    ELH ROAD & BRIDGE CONSTRUCTIONPage 1 of 7

    SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING

    TASK: Conductor Stringing SITE: NorthWst TransitWay Project JOB NO: SY0064

    CONDUCTED AT: Sunnyholt Rd Blacktown DATE: 25/10/05

    INVOLVED PERSONNEL(Please Print)

    Mobile Tel TITLE/POSITIONINVOLVED PERSONNEL

    (Please Print)Mobile Tel TITLE/POSITION

    Alan Leitch 0401 331 735 Project Manager Matt Cochrane None Electrical Technician

    Gerry Edwards 0431 143 377 Site Supervisor

    Alan Walker 0429 846 581 Electrical Technician

    POWERSERVE WILL HAVE A FULL TIME PROJECT MANAGER ON SITE WHILE WORK IS BEING CARRIED OUT, WITH ALL RELEVANT STAFF

    ALL PERSONNEL WILL MEET EACH DAY, WITH THE PROJECT MANAGER, PRIOR TO WORK COMMENCING, FOR A POWERSERVE BRIEFING

    THE DAILY BRIEFING WITH THE PROJECT MANAGER WILL INCLUDE THE FOLLOWING POINTS:-

    Staff completed the main Project Induction

    Staff completed the Zone Induction

    Attendance at the Daily Tool Box Meeting

    Vehicle Inspections completed

    Staff have the correct PPE

    Work to be carried out that day

    Plant & Equipment required that day

    Queries & Concerns

    Work coming up in the next few days

  • 7/29/2019 Electrical Installation & Relocating Works-C-C _1_.pdf

    2/7

    ELH ROAD & BRIDGE CONSTRUCTIONPage 2 of 7

    SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING

    No.JOB PROCEDURE

    (In Sequential Steps)POSSIBLE HAZARDS or

    CONSEQUENCES

    RiskLevel AGREED SAFETY CONTROLS

    PERSON/S RESPONSIBLEFOR COMPLIANCE

    1. Travel to & arrive at site

    Collisions with Other Road Users 2 Licensed Drivers,

    Supervisor & OperativesDirt tracks, loose surface 3 Reduced speed

    Steep Grades 2 Use Low Gear or Range

    Unfamiliar Conditions/Site 2 Site Inductions Supervisor & Operatives

    2.Delivery of Conductors andHardware

    Trip points, Uneven Ground 3Appropriate & Protective footwear Supervisor & Operatives

    Stay where possible to obvious tracks.

    Snake & spider bites 2Awareness of potential habitat First aid kitand trained first aiders

    Moving machinery 1 Operator and personnel to be aware of allmoving parts

    Cable Drums Rolling/ Crushed fingers/limbs/ equipment

    1

    Use of Chocks to prevent Rolling.

    Sling Register and Regular Checks

    Certified Doggers and Crane Drivers.

    WI-013 Pendulum Crane Borer

    Wearing of appropriate PPE (Hard Hatand Gloves Minimum)

    Passing traffic 1Traffic management, signs/stop/go ifrequired

    3.Position Cable drums instands Cable Drums Rolling/ Crushed fingers/

    2Certified Doggers and Crane Drivers.WI-013 Pendulum Crane Borer

    Supervisor & Operatives

  • 7/29/2019 Electrical Installation & Relocating Works-C-C _1_.pdf

    3/7

    ELH ROAD & BRIDGE CONSTRUCTIONPage 3 of 7

    SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING

    No.JOB PROCEDURE

    (In Sequential Steps)POSSIBLE HAZARDS or

    CONSEQUENCES

    RiskLevel AGREED SAFETY CONTROLS

    PERSON/S RESPONSIBLEFOR COMPLIANCE

    limbs/ equipment

    4.Install Running Sheaves onCross- arms

    Drop sheave 2

    Use safety line Supervisor & Operatives

    No Go zone below

    Working from EWP 1 Licensed EWP Operators

    Operator Fall 1 Safety Harnesses

    5. Lay out conductors

    Fall from moving vehicle 2

    Operator in secure position on haulvehicle

    Supervisor & Operatives

    Constant Communication with Driver

    Low speed (walking ) of hauling vehicle

    Caught in rotating drum 2 Operator well clear of drum

    Drum over-run 2Control drum speed with brake

    Control speed of vehicle

    6. Lift conductor to sheaves

    Drop Conductor or Sheave 2 No Go zone below Supervisor & Operatives

    Operator Fall 1Licensed EWP Operators

    Safety Harnesses

    7. Tension Conductors Operator Fall 1 Safety Harnesses Supervisor & Operatives

    Safety line/sling 2 Certified/Tested Slings Supervisor & Operatives

  • 7/29/2019 Electrical Installation & Relocating Works-C-C _1_.pdf

    4/7

    ELH ROAD & BRIDGE CONSTRUCTIONPage 4 of 7

    SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING

    RELEVANT LEGISLATION/STANDARDS/CODES OF PRACTICE(Refer to the Requirements when completing SWMS)

    SPECIALISED TRAINING REQUIRED(Detail here all the Training Required by Personnel)

    Regulation 2001 Workcover Crane ticket

    Workcover Dogman

    Workcover Construction Induction (Green Card)

    Workcover EWP Ticket

    Specific Site Induction

    PLANT/EQUIPMENT INVOLVED(List all Major Items)

    MAINTENANCE CHECKS(Detail Systems Used for Plant/Equipment Servicing & Maintenance)

    Elevated Work Platform (EWP)

    Crane Borer

    Line Truck

    Cable Drums and Stands

    Crane

    QUALIFICATIONS/EXPERIENCE of RESPONSIBLE PERSONNEL(All of the Following were Consulted in the Development of this SWMS)

  • 7/29/2019 Electrical Installation & Relocating Works-C-C _1_.pdf

    5/7

    ELH ROAD & BRIDGE CONSTRUCTIONPage 5 of 7

    SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING

    Name Qualifications Workcover Certificate Class & No. Workcover Green Card No.

    Bob Bush Mechanical Trade N/A CGI00395681SEQ1

  • 7/29/2019 Electrical Installation & Relocating Works-C-C _1_.pdf

    6/7

    ELH ROAD & BRIDGE CONSTRUCTIONPage 6 of 7

    SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING

    Work Cover NSW National OH&S Certificate ClassesC1 Mobile Crane up to 100T C2 Mobile Crane up to 20 T C6 Mobile Crane up to 60TDG Dogging RA Rigging Advanced RI Rigging Intermediate RB Rigging BasicSA Scaffolding Advanced SI Scaffolding Intermediate SB Scaffolding Basic WP Elevated Work Platforms LF Forklift Trucks

    Boilermaker Trade qualified metal fabricator Lineworker -- Trade Qualified Line worker

    Electrician -- Trade Qualified Electrical

    THIS DOCUMENT MUST BE TOOLBOXED, AGREED UPON AND SIGNED BY ALL EMPLOYEES/CONTRACTORS INVOLVED IN THE JOB PRIOR TO THECOMMENCMENT OF ANY WORK

    (A Copy of the Tool Box Meeting is to be Forwarded to the Principal Contractor for Filing)

    Comments: All Personnel Tool Boxed on the Job MUST Sign Below. Supervisor Must Sign and Date this Area on Completion of the Tool Box Meeting.

    Supervisor:(Please Print)

    Signed: Date:

    ALL RISK ASSESSMENT FORMS ARE TO BE RETURNED TO THE RELEVANT SUPERVISOR FOR FILING!

    All Personnel Listed & Signed Below have been Tool Boxed to the Tasks Described and Fully Understand And Agree to Comply with the Controls

    Name (Please Print) Signature Name (Please Print) Signature Name (Please Print) Signature

  • 7/29/2019 Electrical Installation & Relocating Works-C-C _1_.pdf

    7/7

    ELH ROAD & BRIDGE CONSTRUCTIONPage 7 of 7

    SAFE WORK METHOD STATEMENTCONDUCTOR STRINGING

    IF IN DOUBT ASK YOUR SUPERVISOR!