    Bidding Form T-15 Operation and Maintenance Information

    The Bidder shall submit the following operation and maintenance information:

    a. Spare Parts concept .

    b. Recommendation on the organization on of O&M personnel including total staffing

    by section

    c. Training program for O&M personel

    d. Information on Bidder's and sub-suppliers' maintenance services, technical support

    and availability of spare parts

    e. IO&M Manuals

    Contents

    a Spare Parts concept: .............................................................................................. 4

    b Recommendation on the organization on of O&M personnel including total

    staffing by section ................................................................................................. 5

    c Training program for O&M personel: ................................................................... 6

    d

  • 7/26/2019 T15-Operation and Maintenance Info

    2/14

    BiddingformT13ElectricalInformation

    Trang2/14

    Information on bidders and sub-suppliers maintenance services, technical

    support and availability of spare parts:................................................................. 7

    e

  • 7/26/2019 T15-Operation and Maintenance Info

    3/14

    BiddingformT13ElectricalInformation

    Trang3/14

    IO&M Manuals: ................................................................................................... 9

  • 7/26/2019 T15-Operation and Maintenance Info

    4/14

    BiddingformT13ElectricalInformation

    Trang4/14

    a. Spare Parts concept:

    N

    o.

    DESCRIPTIO

    N

    LifeyearRemark1

    st

    2n

    d

    3r

    d

    4t

    h

    5t

    h

    6t

    h

    7t

    h

    8t

    h

    9t

    h

    10

    th

    11

    th

    12

    th

    13

    th

    14

    th

    15

    th

    10

    th

    1 Air handling uint

    Pre. Filter x xbag filter x x

    Belt x x x x

    Bearing x x x x

    2 Chiller

    Sensor x x x x

    Transducer x x x x

    Board x x x x x x x x

    Fan motor x x x x x x x x

    Compressor x x x x x x x x x x x x x x x x

    Valve x x x x x x x xFuse x x x x x x x x

    3 Air split unit package

    Indoor Fan x x x x x x

    Indoor Fanmotor

    x x x x x x

    Indoor Board x x x x x

    Outdoor Fan x x x x x

    Outdoor Fan

    motorx x x x x

    Accumolator x x x x x

    Compressor x x x x x4 Chiller water pump

    Bearing x x x

    Oring x x x

    Wear ring x x x

    Shaft seal x x x

    Impeller x x x x

    Mech.seal x x x

    5 Fan

    Bearing x x x

    Fan motor x x x x xBelt x x x x

    Fan x x x x x x

  • 7/26/2019 T15-Operation and Maintenance Info

    5/14

    BiddingformT13ElectricalInformation

    Trang5/14

    b. Recommendation on the organization on of O&M personnel including total staffing

    by section

    MANAGER

    RECOMMENDATION ON THE ORGANIZATION ON OF O&M PERSONNEL

    SUPERVISOR 1

    ONE PERSON

    ONE PERSON

    SUPERVISOR 1

    ONE PERSON

    I&C TEAM

    3 PERSON

    I&C SYSTEM

    HVAC TEAM

    5 PERSON

    HVAC SYSTEM

    Note:

    Reccommedation for key manager:

    o HVAC Engineer.

    o 5 year experience minimum

    Reccommedation for Supervisor 1:

    o Electric/Electronic Engineer.

    o 4 year experience minimum

    Reccommedation for Supervisor 2:

    o HVAC Engineer.

    o 3-4 year experience minimum

    Reccommedation for I&C team:

    o Skill worker.

    o 3-4 year experience minimum

    Reccommedation for HVAC team:

    o Skill worker.

    o 3-4 year experience minimum

  • 7/26/2019 T15-Operation and Maintenance Info

    6/14

    BiddingformT13ElectricalInformation

    Trang6/14

    c. Training program for O&M personel:

    No. DescriptionTimes

    (hrs)

    Theory

    training

    Field

    trainingRemark

    I Chiller system

    1 Training for operation 2 X

    2 Training for manternace 6 X X

    3Training for

    setup/monitoring4 X X

    IIAir handling unit, air split

    unit

    1 Training for operation 1 X

    2 Training for manternace 4 X X

    3Training for

    setup/monitoring2 X X

    III I&C system

    1 Training for operation 4 X

    2 Training for manternace 4 X X

    3

    Training for

    setup/monitoring of

    parameter

    4 X X

    VI FAN & PUMP

    1 Training for operation 2 X

    2 Training for manternace 4 X X

    V HVAC SYSTEM

    1 Training for operation 3 X

    2

    Training for manternace

    and funtion of equipment

    on system

    5 X X

  • 7/26/2019 T15-Operation and Maintenance Info

    7/14

    BiddingformT13ElectricalInformation

    Trang7/14

    d. Information on bidders and sub-suppliers maintenance services, technical support

    and availability of spare parts:

    1. Information for Bidders and sub-suppliers

    N

    o

    Descriptio

    n

    Company

    nameCompany information

    Maintenanc

    e services

    Technic

    al

    support

    Remark

    1HVAC

    system

    RoseInvestment

    Corporation

    - 9 Dinh Tien Hoang Street,

    Dakao Ward, District 1, HoChi Minh City, Viet Nam.

    - Tel: 84-8-3910 7993- Fax: 84-8-3910 7998

    - Email: [email protected]

    Y Y Bidder

    2Chiler,AHU, Split

    air unit

    Daikin air

    conditiong(Viet

    Nam) joint

    stockcompany

    - Service center:- 100-102 Vu Tong Phan

    Street, An Phu Ward,

    District 2, Ho Chi MinhCity, Viet Nam.

    - Tel: 84-8-628 11 248- Fax: 84-8-628 11 249

    - Email:[email protected]

    Y YSub-

    supplier

    3 Fan

    Quoc Tien

    ProductionTechnolog

    y Co.,

    LTD

    - 167E Thich Quang Duc

    Street, Ward 4, Phu NhuanDistrict, Ho Chi Minh City,

    Viet Nam.

    - Tel: 84-8-3995 1188

    - Fax: 84-8-3995 1199

    - Email: [email protected]

    Y YSub-

    supplier

    4 Pump

    Toan CauPumpsTrading

    and

    Engineerin

    g Co.,LTD

    368/24/28 Tan Son Nhi

    Street, Tan Son Nhi WardTan Phu District. Ho ChiMinh City, Viet Nam

    Tel: 84-08-3812 7327 -

    3812 7329

    Fax: 84-08-3812 7343Email:toancaupumps@vnn.

    vn

    Y YSub-

    supplier

    5I&Csystem

    Niem TinCo., LTD

    142 Doi Can, Ha Noi, Viet

    NamTel: 84-04-722 29 39

    Fax: 84-04- 722 29 40

    Email: [email protected]

    Y YSub-supplier

  • 7/26/2019 T15-Operation and Maintenance Info

    8/14

    BiddingformT13ElectricalInformation

    Trang8/14

    2. spare parts list information

    No.

    Description

    Available

    in

    stock

    Delivery

    time

    RemarkWeek

    1 Air handling uint

    Pre. Filter X

    bag filter XBelt X

    Bearing X

    2 Chiller

    Sensor X

    Transducer X

    Board 6-8

    Fan motor 4-6

    Compressor 8-10

    Valve X

    Fuse X

    3Air split unit

    package

    Indoor Fan 4-6

    Indoor Fan motor 4-6

    Indoor Board 4-6

    Outdoor Fan 4-6

    Outdoor Fan motor 4-6

    Accumolator 4-6

    Compressor 4-6

    4 Chiller water pumpBearing X

    Oring X

    Wear ring X

    Shaft seal X

    Impeller X

    Mech.seal X

    5 Fan

    Bearing X

    Fan motor 6-8

    Belt XFan 6-8

  • 7/26/2019 T15-Operation and Maintenance Info

    9/14

    BiddingformT13ElectricalInformation

    Trang9/14

    e. IO&M Manuals:

    HVAC Control system

    I. OPERATION INSTRUCTION FOR THE HVAC CONTROL SYSTEM

    1. Chiller system:

    The Chiller system will be monitored and controlled by the HMI on the HVAC controlpanel.

    There are 3 modes: Manual/Maintenance/Auto

    1.1Manual mode :

    In manual mode, at HMI the operators shall manually start or stop the chiller and the

    corresponding equipments of selected chiller shall be run/stop automatically.

    1.2Maintenance mode :

    Operator can disable a chiller to maintenance purpose. The rest of chillers and

    corresponding equipments shall be still in manual mode or auto mode for systemoperation.

    1.3Auto mode :

    1.3.1 Call chiller follow min working time

    HCP call priority chiller has min working time

    Chiller is trip, HCP will be called another chiller have min working time

    to replace.

    Chiller is trip after reset will go to standby

    1.3.2 Chiller water pump running follow min working time

    When CHWP is call, BMS will call CHWP1 or 2 or have min working

    time to run.

    CHWP is trip, BMS will be called another CHWP have min working time

    to replace

    CHWP is trip after reset will go to standby.

    CHWP is control by 2 speed by operator.

    The chilled water plant shall be automatically run/stop in schedule, the schedule can

    be adjustable by operators.

    The run chiller/pump shall be automatically scheduled to change over in order to

    balance the totalized running time of each equipments is about the same.

    When the BMS calls for the operation of 1 no. chiller in the auto mode, the

    motorised valve at the chilled pipe of the chiller shall be sequenced open,1 No.

    condenser chiller water pump shall be activated.

  • 7/26/2019 T15-Operation and Maintenance Info

    10/14

    BiddingformT13ElectricalInformation

    Trang10/14

    All Chillers shall be started or stop in the auto mode as required to meet required by

    operator.

    The BMS shall provide auto changeover to the standby/other Chiller/ pump in the

    event of failure of the running chiller/pump.

    2. AHU system:

    At the HMI in the HVAC control panel, the operator can monitor and control the AHU

    system with properly functions.

    HCP operate the AHU system with 2 mode: automation mode and Manual mode.

    2.1Manual mode :

    In manual mode, at HMI the operators shall manually start or stop the AHU and the

    corresponding equipments of selected AHU shall be run/stop automatically.

    2.2Automation mode :

    HCP monitor the filter status, send alarm if the filter is dirty. So the maintenance man can

    replace the new one for AHU.

    The operator can set a setpoint for the return temperature and moisture. To adjust the

    return temperature and moisture, the PXC will control the modulating valve 0 to 100%

    and control the heater 0 -100%.

    And PXC will change the speed of fan to maintain the pressure in duct as required by

    operator.

    The damper of the return duct will be controlled ON/OFF when AHU is run or off mode.

    In the case of fire alarm, BMS Apogee InsightTM system, PXC will stop the AHU to

    minimize the air volume through the room, minimize the factor occur fire.

    On the HMI graphic, the operator can command the AHU and monitor the sensors:

    temperature, moisture, status of the fan and alarm from the fire system.

    II. INSTRUCTION FOR TROUBLE AND MAINTENANCE THE EQUIPMENTS

    1. Instruction for troubles

    Power failure trouble

    o The fail power will take the controller and the device will stop working completely .

    o Overcome

    Step1: Check the power supply to DDC panels

    If there is no power then check and turn on the power, if not skip to

    step 2

    Step 2: Check the trasformers in the DDC panels.

    If the device is damaged the replace the new one, if not skip to step 3

  • 7/26/2019 T15-Operation and Maintenance Info

    11/14

    BiddingformT13ElectricalInformation

    Trang11/14

    Step 3: Check the power cable

    Change the new cable if it is damaged

    o After overcoming the system will automatically recognize the device

    o The power failure will lead to alert, to restore the operating procedures by pressing the

    Reset icon to start the recovery process

    *** When troubles occur, if the operator can not overcome, then transferred to the

    manual operation mode and contact the administrator to resolve the problem .

    2.

    Maintenance the HVAC control system

    o Should every day check the environmental conditions (temperature and humidity) where

    the installation of the sensors, the control unit of the HVAC control panel system,

    ensure the device operates in allowed value (temperature 0500C, huminity

  • 7/26/2019 T15-Operation and Maintenance Info

    12/14

    BiddingformT13ElectricalInformation

    Trang12/14

  • 7/26/2019 T15-Operation and Maintenance Info

    13/14

    BiddingformT13ElectricalInformation

    Trang13/14

  • 7/26/2019 T15-Operation and Maintenance Info

    14/14

    BiddingformT13ElectricalInformation

    Trang14/14

    CHILLER Equipment : view the catalog accompanying the machine

    Low operating cost and extended operating lifeThis chiller range is the result of careful

    design, aimed to optimize the energy efficiency of the chillers, with the objective of bringing

    down operating costs and improving installation profitability, effectiveness and economical

    management.

    The chillers feature a high efficiency single screw Inverter driven compressor design, large

    condenser coil surface area for maximum heat transfer and low discharge pressure, advanced

    technology condenser fans and a shell&tube evaporator with low refrigerant pressure drops.

    Outstanding reliabilityThe chillers have two or three truly independent refrigerant circuits,

    in order to assure maximum safety for any maintenance, whether lanned or not. They are

    equipped with a rugged compressor design with advanced composite compressor gaterotors

    material, a proactive control logic and are full factory-run-tested to optimized trouble-free

    operation.

    Infinite capacity controlCooling capacity control is infinitely variable by means of a

    Inverter driven screw compressor controlled by microprocessor system. Each unit has

    infinitely variable capacity control from 100% down to 13,5%. This modulation allows the

    compressor capacity to exactly match the building cooling load without any leaving

    evaporator water temperature fluctuation. This chilled water temperature fluctuation is

    avoided only with a stepless control.

    Note:

    For other euipment IO&M wille be supplied follow to equipment in installation process

    and training at site.