ENERGY LIMITED (FFCEL)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY
FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR IN PAKISTAN.
(The Project Cost US $ 50 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESCON ENGINEERING
SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 1
(The Project Cost US $ 130 Million Dollars)SRO: 575(I)/2006, DT: 05-06-2006
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
17/116
DESCON ENGINEERING
SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 2
(The Project Cost US $ 130 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
DESCON ENGINEERING
SETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU)
(The Project Cost US $ 30 Million Dollars)
SRO: 575(I)/2006, DT: 05-06-2006
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
18/116
S.M.ASGHAR (PVT) LIMITED
908-910, 9
th
Floor, Chapal Plaza, Hasrat Mohani
Road, Off I.I Chundrigar Road, KARACH I
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
19/116
We have a pleasure to give a brief introduction of our Company
M/s. S.M.Asghar (Pvt) Limited, a name famous for its credibility,reliability & commitment in this part of world.
We are proudly an ISO 9001-2000Certified Company.
We are among the few & pioneer company who got theISO Certificationin Custom Clearance in Pakistan.
With our background experience, M/s. S.M.Asghar (Pvt) Limited
has been able to developed systems and a general flexibility ofapproach tailored & personalized solutions to our Clients most ComplexRequirements that we believe is unparalleled by any competitors.
Most important our customers are able to deal with an InternationalNetwork who can arrange the movement and supervisionof cargo from Europe, and beyond, whilst they onlyinstruct one control office. This International Strengthand wealth of experience combined with a genuinely personal
approach we feel makes us a formidable contender.
Our Credentials our Enthusiasm and our Track Record speak forthemselves.
For over the last 15 Years, M/s. S.M.Asghar (Pvt) Limitedhave developed & specializes and simultaneously Transformitself into a PROJECT CLEARANCE SPECIALIST.
If one can give a brief look at the Pakistans Most Advanced
& the Important Industrial Estate PORT BIN QASIM,by the Grace Of All Mighty Allah it is an Honor for
M/s. S.M.Asghar (Pvt) Limited to perform the Complete CustomClearance & the Logistics Support in the form of Local Transportation tothese Prestigious Projects.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
20/116
Among The Prestigious Projects At
Port Bin Qasim Few Are Listed below
PARCO WHITE OIL PIPE LINE PROJECT BY CHINA PETROLEUM
(The Con tractor fo r PARCO Project Cos t US $ 300 Mil lion Dol lars)
ICI PTA T-11(The Larg est Private Sector Projec t US $ 480 Mil l ion Dollars )
Engro Vopak Terminal Ltd (VCM Tank Farm)
Engro Vopak Term inal Ltd (MEG Tank Farm)
Engro Vopak Term inal Ltd (LPG Tank Farm)
Engro Vopak Terminal Ltd (PARAXYLENE Tank Farm)(Total Investment b y Single Largest Grou p in the Priv ate Sector ov er US $ 30 Mil l ion Dollars)
PROGAS LPG STORAGE & HANDLING TERMINAL(Private Secto r Project US $ 50 Mil l ion Dollars )
INDUS REFINERY L IMITED(Anoth er Largest Private Sector Project US $ 750 Mil l ion Dol lars)
TRANASIA REFINERY LIMITED(Anoth er Largest Private Sector Project US $ 800 Mil l ion Dol lars)
FUAJ I OIL TERMINAL & HANDLING JETTY FAICILITIES(The Second Expans ion Phase Project US $ 30 Mil l ion Dol lars)
CHINA HARBOR ENGINEERING(The Con tractor fo r EVTL for the EVTL JETTY Private Sector Project US
$ 4 Mil l ion Dol lars)
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
21/116
ENGRO ASAHI POLYEMR & CHEMICALS(Ano ther One of the Larg est Private Sector Pro ject US $ 80 Mil l ion Do llars)
FAUJI FERTILIZER BIN QASIM LTD(Handl ing o f Break Bu lk Phosph or ic Acid)
LPG BREAK BULK SHIPMENT(Handl ing of 100% of Pakistan Br eak Bulk LPG Shipments at EVTL)
VCM BREAK BULK SHIPMENT(Handl ing of 100% of B reak Bulk VCM Shipments at EVTL)
ETHYLENE BREAK BULK SHIPMENT(Handl ing of 100% of Break Bu lk ETHELYNE Shipm ents at EVTL)
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
22/116
Karachi International Container Terminal Phase II Expansion ProjectKARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at Karachi
(Total Cos t of th e Project US $ 400 Mil l ion Do llars)
Beside the Port Qasim & Karachi we now take a trip to the otherside & rest of the Pakistan Major Prestigious & Project of NationalImportance.
The Government of Pakistan in the last 5 Years initiated the fewHydropower Power & Dam Projects to overcome the Power Break downCrisis.
Hydro Power Sector
Among these Projects of National Importanceincludes:-
MIRANI HYDRO POWER DAM PROJECT(The Projec t Cos t US $ 80 Mil l ion Dollars )
SATPARA HYDRO POWER DAM PROJECT(The Projec t Cost US $ 30 Mil l ion Dollars)
MANGLA RAISING HYDRO POWER DAM PROJECT(The Projec t Cost US $ 100 Mil l ion Dollars )
GOMAL ZAM HYDRO POWER DAM PROJECT(The Projec t Cost US $ 100 Mil l ion Dollars)
DUBER KHWAR HYDRO POWER DAM PROJECT(The Projec t Cost US $ 100 Mil l ion Dollars )
KHAN KHWAR HYDRO POWER DAM PROJECT(The Projec t Cost US $ 100 Mil l ion Dollars )
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
23/116
ALAI KHWAR HYDRO POWER DAM PROJECT(The Projec t Cost US $ 100 Mil l ion Dollars )
Beside the Hydropow er Projects, the Government also encourages the
other areas such as the Sea to generate Electr ic i ty, beside the supply
of qu ali ty water to the people. Am ong them the DHA Desalination &
Power Project was the only to be setup b y the Private Sector.
DHA DESALINATION & POWER PROJECT(Total Cos t of the Project US $ 160 Mil l ion Do llars)
This is the first ever desalination plant in history of Pakistan. It
has a capacity to Desal, 3 MIGD (Million Gallons per Day)of water, beside to produce & generate Electricity of aCapacity 95 MW
Beside the Hydro Power Project initiated by the Governmentalso focused on the another very important Sector which wasOIL & GAS and LPG (Liquid Petroleum Gas Project)
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I(The Projec t Cost US $ 45 Mil l ion Dollars)
M/s. S.M.Asghar (Pvt) Limited was awarded by thePresident of Pakistan for successfully and timely performance inClearance and Logistics of JJVL Phase I Project
The only Project in the LPG sector which was initiated by
Jamshoro Joint Venture Limited (JJVL)
JJVL is Pakistans single largest producer of LiquefiedPetroleum Gas. Situated in Dei Shah Bukhari, DistrictHyderabad, JJVLs Extraction Plant has a daily output of about500 metric tonnes of LPG and 150 metric tonnes of NGL/Naphtha.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
24/116
JJVL accounts for about one-third of the total local LPG production of thecountry.
JJVL processes about 200-220 million cubic feet of natural gas condensateper day piped from British Petroleum'sBadin Gas Field through the LiquidHandling Facility ofSui Southern Gas Co Ltdat Jamshoro
JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II(The Projec t Cost US $ 20 Mil l ion Dollars)
M/s S.M.Asghar (Pvt Limited also have a privilege of Handling
02 chartered flights carrying main booster pumps weighing over 100 Tons byAir for PARCO White Oil Pipeline Project.
We also have a privilege of handling one of the Heaviestand Length WisePiece in History of Pakistan which Weights 265 M/tons and LengthApprox.76 Meters.
REQUIRED FOR CUSTOM CLEARANCE
http://www.bp.com/http://www.bp.com/http://www.ssgc.com.pk/gssgc/main.htmhttp://www.ssgc.com.pk/gssgc/main.htmhttp://www.ssgc.com.pk/gssgc/main.htmhttp://www.ssgc.com.pk/gssgc/main.htmhttp://www.bp.com/ -
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
25/116
SCOPE OF WORK
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
26/116
BENEFIT OF VAVARIOUS
CONCESSIONARY
SROs EXEMPTIONS
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
27/116
PREPARATION BEFORE ARRIVAL
OF VESSEL
Upon receipt of the written instruction from the Importer /Representatives of the Importer, we will be in close contact with theshipping Company in order to ascertain the expected arrival date( ETA ) of the Ocean going Vessel at the Un-loading Port of theCountry.
CONFIRMATION OF THE ARRIVAL
OF VESSEL:-
We shall inform the arrival and the berthing date of the vessel to theImporter / Representatives of the Importer in order to keep a close
Loop for the berthing of the vessel.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
28/116
CUSTOM CLEARANCE:
We shall collect in full advance all the necessarydocuments for the onward Custom Clearance fromthe Importer / Representatives of the Importerwhen intimated and will prepare GD and all therequired documents and formalities to be submittedto the related Custom Authority and Will Completethe preparation of the GD (Goods Declaration) asper Invoice, Packing List & Bill Of Ladingdepending on weather the Vessel has arrived and
also subject to the Lodging Of Manifestation ofIGM (Import General Manifest) by the Shipping Company / ShippingAgent.
OBTAINING THE DELIVERY ORDER:
We shall complete all the formalities required by the relative Shipping Agent /
Main Carrier Agent/ relevant Port Authority and will obtain the DeliveryOrder from the Shipping Company/ OR their Agent against thepresentation/ submission of Original Bill of Lading.The delivery Order's are generally issued after filing of IGM in order to
ascertain the goods have not been Transshipped.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
29/116
NECESSARY ASSISTANCE:
We shall provide all necessary Assistance andConsultancy Services Concerning Custom Clearance tothe Importer/ Representatives of the Importer.
AIR CARGOES:
We shall also perform the Works Related to the Air Cargo As per request ofImporter / Representatives of the Importer
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
30/116
DELIVERY AT / TO THE PLANT SITE
We shall safely Transport the Cargo by theTrucks, Trailers, Multi Axle, Low Bed OR asper the requirement & Nature of Cargo to theWarehouse or the open storage area as perthe instruction of Importer / Representatives of the Importer.
CUSTOM DUTIES TAXES
SROs
AND NECESSARY
PERMITS
All the Plant, Machinery, Equipment and Parts/Spares which are importedinto Pakistan shall be subject to Custom Duties and Taxes Prevailing at thetime of Import.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
31/116
The Duties and Taxes concerns with the Custom Authorities as per
Pakistan Custom Tariff includes:-
Custom Duty/Duties From 5% Minimum To 25% Maximum
Sales Tax/Taxes 17 %
Income Tax/Taxes 5.5%
The Taxes Concerns with the Port Authorities:-
Port Wharfage
Port Demurrage
Weighment Charges (for Products like Pipes of Iron/Steel/Coil-Bar)
There are two Major Ports in Karachi namely as below:
Karachi Port
Port Bin Qasim
Karachi Port is Further Divided into 02 Parts, namely;
1) EAST WHARF:
a) Pakistan Container Terminal (PICT) Private Terminal
b) KPT owns few Berths such as Berth No 1 Open, Shed No 02, Shed No03, Berth No 04 Open, Berth 10, 11, 12,13,14,15,16 And 17.
c) Ghass Bunder, For Launches, Steamer and Boats
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
32/116
2) WEST WHARF:
a) Karachi International Container Terminal Ltd (KICT)
b) KPT owns few Berths such as Berth Namely 18, 19, 20, 21, 22, 23, 24And 25
c) Berth Number 25 is for Heavy Lift Cargo that has On Shore HeavyCrane for capacity 50 M/Tons.
For Containerized Cargo the various Yards/Ports are charging different
Handling Charges/Lifting Charges/Examination Charges/RD/Seal BreakingCharges/Yard Storage Charges.
Please note that for all the above mentioned charges the relevantPort /Yard will issue Receipts for the relevant charges.
Excise Taxes @ 0.91-0.95% on Import Value/Assessed Value/Appraise Value by the Customs or any other Charges / Taxes prevailing atthe time of Import shall be Paid by the I m p o r t e r immediately beforethe Clearance of the Consignments from the Port.
Further the completion of GDs (Bill of Entry) and other Custom formalitiesare subject to the Final Assessment / Valuation / Any SRO Benefits / PCTconfirmation and also the Container / Marks & Number.
Any discrepancy or mistake or dispute arising due to Invoice/ Packing List /Bill of Lading OR any other relevant documents submitted by the Importer,will may render in delay to clear the consignment.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
33/116
SUBMITTAL OF SHIPPING GUARANTEE
BOND IN ABSENCE OF ORIGINAL BILL OF LADING
If there is a delay in the arrival of the Original Bill of Lading, can cause a
delay in getting the Goods/ Cargo release of the from the Portpremises/Yard.
A Shipping Guarantee Letter/Bond for the said Bill of Lading would betherefore required by the shipping company in order to issue the DeliveryOrder.
It shall be discussed and settle before arrival of the vessel. We will provideall necessary assistance and advice for the Shipping Guarantee to theImporter / Representatives of the Importer.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
34/116
During the Unloading of the Break Bulk/ loose Cargo from the vessel
There are chances of getting the goods Damage OR in case we find any
Loss of Goods and or the Goods already Damage on or after its receiving
We shall report to the Importer / Representatives of the Importer or
Arrange a joint survey as soon as possible. Marine/Transit insurance
Shall be arranged by Importer / Representatives of the Importer, from
Place of Origin up to the Plant Site.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
35/116
METHOD STATEMENT
At the present there are 02 procedures for Custom Clearance:-
1) Newly Implemented Web-Based
One Cus tom s (WeBOC) SYSTEM
Under this newly implemented procedure if the Vessel is berthedat any of the below Ports i.e.
Karachi Port Trust (KPT)Karachi International Container Terminal (KICTL)Pakistan International Container Terminal (PICTL)Qasim International Container Terminal (QICTL Port Qasim)
& the Cargo is a FULL CONTANERIZED CARGO (FCL / FCL), than the
(Goods Declaration) for Custom can be filed through thisWeBOC System.
Goods Declaration (GD) is prepared on Line(Via Electronic Mail Data Transfer System).
WEB BASED ONE CUSTOM WeBOC
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
36/116
The G.D (Goods Declaration) is prepared in accordance with thedeclaration of the Importer and the documents provided by the Importer
i.e. Commercial Invoice, Bill of Landing and the Packing List. Thereafter theG.D (Goods Declaration) is submitted to the Custom for Assessment onLine.
* The amount of Custom Duties & Taxes and the Sindh Infra StructureFee (CESS) has to be paid in advance as per the Importer declaration.
* If the assessment by the WeBOC is done as per the declaration ofImporter, than the G.D is processed and the Importer can take the
delivery of the goods, after the payment of all the necessary PortDues & Excise Tax.
In case the goods have been processed under WeBOC SYSTEM does notaccept the Importer Declaration, than the Importer may asked for additionalDuties & Taxes or If the Importer wants to Contest with the views of theCustoms than they can go for appeal & meet the Senior Custom Officialsalong with the relevant Documents & Proof to justify their claims.
The Custom Authorities may defer in three basic ways :
1) Disagreement in the PCT OR HS Code Classification.
2) Not extending the benefit of the claimed SRO.
3) Disagreement with the Valuation.
2) NORMAL FILING OF GD (MANUAL SYSTEM)
Under this procedure the GD can be filed if the Cargo isthe following nature:-
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
37/116
1) Break Bulk Shipment (Full Chartered Vessel)
2) LCL or Loose Cargo (Not A full Container Load)
3) FCL/LOOSE Cargo whose Vessel is not under theCare System (Vessel berthed other than theQICTL / KICTL / PICTL Terminals.)
The GD is Prepared and filed Online (Via Electronic Filling),as per declaration of the Importer.
If Customs satisfy with all the 03 criteriasmentioned above i.e.
PCTSROValuation
The GD is than completed by the Concerned Group. The Importer hasto than pay the Applicable Duties & Taxes after that the GD isforwarded to the Port side for Examination after which the Importer can
take the Delivery of the goods after the payment necessary PortDues.
* If Customs do not satisfy with all the 03 Criteriasmentioned abovei.e.
PCTSROValuation
Than the GD is forwarded to the Port Sidefor Physical Examination tocheck the goods are in conformity to the declaration of the Importer &under the light of Examination Report GD will be completed by theconcerned Group in the Custom House.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
38/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
39/116
The following documents are required generally by the customs forprocessing the B/E for the Cargo arriving at Sea Port.
I Original Invoice showing complete description of the goods with valueof the each individual item
II Detail Packing List showing complete Description, Quantity GrossWt, Net Wt, Ullage Certificate.
III Original Bill of Lading duly endorsed at the backside in our Favor.
IV Certificate of Origin
V All Govt. Sanctions, Authorization from Government Agenciesif any
VII Original Letter of Credit
VIII Sales Tax Registration Certificate
IX Import Registration
X National Tax No Certificate Copy
Any other document that may be requested by the Custom to verify thedeclaration of Importer
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
40/116
The following documents are required generally by the customs forprocessing the B/E for the Cargo arriving at Air Port.
I Original Invoice showing complete description of the goods with
value of the each individual item
II Detail Packing List showing complete Description, Quantity, Numbersof Packages, Gross Wt, Net Wt. and Size of the Packages in Cu Meter
III Original Airway Bill
IV Certificate of Origin
V Complete Catalogue/Drawing for Machinery & Equipment.
VI All Govt. Sanctions, Authorization from Government Agenciesif any
VII Original Letter of Credit
Any other document that may be requested by the Custom to verify thedeclaration of Importer
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
41/116
Further to the above there may be delays in Clearance due to followingreasons:-
I Non availability of the Original Documents, such as BL
II Delay in meeting Custom Queries.
III Strikes / Weather, Act of God, Force Major Etc
IV Delays due to Non-availability of concerned officers.
V Delays in receipts of payments
VI Delays due to the Non-fulfillment of Shipping Companies
VII Delays due to Non-availability of Trucks / Trailer
POSSBLE
DELAYS
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
42/116
PREVIOUSPROJECTS
HANDLED
.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
43/116
CLIENTS PROJECTS
* M/S ICI PAKISTAN LTD.
C/o TRANSCAR PROJECTS LTD
ICI PTA PROJECT PORT QASIM
* M/S ENGRO PAKTANK TERMINAL.
CHEMICAL STORAGE TERMINAL
* M/S NOEL LGA (GERMANY)
LPG EXPANSION & MARKETING
* M/S ENGRO ASAHI POLYMER & CHEMICALS.
ENGRO PVC PLANT PROJECT
* M/s TEKSER INSAAT SAANAYI
CHASMA RIGHT BANK C-65
* M/S FMC. (MARINE LOADING ARM)
FOTCO OIL TERMINAL BIN QASIM
* M/S SECA PAKISTAN.
KHI - HYDERABAD BY PASS
* M/S TRANSCAR PROJECTS LTD.
DHABEJI PUMPING STATION W-19
* M/S TRANSCAR PROJECTS LTD.
NORTH EAST KARACHI STATION W-18
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
44/116
* M/S CHINA GUANGXI CORPORATION
PATFEEDER CANAL PROJECT
* M/S CHINA DONGFANG CORPORATION
SEWERAGE TREATMENT PROJECT
* M/S CHINA PETROLEUM
KORANGI SEWERAGE TREATMENT
* M/S CHINA YUNNAN CORPORATION
KPT JINNAH BRIDGE PHASE II
* M/S CHINA NATIONAL ELECTRIC WIRE & CABLES
QUEENS ROAD POWER STATION
* M/S CHINA HARBOR ENGINEERING
JETTY FOR ENGRO PAKTANK
* M/S IJM / IGI JOINT VENTURE.
LBOD SANGHAR PROJECTS
* M/S LIFE LINE (Pvt) LTD.
DHURNAL LPG GAS EXPANSION
PROJECT
* M/S ENGRO PAKTANK TERMINAL.
LPG TERMINAL AT BIN QASIM
* M/S ENGRO PAKTANK TERMINAL
VCM TERMINAL HANDLING PROJECT
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
45/116
* M/S HYUNDAI CORP KHI OFFICE.
K.E.S.C HIGH TENSION CABLE PROJ.
* M/S HYDERABAD DEVELOPMENT AUTHORITY.
MACHINERY UNDER SPANISH GRANT
* M/S CHINA YUNNAN CORPORATION.
MALDIVE SPARLIAMENT BUILDING
* M/S CHINA NATIONAL CHEM ENGG CORP.
SUB CONTRACTOR FOR DONGFANG
S2 PROJECT
* ENGRO ASAHI TRADING (PVT) LTD
EXPORT OF PVC WORLD WIDE
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
46/116
* M/S DESCON ENGINEERING WORKED FOR NUMBER OF PROJECTS
1) EPTL FOR LPG TERMINAL
2) EPTL FOR VCM PROJECT
3) EVTL FOR MEG PROJECT
4) FOR PARCO MID COUNTRY REFINERY
5) LASMO OIL BHIT GAS FIELD PROJECT
US $ 6.5 Million Dollars
* M/S BI - WATER INTERNATIONAL KARACHI WATER & SEWERAGE BOARD
HUB & PIPRI PROJECT FUNDED BY ADB
15.8 Million Sterling
* M/S HYUNDAI HIDCO HAKAS JV
EXPORT OF HEAVY DREDGING MACHINERY
US $ 2.5 Million Dollars
* M/S AL - NOOR SUGAR MILLS LTD
MDF BOARD FIBRE BUILDING BOARD PLANT
(LASSANI)
* PROCTER & GAMMBLE PAKISTAN SOAP CAPACITY EXPANSION PLANT.
US $ 4.5 Million Dollars
* M/S ENGRO PAKTANK TERMINAL.
CHEMICAL STORAGE TERMINAL
US $ 5.5 Million Dollars
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
47/116
* M/S SHV ENERGY PAKISTAN
GAS EXPANSION PROJECT
US & 1.5 Million Dollars
* M/S TEKSER INSAAT SANAYI VE TICCARRET
CHASMA RIGHT BANK CANNAL PROJECT C-
65 US $ 260 Million Dollars
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
48/116
BREAK BULK
LIQUID CHEMICALS &
PETROCHEMICALS HANDLING
PROJECTS IN HAND
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
49/116
* M/s. SHV ENERGY LIMITED
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* M/s. JAMSHORO JOINT VENTURE LIMITED
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* M/s. AFTAB TRADERS
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* M/s. CRESS LPG
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* M/s. RELIANCE CONSULTANCY
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS
* M/s. ENGRO POLYMER & CHEMICAL LIMITED
VINYL CHLORIDE (VCM)
IN BULK OF VARIOUS PARCELS
EDC
IN BULK OF VARIOUS PARCELS
CAUSTIC SODA
IN BULK OF VARIOUS PARCELS
ETHELYNE
IN BULK OF VARIOUS PARCELS
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
50/116
UNDER GOING
PROJECTS
IN HAND
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
51/116
* M/S ENGRO FOODS LIMITED
1) LAUNCHING & SETTING UP A COMPLETE
STATE OF AN ART OF O'MORE ICE
CREAM PLANT
2) BRAND NEW STATE OF AN ART ENGRO
RICE & PAR BOILING PLANT
3) EXPANSION OF EXISTING DAIRY MILK
PLANT. (OLPER'S MILK)
* M/s. FOUNDATION ENERGY LIMITED-1
SETTING UP A STATE OF AN ART WIND
POWER PROJECT OF A CAPACITY 49.50
MW AT JHAMPIR, SINDH PROVINCE
* M/s. FOUNDATION ENERGY LIMITED-II
SETTING UP A STATE OF AN ART WIND
POWER PROJECT OF A CAPACITY 49.50
MW AT JHAMPIR, SINDH PROVINCE
* M/S. PAK ARAB REFINERY LIMITED
SETTING UP A COMPLETE BRAND NEW
ASPHALT BUILT UNIT (ABU UNIT)
* ENGRO POLYMER TRADING LIMITED
EXPORT OF PVC RESIN (SABZ BRAND)
WORLD WIDE APPROXIMATE EXPORT IN
M/TONS 2500 PER MONTH
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
52/116
* M/s. CIVIL AVIATION AUTHORITY
SETTING UP A BRAND NEW BENAZIR
BHUTTO INTERNATIONAL AIRPORT,
ISLAMABAD, and PACKAGE 06 REFUEL
HYDRANT SYSTEM.
* M/s. KARKEY PAKISTAN
POWER SHIP & OIL SUPPLY TANKER
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
53/116
VARIOUS OTHER PROJECTS
OF NATIONAL IMPORTANCE
INCLUDING HYDRO, SEWERAGE
WATER TREATMENT, DAMS
CHEMICAL INDUSTRY
OIL & GAS SECTOR
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
54/116
* M/S CHINA SINOHYDRO CORPORATION
1) GOMAL ZAM DAM HYDRO POWER
2) DUBAR KHAWAR DAM HYDRO POWER
3) KHAN KHAWAR DAM
4) KWSB K-III
* M/S. INDUS REFINERY LIMITED.
HI-TECH 100,000 BPSD OIL REFINERY
ON RELOCATION BASIS
* M/S. JAMSHORO JOINT VENTURE
LPG EXTRACTION PLANT
* M/S. PETROSIN RAVI ENGINEERING
OIL & GAS PROJECTS LTD.
* M/S. SHELL GAS LPG PAKISTAN LTD
LPG PROJECTS / LPG GAS
* M/S. BI-WATER INTERNATIONAL
KARACHI WATER & SEWERAGE
BOARD HUB & PIPRI PUMPING
STATION PROJECT
* M/S. DESCON ENGINEERING LTD (HYDRO POWER PROJECTS)
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
55/116
1) SATPARA DAM PROJECT
2) MIRANI DAM PROJECT
3) MANGLA RAISING PROJECT
4) TUNSA BARRAGE PROJECT
5) HYDERABAD WATER
TREATMENT PROJECT.
* M/S. FAUJI FERTILIZER BIN QASIM LTD
BREAK BULK HANDLING OF
PHOSPHORIC ACID
* M/S. ENGRO ASAHI POLYMER AND CHEMICAL LTD.
V.C.M / MACHINERY &
EQUIPMENT / EXPORT
* M/S. DHA COGEN LTD.
DESALINATION / POWER
PROJECT
* M/S. BAHRIA TOWN HOUSING & INFRASTRUCTURE P ROJECT
RE-LOCATION OF PLANT &
MACHINERY FOR PRE-
FABRICATING HOUSING
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
56/116
* AREVA T&D PAKISTAN (PVT) LTD.
132 KV GRID STATION AT
CREEK CITY, DHA
* KHALID RAUF & CO., (PVT) LTD.
INFRASTRUCTURE PROJECTS
LAHORE RING ROAD
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
57/116
HYDROPOWER PROJECTS
From our background experience, strength & experiences from
industrial development projects, S.M.Asghar Pvt) Limited
has rapidly established itself as a key player in infrastructure
projects.
We successfully did the Custom Clearance & In-land
Transportation jobs of large-scale projects like dams, barrages,
highways and housing complexes.
We hold the distinction of being the first ever local company to
do the 07 Major Hydropower Projects Simultaneously of National
Importance in Pakistan
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
58/116
HYDROPOWER
PROJECT.
Taunsa Barrage Rehabilitation and Modernization
Location: Taunsa Pakistan
Nature Of Job Custom Clearance & Inland Transportation.
Year Of Project March 2006-2007
Cost Of Project US $ 140 Million Dollars
Completion : May 2008
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
59/116
HYDROPOWER
PROJECT
MANGLA DAM RAISING PROJECT
LOCATION Mangla
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION
COST OF
PROJECT
US $ 140 Million Dollars
Expected
Completion
Date:
September 20 2007
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
60/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
61/116
Project Name Kachhi Canal Project Contract KC-03
Location: Taunsa Barrage Kot Addu
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF
PROJECT
US $ 65 MILLION DOLLARS
Completion: January 2009
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
62/116
Project NameGOMAL ZAM HYDROPOWER PROJECT
CLIENT CHINA SIOHYDRO CORPORATION
NATURE OF
JOB
CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF
PROJECT
US $ 220 MILLION DOLLARS
Completion: 4 YEARS
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
63/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
64/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
65/116
Project NameDuber Khwar
Location:
The project located on river Duber Khwar, right
bank tributary of Indus river near Patan in NWFP
at a distance 265 Km from Islamabad.
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF
PROJECT
US$ 109 million
Completion: 4 YEARS
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
66/116
Location: The project is located on Allai Khwar river, left
tributary of River Indus near Besham in NWFP, 245
km from Islamabad
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OFPROJECT
US$ 110 million
Completion: 4 YEARS
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
67/116
Project Name MIRANI DAM
Location: In the Dasht River Basin about 30 miles (48 km)
West of Turbat Town in Makran Div of
Baluchistan.
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF
PROJECT
US$ 120 million
Completion: 4 YEARS
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
68/116
Project Name MIRANI DAM
Location: In the Dasht River Basin about 30 miles (48 km)
West of Turbat Town in Makran Div of
Baluchistan.
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF
PROJECT
US$ 120 million
Completion: 4 YEARS
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
69/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
70/116
LPG Storage & Handling Facilities
Project Name ENGRO PAKTANK LPG TERMINAL
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF
PROJECT
US$ 10 million
CAPACITY 4,500 METRIC TONES OF LPG
LPG BULLETS 10 LPG bullets
Completion: 1997 -98
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
71/116
Integrated Bulk Liquid Chemical
Terminal Storage & Handling Facilities
Project NameENGRO PAKTANK VCM TERMINAL
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND
TRANSPORTATION.
COST OF PROJECT US$ 80 million
CAPACITY 41,000 CUBIC METER STORAGE FACILITY
SPHERICAL TANK 2 SPHERICAL TANK
Completion: 1997 -98
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
72/116
In the first phase EPTL constructed facilities for the integrated
bulk liquid Chemical and Storage Terminal the first phase comprised construction
of 41,000 cubic meter of storage facility the cost of first phase of the Project was
US $ 60 million the tank farm is situated on reclaimed land in the PQA.
PARAXYLENE
ACETIC ACID
PHOSPHORIC ACID (HANDLING ONLY)
VINYL CHLORIDE MONOMER
ACRYLONITRILE
LIQUEFIED PETROLEUM GAS
MONO ETHYLENE GLYCOL
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
73/116
Project Name ENGRO ASAHI POLYMER & CHEMICALS LIMITED
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CAPACITY 100,000 (TPA) PVC MANUFACTURING PLANT
CLIENT ENGRO ASAHI POLYMER & CHEMICALS LTD
Completion: 1999-2000
Engro Asahi Polymer & Chemicals Limited (EAPCL or the company) is a joint
Venture between Engro Chemical Pakistan Ltd. (ECPL) and Mitsubishi
Corporation (Japan), each with an 80% and 20% shareholding, respectively
EAPCL is the only PVC manufacturer in Pakistan with a Capacity
Of 100,000tons per annum (TPA) and its operations are located at Port Qasim
Karachi. Its plant was commissioned in November 14, 1999.
Engro Asahi Polymer & Chemicals Limited
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
74/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
75/116
ICI T11 PTA Plant
Project Name ICI PTA T11 PLANT
Location: EASTERN INDUSTRIAL ESTATE PORT QASIM
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 480 million
CLIENT TRANSCAR PROJECTS UK/ FOOSTER WHEELER UK
Completion: 1998
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
76/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
77/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
78/116
PARCO Mid Country Refinery (100, 000 BPD)
Project Name PAK ARAB REFINERY COMPANY
Location:MULTAN, PAKISTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CLIENT DESCON ENGINEERING
Completion: 1998
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
79/116
JAMSHORO JOINT VENTURE LIMITED
SINGLE LARGEST LPG EXTRACTION PLANT
Project Name JAMSHORO JOINT VENTURE LIMITED
Location: JAMSHORO, SINDH
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 80 million
CLIENT ASSOCIATED GROUP
Completion: 2005
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
80/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
81/116
-------
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
82/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
83/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
84/116
INDUS REFINERY LIMITED
PAKISTAN SECOND LARGEST REFINERY
Project Name IRL is a 100,000 bpd or 4.95 million metric tons per
annum complex fuels refinery. It will be the sixth
petroleum refinery in Pakistan and the countrys
largest refinery.
Location: PORT QASIM INDUSTRIAL ESTATE
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 700 million
CLIENT INDUS REFINERY LIMITED
Completion: UNDER CONSTRUCTION
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
85/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
86/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
87/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
88/116
RELOCATION OF 100,000 BARRELS CAPACITY REFINERY
PETRO CANADA REFINERY TO PAKISTAN PORT QASIM
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
89/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
90/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
91/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
92/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
93/116
FAUJI FERTILIZER ENERGY COMPNAY
LIMITED (FFCEL) 49.5 MW WIND ENERGY
PROJECT AT JHAMPIR, KARACHI
Project Name FFCEL WIND ENERGY PROJECT OF CAPACITY 49.5
MW
Location: JHAMPIR, NEAR THATTA
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 110 million
CLIENT DESCON ENGINEERING LIMITED
Completion: UNDER FINAL STAGES OF COMPLETION
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
94/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
95/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
96/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
97/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
98/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
99/116
DHA DESALINATION PLANT 3 MIGD
& 94 MW POWER PLANT KARACHI
Project Name DHA DESALINATION & POWER PLANT
PAKISTAN FIRST EVER SEA DESALINATION
& POWER PLANT
Location: DHA, PHASE VIII. KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 130 million
CLIENTDHA COGEN LIMITED (DCL)
Completion: UNDER CONSTRUCTION
TOTAL VALUE OF L/C ESTABLISHED:
Siemens AG Germany $ 41,400,000 $ 33,120,000
Siemens AG Germany 6 550 000 5 240 000
Alfa Laval AS Copenhagen 15 165 300 12 132 241
Lincas Electro Vertibas 295 500 236 390
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
100/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
101/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
102/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
103/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
104/116
KARACHI INTERNATIONAL CONTAINER
TERMINAL (KICTL) KARACHI
Project Name KARACHI INTERNATIONAL CONTAINER
TERMINAL (KICTL)
PHASE III EXPANSION PROJECT
Location: WEST WHARF ROAD, KARACHI
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 400 million
CLIENT KICTL PAKISTAN
Completion: UNDER CONSTRUCTION
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
105/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
106/116
BAHRIA TOWN (PVT) LIMITED
RAWALPINDI
Project Name BAHRIA TOWN (Pvt) LIMITED
AWAMI VILLAS PROJECT.
TOTAL OF VILLAS 8000
Location: RAWALPINDI, PAKISTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 120 million
CLIENT BAHRIA TOWN (Pvt) LIMITED
Completion: UNDER CONSTRUCTION/ PROGRESS
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
107/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
108/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
109/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
110/116
S A F E - P L A C E S
S STRUCTURE : Floors, Walls, Ceilings, Road
A ATMOSPHERE : Dust, gases, fumes & Spray.
F FIRE : Fire Points & Fire Exits.
E ELECTRICITY : Wires, Cables, Switches.
P PRESSURE VESSEL : Boilers & Compressors
L LADDERS : Steps, trestles & Scaffolds
A ATTIRE : Protective Clothing, Helmets
C CRANES : Hoist, Derricks & Ropes / Hooks
E EXPLOSIVES : Flammable Liquids, LPG, Radioactive.
S For SIGNALS :
Warning Light, Telephone Buzzers.
As a Company Policy we take care of our Employee to the best Standards
because Employees are Our Assets.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
111/116
We provide following safety Equipments to our Port staff such as :
Safety Belts : They are provided to the Staff who
Works On the Ship /Vessel (VCM/LPG)
Emergency Lights : In case of Night Delivery at the Port
Premise/ Highways
Safety Helmets : At time of delivery at the Port Area
During Loading/ Unloading
Heavy Machineries/ Hazardous Cargo
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
112/116
Safety Boots : At the Ship Derricks & the Port Premises
Safety Glasses : They are provided to the Staff who
Work on the Ship /Vessel.
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
113/116
HEAVY & SUPER HEAVY LIFT
TRANSPORTATION EXPERIENCEWE CALLED THIS ASABNORMAL LOADS
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
114/116
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
115/116
Project Name ASPHALT BUILT UNIT PROJECT (ABU)
FOR PARCO
Location: PARCO MID COUNTRY REFINERY, MULTAN
NATURE OF JOB CUSTOM CLEARANCE & INLAND TRANSPORTATION.
COST OF PROJECT US$ 30 Million
Completion:DECEMBER 2012
-
7/25/2019 S.M.Asghar Brochure - For Atomic Energy Comission
116/116
For The Kind Attention Of:
Mr. SOHAIL ISHAQUE
DIRECTOR PROJECTS
PAKISTAN ATOMIC ENERGY COMISSION FOUNDATION
P.O.BOX # 216, HANNA ROADG-8/3, ADJACENT NORI HOSPITALIslamabad