  • CODELCO NORTEChallenges and Opportunities

    CRU 7th World Copper Conference, Santiago, Chile

    April 2008

    Sergio Jarpa, Corporate Vice President Codelco Norte

  • CODELCO NORTE Challenges and Opportunities

    CODELCO NORTEChuqui Norte

    Expansión Norte Mina Sur

    MM

    Toki

    Genoveva

    Opache

    Quetena

    Radomiro Tomic

    Mina Sur

    Chuquicamata

    CHUQUICAMATA

    CALAMA

    Radomiro Tomic MineOpen pit mining,

    commisioning in 1995

    Chuquicamata MineOpen pit mining, industrial scale

    commisioning since 1915

    Sur Mine Open pit mining, started in 1970 as

    La Exótica,

  • CODELCO NORTE Challenges and Opportunities

    !. !.

    !.

    !.

    !.

    !.

    !.

    !.

    !.

    Ruta 24 Cobija

    Bypa ss MM

    Circunvalac ionesPe ri urba nas

    £¤5

    £¤1

    £¤24

    £¤25£¤23

    £¤21£¤50

    £¤27

    £¤180

    £¤272

    £¤28£¤26

    £¤180

    £¤23

    £¤23

    B-400

    CALAMACALAMA

    BAQUEDANOBAQUEDANO

    TOCOPILLATOCOPILLA

    MEJILLONESMEJILLONES

    MARIA ELENAMARIA ELENA

    CHUQUICAMATACHUQUICAMATA

    SIERRA GORDASIERRA GORDASAN PEDRO DE ATACAMASAN PEDRO DE ATACAMA

    ANTOFAGASTAANTOFAGASTA

  • CODELCO NORTE Challenges and Opportunities

    2000 l/s from own sources in the mountain range1. Water :

    390 MW from the SING, Electroandina Company.Contracts until 2009 and 2017. Coal and Diesel Generation

    2. Electric Power :

    Diesel and bunker: via trucks from Antofagasta3. Fuels :

    Via truck or railroad from the ports of Antofagasta, Iquique, Mejillones and other places from the country.

    4. Materials :

    Own production, occasional purchases from Mejillones.5. Acid :

    Railroad (Chuqui) and trucks (RT y SBL).6. Transportation :

    Roads: Antofagasta – Tocopilla.Railroad: to the ports of Antofagasta and Mejillones.Air: 3 airlines.

    7. Logistic routes :

  • CODELCO NORTE Challenges and Opportunities

    • Sustainable Development Policy: Environmental Management – Safety and Social Responsibility.

    • ISO 14.001 and 9001 and OHSA 18.001 Certification

    • Chuquicamata cease to be an SO2 emission saturated zone and has its own air quality monitoring system.

    • Mining Camp relocation to Calama

    • Environmental Investment: 1,000 MUS$ in last 10 years

    • EIA Puno and MM Proceedings

    • Codelco Strong Social Commitment with local community

  • CODELCO NORTE Challenges and Opportunities

    Total in Situ 17.707 Millions of Tons@ 0,52 % Cu - 92,7 Mtons of i.s. Copper

  • CODELCO NORTE Challenges and Opportunities

    -

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    110

    120

    Division

    Mto

    n

    Recursos 26 39 13 91 102 99

    Reservas 10 13 9 34 44 38

    RT Chuquicamata MMH DCN Andina Teniente

  • CODELCO NORTE Challenges and Opportunities

    ENMS

    HidrosurCathode

    Heap Leaching SX-EW

    CHUQUI

    MM Project

    ER

    Roaster

    Cathode

    Calcine

    Smelter

    Bioleaching

    Heap LeachingRT

    Anodes

    Mill

    SX-EW

    Hidronorte

    Sulphur Line

    Cu/MoConcentrateCalcine

  • CODELCO NORTE Challenges and Opportunities

    PREStripping

    MMH

    20522007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

    Bioleaching oftailing sands

    RT OreBioleaching

    Roasting procesFor MMH concentrates

    2020 2023

    MMHUnderground

    ChuquiUnderground

    Chuqui Open Pitclosed

    MMHOpen Pit

  • CODELCO NORTE Challenges and Opportunities

    KTPD

    Ave

    rage

    Gra

    de

    (%)

    RTS

    Chuqui Open Pit RTS Chuqui UG MMH Open Pit MMH UG Average Grade (%)

  • CODELCO NORTE Challenges and Opportunities

    Undevelopedplan

    0

    20

    40

    60

    80

    100

    120

    140

    160

    180

    200

    2008 2010 2012 2014 2016 2018 2020 2022 2024

    Chuqui Under. Chuqui Open P. MM Under. RT MM Open P.

    RT Plan

    60 ktpd

    2010 020

    40

    60

    80

    100

    120

    140

    160

    180

    200

    2008 2010 2012 2014 2016 2018 2020 2022 2024

    VaR95% : MUS$ 2.055

    VaR95% : MUS$ 480

    ΔVaR95%: MUS$ - 1.575Variation

    Chuqui Under. Chuqui Open P. MM Under. RT MM Open P.

    Risk Analisys to 95% Reliability

  • CODELCO NORTE Challenges and Opportunities

    4

    CHANCADOR4

    MINA R.TOMIC

    MINA CHUQUI

    7,2

    Kms7,2

    STOCKPILEFINAL

    CORREA

    PRIMARY CRUSHER STATION

    INITIAL STOCKPILE

    CONVEYORBELT

    FINALSTOCKPILE

    StockpileInicial

  • CODELCO NORTE Challenges and Opportunities

    38S

    42N

    49NW

    48N

    51W

    52W

    53W

  • CODELCO NORTE Challenges and Opportunities

  • CODELCO NORTE Challenges and Opportunities

    Cu

    tA

    cum

    (%)

    Kto

    nC

    u F

    ino

    o

  • CODELCO NORTE Challenges and Opportunities

    • Continue to mitigate geotechnical risk by monitoring and unloading.

    • Improve “control” of ongoing operations – benchmarking and operational excellence integration.

    • Investigate pre-stripping of RT and acceleration of MMH open pit as opportunities to mitigate risk.

    • Revisit high arsenic issue - a long term strategic perspective considering market-values of concentrates and environmental restrictions.

    • Reassess the mill expansion strategy - requires a rigorous quantitative approach that fully considers associated risks but also the opportunities to expand production capacity based on our significant mineral resources potential.

    • Reevaluate Toki and bioleaching of low grade sulphide resources to mitigate exhaustion of MS an RT leacheable ore.

  • CRU 7th World Copper Conference, Santiago, Chile

    April 2008