wika...combined cycle power plant muara karang 740 mw, jakarta energy ( .),6 ... de papilio...
TRANSCRIPT
![Page 1: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/1.jpg)
![Page 2: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/2.jpg)
• Providing Excellent Integrated Product and Services on EPC and Investment for Infrastructure, High-Rise Building, Energy, Industrial Plant, Precast Industry & Property
• Accomplish Key Stakeholders Expectation• Practicing Business Ethics to Promote Good Corporate
Citizen and Company Sustainability• Strategic Overseas Expansion• Implementing “Best Practice” Integrated Management
System
![Page 3: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/3.jpg)
••••••
•
Investment in Associates
![Page 4: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/4.jpg)
CONSTRUCTION OF BULK WATER PIER, TRESLE AND BREASTING DOLPHIN IN PORT STAGEN, KOTABARU-SOUTH KALIMANTAN
CIVIL CONSTRUCTION
![Page 5: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/5.jpg)
Bogor Ring Road, BOGOR
CIVIL CONSTRUCTION
![Page 6: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/6.jpg)
Terminal 3 Extension Soekarno-Hatta Airport , Jakarta
BUILDING CONSTRUCTION
![Page 7: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/7.jpg)
Ngurah Rai Airport, BALI
BUILDING CONSTRUCTION
Sepinggan Airport,
Sepinggan Airport,
![Page 8: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/8.jpg)
DPPU Soekarno Hatta, Banten
INDUSTRIAL PLANT
![Page 9: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/9.jpg)
Instalasi Pompa Angguk NDD 13, Duri Pekanbaru
INDUSTRIAL PLANT
![Page 10: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/10.jpg)
Coal Fired Power Plant Amurang 2 X 25 MW, North Sulawesi
ENERGY
![Page 11: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/11.jpg)
Combined Cycle Power Plant Muara Karang 740 MW, Jakarta
ENERGY
![Page 12: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/12.jpg)
8 PLANTS2.000.000 Ton/years
Operational Area
![Page 13: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/13.jpg)
Bogor And Karawang Factories
WIKA BETON FACTORIES
![Page 14: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/14.jpg)
Bogor Ring Road
WIKA BETON PRODUCT
![Page 15: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/15.jpg)
NORTH SUMATERA
DeDDD bag TTaTaTaTTTTaTaTaTTaTTaTaaamanm sari ---- MedanLaLaLaLaLaLaLaLLaLaandendndnnn d hd hhhhhhhhd hhousouousoousoouoususousuouo e: 11.77757757547575757 m2 Tanahnahnahahahahahhahh AcAcAcAAAAAAAA eh h eh- A- AAAAAAAA- AAAAcecccccccccccAcLaLaLaLaLaLaLLaLaLandenndenddededdd hd hhhhhhd hddd d hd ouso e: 8788777887777787787878888 m2m2m2m2m222mmmse: 888
EAST KALIMANTAN
Tamanmam sarri Bi ukit Mutiara - Balalalalalalalala ikpikpikpikpikpikpikpkpi apaaapaapaapaapaaap nnn Landedededeeed house: 19.543 m22222 Grand TaTaT mansari - Saaaamarmarmamamarmammm inda Landed hhhouse: 7707007070700700707 .57... 8 m2
SULAWESI
TaTammansari Metropolitaanan - M- Manaananaann doodo Landed house: 27.0444 m2m2m2 The Lagoon Tamansarri ApAApartartmenmentt High rise: 2.488 m2AtA angangg MaMakaska sar -- MMakkaakMaaakMakMakMaakasasaa rrLaLaaLaaaaandndddendedendndndenndended d hdd hhdd hhhhd hdd hhd hd hd ousoousousousousousousoousousousso eeeeeeeeeeee 15..6956696969699559566995 mm2ee:e:e:e:e:eeeee:eee:eeee: : 151555515151515515551TaTaTaTaTaTTTTaaTaTamanmanmanmanm nansssararsarri Ki KKii Ki Ki Ki Kaaaaaaa gggaagagan -n - KeKendandarii ii iirayaayayaayayaayaayyaayayaaayaayyayaay nnggnnngngnngngyanLaLaLaLaaLaLaLaaLandeded hd hhhoouousouuusssuuusse:ee::e: 40240244 4.410 mm22
WEST JAVA & BANTEN Tamansari Maglayang Regency - BandungngLanded housed: 88.183 m2 Landed housed: 888 .183 m2 Tamansari Puri Bali - Depok Landed house: 19.152 m2 Tamansari Pelabuhan ratu - Sukabumi Landed house: 242.338 m2 Tamansari Panoramic - Bandung High rise: 4.125 m2 La Grande Tamansari Merdeka - Bandung High rise: 4.393 m2 Taman Bukit Damai - Bandung Landed house: 829 m2 Tamansari Persada - Bogor Landed house: 1.757 m2
JAKARTA
CENTRAL JAVA Tamansari Majapahit - Semarang Landed house: 5.760 m2 The Hill Tamansari - Semarang Landed house: 16.480 m2
EAST JAVA De Papilio Tamansari - Surabaya High rise: 5.384 m2
BALI
Jivva Resort @Tamansari - Lepang Landed house: 10.259 m2 Jineng Tamansari - Bali Landed house: 12.000 m2
Tamanm sari SSemaemaemmaamamammamanggi i AAAi A AAAAparararrpapaarpaparara tetttetemtttttemen High rise: 82221 mmmmmmm1 m222222222 The Hive @Tamansnsasaaaaaririririrriririr High rise: 6.070 m22 Tamansari Pesona Balli -i Jakarrrrrrttataattaaaatataattata Landed house: 1.144 m22 Festival Fatmawati - Jakark tataFestival Fatmawati Jakartaa Landed house: 129 m2
Ongoing Project
![Page 16: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/16.jpg)
THE HIVE @Tamansari, Jakarta
WIKA REALTY
![Page 17: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/17.jpg)
BELMONT RESIDENCE, JAKARTA
WIKA GEDUNG
PINEWOOD JATINANGOR, SUMEDANG
![Page 18: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/18.jpg)
Steel Fabrication
WIKA INDUSTRI & KONSTRUKSI
![Page 19: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/19.jpg)
TANK-FARM
WIKA INDUSTRI & KONSTRUKSI
![Page 20: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/20.jpg)
Operation & Maintenance Diesel Engine PP Bali 3X18 MW
WIKA REKAYASA KONSTRUKSI
![Page 21: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/21.jpg)
ASPHALT MINING
PT SARANA KARYA
![Page 22: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/22.jpg)
1.BPKP = Board of Finance and Development Control2.PEFINDO = Indonesian Securities Rating Agency3.Assessment by Indonesia Quality Award (IQA)4.Assessment by Kriteria Penilaian Kinerja Unggul (KPKU)5.Assessment by LPPM6.Assessment by AON Hewitt
GCG SCORE(BPKP
ASSESSMENT)1)
CORPORATE RATING (PEFINDO)2)
PERFORMANCE EXCELLENCE
ENGAGEMENT LEVEL
![Page 23: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/23.jpg)
![Page 24: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/24.jpg)
![Page 25: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/25.jpg)
Carry Over from 2009
![Page 26: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/26.jpg)
14,590
17,907
20,831
26,591
38,278
33,718
49,972
![Page 27: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/27.jpg)
Government Private
28.5%21.9%
31.6%22.2%
*51.0%
26.2%35%
43%37% 40%
![Page 28: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/28.jpg)
Description Sep ‘13 Sep ‘12 Growth %YoY
New Order Book 13,260.58 11,340.60 16.90%Total Order Book 33,394.85 27,631.95 20.86%Net Sales 7912.64 6370.32 24.20%Cost of Sales (7068.59) (5779.17) 22.30%Profit (Loss) JO Projects 176.28 108.52 62.40%Gross Profit 1,020.33 699.67 45.80%
12.90 11.00Operating Expense (243.62) (185.60) 31.30%
Operating Income 776.71 514.07 51.10%9.80 8.10
Other Income (expense) (74.46) (13.12) 467.50%Profit (Loss) before Income Tax 702.25 500.95 40.20%
8.90 7.90Final Tax (189.39) (160.71) 17.80%Non Final Tax (71.05) (27.87) 154.90%Deferred Tax (3.34) 1.02 (427.50%)Net Income 438.47 313.39 39.90%
5.50 4.90Other Comprehensive Income After Tax 0.00 0.00Comprehensive Income 438.47 313.39 39.90%
5.50 4.90 12.60%Income Attributable To:Parent Entity Owner 390.03 282.57 38.00%Non Controlling Interest 48.44 30.82 57.20%Total 438.47 313.39 39.90%
5.50 4.90Earning Per Share (Rupiah Penuh) 63.54 46.56 36.50%
![Page 29: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/29.jpg)
Description Sep ’13 2012 Growth YoYTotal Current Assets 7,657.11 7,186.55 6.5%Total Non Current Assets 4,383.31 3,758.65 16.6%TOTAL ASSETS 12,040.42 10,945.20 10.0%
Total Current Liabilities 7,176.00 6,527.62 9.9%Total Non Current Liabilities 1,763.90 1,603.58 10.0%TOTAL LIABILITIES 8,939.90 8,131.20 9.9%
Share Capital 613.95 610.56 0.6%Treasury Stock -0.35Additional PIC 747.35 743.63 0.5%Change of Equity in Subsidiaries 23.53 23.53 0.0%Retained Earning 1,449.03 1,196.35 21.1%Sub TOTAL EQUITY 2,833.51 2,574.07 10.1%
Non Controlling Interest 267.01 239.93 11.3%TOTAL EQUITY 3,100.52 2,814.00 10.2%
TOTAL LIABILLITIES & EQUITY 12,040.42 10,945.20 10.0%
![Page 30: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/30.jpg)
Description Sep ’13 Sep ’12
Received from Customers 7,275.81 5,986.25
Payment to Suppliers (7,658.88) (5,550.77)
Payment for Directors and Employee (168.47) (139.60)
Payment for Operating Expense and Others (85.57) (56.52)
Deposit Interest Receipt 16.50 29.54
Payment of Interest (15.96) (24.00)
Payment – Receipt of Income Tax (134.55) (165.78)
CASH FLOW FROM OPERATING ACTIVITIES (771.12) 79.12
CASH FLOW FROM INVESTING ACTIVITIES (527.14) (1,093.63)
CASH FLOW FROM FINANCING ACTIVITIES 684.64 984.43
Increase of Net Cash and Cash Equivalent (613.62) (30.08)
Beginning Balance of Cash and Cash Equivalent 1,499.14 1,244.32
Ending Balance of Cash and Cash Equivalent 885.52 1,214.24
![Page 31: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/31.jpg)
![Page 32: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/32.jpg)
![Page 33: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/33.jpg)
![Page 34: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/34.jpg)
![Page 35: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/35.jpg)
![Page 36: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/36.jpg)
![Page 37: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/37.jpg)
![Page 38: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/38.jpg)
![Page 39: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/39.jpg)
YearNet Income(IDR Bio)
EPS(IDR) Dividend Payout Ratio
2008 156.03 26.75 30%2009 189.22 33.37 30%2010 284.92 50.15 35%2011 354.50 60.59 30%2012 457.86 76.01 30%
![Page 40: WIKA...Combined Cycle Power Plant Muara Karang 740 MW, Jakarta ENERGY ( .),6 ... De Papilio Tamansari - Surabaya High rise: 5.384 m2 BALI Jivva Resort @Tamansari - Lepang ... BELMONT](https://reader034.vdocument.in/reader034/viewer/2022042201/5ea1e2dcbb002f3755602eb1/html5/thumbnails/40.jpg)
Additional Information is available upon request. For further Information please contact:
Natal Argawan Pardede, Corporate SecretaryPhone (021) 8192808 or Facsimile (021) 8191235
Visit us: www.wika.co.id
DisclaimerThis material is for Information only, and we are not soliciting any action based upon it. This report is not to be construed as an offer to sell or the solicitation of an offer to buy any security in any jurisdiction where such an offer or solicitation would be illegal. The Information herein has been obtained from sources believed to be reliable, but we do not warrant that it is accurate or complete, and it should not be relied upon as such. Opinion expressed is our current opinion as of the date appearing on this material only, and subject to change without notice. It is intended for the use by recipient only and may not be reproduced or copied/photocopied or duplicated or made available in any form, by any means, or redistributed to others without written permission of PT Wijaya Karya (Persero) Tbk.
The End of Presentation