the adkar model: change management that drives exceptional...
TRANSCRIPT
The ADKAR Model: Change Management that Drives Exceptional Project Results
Susie Patterson, Director of Research and Development
© Prosci. All Rights Reserved. 2
48%
62%70%
81%
0%
100%
Poor Fair Good Excellent
14%
32%
52%
71%
0%
100%
Poor Fair Good Excellent
15%42%
76%
94%
0%
100%
Poor Fair Good Excellent
0%
100%
Poor Fair Good Excellent
Change management correlates directly with project success
6xIncrease in likelihood of meeting objectives with excellent change
management
Met or exceeded objectives
On schedule
On budget
Change Management Effectiveness
© Prosci. All Rights Reserved. 3
What percent of your project objectives depend on people changing how they work?
© Prosci. All Rights Reserved. 4
Change ManagementActivities
Individual Change
Outcomes
OverallProjectGoals
© Prosci. All Rights Reserved. 5
The achievements
of an organization
are the results of the
combined effort of
each individual.Vince Lombardi
© Prosci. All Rights Reserved. 6
Organizations are Made Up of Individuals
Current Transition Future
C C C C C
C C C C C
C C C C C
C C C C C
C C C C C
T T T T
T T T T
T T T T
T T T
T T T T
T
T
T
T T
T
F F F F
F F F
F F F
F
F F
F
FF
F F
F F
F F
F
F
F
© Prosci. All Rights Reserved. 7
If we do not support and equip individual transitions
then our future state looks nothing like the future state we expected
F F F F
F F F
F F
F
F F
F F F F F
F F F F F
F F F F F
F F F F F
F F F F F
Instead of
© Prosci. All Rights Reserved. 8
Change is not a switch
© Prosci. All Rights Reserved. 9
Identify who has to do their jobs differently and define how
Apply a model of how individuals change successfully
Plot individual change journeys
YourADKAR Mapfor success
Building Your ADKAR Map
© Prosci. All Rights Reserved. 10
Copyright Prosci 2014. All rights reserved.
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R J F M A M J J A S O N D
Example Group 1 3/18 4/19 5/26 7/12 10/15
Initiate Plan Design/Develop Deploy Sustain
Prosci®
ADKAR®
Map: TimelineADKAR Your Change Effort to Capture People-Dependent ROI
© Prosci Inc. 2015. All rights reserved.
Project/Initiative:
A D K A R
+1-970-203-9332
www.prosci.com
Initiate Plan Design/Develop Deploy Sustain
A D K A R
Ocg Nov Dec Jan Feb March April May June July Aug Sept
A D K A R
A D K A R
Example Group 3/18 4/19 5/26 7/12 10/15
Example Group 3/18 4/19 5/26 7/12 10/15
Example Group 3/18 4/19 5/26 7/12 10/15
Example Group 3/18 4/19 5/26 7/12 10/15
Example Group 3/18 4/19 5/26 7/12 10/15
A D K A R
A D K A R
© Prosci. All Rights Reserved. 11
Apply a model of how individuals change successfully
Plot individual change journeys
YourADKAR Mapfor success
Identify who has to do their jobs differently and define how
Building Your ADKAR Map
© Prosci. All Rights Reserved. 12
Processes
Tools
SystemsCompensation
Performance Reviews
Reporting Structure
Critical Behaviors
Job Roles
Location
Mindset/Attitudes/Beliefs
Equipping and supporting these individual changes is how results are realized
Aspects of a Person’s Job You
Can Impact
© Prosci. All Rights Reserved. 13
Awareness“I understand why”
Desire“I have decided to”
Knowledge“I know how to”
Ability“I am able to”
Reinforcement“I will continue to”
Profile graphBarrier point
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Awareness“I understand why”
Desire“I have decided to”
Knowledge“I know how to”
Ability“I am able to”
Reinforcement“I will continue to”
Profile graphBarrier point
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Copyright Prosci 2014. All rights reserved.
Awareness“I understand why”
Desire“I have decided to”
Knowledge“I know how to”
Ability“I am able to”
Reinforcement“I will continue to”
Profile graphBarrier point
Group name:
Impact:
Barrier point:Score:Target
date:Score:
Target
date:Score:
Target
date:Score:
Target
date:Score:
Target
date:
Group name:
Impact:
Barrier point:Score:Target
date:Score:
Target
date:Score:
Target
date:Score:
Target
date:Score:
Target
date:
Group name:
Impact:
Barrier point:Score:Target
date:Score:
Target
date:Score:
Target
date:Score:
Target
date:Score:
Target
date:
Group name:
Impact:
Barrier point:Score:Target
date:Score:
Target
date:Score:
Target
date:Score:
Target
date:Score:
Target
date:
Group name:
Impact:
Barrier point:Score:Target
date:Score:
Target
date:Score:
Target
date:Score:
Target
date:Score:
Target
date:
Prosci® ADKAR® MapADKAR-ing Change Effort to Capture People-Dependent ROI
+1-970-203-9332
www.prosci.com
blog.prosci.com
A D K A R
© Prosci Inc. 2015. All rights reserved.
A D K A R
A D K A R
A D K A R
A D K A R
Project/Initiative:
Groups experiencing similar impacts
your project name
one of your groups
change definition
another group
change definition
© Prosci. All Rights Reserved. 14
Identify who has to do their jobs differently and define how
Plot individual change journeys
YourADKAR Mapfor success
Apply a model of how individuals change successfully
Building Your ADKAR Map
© Prosci. All Rights Reserved. 15
The Five Building Blocks forSuccessful Change
Knowledge
Ability
Desire
Awareness
Reinforcement®
© Prosci. All Rights Reserved. 16
Knowledge
Ability
Desire
Awareness
Reinforcement®
What is the nature of the change?Why is the change needed?
What is the risk of not changing?
Change begins with understanding whyCommunication
Sponsorship
Coaching
Training
Resistance management
© Prosci. All Rights Reserved. 17
Your ADKAR Map
Awareness“I understand why”
Score:
notes
1-5
Why?
Why now?
What if we don’t?
© Prosci. All Rights Reserved. 18
Knowledge
Ability
Desire
Awareness
Reinforcement®
What’s in it for me (WIIFM)?A personal choice
A decision to engage and participate
Change involves personal decisionsCommunication
Sponsorship
Coaching
Training
Resistance management
© Prosci. All Rights Reserved. 19
Your ADKAR Map
Desire“I have decided to”
Score:
notes
1-5
Personal and Organizational
Motivators
© Prosci. All Rights Reserved. 20
Knowledge
Ability
Desire
Awareness
Reinforcement®
Understanding how to changeTraining on new processes and tools
Learning new skills
Change requires knowing howCommunication
Sponsorship
Coaching
Training
Resistance management
© Prosci. All Rights Reserved. 21
Your ADKAR Map
Knowledge“I know how to”
Score:
notes
1-5
Following A&D
During and After
© Prosci. All Rights Reserved. 22
Knowledge
Ability
Desire
Awareness
Reinforcement®Demonstrated ability to implement change
Change in the performance or behavior
Change requires action in the right directionCommunication
Sponsorship
Coaching
Training
Resistance management
© Prosci. All Rights Reserved. 23
Your ADKAR Map
Ability“I am able to”
Score:
notes
1-5
K-A Gap
Barriers
Capacity
© Prosci. All Rights Reserved. 24
Knowledge
Ability
Desire
Awareness
Reinforcement®Actions that ensure a change will continue Recognition and rewards to sustain change
Change must be reinforced to be sustainedCommunication
Sponsorship
Coaching
Training
Resistance management
© Prosci. All Rights Reserved. 25
Your ADKAR Map
Reinforcement“I will continue to”
Score:
notes
1-5
Mechanisms
Measurement
Sustainment
© Prosci. All Rights Reserved. 26
Individual Change Management Outcomes
A Awareness “I understand why…”
R Reinforcement “I will continue to…”
A Ability “I am able to…”
K Knowledge “I know how to…”
D Desire “I have decided to…”
When you create: You hear:
© Prosci. All Rights Reserved. 27
The Five Building Blocks forSuccessful Change
Knowledge
Ability
Desire
Awareness
Reinforcement®
© Prosci. All Rights Reserved. 28
Copyright Prosci 2014. All rights reserved.
Awareness“I understand why”
Desire“I have decided to”
Knowledge“I know how to”
Ability“I am able to”
Reinforcement“I will continue to”
Profile graphBarrier point
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Group name:
Individual change definition:
Barrier point:Score: Score: Score: Score: Score:
Prosci® ADKAR® Map: AnalysisADKAR Your Change Effort to Capture People-Dependent ROI
+1-970-203-9332
www.prosci.com
blog.prosci.com
A D K A R
© Prosci Inc. 2015. All rights reserved.
A D K A R
A D K A R
A D K A R
A D K A R
Project/Initiative:
4 2 4 3 1
barrier pointfirst <=3
A D K A R
A D K A R
© Prosci. All Rights Reserved. 2929
ROI predictions assume high levels of ability and proficiency
at or soon after go-live
© Prosci. All Rights Reserved. 30
Initiate Plan Design Develop Deploy
“Go Live”Kick off
Phase 3: Reinforcing
Change
Phase 2: Managing
Change
Phase 1: Preparing for Change
A D K A R
Strategy Plans Measures
General
Project
Lifecycle
Individual Change Journey
Milestones
OrganizationalChange Mgmt
Activities
Major events
Prosci®
ADKAR ®
Model
Prosci®
3-PhaseProcess
Aligning CM to Project Lifecycle
© Prosci. All Rights Reserved. 31
Initiate Plan Design Develop Deploy
“Go Live”Kick off
ADKA R
General
Project
Lifecycle
Individual Change Journey
Milestones
OrganizationalChange Mgmt
Activities
Major events
Prosci®
ADKAR ®
Model
Prosci®
3-PhaseProcess
Phase 2:
Plans
Aligning CM to Project Lifecycle
© Prosci. All Rights Reserved. 32
Identify who has to do their jobs differently and define how
Apply a model of how individuals change successfully
YourADKAR Mapfor success
Plot individual change journeys
Building Your ADKAR Map
© Prosci. All Rights Reserved. 33
We are going to define our success milestones by
the achievement of the outcomesdefined by ADKAR
Copyright Prosci 2014. All rights reserved.
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R J F M A M J J A S O N D
Example Group 1 3/18 4/19 5/26 7/12 10/15
Initiate Plan Design/Develop Deploy Sustain
Prosci®
ADKAR®
Map: TimelineADKAR Your Change Effort to Capture People-Dependent ROI
© Prosci Inc. 2015. All rights reserved.
Project/Initiative:
A D K A R
+1-970-203-9332
www.prosci.com
Initiate Plan Design/Develop Deploy Sustain
A D K A R
Ocg Nov Dec Jan Feb March April May June July Aug Sept
A D K A R
A D K A R
Example Group 3/18 4/19 5/26 7/12 10/15
Example Group 3/18 4/19 5/26 7/12 10/15
Example Group 3/18 4/19 5/26 7/12 10/15
Example Group 3/18 4/19 5/26 7/12 10/15
Example Group 3/18 4/19 5/26 7/12 10/15
A D K A R
A D K A R
© Prosci. All Rights Reserved. 34
Copyright Prosci 2014. All rights reserved.
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R J F M A M J J A S O N D
Example Group 1 3/18 4/19 5/26 7/12 10/15
Initiate Plan Design/Develop Deploy Sustain
Prosci®
ADKAR®
Map: TimelineADKAR Your Change Effort to Capture People-Dependent ROI
© Prosci Inc. 2015. All rights reserved.
Project/Initiative:
A D K A R
+1-970-203-9332
www.prosci.com
1. Define your timescale
2. Sketch your high-level project phases
3. Label groups from ADKAR Map: Analysis
4. Specify Milestone Date Targets
5. Plot your ADKAR Milestones on the timeline
1. Define
2. Sketch
3. Label
4. Specify
5. Plot
Building Your ADKAR Map
© Prosci. All Rights Reserved. 35
Copyright Prosci 2014. All rights reserved.
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R
Initiate Plan Design Develop Deploy
“Go Live”Kick off
Phase 3: Reinforcing
Change
Phase 2: Managing
Change
Phase 1: Preparing
for Change
A D K A R
Strategy Plans Measures
General
Project
Lifecycle
Individual
Change Journey
Milestones
Organizational
Change Mgmt
Activities
Major events
Prosci®
ADKAR ®
Model
Prosci®
3-Phase
Process
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R J F M A M J J A S O N D
Example Group 1 3/18 4/19 5/26 7/12 10/15
Initiate Plan Design/Develop Deploy Sustain
Prosci® ADKAR® Map: TimelineADKAR Your Change Effort to Capture People-Dependent ROI
+1-970-203-9332
www.prosci.com
blog.prosci.com
© Prosci Inc. 2015. All rights reserved.
Project/Initiative:
A D K A R
Translating your ADKAR Map Analysis into an ADKAR Map Timeline
1. Define and label your timescale (weeks, months, quarters).
2. Sketch your high-level project phases
(e.g. Initiate, Plan, Design/Develop, Deploy, Sustain).
3. Label the five groups you used for your ADKAR Map: Analysis.
4. Specify Milestone Date Targets for each ADKAR element for each group.
5. Sketch your ADKAR Milestones on the timeline.
6. Next steps: create the action plans that will support “Ability at Go Live”
and attainment of each of the ADKAR Milestones you have defined.
Individual:
Awareness Desire Knowledge Ability Reinforcement
Communication plan
Sponsor roadmap
Coaching plan
Training plan
Resistance Mgmt
Organizational:
Initiate Plan Design/Develop Deploy Sustain
Ocg Nov Dec Janc Feb March April May June July Aug Sept
Copyright Prosci 2014. All rights reserved.
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R
Initiate Plan Design Develop Deploy
“Go Live”Kick off
Phase 3: Reinforcing
Change
Phase 2: Managing
Change
Phase 1: Preparing
for Change
A D K A R
Strategy Plans Measures
General
Project
Lifecycle
Individual
Change Journey
Milestones
Organizational
Change Mgmt
Activities
Major events
Prosci®
ADKAR ®
Model
Prosci®
3-Phase
Process
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R J F M A M J J A S O N D
Example Group 1 3/18 4/19 5/26 7/12 10/15
Initiate Plan Design/Develop Deploy Sustain
Prosci® ADKAR® Map: TimelineADKAR Your Change Effort to Capture People-Dependent ROI
+1-970-203-9332
www.prosci.com
blog.prosci.com
© Prosci Inc. 2015. All rights reserved.
Project/Initiative:
A D K A R
Translating your ADKAR Map Analysis into an ADKAR Map Timeline
1. Define and label your timescale (weeks, months, quarters).
2. Sketch your high-level project phases
(e.g. Initiate, Plan, Design/Develop, Deploy, Sustain).
3. Label the five groups you used for your ADKAR Map: Analysis.
4. Specify Milestone Date Targets for each ADKAR element for each group.
5. Sketch your ADKAR Milestones on the timeline.
6. Next steps: create the action plans that will support “Ability at Go Live”
and attainment of each of the ADKAR Milestones you have defined.
Individual:
Awareness Desire Knowledge Ability Reinforcement
Communication plan
Sponsor roadmap
Coaching plan
Training plan
Resistance Mgmt
Organizational:
Initiate Plan Design/Develop Deploy Sustain
Ocg Nov Dec Janc Feb March April May June July Aug Sept
1. Define
2. Sketch
3. Label
4. Specify
5. Plot
© Prosci. All Rights Reserved. 36
Copyright Prosci 2014. All rights reserved.
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R
Initiate Plan Design Develop Deploy
“Go Live”Kick off
Phase 3: Reinforcing
Change
Phase 2: Managing
Change
Phase 1: Preparing
for Change
A D K A R
Strategy Plans Measures
General
Project
Lifecycle
Individual
Change Journey
Milestones
Organizational
Change Mgmt
Activities
Major events
Prosci®
ADKAR ®
Model
Prosci®
3-Phase
Process
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R J F M A M J J A S O N D
Example Group 1 3/18 4/19 5/26 7/12 10/15
Initiate Plan Design/Develop Deploy Sustain
Prosci® ADKAR® Map: TimelineADKAR Your Change Effort to Capture People-Dependent ROI
+1-970-203-9332
www.prosci.com
blog.prosci.com
© Prosci Inc. 2015. All rights reserved.
Project/Initiative:
A D K A R
Translating your ADKAR Map Analysis into an ADKAR Map Timeline
1. Define and label your timescale (weeks, months, quarters).
2. Sketch your high-level project phases
(e.g. Initiate, Plan, Design/Develop, Deploy, Sustain).
3. Label the five groups you used for your ADKAR Map: Analysis.
4. Specify Milestone Date Targets for each ADKAR element for each group.
5. Sketch your ADKAR Milestones on the timeline.
6. Next steps: create the action plans that will support “Ability at Go Live”
and attainment of each of the ADKAR Milestones you have defined.
Individual:
Awareness Desire Knowledge Ability Reinforcement
Communication plan
Sponsor roadmap
Coaching plan
Training plan
Resistance Mgmt
Organizational:
Initiate Plan Design/Develop Deploy Sustain
Ocg Nov Dec Janc Feb March April May June July Aug Sept
Example Group
1. Define
2. Sketch
3. Label
4. Specify
5. Plot
© Prosci. All Rights Reserved. 37
Copyright Prosci 2014. All rights reserved.
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R
Initiate Plan Design Develop Deploy
“Go Live”Kick off
Phase 3: Reinforcing
Change
Phase 2: Managing
Change
Phase 1: Preparing
for Change
A D K A R
Strategy Plans Measures
General
Project
Lifecycle
Individual
Change Journey
Milestones
Organizational
Change Mgmt
Activities
Major events
Prosci®
ADKAR ®
Model
Prosci®
3-Phase
Process
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R J F M A M J J A S O N D
Example Group 1 3/18 4/19 5/26 7/12 10/15
Initiate Plan Design/Develop Deploy Sustain
Prosci® ADKAR® Map: TimelineADKAR Your Change Effort to Capture People-Dependent ROI
+1-970-203-9332
www.prosci.com
blog.prosci.com
© Prosci Inc. 2015. All rights reserved.
Project/Initiative:
A D K A R
Translating your ADKAR Map Analysis into an ADKAR Map Timeline
1. Define and label your timescale (weeks, months, quarters).
2. Sketch your high-level project phases
(e.g. Initiate, Plan, Design/Develop, Deploy, Sustain).
3. Label the five groups you used for your ADKAR Map: Analysis.
4. Specify Milestone Date Targets for each ADKAR element for each group.
5. Sketch your ADKAR Milestones on the timeline.
6. Next steps: create the action plans that will support “Ability at Go Live”
and attainment of each of the ADKAR Milestones you have defined.
Individual:
Awareness Desire Knowledge Ability Reinforcement
Communication plan
Sponsor roadmap
Coaching plan
Training plan
Resistance Mgmt
Organizational:
Initiate Plan Design/Develop Deploy Sustain
Ocg Nov Dec Janc Feb March April May June July Aug Sept
Example Group
1. Define
2. Sketch
3. Label
4. Specify
5. Plot
A D K A R
Copyright Prosci 2014. All rights reserved.
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R
Initiate Plan Design Develop Deploy
“Go Live”Kick off
Phase 3: Reinforcing
Change
Phase 2: Managing
Change
Phase 1: Preparing
for Change
A D K A R
Strategy Plans Measures
General
Project
Lifecycle
Individual
Change Journey
Milestones
Organizational
Change Mgmt
Activities
Major events
Prosci®
ADKAR ®
Model
Prosci®
3-Phase
Process
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R J F M A M J J A S O N D
Example Group 1 3/18 4/19 5/26 7/12 10/15
Initiate Plan Design/Develop Deploy Sustain
Prosci® ADKAR® Map: TimelineADKAR Your Change Effort to Capture People-Dependent ROI
+1-970-203-9332
www.prosci.com
blog.prosci.com
© Prosci Inc. 2015. All rights reserved.
Project/Initiative:
A D K A R
Translating your ADKAR Map Analysis into an ADKAR Map Timeline
1. Define and label your timescale (weeks, months, quarters).
2. Sketch your high-level project phases
(e.g. Initiate, Plan, Design/Develop, Deploy, Sustain).
3. Label the five groups you used for your ADKAR Map: Analysis.
4. Specify Milestone Date Targets for each ADKAR element for each group.
5. Sketch your ADKAR Milestones on the timeline.
6. Next steps: create the action plans that will support “Ability at Go Live”
and attainment of each of the ADKAR Milestones you have defined.
Individual:
Awareness Desire Knowledge Ability Reinforcement
Communication plan
Sponsor roadmap
Coaching plan
Training plan
Resistance Mgmt
Organizational:
Initiate Plan Design/Develop Deploy Sustain
Ocg Nov Dec Janc Feb March April May June July Aug Sept
Example Group 3/18 4/19 5/26 7/12 10/15 A D K A R
1/5 2/5 3/20 5/1 8/1
© Prosci. All Rights Reserved. 38
Copyright Prosci 2014. All rights reserved.
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R
ADKAR Milestone
Date Targets
Project Phases:
Timescale (weeks, months, quarters):
Groups: A D K A R J F M A M J J A S O N D
Example Group 1 3/18 4/19 5/26 7/12 10/15
Initiate Plan Design/Develop Deploy Sustain
Prosci®
ADKAR®
Map: TimelineADKAR Your Change Effort to Capture People-Dependent ROI
© Prosci Inc. 2015. All rights reserved.
Project/Initiative:
A D K A R
+1-970-203-9332
www.prosci.com
Initiate Plan Design/Develop Deploy Sustain
A D K A R
Oct Nov Dec Jan Feb March April May June July Aug Sept
A D K A R
A D K A R
Example Group
Example Group
Example Group
Example Group
Example Group
A D K A R
A D K A R
1/5 2/5 3/20 5/1 8/1
1/5 2/5 3/20 5/1 8/1
10/25 11/30 12/20 1/5 5/1
12/21 1/21 2/15 3/2 7/1
12/5 1/10 3/7 4/19 7/15
© Prosci. All Rights Reserved. 39
Individual:
Awareness Desire Knowledge Ability Reinforcement
Communication plan
Sponsor roadmap
Coaching plan
Training plan
Resistance mgmt plan
Organizational:
Aligning Project Deliverables to Individual Milestones
© Prosci. All Rights Reserved. 40
The right toolfor the right job
© Prosci. All Rights Reserved. 4141
“What are we trying to achieve?”
Communications that build awareness
of the need for change
Communications plan “because we
should have a communications
plan”
For Practitioners
© Prosci. All Rights Reserved. 42
For Leaders and Managers
42
“What are you trying to achieve right now?”
Build awareness of the need for the new ERP system
by sharing details of our profitability forecasts
at this town hall meeting.
Speak at this town hall meeting
© Prosci. All Rights Reserved. 43
Identify who has to do their jobs differently and define how
Apply a model of how individuals change successfully
Plot individual change journeys
YourADKAR Mapfor success
Building Your ADKAR Map
© Prosci. All Rights Reserved. 44
To summarize…Change management activities are intended
to drive individual change outcomes
ADKAR provides clear individual change
outcomes and milestones
Plotting ADKAR milestones by group
guides change management activities
Don’t throw spaghetti at the wall
Change is a process, not a switch
Right tool for the right job
Susie PattersonDirector of Research and [email protected]