ELH ROAD & BRIDGE CONSTRUCTIONPage 1 of 7
SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING
TASK: Conductor Stringing SITE: NorthWst TransitWay Project JOB NO: SY0064
CONDUCTED AT: Sunnyholt Rd Blacktown DATE: 25/10/05
INVOLVED PERSONNEL(Please Print)
Mobile Tel TITLE/POSITIONINVOLVED PERSONNEL
(Please Print)Mobile Tel TITLE/POSITION
Alan Leitch 0401 331 735 Project Manager Matt Cochrane None Electrical Technician
Gerry Edwards 0431 143 377 Site Supervisor
Alan Walker 0429 846 581 Electrical Technician
POWERSERVE WILL HAVE A FULL TIME PROJECT MANAGER ON SITE WHILE WORK IS BEING CARRIED OUT, WITH ALL RELEVANT STAFF
ALL PERSONNEL WILL MEET EACH DAY, WITH THE PROJECT MANAGER, PRIOR TO WORK COMMENCING, FOR A POWERSERVE BRIEFING
THE DAILY BRIEFING WITH THE PROJECT MANAGER WILL INCLUDE THE FOLLOWING POINTS:-
Staff completed the main Project Induction
Staff completed the Zone Induction
Attendance at the Daily Tool Box Meeting
Vehicle Inspections completed
Staff have the correct PPE
Work to be carried out that day
Plant & Equipment required that day
Queries & Concerns
Work coming up in the next few days
-
7/29/2019 Electrical Installation & Relocating Works-C-C _1_.pdf
2/7
ELH ROAD & BRIDGE CONSTRUCTIONPage 2 of 7
SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING
No.JOB PROCEDURE
(In Sequential Steps)POSSIBLE HAZARDS or
CONSEQUENCES
RiskLevel AGREED SAFETY CONTROLS
PERSON/S RESPONSIBLEFOR COMPLIANCE
1. Travel to & arrive at site
Collisions with Other Road Users 2 Licensed Drivers,
Supervisor & OperativesDirt tracks, loose surface 3 Reduced speed
Steep Grades 2 Use Low Gear or Range
Unfamiliar Conditions/Site 2 Site Inductions Supervisor & Operatives
2.Delivery of Conductors andHardware
Trip points, Uneven Ground 3Appropriate & Protective footwear Supervisor & Operatives
Stay where possible to obvious tracks.
Snake & spider bites 2Awareness of potential habitat First aid kitand trained first aiders
Moving machinery 1 Operator and personnel to be aware of allmoving parts
Cable Drums Rolling/ Crushed fingers/limbs/ equipment
1
Use of Chocks to prevent Rolling.
Sling Register and Regular Checks
Certified Doggers and Crane Drivers.
WI-013 Pendulum Crane Borer
Wearing of appropriate PPE (Hard Hatand Gloves Minimum)
Passing traffic 1Traffic management, signs/stop/go ifrequired
3.Position Cable drums instands Cable Drums Rolling/ Crushed fingers/
2Certified Doggers and Crane Drivers.WI-013 Pendulum Crane Borer
Supervisor & Operatives
-
7/29/2019 Electrical Installation & Relocating Works-C-C _1_.pdf
3/7
ELH ROAD & BRIDGE CONSTRUCTIONPage 3 of 7
SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING
No.JOB PROCEDURE
(In Sequential Steps)POSSIBLE HAZARDS or
CONSEQUENCES
RiskLevel AGREED SAFETY CONTROLS
PERSON/S RESPONSIBLEFOR COMPLIANCE
limbs/ equipment
4.Install Running Sheaves onCross- arms
Drop sheave 2
Use safety line Supervisor & Operatives
No Go zone below
Working from EWP 1 Licensed EWP Operators
Operator Fall 1 Safety Harnesses
5. Lay out conductors
Fall from moving vehicle 2
Operator in secure position on haulvehicle
Supervisor & Operatives
Constant Communication with Driver
Low speed (walking ) of hauling vehicle
Caught in rotating drum 2 Operator well clear of drum
Drum over-run 2Control drum speed with brake
Control speed of vehicle
6. Lift conductor to sheaves
Drop Conductor or Sheave 2 No Go zone below Supervisor & Operatives
Operator Fall 1Licensed EWP Operators
Safety Harnesses
7. Tension Conductors Operator Fall 1 Safety Harnesses Supervisor & Operatives
Safety line/sling 2 Certified/Tested Slings Supervisor & Operatives
-
7/29/2019 Electrical Installation & Relocating Works-C-C _1_.pdf
4/7
ELH ROAD & BRIDGE CONSTRUCTIONPage 4 of 7
SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING
RELEVANT LEGISLATION/STANDARDS/CODES OF PRACTICE(Refer to the Requirements when completing SWMS)
SPECIALISED TRAINING REQUIRED(Detail here all the Training Required by Personnel)
Regulation 2001 Workcover Crane ticket
Workcover Dogman
Workcover Construction Induction (Green Card)
Workcover EWP Ticket
Specific Site Induction
PLANT/EQUIPMENT INVOLVED(List all Major Items)
MAINTENANCE CHECKS(Detail Systems Used for Plant/Equipment Servicing & Maintenance)
Elevated Work Platform (EWP)
Crane Borer
Line Truck
Cable Drums and Stands
Crane
QUALIFICATIONS/EXPERIENCE of RESPONSIBLE PERSONNEL(All of the Following were Consulted in the Development of this SWMS)
-
7/29/2019 Electrical Installation & Relocating Works-C-C _1_.pdf
5/7
ELH ROAD & BRIDGE CONSTRUCTIONPage 5 of 7
SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING
Name Qualifications Workcover Certificate Class & No. Workcover Green Card No.
Bob Bush Mechanical Trade N/A CGI00395681SEQ1
-
7/29/2019 Electrical Installation & Relocating Works-C-C _1_.pdf
6/7
ELH ROAD & BRIDGE CONSTRUCTIONPage 6 of 7
SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING
Work Cover NSW National OH&S Certificate ClassesC1 Mobile Crane up to 100T C2 Mobile Crane up to 20 T C6 Mobile Crane up to 60TDG Dogging RA Rigging Advanced RI Rigging Intermediate RB Rigging BasicSA Scaffolding Advanced SI Scaffolding Intermediate SB Scaffolding Basic WP Elevated Work Platforms LF Forklift Trucks
Boilermaker Trade qualified metal fabricator Lineworker -- Trade Qualified Line worker
Electrician -- Trade Qualified Electrical
THIS DOCUMENT MUST BE TOOLBOXED, AGREED UPON AND SIGNED BY ALL EMPLOYEES/CONTRACTORS INVOLVED IN THE JOB PRIOR TO THECOMMENCMENT OF ANY WORK
(A Copy of the Tool Box Meeting is to be Forwarded to the Principal Contractor for Filing)
Comments: All Personnel Tool Boxed on the Job MUST Sign Below. Supervisor Must Sign and Date this Area on Completion of the Tool Box Meeting.
Supervisor:(Please Print)
Signed: Date:
ALL RISK ASSESSMENT FORMS ARE TO BE RETURNED TO THE RELEVANT SUPERVISOR FOR FILING!
All Personnel Listed & Signed Below have been Tool Boxed to the Tasks Described and Fully Understand And Agree to Comply with the Controls
Name (Please Print) Signature Name (Please Print) Signature Name (Please Print) Signature
-
7/29/2019 Electrical Installation & Relocating Works-C-C _1_.pdf
7/7
ELH ROAD & BRIDGE CONSTRUCTIONPage 7 of 7
SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING
IF IN DOUBT ASK YOUR SUPERVISOR!