October 2016

The Nureva™ Span™ ideation system

Installation guide

Single panoramic system

Page 2: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

2October 2016

ImportantSAFETY WARNINGS

Prior to the installation of this product, the installation instructions should be completely read and completely understood to avoid personal injury and property damage. The installer is responsible for ensuring all components are properly assembled and installed using the instructions provided.

WARNING: Failure to provide adequate structural strength for the wall mount can result in serious personal injury or damage to property. The anchors and wall to which this equipment is attached must be able to support four times the combined weight of all equipment. Ensure the wall structure is reinforced as required before installing the equipment.

WARNING: Exceeding the wall mount’s weight capacity can result in serious personal injury or damage to equipment. The installer is responsible for ensuring the combined weight of all components attached to the wall mount does not exceed 33 lb. (15 kg).

WARNING: Adding additional weight to the boom by leaning, hanging or storing items on it can result in serious personal injury or damage to property.

WARNING: Never operate this system if it is damaged. Do not open or modify the parts or accessories. Do not use with parts or accessories not recommended by the manufacturer. Contact your reseller with questions regarding replacement parts.

WARNING: The projector is a Class 2 laser device. Do not stare into the projector beam. The bright light may result in permanent eye damage This projector conforms to IEC 60825-1: 2007 and CFR 1040.10 and 1040.11. Except for deviations to Laser Notice No.50, dated June 24, 2007.

WARNING: The touch module is certified as a Class 1 laser device. Do not open or disassemble the touch module. Any operation or adjustment not specifically instructed by the user’s guide creates the risk of hazardous laser radiation exposure.

IMPORTANT: Carefully inspect the installation area.

• Avoid areas with high temperatures, humidity or concentration of dust (such as near vents or air conditioners)

• Ensure the projector gets adequate ventilation

• Do not install on walls subject to vibrations and shocks

IMPORTANT: Do not use chemical or abrasive cleaners on the equipment.

IMPORTANT: Avoid touching the optical components to prevent scratches.

Page 3: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

3October 2016

Table of contentsB E FO R E YO U B EG I N

What's in the box

Supply checklist

Location requirements and recommendations

I N STA L L AT I O N

1. Wall mount and projector installation

2. Image alignment

3. Surface installation

4. Touch module installation and callibration

5. Download Span wall software and touch driver and callibrate touch

Troubleshooting

4

5

6

7

10

13

14

18

20

Page 4: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

4October 2016

B OX O N E

a - Wall mount boom

b - Adjustment cover

c - Wall mount plate

d - Wall mount cover

e - Screws to attach plate to projector (x 4) and screws to attach projector to mount (x 4)

f - Projector plate

B OX T WO

h - Touch module power cord

i - Bracket

j - Alignment card

k - Touch module

l - Touch module cover

m - Wire cover

n - Screws to attach touch module to bracket

p - Interactive projector

q - Power cable

r - Projector remote control

s - Stylus x 2

t - USB cable - USB-B Mini to USB-A cable 6' (2 M)

What's in the box

a

b

cd

e

f

h

j

i

k

l

n

m

p

q

rs

BOX TWO: NSPi -1

BOX ONE: NMW -1

t

Page 5: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

5October 2016

Supply checklist

HDMI cable

Cables and connectorsCat5e Extenders - USB2.0 if your USB cord requires extension beyond 14.7' (4.5 M)

PCPC connected to the projectors

Windows® 8.1 and Intel i5 or equivalent

HDMI video out port or adaptor

Supports 1920 x 720 video resolution

4GB+ RAM and 2GB+ free storage

Wireless keyboard

Wireless mouse

Must meet the following specifications:

PartsScrews and anchors x 6 capable of supporting 132 lb. (59.9 kg)

#4 screws and anchors x 2

ToolsTape measure

Laser level

10 mm wrench

#1 - Phillips screwdriver

#2 - Phillips screwdriver

Pencil

Drafting (white) eraser

If you are installing a WhisperTek™ surface:3" roller

If you are installating a Da-Lite surface:Rubber Mallet

3/8" open wrench or socket driver

Screws and anchors x 20 capable of supporting 350 lb. (158.7 kg)

To install the system sucessfully you need to provide the following items. Go through this checklist and ensure everything is on hand before you begin to install the system.

Page 6: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

6October 2016

Location requirements and recommendationsEnsure the area you select to install your system meets the following requirements and recommendations.

A minimum ceiling height of 100" and adequate space for a 122" (310 cm) wide image projected 33" from the floor.

R EQ U I R E M E N TS

A wall capable of supporting weight of 132 lb. (59.9 kg).

A wall flatness with less than a 1/4" bow.

1/4" MAX.1/4" MAX.1/4" MAX.1/4" MAX.

To optimize touch functionality and image quality, select an area away from direct sunlight where lighting can be dimmed.

Page 7: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

7October 2016

Wall mount and projector installationThis portion of the installation requires two people. You will need the following tools and parts:

e - Screws to attach plate to projector

f - Projector plate

e - Screws to attach projector to mount

b - Wall mount plate

d - Wall mount cover

a - Wall mount boom

Provided

c - Adjustment cover

t - USB cable - USB-B Mini to USB-A cable 6' (2 M)

p - Interactive projector

h - Touch module power cable

q - Power cable

a

b

c

d

p

qf

e

You must provideScrews and anchors x 6 capable of supporting 132 lb. (59.9 kg)

HDMI cable

Tape measure

Level

10 mm wrench

#2 Phillips screwdriver

t

1.

x6x6

Page 8: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

October 2016 8

130"

122" 32"

CENTERLINE

130"130"130"

122"122"122" 32"32"32"

CENTERLINECENTERLINECENTERLINE

Using the measurement marking on the side of the boom, adjust the boom length to 27.5" and tighten the top bolts.

NOTE: If the mount or projection surface is extended or recessed, add or subtract the difference from this measurement.

With the projector on a soft surface to prevent scratches, place the projector plate with the angled edge alongside the projector’s vent. Attach the plate with the four provided screws.

Feed the projector power cord, HDMI cable, mini USB cable and touch module cord through the wall mount boom. Ensure the correct connector ends are being fed through.

1 Assemble the parts

2 Determine the wall mount placement

Once an appropriate location has been established for the system installation, determine where the centerline of the image will land. The projected image will be 130" (330 cm)diagonally and 122" (310 cm) long.

3 Install the wall mount

Ensure the mounting plate is level, mark the remaining holes, then secure the plate to the wall using screws and anchors capable of supporting 132 lb. (59.9 kg).

Mark the centerline, then measure 1 ⅜" (3.5 cm) to the right. Mark that measurement and from there measure 98 ⅜" (250 cm) from the floor to the top pair of mounting holes on the plate. Place a mark at the top of all six mounting holes.

CENTERLINE

97 ¼"

1 ⅜"

CENTERLINECENTERLINECENTERLINE

97 ¼"97 ¼"97 ¼"

1 ⅜"1 ⅜"1 ⅜"

33"122"

130"

98 ⅜"

Page 9: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

October 2016 9

p X4p X4p X4p X4

PROJECTOR POWER CORD

HDMI

MINI USB

TOUCH MODULEPOWER CORDPROJECTOR

POWER CORDPROJECTOR

POWER CORDPROJECTOR

POWER CORD

HDMIHDMIHDMI

MINI USBMINI USBMINI USB

TOUCH MODULEPOWER CORD

TOUCH MODULEPOWER CORD

TOUCH MODULEPOWER CORD

4 Attach the wall mount boom to the plate

6 Connect cords to the projector

5 Attach the projector to the mount

Place the boom over the plate. Leave bolts loose in order to complete the image alignment steps.

Connect the following cords into the back of the projector:

Projector power cord

Touch module power cord

USB cable

HDMI cable

Slide the projector onto the mount until the plate is centered. Secure the plate to the mount with the four screws provided.

e

Page 10: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

10October 2016

UP/DOWN LEFT/RIGHT

IMAGE SIZEIMAGE

ADJUSTMENT

UP/DOWNUP/DOWNUP/DOWN LEFT/RIGHTLEFT/RIGHTLEFT/RIGHT

IMAGE SIZEIMAGE SIZEIMAGE SIZEIMAGE

ADJUSTMENTIMAGE

ADJUSTMENTIMAGE

ADJUSTMENT

Imagealignment2.

Page 11: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

October 2016 11

Slide the focus switch on the left side of the projector to bring the image into focus.

Ensure the projector is plugged in, then press the power button on the projector remote control.

1 Power on the projector

3 Level image 4 Even image height 5 Square the image

Use the middle knob marked Roll to level the top of the projected image. Check image with a level before proceeding to the next adjustment.

Use the far-right knob marked Yaw to adjust the image until both sides are the same height. At this point it is more important to get the sides even in length than it is to get them to the recommended length.

Use the far-left knob marked Pitch to adjust the image until both sides are plum and the image is squared.

2 Adjust the focus

Image alignment is an iterative process. You may need to perform these steps more than once to achieve a correctly sized, aligned image.

NOTE: Use the knobs on the mount to adjust the image. Do not attempt to shift the projector with your hands as this will make the image more difficult to align and could damage the adjustment mechanism .

Page 12: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

October 2016 12

If you need to raise or lower the image, use the bolt at the bottom of the boom. The bottom of the projected image must be 33" from the floor.

6 Adjust the height

UP/DOWNUP/DOWNUP/DOWNUP/DOWN

If the image needs to be adjusted either to the left or to the right, loosen the screws that attach the projector plate to the boom, slide the projector and tighten the screws again before making the next adjustment.

7 Adjust image left/right

LEFT/RIGHTLEFT/RIGHTLEFT/RIGHTLEFT/RIGHT

8 Measure and adjust

Measure the image diagonally to determine if it is close to the recommended 130" (330 cm) size with a height of 46" (117 cm) and length of 122" (310 cm). If the image is significantly larger or smaller, adjust the boom length and re-adjust the image in the same order of roll, yaw, and pitch. If the image is skewed, make adjustments in the order of roll, yaw and pitch until the image is square.

90o

90o

90o

90o

130"

90o90o90o

90o90o90o

90o90o90o

90o90o90o

130"130"130"

9 Tighten bolts

Once this is complete, ensure all bolts on the mount are tightened and attach the knob adjustment cap.

Page 13: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

13October 2016

Install the surfaceFollow the instructions for your selected surface

D a - L i t e I D E A s c r e e n

W h i s p e r Te k ™ s u r f a c e

Da-Lite screen installation guideWebsite: nureva-span.uservoice.comSearch: Da-liteNOTE: The touch module is attached to the Da-Litescreen via a bracket included with the screen. Once the screen is installed, skip ahead to step 4 of the touch module installation in the next section of this guide.

WhisperTek™ surface installation guideWebsite: nureva-span.uservoice.comSearch: WhisperTek

3.

Page 14: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

14October 2016

Touch moduleinstallation and calibration You will need the following tools and parts:

x 2 x 3 i - Bracket

x 4 x 6 j - Alignment card

x 2 x 3 k - Touch module

x 2 x 3 l - Touch module cover

x 2 x 3 m - Wire cover

x 4 x 6

Double system

Triple system Provided

n - Screws to attach touch module to bracket

h i

j k

l

m n

You must provide#4 screws and anchors x 2

Level

Tape measure

#1 Phillips screwdriver

4.

x2

Page 15: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

October 2016 15

Place the hole on the left side of the bracket over the mark on the centerline. Ensure the bracket is level, and secure to the wall with the #4 screws and anchors.

CENTERLINE

#4 SCREWS WALL ANCHORS

X2 X2

CENTERLINECENTERLINECENTERLINE

#4 SCREWS#4 SCREWS#4 SCREWS WALL ANCHORSWALL ANCHORSWALL ANCHORS

X2X2X2 X2X2X2

2 Install the touch module bracket

Test fit wire cover to conceal the wire. Remove the backing on the adhesive and attach the cover to the wall. Trim the cover if necessary.

4 Attach wire cover to wall

Open the wire cover and lay the touch module cord inside. Route the cord through the channel in the touch module and plug it in on the side of the unit.

6 Attach power cord to touch module

Remove the touch module cover and place the touch module over the bracket. The unit is magnetic and will hold itself in place while you secure it from the front with the two screws provided.

3 Attach the touch module

kkkk

Measure 9 ½" (24 cm) from the bottom corner of the wall mount. From there, measure ⅜" (1 cm) to the left and place a mark on that spot.

1 Determine touch module placement

n

9 ½ " (24 cm)

Page 16: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

October 2016 16

5 Align the lasers

Press the adjustment button to switch the touch module to adjustment mode; the LED on the module will blink red.

ADJUSTMENT ON/OFFADJUSTMENT ON/OFF

Gently rotate both the black and grey knobs clockwise until they cannot be turned any further.

Rotate the black knob counter-clockwise to move the laser beams downward until they appear on the floor or surface below the projected image.

Rotate the grey knob counterclockwise until both lasers align symmetrically.

Page 17: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

October 2016 17

Use the two screws captured in the cover to reattach the cover to the touch module.

Fold the laser alignment cards along the dotted line while keeping the paper backing on the body of the sticker.

Slide the card diagonally toward the touch module to check if the dot stays within the grey zone all the way to the top. Repeat this process on the other beam. Ensure both beams are an equal distance from the wall.

Hold the alignment cards against the wall to check if the laser falls within the grey zone. If the dots are blurred or scattered, adjust the black knob until they are properly defined.

If your wall flatness varies causing the laser to fall outside of the grey zone, use the grey knob to adjust the distance of the laser from the wall.

Press the adjustment button again to switch off the adjustment mode. The LED will go back to solid blue.

WARNING: Touch does not function when the module is in adjustment mode. Ensure it is switched back after any adjustments.

ADJUSTMENT ON/OFFADJUSTMENT ON/OFF

Page 18: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

18October 2016

Download the touch driver and Span ideation software

Download Span wall software and touch driver and calibrate touch

Go to span.nureva.com/download.html and download and install the software and touch driver onto your PC.

Ensure your PC is connected to the projector via the HDMI and USB cables.

Follow these steps to install the software and calibrate touch.

5.

Page 19: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

October 2016 19

Once the driver has been installed, use the PC keyboard and mouse to click on the touch icon to launch the menu.

1 Launch touch software settings

Select Touch Area Setting and choose Auto from the drop-down menu. The screen will flash a series of dots.

2 Touch Area settings

Select Calibration from the menu and choose Manual from the drop-down menu.

3 Calibration

Press and hold the crosshair symbol that appears on the screen until it changes to a darker color. Lift your finger and follow the dot to the next location. Repeat this step until the calibration process is complete.

4 Follow the on-screen calibration

Page 20: The Nureva™ Span™ ideation system Installation guide · 10/19/2016  · The Nureva™ Span™ ideation system Installation guide Single panoramic system. October 2016 2 Important

October 2016 20

TroubleshootingFor troubleshooting, please see our Customer Support Portal. https://nureva-span.uservoice.com