Brownville Bridge Planning Study Stakeholder Workshop
January 31, 2018
Welcome!
2/16/18
2
Agenda
• About the project
• Q&A
• Interactive Exercise
• Wrap-up & Next Steps
About the Project
2/16/18
3
Why is this study necessary?
• Age of the bridge/design life
• Traffic/operational issues
• Geometry issues (steep grade, sharp curve, narrow shoulders)
Project Boundaries
� Map
2/16/18
4
Project Scope
• Explore replacement option and potential new locations for future bridge over the Black River
• Evaluate up to five (5) alternative locations
Project Scope • Develop criteria for
bridge relocation analysis (cost, environmental impacts, private property impacts, engineering)
• Rank Alternatives based on criteria
2/16/18
5
Project Outcome
• A planning-level report that recommends a replacement alternative
• Late Summer / Fall 2018
• Next steps would be funding and bridge design
Data & Analysis
• Past plans, reports, & design documents
• Condition assessment
• Vehicle, ped/bike traffic
• Origin/destination
• Traffic model
• Land use
• Property ownership
• Slopes & environmental constraints
2/16/18
6
Engagement
• Stakeholder Interviews
• Develop Public Engagement Plan
• Press release
• Door-to door outreach
Engagement
• Stakeholder Workshops
• Website
• Public Meeting
• Pop-up event
• Open House
2/16/18
7
January Existing Conditions
Develop planning criteria
Develop alternatives
Evaluate alternatives
Recommendation and Reporting
Engagement Opportunities
September
Q&A
2/16/18
8
Interactive Exercise
What are evaluation criteria?
Standards & requirements used
to help make a decision
2/16/18
9
Examples of criteria
EnvironmentalProperty & land use
Economic development
Cost
Traffic
Structural requirements
Discussion
Goals:
• Understand your concerns about the project
• Help us identify evaluation criteria
2/16/18
10
Discussion Questions
1. What do you like most about the Brownville bridge in its current location? What do you like least?
2. What are your biggest concerns about this project?
3. What are the greatest opportunities?
4. What are the most important factors the planning the design team should consider when identifying and evaluating potential new locations for a river crossing?
Wrap-up
2/16/18
11
Next Steps
Feb.–Mar.
Technical Analysis Existing Conditions
Feb.–Mar.
Develop draft evaluation criteria
May
Public Meeting
Thank you!
Contact: Susan Hopkins