GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106 / 2344116 FAX NO.: (0288) 2344033 GRAM : SELGRID Web Site : www.gseb.com E-mail : [email protected] : REGISTERED OFFICE : “ VIDYUT BHAVAN ”, RACE COURSE, VADODARA – 390 007. PHONE NO.: (0265) 2355193-95 FAX NO.: (0265) 2338847 Web Site : www.gsecl.com E-mail : [email protected]. TENDER NOTICE NO. 20 / 01 / 2014 (CIVIL / 28092) WEB-TENDER FOR THE WORK OF MISCELLANEOUS CIVIL WORK AT VARIOUS LOCATION AS AND WHEN REQUIRED IN PLANT @ STPS

Upload: nguyenquynh

Post on 17-May-2018

226 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION,

SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106 / 2344116

FAX NO.: (0288) 2344033 GRAM : SELGRID

Web Site : www.gseb.com E-mail : [email protected]

: REGISTERED OFFICE : “ VIDYUT BHAVAN ”, RACE COURSE,

VADODARA – 390 007. PHONE NO.: (0265) 2355193-95

FAX NO.: (0265) 2338847 Web Site : www.gsecl.com

E-mail : [email protected].

TENDER NOTICE NO. 20 / 01 / 2014 (CIVIL / 28092)

WEB-TENDER FOR THE WORK OF

MISCELLANEOUS CIVIL WORK AT VARIOUS LOCATION AS AND WHEN REQUIRED

IN PLANT @ STPS

Page 2: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION,

SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106 / 2344116

FAX NO.: (0288) 2344033 GRAM : SELGRID

Web Site : www.gseb.com E-mail : [email protected]

: REGISTERED OFFICE : “ VIDYUT BHAVAN ”, RACE COURSE,

VADODARA – 390 007. PHONE NO.: (0265) 2355193-95

FAX NO.: (0265) 2338847 Web Site : www.gsecl.com

E-mail : [email protected].

NAME OF WORK: - MISCELLANEOUS CIVIL WORK AT VARIOUS LOCATION AS AND WHEN REQUIRED IN PLANT @ STPS

I N D E X

TENDER NOTICE ANNEXURE- I INTEGRITY PACT DETAILS OF BIDDER SPECIAL NOTE FOR PRE-QUALIFICATION FORMS AND AGREEMENT GENERAL INSTRUCTION TO BIDDER SPECIAL CONDITION OF THE WORK GENERAL CONDITIONS OF CONTRACT CIRCULAR-I SPECIAL CONDITION FOR USE OF CEMENT IN

WORK SCHEDULE-B ITEMWISE DETAILED SPECIFICATION

Page 3: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION,

SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106 / 2344116

FAX NO.: (0288) 2344033 GRAM : SELGRID

Web Site : www.gseb.com E-mail : [email protected]

: REGISTERED OFFICE : “ VIDYUT BHAVAN ”, RACE COURSE,

VADODARA – 390 007. PHONE NO.: (0265) 2355193-95

FAX NO.: (0265) 2338847 Web Site : www.gsecl.com

E-mail : [email protected].

TENDER NOTICE NO. :- CE (Gen.) – Sikka TPS invites “Web Tenders” for the work of “MISCELLANEOUS CIVIL WORK AT

VARIOUS LOCATION AS AND WHEN REQUIRED IN PLANT @ STPS - Tender Papers & Specifications may be down loaded from Web site http://gsecl.nprocure.com (For view, down load and hardcopy submission) and GUVNL / GSECL web sites www.gseb.com & www.gsecl.in (For view & down load only). Tender fee and EMD shall be paid along with submission of tender in separate cover, for respective tender. “All the relevant document of tenders to be submitted physically will be received only by Registered Post A.D or Speed Post addressed to CHIEF ENGINEER (GEN.) GUJARAT STATE ELECTRICITY CORPORATION LTD, THERMAL POWER STATION SIKKA. DIST:-JAMNAGER –

361141. “NO COURIER SERVICES OR HAND DELIVERY” will be accepted.

Further bidder should be registered in class “E-2” or above with Govt/ semi Govt as per tender conditions. Otherwise their bids will not be considered eligible for technical scrutiny and as such, their technical bids will not be opened & price bid will not be considered.

1 ESTIMATED COST RS. Rs:- 499102=00

2 EARNEST MONEY DEPOSIT Rs:- 4990=00

3 TIME LIMIT 04 (FOUR) CALANDER MONTH

4 TENDER FEE Rs.:- 500=00

5 VALIDITY OF TENDER 06 MONTHS [FROM THE OPENING OF TECHNICAL BID].

6 CLASS OF REGISTRATION „ E-2 ‟ CLASS AND ABOVE

7 LAST DATE OF ISSUE OF TENDER As per Tender Notice No. 20

8 LAST DATE OF RECEIPT OF TENDER (BY RPAD

ONLY) As per Tender Notice No. 20

9 DATE OF OPENING OF TECHNICAL BID (IF

POSSIBLE)

As per Tender Notice No. 20

Tender fee of Rs. ______ paid vide Receipt No. /D.D. No. ________ Dated ______ E.M.D. of Rs. _________ paid vide Receipt No. /D.D. No. ________ Dated ______

Note: Tender Fee/Earnest Money Deposit will be accepted by Demand Draft in favor Gujarat State Electricity Corporation Ltd. Payable at State Bank of India only (Branch Cod No. 60417). Cheque or Bank Guarantee will not accept. Right to reject any or all Tenders without assigning any reason there of is reserved by competent authority.

For Gujarat State Electricity Corporation Ltd.

Chief Engineer (Gen.) Dated Signature of Contractor Thermal Power Station, Sikka

Page 4: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION,

SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106 / 2344116

FAX NO.: (0288) 2344033 GRAM : SELGRID

Web Site : www.gseb.com E-mail : [email protected]

: REGISTERED OFFICE : “ VIDYUT BHAVAN ”, RACE COURSE,

VADODARA – 390 007. PHONE NO.: (0265) 2355193-95

FAX NO.: (0265) 2338847 Web Site : www.gsecl.com

E-mail : [email protected].

ANNEXURE-I TENDER FOR THE WORK ________________________________________ On Firm‟s Letter Head.

CERTIFICATE-“A”

I / We _____________________________________________________ M/s. ___________________ hereby

Certify that M/s. ___________________ is not related with other firms who have submitted tenders

for the same items under this inquiry / Tender.

Seal of the Firm Place Date

SIGNATURE OF THE BIDDER WITH DESIGNATION

Page 5: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION,

SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106 / 2344116

FAX NO.: (0288) 2344033 GRAM : SELGRID

Web Site : www.gseb.com E-mail : [email protected]

: REGISTERED OFFICE : “ VIDYUT BHAVAN ”, RACE COURSE,

VADODARA – 390 007. PHONE NO.: (0265) 2355193-95

FAX NO.: (0265) 2338847 Web Site : www.gsecl.com

E-mail : [email protected].

I N T E G R I T Y P A C T OUR ENDEAVOUR

To create an environment where business confidence is built through best business practices and is fostered in an atmosphere of trust and respect between providers of goods and services and their users for the ultimate benefit of society and the nation.

GSECL‟S COMMITMENT PARTY‟S COMMITMENT

To maintain the highest ethical standards in business and professions.

Not to bring pressure recommendations from outside GSECL to influence its decision.

Ensure maximum transparency to the satisfaction of stakeholders.

Not to use intimation, threat, inducement or pressure of any kind on GSECL or any of its employees under any circumstances.

To ensure to fulfill the terms of agreement / contract and to consider objectively the view point of parties.

To be prompt and reasonable in fulfilling the contract, agreement, legal obligations.

To ensure regular and timely release of payments on due dates for work done.

To provide goods and / or services timely as per agreed quality and specifications at minimum cost to GSECL.

To ensure that no improper demand is made by employees or by anyone on our behalf.

To abide by the general discipline to be maintained in our dealings.

To give maximum possible assistance to all the Vendors / Suppliers / Service Provider and others to enable them to complete the contract in time.

To be true and honest in furnishing information.

To provide all information to suppliers / contractors relating to contract / job which facilitates him to complete the contract / job successfully in time.

Not to divulge any information, business details available during the course of business relationship to others without the written consent of GSECL.

To ensure minimum hurdles to vendors / suppliers / contractors in completion of agreement / contract / work order.

Not to enter into cartel / syndicate / understanding whether formal / non-formal so as to influence the price.

Seal & Signature (GSECL‟s Authorized Signature)

Seal & Signature Party‟s Authorized Person)

Page 6: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION,

SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106 / 2344116

FAX NO.: (0288) 2344033 GRAM : SELGRID

Web Site : www.gseb.com E-mail : [email protected]

: REGISTERED OFFICE : “ VIDYUT BHAVAN ”, RACE COURSE,

VADODARA – 390 007. PHONE NO.: (0265) 2355193-95

FAX NO.: (0265) 2338847 Web Site : www.gsecl.com

E-mail : [email protected].

DETAILS OF BIDDER

1 Name of Firm & Contact Person:-

2

Full Postal Address

Phone/Fax No.

Mobile No.

E-mail Address:

3 GST/CST/ECC No.

4 Status of the firm with supporting documents Proprietary /Partnership /Pvt. /Public Limited.

5 Name of Agencies/Directors if not prop. Name of owner, if propriety, with phone/Fax Nos.

6 Registration certificate No.: with GSECL.

7 SSI No. ( Enclose copy)

8 Labour License No.

9 P.F. A/C. Code No.

10 Service Tax No.

11 PAN No.

12 Last bank solvency certificate at least 20 % of estimated cost ( Not more then one year old)

13 Tender fee Amount DD No. and Date.

14 EMD Amount DD No. and Date.

IMPORTANT NOTE

01. The tender should be submitted duly signed without removing a single page. Otherwise the tender is liable to be rejected.

02. For SUPPLY TENDER, TIN number should be invariable mentioned in their technical bid otherwise your offer will be ignored and price bid will be not opened.

For Gujarat state Electricity Corporation Ltd.

Chief Engineer Thermal Power Station Sikka

Dated Signature of Vendor/Contractor

Page 7: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION,

SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106 / 2344116

FAX NO.: (0288) 2344033 GRAM : SELGRID

Web Site : www.gseb.com E-mail : [email protected]

: REGISTERED OFFICE : “ VIDYUT BHAVAN ”, RACE COURSE,

VADODARA – 390 007. PHONE NO.: (0265) 2355193-95

FAX NO.: (0265) 2338847 Web Site : www.gsecl.com

E-mail : [email protected].

SPECIAL NOTE FOR PRE-QUALIFICATION

NAME OF WORK: - MISCELLANEOUS CIVIL WORK AT VARIOUS LOCATION AS AND WHEN REQUIRED IN PLANT @ STPS

The tender documents are of two separate bids i.e. technical and price bids. You are requested to submit the technical bid with the following credentials for pre-qualification, both online as well as physical as per schedule.

1. Contractor should produce evidence of having experience of executed similar nature of jobs in last seven years. Such as civil construction works etc. (one work) executed successfully of 40 % amount of work estimated value in a single contract in the last seven years or 30% cost of tender executed -Two orders in last five years. in Govt., /Semi Govt., along with certified copies of documentary evidence, preferably photo copy of orders secured from GSECL /GETCO / DISCOMS / GEB / Central / State Government/Semi- Government,/ Railway department and satisfactory completion certificate from respective department thereof.

The experience certificate from Private Individuals / Company for whom the work is executed/ being executed, shall not be acceptable.

2. Latest bank solvency certificate from any Nationalized bank , Public Sector Banks, or IDBI Bank / AXIS Bank / HDFC Bank / ICICI Bank / The Kalupur Commercial Co-Operative Bank Limited for a sum of Minimum 20% of estimated cost, of this wok, not more than 12 months old.

3. Separate provident fund code number towards registration of your firm with Regional P.F. Commissioner.

4. Contractor should submit evidence as a register contractor in appropriate class With Govt./ Semi. Govt.i.e. Class “E-2” and above or any such registration allowed to work for amount more than Rs. 15 Lacs or enlisted with or an un-enlisted contractor working with, erstwhile GEB / GSECL/ GETCO / DISCOM / Central / State Government / Semi Government.

5. EMD & Tender fee as described in the tender document.

6. Service tax Registration is mandatory and registration documents proof is compulsory. Attested copies of all above documents are to be submitted.

The above documents will be analyzed and after satisfaction, the price bid will be opened. GSECL may verify the documents, experience certificates from authority who have issued such certificates / details.

Sing. Of Contractor CHIEF ENGINEER (Gen)

G.S.E.C.L., SIKKA TPS.

Page 8: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION,

SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106 / 2344116

FAX NO.: (0288) 2344033 GRAM : SELGRID

Web Site : www.gseb.com E-mail : [email protected]

: REGISTERED OFFICE : “ VIDYUT BHAVAN ”, RACE COURSE,

VADODARA – 390 007. PHONE NO.: (0265) 2355193-95

FAX NO.: (0265) 2338847 Web Site : www.gsecl.com

E-mail : [email protected].

FORMS AND AGREEMENT

Form - A: Details of Structure & Organization.

Form - B: Details of Personnel.

Form - C : Details of Machineries & Equipments

Form - D1: Details of Experience of completed works.

Form- D2: Details of Experience of Ongoing work.

Form - E : Details of Financial Capability

Form - F : Additional information

Form - H : Details pertaining to the GSECL works for which bidder has been

qualified during last two years (i.e. during period 1.04.11 to 31.03.13)

Form- I : Additional Information & Litigation History

Signature of the Contractor

Page 9: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

FORM-A

DETAILS OF STRUCTRURES & ORGANIZATION

1 Name of Bidder

2 Nationality of Bidder

3 Office address Telegraphic Number Telephone Number Telex / Fax Number

4 Year of Establishment

5 Location of Establishment

6 Application is submitted as

A an individual

B A proprietary firm

C a firm in partnership

D a limited company or corporation

E A group of companies

7 Attach the Organization chart Showing the structures of the Organization including the names of the Directors & position of Officers

8 Number of years of Experience

a) as a prime contractor (shouldering major responsibility)

i) in own country

ii) other countries (specify country)

9 For how many years has your organization been in business of similar work under its present Name? What were your fields when your organization was established? Whether any new fields were added in your organization? And if so, when?

10

Whether you were required to suspend construction for period more than six months continuously after the work is started? if so, give the name of project and reasons therefore.

11 Have you ever left the work awarded to you incomplete? If so, give name of projects and reasons for not completing work.

12 In how many your projects were penalties imposed for delay? (Please give details)

13 In which fields of civil engineering construction do you claim specialization and interest?

14 Give details of experience in Dismantling & construction works with modern Technology & quality control.

15 Give details of experience for various related works of similar magnitude

Page 10: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

16 Give details of experience in using latest demolishing & construction equipments and related to quality control.

17 Give details of soil and material testing laboratory, if any?

18 In how many of your works cases Litigation has arisen.

Signature of the Contractor

Page 11: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

FORM – B

DETAILS OF PERSONNEL

Give details of key Technical & Administrative Personnel who could be assigned the work. (A) Details of the Directors: 1. Name of Director : 2. Address : 3. Organization : (B) Key Technical & Administrative Personnel & Consultants 1. Name 2. Professional Qualification 3. Present position in the firm 4. Professional expérience and détails of work carried out. 5) No. of years worked with the Applicant. 6) Languages known 7) Additional information (C) Skilled and other labour (indicate number category wise)

1) Skilled labour 2) Other labour

Signature of the Contractor

Page 12: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

FORM – C

DETAILS OF MACHINERY & EQUIPMENT

Give details of Machinery & Equipments owned and proposed to be used for the work of – 1. Name of Equipment i) Excavation Equipment a) Excavators b) Tippers c) Dozers/Tractors with blade d) Compressors and Breakers equipments for rock excavation e) Equipment required for drilling & blasting. ii) Concreting Equipment

a) Mobile concrete mixers b) Vibrators c) Water tankers iii) Dismantling /Rock cutting & Other machineries

a) Pump sets for dewatering b) Generators c) Cranes d) Concrete Breakers with compressor machine e) JCB/ Hitachi with Hydraulic Hard rock Breakers f) If any other latest machineries 2. No. of units of each category

(Give details whether new and/or old

owned and / or leased)

3. Year & make of equipment for

each category & date of purchase/

lease (with period of lease & date

of completion of the lease)

4. Capacity of each category of equipment.

5. Normal life specified by the

Manufacturer for each equipment

in working hours (age & condition

of the equipment)

6. No. of actual working hours put

in by the machine/equipment.

7. Present location of each equipment.

8. Present condition of each equipment.

9. Depreciated cost of each equipment

10. Remarks.

Signature of the Contractor

Page 13: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

FORM –D1

DETAILS OF EXPERIENCE OF COMPLETED WORKS Give details of the similar type of work completed during last 7 years in the following Proforma (separately for each work)

1. Name of work.

2. Agreement No. & Date

3. Country and location

4. Client‟s name and address

5. Total tendered cost of work

6. Brief description of work Including principal features and quantities of main items of the work such as civil construction work.

7. Annual achievement (duly supported by certificate from Engineer-in-charge)

a) Of key quantities, total Physical out put of last five Years.(Separately for each item) b) Financial out put in Rs. (Including cost of materials supplied by department) 8. Period of completion

a) Originally stipulated time limit Date of start. b) Extended time limit if any c) Actual time taken to complete the work. d) Reasons for non completion of work in stipulated time limit/ Extended time limit if so. 9. Name of applicant‟s Engineer-In-Charge of the work and his educational Qualification.

10. Where there any penalties/fines/ stop notice/compensation/liquidated Damage imposed? (Yes or NO) (If yes, give amount and explanation) 11. Details of litigation/arbitration Cases, if any pertaining to works completed. NOTE: Attached clients certificate for the details furnished in this Form.(Not below rank of Exe. Engineer or equivalent). Signature of the Contractor

Page 14: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

FORM – D 2

DETAILS OF EXPERIENCE OF ON-GOING SIMILAR WORK Give details of ongoing work and performance during last 7 years in the following Performa (separately in form for Rail Track line work) 1. Name of work

2. Agreement No. & Date 3. Location 4. Client‟s name and Address 5. Tendered cost of work

6. Name of applicant‟s E.I.C. With his educational qualification 7. Brief description of work including principal features and quantities of main items of the

work such as civil construction work. 8. Details of works on hand

i. Percentage of Physical completion ii. Amount billed for the work completed

a) up to b) up to iii. Date of start

(iv)Cost of work remaining to be executed

(v) Stipulated date of completion

(vi. Anticipated date of completion 9. Explain for non completion of work within stipulated time limit, if so. 10. Where there any penalties/fine/Claims/stop notice/compensation liquidated damages imposed?

(Yes/No) (If yes, give amount and explanation) 11. Details of litigation/arbitration Cases, if any. 12. Attach client‟s certificate for the Details furnished in this form (Not Below the rant of Exe. Engineer or Equivalent) Signature of the Contractor

Page 15: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

FORM – E

DETAILS OF FINANCIAL CAPABILITY 1. Name of firm

2. Name of Partner/Director

3. Capital

a) Authorized b) Issued and paid –up

4. Furnish Balance sheet and profit and loss statement with Auditor‟s report and Income Tax assessment orders for last seven years. It should Interalia include the following information.

i.) Working capital

ii) Foreign Investment

iii) Turnover for the last seven year

(Furnish reference page number to Balance sheet attached)

Sr. No

Year Turnover Rs in Lac Reference pg. No. of balance sheet

1 2006 - 2007

2 2007 - 2008

3 2008- 2009

4 2009- 2010

5 2010- 2011

6 2011- 2012

7 2012- 2013

iv) Gross income during last seven years.

Sr.No

Year Gross Income Rs. in lac

Reference pg. No. of balance sheet

1 2006 - 2007

2 2007 - 2008

3 2008- 2009

4 2009- 2010

5 2010- 2011

6 2011- 2012

7 2012- 2013

v) Total liabilities a) Ratio or acid- test (Ratio of Assets divided by current liabilities)

b) Total liabilities to net worth

Page 16: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

vi.) Maximum gross income from

Contract works during the seven years.

vii) Details of cash flow for three months

at the peak construction period.

5. What is the maximum annual turn

over of the project that you can handle ?

(please give details)

6. Have you ever been denied tendering

facilities by any Govt., Department/

Public sector under taking ?

(If yes, please give details)

7. List your source of finance.

8. Amount of financial soundness

Certified by Nationalize Bank (Attach copy

of certificate)

9. Name and address of Bank from whom

Reference can be obtained.

10. Have you ever been declared bankrupt?

(if yes, please give details ).

Sign of Contractor

Page 17: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

FORM – F

ADDITIONAL INFORMATION (A) Please add any further information, which the applicant considers relevant in regard to his capabilities. (B) Please give a brief note indicating why applicant considers himself eligible for pre qualification for the work. (C)List of works for which bidder have already been submitted to the client but not awarded.

Sr.No Name of work Estimated amount Rs. in Crore

Date of submission of offer

Name of client

Likely date of award

Position with reference to lowest bid.

Sign of Contractor

Page 18: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

FORM – G

ADDITIONAL INFORMATION & LITIGATION HISTORY

NAME OF APPLICANT OR PARTNER OF A JOINT VENTURE

1. Please describe: Company‟s history of litigation or arbitration from contracts executed in the last ten years or currently under execution. Please indicate for each case the year, name of employer, cause of litigation, matter in dispute, disputed amount, and whether the award was for or against company. Please add any further information that you consider to be relevant to the evaluation of your application for qualification. If you wish to attach.

Sign of Contractor Chief Engineer (gen)

GSECL,SIKKA TPS.

Page 19: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

TENDER AND CONTRACT FOR WORKS I/We hereby tender for the Gujarat State Electricity Corporation Ltd (herein referred as “GSECL”) of the work specified in the underwritten memorandum within the time specified Schedule B (Memorandum showing items of work to be carried out) and in accordance, in all respect, with the specifications, design, drawings and instructions in writing and as per annexed conditions of contract and agree that when the materials for works are provided by the GSECL such materials and rates to be paid for them shall be as provided in Schedule A hereto. MEMORANDUM a) General Description of Work : b) Estimated Cost : c) Earnest Money : d) Security Deposit : (1) The entire S.D amount (5% of contract value) is to be paid after placement of L.O.I & before placement of work order. (2) Alternatively if desired by contractor, entire S.D can be paid in form of bank guarantee of

the following banks.

1. All Nationalized Banks including the Public Sector Bank - IDBI.

2. Private Sector Banks authorized by RBI to undertake State Government Business, which are at present,

(a) Axis bank (b) HDFC bank (c) ICICI bank.

Guarantee issued by following Banks will be accepted as SD/EMD for period up to March 31, 2014. (i) Commercial Banks

1. Kotak Mahindra Bank 2. Yes Bank 3. Induslnd Bank 4. Ratnakar Bank

(ii) Regional Rural Banks of Gujarat – 1. Dena Gujarat Gramin Bank (iii) Co-operative Banks of Gujarat

1. The Kalupur Commercial Co-operative Bank Ltd. 2. Rajkot Nagarik Sahakari Bank Ltd. 3. The Ahmedabad Mercantile Co-operative Bank Ltd. 4. The Mehsana Urban Co-operative Bank Ltd. 5. Nutan Nagrik Sahakari Bank Ltd.

(e) Time allowed for the completion of work from date of issuing of commencement letter by E.I.C.

Should this tender be accepted I/We hereby agree to abide by and fulfill all the terms and provisions of the conditions of contract annexed hereto as applicable and in default thereof forfeit and pay to the GSECL the sums of money mentioned in the said conditions. Receipt No.___________ Date _____________ from the Gujarat State Electricity Corporation Ltd in respect of the sum of Rs.__________________________ (Rupees ________________________________________________________________ (the amount to be specified in figures and words) is herewith forwarded representing the earnest money (the full value of which is to be absolutely forfeited to the GSECL should I/We not deposit the full amount of security deposit specified in above memorandum in accordance with clause-(d). Security Deposit of the said conditions / otherwise the said sum of Rs______________ shall be refunded on surrendering the original receipt, in case of non-awardance of contact. Signature of the contractor Address of the contractor Dated _________________ day of ________________year Signature of Witness Address of Witness Occupation Dated ______________ day of ___________ year. The above tender is hereby accepted by me on behalf of the Gujarat State Electricity Corporation Ltd. Chief Engineer (Civil) or his duly authorized assistant.

Page 20: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

GENERAL INSTRUCTION TO BIDDERS 1. The tender‟s documents are of two bid system

i) The technical bid which is to be submitted in sealed envelope mentioning „TECHNICAL BID‟ on envelope, invariably be accompanied with an E.M.D. draft amount specified in details in Tender Notice. The bid should be clearly subscribed with our reference Tender Notice number, due date and title of work. The offer should be valid for acceptance for minimum period of 6 months from

the date of opening of Technical bid and reached to Chief Engineer [Gen] TPS Sikka at Specified date and time mentioned in the tender notice. ii) The items of work involved under the contract are described separately in schedule attached as price bid for which the rates should be quoted as the percentage rate below or above or same rate for the work, to be filled in e-tender format.

2. The technical bid received after time and date specified in the tender notice will not be accepted. Once the offer submitted by the bidder before due date of submission, the bidder will not be allowed to submitted revised / additional / modified / other even before due date.

3. The bidder should complete the tender / technical bid document and sign on every page of tender document as a token of acceptance of all the condition mentioned there in and submit the same on due date.

4. The bidder should produce evidence of having experience of similar jobs carried out with government, semi-government, other state electricity boards and attested true copies of orders secured from other clients and satisfactorily completion certificate / performance certificate from respective clients as under in supports of his past experience as a contractor and fill the schedule I to V enclosed else where along with this tender limited to under mentioned period & percentage. [1] 40% cost of tender executed -Single order in last seven years. [2] 30% cost of tender executed -Two orders in last five years. Experience of private companies shall not be considered. Special work of more than Rs.2.00 crores like building works, road works & railways siding etc experience of corporate should be considered as a special case.

5. Intending bidder may submit their tenders / technical bid after studying and requirement of all tender document carefully and after visiting the site for satisfying himself of the local conditions and location of site. Submission of tender implies that the bidder has obtained all the information required and contractor is fully acquainted with the work.

6. Tender do not fulfill all or any of the above conditions or incomplete in any respect are liable for rejection.

7. The bidder will not be permitted to assign or give a sub contract of the work awarded to him for any reason what so ever with out the prior permission of GSECL in writing.

8. Copy of Group Insurance Policy if applicable is required, along with all other relevant attested documents mentioned elsewhere in this tender.

9. On receipt of LOI/Work Order the bidder should process for obtaining Labour Licenses from Assistant Commissioner of labour, Jamnagar, before starting execution of work at site, if the numbers of contract labour being engaged exceeds nine or more. Bidder should submit the labour licenses of past executed works.

10. The technical bid shall be opened at 3.30 PM if possible on date specified in Tender Notice. After scrutinize of the technical bid if party fails the requirements for pre-qualification mentioned in the technical bid and here, the commercials bid of such parties will not be opened. The commercials bid of qualified parties shall be opened afterwards in the presence of parties.

11. Security Deposit (5% of contract value) shall be payable by the contractor. The lowest bidder shall have to pay the security deposit (SD) before placement of work order & same shall be refunded after satisfactory completion of work & finalization of final bill or SIX months whichever is later. 12. If the successful bidder not paying SD within 10 days from issue of LOI, then RPAD notice will be issued to pay Security Deposit within next 07 days, failing which EMD will be forfeited.

13. In case the successful bidder not at all responding within notice period or withdraws his offer

then his EMD shall be forfeited and he will not be allowed to participate in the Tenders invited by this office for the period of ONE year for the Tender invited. In that particular case next

successful bidder (L-2) may be consider to carry out the work at L-1 bidder rates or go for re-

tenderize.

Signature of Chief Engineer (Gen.), Contractor with seal GSECL, TPS, Sikka

Page 21: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

SPECIAL CONDITIONS OF THE WORK

NAME OF WORK: MISCELLANEOUS CIVIL WORK AT VARIOUS LOCATION AS AND WHEN REQUIRED IN PLANT @ STPS.

01. The work is to be executed at any height for any leads and lifts with all tools, tackles, equipment‟s, for purpose of work shall have to be brought by the contractor at his own cost.

02. The workers, supervisory staff and manager or contractors authorized representative of contractor himself shall be available full time on site of work.

03. The daily report of work done on each day and same checked and signed by GSECL supervisor JE / DE shall be submitted by contractor

04. Contractor shall be responsible for any accident or damage to road, gutter, manholes, dustbins, water closets, pipe line, etc. or any inconveniency caused by contractor for which the necessary compensation shall be paid by the contract or recovered from the bill as deem fit by the GSECL.

05. The contractor or his authorized representative and his supervisor shall remain present during working hours.

06. Any description is left out in specification the work shall be executed as per the instruction of EIC.

07. If the work is not completed in time satisfactorily, the recovery for the same shall be made as estimated rate plus 15% supervision charges.

08. If work is not carried out by contractor, same will be get done at risk and cost of contractor with 15% supervision charges will be recovered from the next R.A. Bill.

09. If any dispute arise the booklet of “TENDER AND CONTRACT FOR WORKS‟ may be referred and it will be treated as part of the contract.

10. Contractor should keep the instruction book readily available at site.

11. Contractor shall be held fully responsible for any accident or damage to GSECL assets or persons or inconvenience is caused for the work, the necessary compensation shall be paid by the contractor or recovered from his bill. The contractor shall engage all the labours / personals at his own risk and cost and shall comply binding with all the labour laws, acts, securities, all types of insurances, regulation of compensation for accident etc. at his own risk and cost.

12. Looking to the urgency of the particular work, the EIC will instruct to take up and complete that particular job / work in specified time. Otherwise for incomplete work the EIC will arrange to execute the same without giving any notice or intimation and work will be executed through any other agency and recovery will be made as per actual payment made to other agency plus 15% supervision charges and this will be recovered from R.A. Bills.

13. The contractor shall be responsible for proper behavior of his labours / persons. Also he should instruct his person / labours to work as per the instruction of EIC.

14. The contractor should clean all the works as per daily schedule timing i.e. from 8-00 AM to 1-00 PM and from 2-00 PM to 5-00 PM except Sunday or as directed by EIC.

15. Quantities shown in the Tender are approximate. No claim shall be entertained for quantities of work executed being more or less than those entered in the Schedule –B of the Tender.

16. The GSECL reserves the right to terminate this contract at any time, without assigning any reason whatsoever by giving a notice period of one month from the date of notice of termination of the contract. Contractor will not be entitled for any compensation / damages / losses. Whatsoever, on account of such termination of the contract.

Chief Engineer (Gen) GSECL, SIKKA TPS.

SIGNATURE OF CONTRACTOR

Page 22: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION,

SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106 / 2344116

FAX NO.: (0288) 2344033 GRAM : SELGRID

Web Site : www.gseb.com E-mail : [email protected]

: REGISTERED OFFICE : “ VIDYUT BHAVAN ”, RACE COURSE,

VADODARA – 390 007. PHONE NO.: (0265) 2355193-95

FAX NO.: (0265) 2338847 Web Site : www.gsecl.com

E-mail : [email protected].

GENERAL CONDITION OF CONTRACT

1. The contractors, shall at their own expense make all necessary provision for housing water supply and sanitary arrangements for their employee as well as for works and shall pay direct to the authorities concerned all rates, and taxes.

2. The contractors shall make their own arrangements for the necessary approach road, for transport of their materials and be responsible for the compensations on account of damage to crop on GSECL property.

3. All royalties, sales tax, toll tax, local tax, development charges, VAT tax welfare cess and any other taxes including works contract tax etc. in respect of this contract and also any statutory variation in future towards above mentioned taxes and any other taxes if levied in future by statutory authority applicable to the this contract shall be payable by the Contractor and GSECL will not entertain any claim whatsoever in this respect. The rate will be “Excluding the service tax“.

THE SERVICE TAX WILL BE APPLICABLE AS PER GOVT. NOTIFICATION NO. 30-2012 DT. 20/06/2012 AS PER PREVAILING GOVT. RULES & REGULATIONS

4. The Proof of payment made by the contractor to the appropriate department shall be submitted to GSECL, failing which appropriate amount shall be withheld on getting information/ instruction from the concerned department. The contractor shall also produce the receipt of payment of 1% welfare cess from the respective Govt., Department before submission of final bill, otherwise final bill for the works will not be finalized.”

5. The organization will supply articles at the place and rates mentioned in Schedule „A‟ of Tender form.(if applicable). In case of the materials issued either through or with the recommendation of this organization it will be absolutely necessary for the contractor to maintain a correct and honest record of the daily consumption of the said materials with in side particular reference to the work during the day.

The Engineer in charge of this department, or his authorized agent shall have the right to inspect and check the stores containing these materials and the accounts for these materials shall be presented for inspection whenever asked for by them Every facility shall be afforded by the contractors for all these inspections Engineer in-charge will supply materials in any quantity as deemed fit.

6. Godowns or sheds hired or constructed for storage controlled materials and more particularly of cement shall be such as would prevent material from getting damaged in any way.

7. It will be absolutely incumbent on the contractors to have on the site of work only such of the materials as have been duly passed by the Engineer-in-charge Materials that have rejected must on no account be allowed to remain on the site and in spite of written order to do so any such rejected materials is on the site beyond a period of 48 hours notice, the Engineer-in-charge shall have the right to remove it at the risk and cost of the contractor and even destroy it.

8. It must be distinctly understood that the conditions of contract and claims in respect of extra work will not be allowed unless the works to which they relate is clearly without the spirit and meaning of the specifications or unless such work are ordered in writing by the Engineer-in-charge and claimed for in specified manner.

9. On completion of the work, the site shall be cleared by the contractors within the stipulated period and ground brought to original state and they shall not be entitled for any extra claim on this account.

10. General specifications of the latest edition of the P.W.D. Hand book volume I & II shall also apply.

11. When cement is obtained either through or with the recommendation or issued by the GSECL, it should be understood that the contractors will have to be very careful regarding the handling of the cement bags so to preserve their serviceability and quality.

Page 23: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

12. DAMAGE CAUSES TO WORK: - The works whether fully constructed or not, and all materials, machinery plant tools, temporary building and other things connected there shall be at the risk and in the sole charge of the contractor until the works have been completed & delivered, to the Engineer in charge and certificate from him to that effect obtained Until such delivery the contractor shall at their own cost, take all the precautions reasonably necessary to keep all the aforesaid work materials machinery, plant, tools, Temporary building and other things connected with the work, free from any loss or damage and in the event to the some or any part there of being lost or damage shall from with within possible speed, reinstate and make good such loss or damages at contractor‟s own cost.

13. Supply of controlled articles will be invariably recommended after the actual requirement have been carefully scrutinized, In the event of any such materials remaining in surplus in charge of the contractor, on account of some modifications either in the design or changes in construction or any other reason will be returned to the department.

14. There will be generally no objection on the component parts of the works being given over to responsible sub contractors but it must be borne in mind that this department would under no circumstances recognize these sub-contractors and the responsibility of executing the work in accordance with the condition of contract will entirely on the main contractors. The main contractors will therefore always have the very responsible member preferably a technical hand, present on the works with power to sign, all work orders issued on the site of work and to take requisite actions in the interest of very efficient execution of works.

15. The Engineer in charge will fix the hours of work and no work shall be executed beyond that period during night time or in absence of the Engineer in charge or his authorized agent. The box measures shall be filled only in the presence of the Engineer in charge or his authorized agent.

16. Contractor will be asked to present the sample of materials and the approved samples will be preserved at the site of work no charge in the approved sample will be allowed without the written permission of the Engineer in charge.

17. If any work is not executed according to the specifications and the directions of the Engineer in charge the same will be rejected or reduce rate will be allowed as deemed fit by the Engineer in charge.

18. Contractor will have to communicate the name of his agent who shall be present at the works site and shall be authorized to sign the material requisitions receive instructions given verbally, or on the order book on behalf of the contractor.

19. The materials issued to the contractor as per schedule „A‟ of the tender shall not be removed from the works and all the surplus material at end of the works which is considered serviceable shall returned to the GSECL and even the unserviceable materials shall be removed only with the prior permission in writing.

20. The contractor will have to sign the conditions of contract and execute the agreement, send the list of previous works executed solvency certificates and pay up the security deposits, failing to that the tender will be rejected and earnest money deposit will be forfeited. The value of the stamp paper and stamp duty charges shall be borne by the contractor.

21. Bidder must return the form of tender with the specifications and the schedule of quantities and rate and other schedule duly signed, any tender not bearing signature of the bidder on the entire documents accompanying the tender is liable to be rejected.

22. Before submitting his percentage rate tender which shall be for the finished work complete including charges involved in testing and maintenance for a period of 04 [FOUR] MONTHS. The bidder shall closely examine the specifications and carefully study the drawings and all document which from a part of the contract to be entered in to by the accepted tender.

23. The bidder must visit the site of works and see for himself the site conditions regarding availability and building materials rates, approach road during all season and other matters affecting the works before submitting the tender.

24. The submission of tender by a contractor implies that he has read these instructions, the conditions of contract etc, and has make himself aware of the scope and specifications of the work to be done and of conditions and rates at which stores will be issued to him and local conditions and other factors bearings on the execution of the works, the GSECL will not therefore after acceptance of contractor‟s rate pay any extra charge for lead of for any other reason, in case the contractor is found letter on the have misjudged the site conditions.

25. The contractor must arrange for all transport of materials weighting of material issued at department stores and all such cost include in the rates of schedule „B‟ with the less or above percentage quoted by the contractor for finished work.

25A. GSECL reserves the right to delete any item of schedule-B for which contractor shall not have any right to claim on this account.

Page 24: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

25 B. Schedule of quantities is included in the tender documents for which it shall be definitely understood that the GSECL does not accept any responsibility for the correctness or completion of this schedule and this schedule is liable to alternations by deductions or additions at the description of the Chief Engineer or as set for the in the conditions of contract, specific percentage less or above shall be quoted by the contractor below the total amount of schedule „B‟. The tender document shall be written legibly and free from erasure, over writing on conversion of figures correction where unavoidable shall be made by crossing out initialing dating and rewriting both in figures and in words. In case of any discrepancy in figures; the price quoted in words shall prevail.

26. Tenders shall remain open for acceptance up till the validity period and during this period bidder shall not be allowed to with draw his tender. Any such withdrawal during the said period will entail forfeiture of the earnest money deposited with the tender.

27. This notice to tender shall from a part the contract.

28. The entire work is to be completed within the stipulated time limit from the date of work order or from the date of issuance of commencement letter from GSECL. The contractor will not be eligible for any extra for the idle period of work or waiting period that may be required to suit other considerations and no claim for compensation on account of such will be considered However in case of delay due to circumstances beyond the control of contractor either in date of commencement or due to waiting during construction extension time may be considered for completion of work.

29. The contractor shall keep one full time qualified Civil Engineer at site who shall be fully authorized to receive and comply with such instructions as given by the Executive Engineer. The names of such Engineer with his qualification and experience shall be intimated by the contractor. The E.E. shall have the right to demand the removal of any technical person, Skilled or unskilled workmen who in his opinion are considered to cause bad workman ship in the execution of work or to cause in discipline.

30. The department reserves the right to make any change in the design and the plans of the work. No, claim of compensation will be allowed on this account.

31. Bill in duplicate shall be submitted by the contractor monthly on or before the date fixed by the E.E. for all works executed in the previous months along with all supporting documents related with executed work. The work bill payment shall be made within 30 days on passing of R.A. bill / Final bill to Agency.

32. SUPPLY OF WATER: - Water for construction work shall be arranged by the contractor at his own cost. If possible water for construction may be supplied by the GSECL at single point and onwards distribution shall be arranged by contractor at his own cost. In case water supplied by GSECL, recovery towards water supplied shall be levied at [2%] two percent of cost of item rates as executed in which the water used.[Applicable to civil works only]

32 A. ELECTRICITY SUPPLY: Electric Power Supply if required for the work shall be given at single point, with free of cost by GSECL, STPS. Onwards distribution shall be arranged by the contractor at his own cost.

33. Should this tender be accepted, the contractor has agreed to abide by and full fill all the terms and provision of „Tender and Contract of works‟ applicable and in default there to we shall pay to the GSECL the sum of money due.

34. On acceptance of the tender the contractor has agreed that the full amount of „Earnest Money Deposit‟ paid shall be forfeited to the GSECL if he will not deposit the full amount of specified security deposit.

35. The work will have to be carried out in-co-coordination with other, agencies on the same site and on account of this in case the contractor has to stop or delay his works for some time he will not claim any thing extra and only GSECL may consider to give suitable extension in time limit if necessary on such account.

36. Any dispute arising out of the contract, if not settled mutually, than only the Jamnagar court shall have jurisdiction to settle & decide the dispute.

37. The GSECL reserves the right to terminate this contract at any time without assigning any reason whatsoever by giving a notice period of one month. From the date of notice of termination of the contract contractor will not be entitled for any compensations / damages / losses, whatsoever on account of such termination of the contract.

38. Before the work commencement the area as described and shown on the plan shall be cleared by the contractor at his own cost of all construction, loose stone, and material, grass, lumps of trees root and shrub etc. and stacked in such a way in any way hinder the construction of work. All the pits whether original existing or produced by digging roots or demolition of any old structures etc. shall be carefully filled up with earth rammed and leveled properly as directed at the cost of contractor.

Page 25: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

39. The department shall provide one Benchmark for plinth height of all buildings and it shall be the responsibility of the contractor of providing BM pillar and thereafter maintaining it and proper protection of Benchmark from the commencement of work to its completion.

40. In addition to the general soundness of the construction, particular attention to be paid to the final finish and every effort should be made to have the entire work is completed with high standard of workmanship by the contractor.

41. AGREEMENT: The contractor will have to enter in an agreement with GSECL as per rules. The agreement will have to be executed by the contractor on required stamp paper at his own cost before commencement of work and submit to the Engineer-In- Charge.

42. The details specifications are not intended to cover all the minutes‟ details and work shall be executed according to the spirit of the specifications for the relevant items and in the event of any discrepancy the opinion of the EIC as to which of them is applicable shall be final and binding to the contractor.

43. PROGRESS REPORT: The contractor shall have to submit the weekly progress report to Chief Engineer/Executive Engineer (Civil), TPS, Sikka.

44. UNSATISFACTORY PROGRESS OF WORK: If your work is found slow and unsatisfactory, then GSECL shall arrange to complete this work through other agency at your risk and cost. Incase of work not carried out satisfactorily either during the progress of work or on its completion, the condition no. 5 read with condition no. 4 (b) of “ Tender & contract for work” booklet shall apply.

45. SUBMISSION OF BILL: If the work has been carried out satisfactorily, the contractor has to submit his monthly R.A. bill after due measurement along with the materials issued/supplied and consumption and balance details, then by prior intimation from the GSECL‟s officer, contractor shall have to sign/witness the recording of measurement on the appointed date within one month completion of the work. Measurement shall be considered as per the drawing or as per actual whichever is less. Bills shall be forwarded only after getting details of material account from the contractor.

46. Party has to maintain coordination & harmonious relations with GSECL staff and other agencies working in the same site

47. If the site in charge, supervisor or any labour of the contractor found misbehaving with GSECL‟s staff or found acting in such a manner which is objectionable to GSECL, directly or indirectly causing financial loss to GSECL such contractor‟s person, employee, labour etc. must be removed immediately at the risk & cost of contractor from the work after receiving return complains from the Executive Engineer [Civil]

48. WAGES TO BE PAID & TIME OF PAYMENT ETC, BY THE CONTRACTORS:- A) The Contractors shall pay minimum rates fixed under the minimum wages act. The wages of

every contract labour employed by him under this contract shall be paid by him before the expiry of 7th day of the last day of the month in respect of which the wages are payable (i.e. wages of a month have to the paid by him in the first week of the next month) The payment shall be disbursed in the presence of management representative during the working hours in factory premises and the contractor shall get the entries certified in the register of wages by the representatives of the company, Any default will result in cancellation of contract forthwith or also the contract shall be punishable to the extent of Rs. 100/- fine per each day.

B) The contractor shall give his telephone number and address to the Corporation so that in case of labour trouble etc. the contractor can be contacted. The contractor shall arrange to have his office outside the factory premises and the contractor shall keep himself present through out the working hours.

49 LABOURS LAWS: - A) Person below the age of 18 years and above the age 60 years shall not be employed for the work. B) No. female worker shall be employed in the night shift between 07-00 PM. To 06-00 AM. C) Contractor shall maintain a valid labour license under the contractor labour (Regulation and

Abolition) Act for the employing necessary manpower to be required by him in the absence of such license the contractor shall be liable to terminated without assign any reasons thereof.

D) The contractor shall at his own expense comply with all labour laws and keep the board indemnified in respect thereof. Some of the major liabilities under various labour and industrial laws which the contractor shall comply which are as under.

1) Payment of contributing of way of Employer‟ s contribution towards provident fund, family pension scheme, deposit linked insurance scheme, administrative charges etc, at the rates made applicable from time to time by Government of Gujarat / Government of India or other Statutory Authorities.

2) Payment of deposit in respect of each contract labour at rate of Rs. 30/- with the office of Commissioner of labour as per contract labour (Regulation and Abolition) Act.

Page 26: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

3) License as prescribed under the contract labour (Regulation and Abolition) Act, and rules farmed there under depending upon the number of workman employed by the contractor License is compulsory if ten or more labours engaged during day.

4) Identity cards as prescribed under the factories Act, with photo affixed there to the same for identification.

5) Payment of retrenchment compensation, Notice pay and other liabilities as per Industrial Disputes Act. Payment to the contractor‟s employees arising out of any claim or disputes under the industrial Disputes Act. 1947 or any other labour laws.

6) Payment of compensation in case of accidental injury. 7) Provision of Creche if female labour employed is more than 30 numbers. 8) Maternity leave as per the provision of the Maternity Benefit Act.

50 PROVIDENT FUND AND FAMILY PENSION SCHEME: The contractor shall submit along with his bill (month wise) a statement regarding deduction

against employee provident fund and family pension scheme in respect of each concerned employees, provident fund and Family pension scheme at the rate applicable time to time by the Government from time to time of Wage. The contractor‟s and his workers contribution towards provident fund and family pension scheme shall be deposited by the contractor with Regional Provident fund commissioner Ahmedabad.

51. DEPOSIT LINKED INSURANCE SCHEME: The contractor shall have to deposit ½ % of the wages in respect of employees who is a member

of the provident fund as the contribution to the Deposit linked insurance Scheme with Regional Provident fund Commissioner Ahmedabad.

52. ADMINISTRATIVE CHARGES: Administrative charges for maintaining Provident fund account shall be deposited by the

contractor with regional provident fund commissioner Ahmedabad at the rates applicable.

53. PAID LEAVE FACILITY: Paid leave facility at the rate of one day for every 29 days worked by the contractor labour shall

be provided by the contractor to his workers. He shall maintain leave records / leave cards for individual labourers which be duly verified and approved certified by the authorized officer of the GSECL.

54. WORKMEN‟ S COMPENSATION FUND AND EMPLOYERS LIABILITY INSURANCE: The contractor shall cover all his employees under workmen‟s compensation fund and under the

liability Insurance.

55. The contractor shall employ adequate number of experienced staff at site for daily supervision and for maintenance of various registers and records required under the law and contract. No payment for supervision shall be admissible.

56. CONTRACTOR TO INDEMINITY THE GSECL: The contractor shall indemnity and keep Indemnified the GSECL and every member, officer and

employees of the GSECL, also Engineer in charge and his staff against action proceeding claims, costs and expenses whatever arising out of or in connection with the matters referred in above clauses and elsewhere and against all actions claims, demands, cost and expenses which may be made against the GSECL by any workmen / employees of the contractor or any sub contractor and / or contractor from any liability any wise workman employees of the contractor or sub contractor under any laws rules or regulation having the force or low including but not limited to claims against the owner workmen‟s compensation Act. 1923.

The employees Provident Fund 1952, and or / the Contract labour (Abolition and Regulation) Act. 1970 the GSECL shall no be liable for in respect of or in consequence of any accident or injury to workmen or other person in the employment of the contractor or his sub contractor and the contractor shall identify workmen in the GSECL against all such damage and compensation and against all claims, demands, proceedings costs charge and expenses what so ever in respect thereof or in relation there to.

57. WORKMAN‟ S COMPENSATION & EMPLOYER‟ S LIABILITY INSURANCE: - Insurance shall be applicable for all the contractor‟s employees engaged in the performance of

this contract. If any of the work is given on sublet, the contractor shall require the sub contractor to provide workman‟s compensation and Employers Liability Insurance for the employees covered under this scheme.

58. The Company reserves the right to terminate this rate contract at any time during contract period without giving notice of termination of any reasons thereof.

59. The Company will be entitled to deduct directly from the bills, to be paid to the contract or for any sum of sums payable by the contractor and which sum / sums the GSECL is required to pay as a principal employer on account of Contractor default in respect of all liabilities referred to in above clauses.

60. Nothing in the contract document stated shall anywise constitute that any workman/employees of the contractor or any sub contractor or to be workman employees of the owner are placed the obligation and liability in respect of any such workman / employee upon the GSECL.

Page 27: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

61. Office Correspondence will be carried out in English and if any time to facilitate the contractor, Gujarati Translation may be furnished if deemed fit, the English version will be the contract one, the same only will held good for legal matters.

62. Contractor will be responsible and liable to pay difference in wages if any or observe the revised service conditions that may be awarded by the honorable Industrial Tribunal effective from the dated directed in the award.

63. Rate quoted are firm and hence no price escalation or labour escalation will be applicable towards execution of work.

64. In case of delay in execution of work the penalty as CI. No. 3 of “Tender and contract for work” will be applicable.

65. Party shall have to provide at their own the required personal protective equipments of standard make (ISI approved) to their staff during work execution and it will be your responsibility to see that the same are by your staff while at works.

66. Arbitration Clause shall be applicable as mention elsewhere in this tender in case of any dispute.

67 The rates of all items are inclusive to carry out the work at any height/ depth unless specified in

the item, and at any location /building / structures anywhere in plant area, irrespective the

quantum of work.

68 The quantity mention in schedule-B is totally tentative & may vary up to any extent in any of the

individual items to be carried out as per GCECL‟s requirements. However the payment will be

made on the base of quantity of actual work done.

69 The responsibility & liability of man power engaged for this work will be totally of contractor who

has been awarded this contract & he will take away all these man power for his own

establishment on completion of contract. The GSECL will not be held any responsible & liable in

any way in the matter.

70The agency has to carry out the work as per the GSECL's requirement as & when required.

71Due care has to be taken by the agency to carry out the above work in running plant, in safe

manner, without affecting/damaging the plant auxiliaries, installations, machineries,

structures, generation activities etc and in coordination by getting clearances from the concern

departments time to time.

72 GUARANTEE PERIOD: The party has to give the guarantee of the work for 06 months from the date of completion of the work. Damage or leakage, if found, the party will have to arrange for the rectification of same at his risk & cost. The Security Deposit will be refunded after r successful completion of guaranty period condition.

73. ARBITRATION. „ALL QUESTIONS, DISPUTES OR DIFFERENCES, WHATSOEVER WHICH MAY AT AN TIME

ARISE BETWEEN THE PARTIES TO THIS CONTRACT IN CONNECTION WITH THE CONTRACT OR ANY MATTER ARISING OUT OF OR IN RELATION THERE TO, SHALL BE REFERRED TO THE “GUJARAT PUBLIC WORKS CONTRACTS DISPUTES ARBITRATION TRIBUNAL” AS PER THE PROVISIONS OF THE GUJARAT PUBLIC WORKS CONTRACTS DISPUTES ARBITRATION TRIBUNAL ACT, 1992.

Signature of Contractor Chief Engineer (Gen.), With Seal GSECL-TPS Sikka

Page 28: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

CIRCULAR – I

The following are the major obligations to be fulfilled by the Contractors as per the Contract

Labour (R&A) Act 1970 and rule mentioned there under:

1. License to be obtained before starting the Work where number of contract laborers is ten or

more.

2. Payment to contract labourers has to be made in presence of IRO/LWO. Wages rates for

contract labourers are applicable as per the terms and conditions of the license. Minimum rate of

the wages for unskilled labour is Rs. 211.00 for semiskilled labour is Rs. 215.00 and for skilled

labour is Rs. 220.00 w.e.f. 01-04-2013 to 30.09.2013 or as per the circular of GoG time to time.

3. Every contractor shall have to maintain the muster roll and wages register in respect of his

contract labour.

4. Every contractor is required to issue employment card, wages slip and attendance card to their

laborers.

5. The contractor has to maintain the register No. 13 containing details of contract labors

employed by him.

6. Earned leave register/ card as per the Factories Act and Rules.

7. Other registers required under Contract Labour Rules and the Factories Act and Rules.

8. Every contractor shall have to obtain insurance policy in respect of the contract labors engaged

by him to cover them under workmen‟s Compensation Act.

9. To send half yearly return to licensing officer as per Rule 82 (1) as per schedule time.

10. Before starting the work as per the contract awarded to him, he should make arrangement to

enter into the agreement in the prescribed format on the stamp paper as applicable. Before

fulfilling the above requirement the contractor is instructed not to start the work. The

responsibility will be on his head in case he fails.

11. Contractor should posses separate P.F. code on their firm, name otherwise their offer may not

be considered.

12. contractors shall have to pay wages as may be revised from time to time as may be declared by

GOVERNMENT All the contractors are informed to adhere to the rules and regulations applicable

to them, particularly in respect of the laborers engaged by them, the contractor not fulfilling the

obligations will not be allowed or continue with work/not be held qualified to carry out the work at

Sikka TPS.

SIGN OF CONTRACTOR CHIEF ENGINEER (G) GSECL, STPS

Page 29: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

ANNEXURE-II

“GENERAL SAFETY RULES / NORMS TO BE OBSERVED BY THE CONTRACTORS”

All the contractors working at SIKKA Thermal Power Station shall have to strictly observe the following Safety Rules. The Contractors shall be responsible for informing & observing these rules by their supervisors / employees / labours as well as the supervisors / employees/ labours of their sub-agencies / sub-Contractors engaged, if any. Prior to commencement of the work, Contractor shall have to submit a written assurance on their letterhead to the concerned Sectional Head / Engineer-in-charge that they have thoroughly gone through these Rules, have educated their employees / employees of their sub contractor and will strictly observe the said Rules while execution of work under work contract awarded to them. They will have to indemnify the Corporation for any loss or damage / accident / injury to the Corporation‟s property / employee or employee of their own in default of non - observing these rules.

01 Persons to be employed for carrying out the work shall possess required qualification, be fully trained and conversant for works to be done. All persons should have gate pass. Register consisting the full details (i.e. address, phone no, details of nearest relative, etc.) of all persons is to be maintained. During the work execution, one trained & competent supervisor should always remain present at site.

02 The contractor shall take all the required safety measures prior to commencement of work on dangerous substances, machineries or area at which cautionary notice is displayed and obtain “Line Clear” or “Work Permit” through the concerned Department / Section.

03 Prior to carrying out welding, gas cutting, furnace heating or any other hot work job, the contractor shall remove all the inflammable material lying at or nearby worksite or cover it properly by suitable protective covering. Also, special care shall be taken before carrying out such job & see that all possible contributing factors to set fire shall be removed / vanished prior to commencement of the work. Advance intimation shall be given to concerned section / fire section to commence the work in fire prone areas. They should also keep ready all the First Aid Fire Extinguishers / equipments & fire extinguishing media / material like sand / water buckets or other appropriate equipment at such place.

04 While carrying out work in confined space or inside vessel, the contractor shall obtain necessary “Confined Space / Vessel Entry Permit” from concerned department prior to commencement of the work.

For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp shall be used.

For taking care of the persons working inside the confined space / vessel, a supervisor / person capable to keep continuous watch on person(s) working inside, assist them incase of emergency or arrange to get immediate outside help, shall remain present at entry point and shall use full body safety belt without fail.

While working inside sewage, trench or in-depth, a person to warn outsiders / entrants / passers etc shall remain available near entry point or the entry point shall be cordoned by a barricaded tape with a cautionary notice. After completion of the works, all the lids / covers / grills / grits opened, shall be re-fixed / re-placed in the original position as it were prior to commencement of the work and leave the work place in safe condition in all respect, so as to prevent accident to fellow workers.

05 The contractor shall see that he / his persons do not block (by stacking material, spare parts, tools-tackles, equipments etc), any passages / walkways / gangways / aisles / staircases / ladders / lifts or any other approaches / roads leading to plants or its auxiliaries, on which there is a traffic movement or possible traffic movements in case of emergency. Such passages are meant for safe escape in the event of emergency. If it is utmost necessary to carry out work in such area with blocking of passage, prior permission of Competent Authority or the Engineer-In-Charge shall be obtained. To demarcate / declare the area as UNSAFE, cordon it using barricading tape & display suitable caution notice or keep a person to restrict / divert the traffic on this route through other safe passage.

06 Prior to use power / electrically operated hand tools / equipments / machines / gadgets like welding machine, hand grinder, hand drill etc, ensure for its safe operation & use it only if it is found safe to use. Do not use defective, unsafe or improperly maintained equipments.

The electrical power supply required to run such equipments shall not be taken directly at their own but shall be obtained through concerned Electrical Maintenance Departments or their authorized persons or under their observations / guidance only. The Electrical Section shall provide temporary electrical connection up to contractor‟s Mains Board on which it is compulsory to install mains switch, ELCB & fuses of adequate capacity. All such equipments shall invariably be earthed adequately to prevent electrical shock, sparking, short circuit etc. Power cord to be used shall be of adequate capacity, without any joint & shall consist of earth wire also. Hence, it is necessary to use adequate capacity 3-wire power cord for single & 5-wire

Page 30: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

power cord for three phase power connections. The plugs, receptacles, pins, holders etc shall be of adequate capacity & safe to use.

All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be used during work execution shall be of standard make & bear ISI certification mark on it. The consumables like welding electrodes, grinding wheels / discs etc which has specific prescribed life span shall not be used in any case if its expiry date is over.

07 It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as per the job requirement. Do not work without use of required P.P.Es. Contractor is responsible to provide standard make (ISI approved) Personal Protective Equipments / Safety Gadgets suitable to give sufficient protection against hazards involved in their work / job to their staff, as per the job requirement and insist / enforce their staff to put on the same while at works.

The ongoing work is liable to be stopped at any time if the contractors‟ staff is found working without P.P.Es. Following is the list of various P.P.Es. to be used for various works / worksites.

LIST OF SAFETY EQUIPMENT

01 Industrial Safety Helmet. For protection of head against falling objects or during fall of person from height.

02 Safety Goggles (Grinding, Welding, etc).

For protection of eyes against flying particles / dust, chemical splash, spark, arc, flashover etc.

03 Face shield (Half or full). For protection of face against flying particles / dust, chemical splash, spark, arc, flashover etc.

04 Earplug / Ear muffs. For ear / hearing system protection while working in high noise level area.

05 Apron (Rubber / PVC / Asbestos / Leather / Cotton).

For body protection against chemicals, oils, sharp edged objects, heat, hot objects etc.

06 Gloves (Rubber/PVC, Asbestos, Leather, Electrical shock proof).

For protection of hands against chemicals, oils, sharp edged objects, heat, hot metals/objects, electricity etc.

07 Safety / Leather / Asbestos shoes, Gum Boots etc.

For protection of leg/feet against falling objects, sharp edged objects, heat, hot metals/objects, electricity etc.

08 Safety Belt(full body) / Rope / Life line / Fall prevention system etc.

For fall prevention while working at heights or in depth, working in vessel or in confined space.

09 Dust Respirator / Scarf. Protection of respiratory system against dust.

10 Chemical Cartridge Respirator Protection against chemical fume / vapor etc.

11 Canister Gas mask. Protection against toxic/poisonous fumes/gases.

12 Air supply respirators. Working in oxygen deficient zone.

08

Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift, mobile crane, EOT crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye bolts or any fixtures), it shall be checked and used only if found safe to use. Also, ensure that these are tested, examined & certified in form no 9 / 10 by Competent Person as per the Factory act-1948 and its validity is not expired. Further, it shall be fixed properly and firmly prior to lifting the weight.

09 Scaffoldings to be used for working at height shall be of adequate size & capacity. Obtain the work permit when working at height. While climbing on such scaffolding or working on any structure at height, use of full body safety belt & Helmet is compulsory. It is also necessary to fasten chinstraps of the helmet.

10 Contractor or their employee shall not interfere in day-today routine plant activities / works except the work assigned to them, shall not loiter in the areas other than their work jurisdiction, as well as shall not temper / operate / touch the machineries / equipments / auxiliaries with which they are not concerned. Also, the contractor shall strictly instruct their staff not to sit or take rest at / near / below running plants, auxiliaries, systems or any place which is risky, hazardous & prone to accident.

11 The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen, Acetylene, LPG, Hydrogen, Ammonia, Chlorine, CO2

or any type of material of explosive nature etc. shall be handled safely taking due care. To handle / shift such cylinders a special trolley / cage meant for it must be used but in no case it should be rolled. Domestic LPG cylinder shall not be used / permitted.

12 On completion of the work, cotton waste, spilled oil / grease, pieces of welding rod & other waste material shall be removed from work site and the area shall be left safe, neat & clean.

Page 31: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

13 In case of any injury / accident while working, it shall immediately be reported to Safety Department through concerned Sectional Head / Engineer. The prescribed Form No. 21 may be obtained from concerned section or Safety Officer.

For any incident occurred but have no injury to any persons should also be informed to Safety Officer as “Near Miss Incident.”

14 In all risky jobs, before starting the work, contractor should obtain General Safety Work Permit from concerned section well in advance.

15 In case of noticing smoke or fire during their work execution, they shall make immediate efforts to extinguish / control it and simultaneously inform the Fire Brigade on phone No. 444 or 421 or 491 or 492 shall shift the casualty to nearby hospital after rendering first aid in case of accident.

16 Over & above these, contractor shall have to follow all the safety requirements / rules & regulations / norms and legal provisions laid down in various statutes, particularly the provisions of The Factories Act-1948 & The Gujarat State Factories Rules-1963 (Amended up to date) shall be followed strictly. The contractor shall also obey the rules / regulations / instructions of the local Competent Authority for safety requirements.

17 No women or young person shall be allowed to clean, lubricate or adjust any part of a prime mover or of any transmission machinery while the prime mover or transmission machinery is in motion. Examination or operation of motion machinery shall be made or carried out only by a specially trained adult male worker wearing tight fitting clothing as per section 22 of factories act 1948.

18 No women or young person shall be employed or permitted to work in Lead-compound area like battery room etc. as per schedule VI of GFR 1963.

19 All the relevant labour and industrial laws shall also be followed compulsorily.

20 It is felt necessary to deploy safety officers / Safety supervisors by contractors / Agencies involved in carrying out hazardous activities / operations inside TPS to have better and constant supervision in terms of Health Safety and Environment activities.

21 In case, it comes to the notice of GSECL STPS management that the safety guidelines / safety rules / safety norms are not being followed then a minimum sum of Rupees One Thousand shall be penalized on the contractor / Agency and for subsequent such violation, a severe penalty / action as deemed fit shall be imposed, which may please be noted.

22 The above rules shall be scrupulously followed and where required, they may contact the Safety Officer for any ambiguity / further guidance in this regard.

23 For performance evaluation of contractor, safety factors of work accident, fire incident & near miss accident will be considered. Steps can be taken to review the job assignment up to cancellation for negligence.

Chief Engineer (gen)

GSECL, SIKKA TPS.

SIGNATURE OF CONTRACTOR

Page 32: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION,

SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106 / 2344116

FAX NO.: (0288) 2344033 GRAM : SELGRID

Web Site : www.gseb.com E-mail : [email protected]

: REGISTERED OFFICE : “ VIDYUT BHAVAN ”, RACE COURSE,

VADODARA – 390 007. PHONE NO.: (0265) 2355193-95

FAX NO.: (0265) 2338847 Web Site : www.gsecl.com

E-mail : [email protected].

SCHEDULE: B

NAME OF WORK:- MISCELLANEOUS CIVIL WORK AT VARIOUS LOCATION AS AND WHEN REQUIRED IN PLANT @ STPS

SR.NO.

ITEM DESCRIPTION QTY. RATE UNIT AMOUNT

1 Demolition of brick work and stone masonry including stacking of serviceable materials and disposal of un-serviceable materials with all lead and lift in Cement Mortar.

10.00 236.00 CMT 2360.00

2 Dismentalling by chipping the reinforced concrete of any grade and age of old foundation, slab/wall for mass heavy concrete structure of power house etc. making hole, slot of any size and shape by mannually with pnematic air compressor breaker at any height/depth, cutting the reinforcement,as required and dispossing the chopped out stuff within lead of 500 Mts. Etc. complete as per requirement and as directed by E.I.C.

10.00 3200.00 CMT 32000.00

3

Brick work using common burnt fly ash bricks having crushing strength not less than 35Kg./Sq. in foundation and pinth in Cement Mortar 1:6 (1-Cement:6-fine sand)

Up to floor level two 30.00 3994.00 CMT 119820.00

Above floor level two(G+2) 15.00 4032.80 CMT 60492.00

4 Excavation for foundation up to 1.5m depth including sorting out and stacking of useful materials and disposing of the excavated stuff up to 50M.lead for Dense or Hard soil.

50.00 106.00 CMT 5300.00

5 Providing H.Y.S.D. bar reinforcement as per I.S. Standard for R.C.C.work including bending, binding and placing in position complete Up to floor two level

300.00 51.00 Kg. 15300.00

6 Providing and Laying cement concrete 1:4:8(1-Cement:4-Coarse sand:8-Hand broken stone aggregate 40MM nominal size) and curing complete excluding cost of form work in Foundation and plinth

10.00 2258.00 CMT 22580.00

7 Providing and Laying cement conceret 1:2:4(1-Cement : 2- Coarse sand : 4- graded stone aggregates 20mm nominal size) and curing complete excluding cost of formwork and reinforcement for reinforced concrete work in [A] Foundation, footings, Base or columns and Mass concrete.

20.00 3530.00 CMT 70600.00

Page 33: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

8 Providing formwork of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and proppimg etc. height of propping and centering below supporting floor to celing not exceeding 4 M and removal of the same for in sity reinforced concrete and plinth concrete work in [A] Foundations, Footings, Bases of columns etc and mass concrete.

150.00 128.00 SMT 19200.00

9 Providing 15 mm thick cement plaster in single coat on brick/concrete walls for interior plastering upto floor two level and finished even and smooth in [I] Cement Mortar 1:3 [1-Cement : 3-Sand]

350.00 131.00 SMT 45850.00

10 White washing with lime on wall surface [two coats] to give an even shade including thoroughly booming the surface to remove all dirt, dust, mortar drops and other foreign matter.

1000.00 5.60 SMT 5600.00

11 Execution of any item of SOR as per instruction of Engineer in charge. Lum sum 100000.00

ESTIMATED COST 499102=00

%ABOVE/BELOW

NET OFFER AMOUNT

I/We am/are willing to carry out the work at _____% (in words ________percentage) above/below the estimated cost. Accordingly the total amount of my/our tender works out to Rs._____________________________(in words Rs._______________________ ________________________________________________________________________________________________________)

Note: (1) The service tax will be applicable as per Govt. Notification No. 30-2012 dt. 20/06/2012 as per prevailing GOVT. rules & regulations. I/We hereby accept all the conditions and specifications of this tender document, and accordingly,

Sing. Of Contractor CHIEF ENGINEER (Gen) G.S.E.C.L, TPS, SIKKA

Page 34: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION,

SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106 / 2344116

FAX NO.: (0288) 2344033 GRAM : SELGRID

Web Site : www.gseb.com E-mail : [email protected]

: REGISTERED OFFICE : “ VIDYUT BHAVAN ”, RACE COURSE,

VADODARA – 390 007. PHONE NO.: (0265) 2355193-95

FAX NO.: (0265) 2338847 Web Site : www.gsecl.com

E-mail : [email protected].

ITEM SPECIFICATIONS AND MATERIALS

NAME OF WORK: - MISCELLANEOUS CIVIL WORK AT VARIOUS LOCATION AS AND WHEN REQUIRED IN PLANT @ STPS. M-1: WATER 1.1 Water shall not be salty or brackish and shall be clean, reasonably clear and free from objectionable quantities of silt and traces of oil and injurious alkalis, salts, organic matter and other deleterious material which will either weaken the mortar or concrete or cause efflorescence or attack the steel in R.C.C Container for transport, storage and handling of water shall be clean. Water shall conform to the standards specified I.S 456-1978.

1.2 If required by Engineer-in-charge it shall be tested by comparison with distilled water. Comparison shall be made by means of standard cement tests for soundness, time of setting and mortar strength as specified in I.S.269-1976. Any indication of unsoundness, change in time of setting by 30 minutes or more or decrease of more than 10 per cent in strength of mortar prepared with water sample when compared with the results obtained with mortar prepared with distilled water shall be sufficient cause for rejection of water under test.

1.3 Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It shall be free of elements which significantly affect the hydration reaction or otherwise interfere with the hardening of concrete during curing or those which produce objectionable stains or other unsightly deposits on concrete or mortar surfaces.

1.4 Hard and bitter water shall not be used for curing. Potable water will be generally found suitable for curing mortar or concrete.

M-3: CEMENT

3.1 Cement shall be ordinary Portland slag cement as per I.S. 269-1976 or Portland slag cement as per I.S. 455-1976.

M-6: SAND

6.1 Sand shall be natural sand, clean, well graded, hard strong durable and gritty particle free from injurious amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali, salts organic matter, loam, mica or other deleterious substance and shall be got approved from the Engineer-in-charge. The sand shall not contain more that 8 percent of silt as determined by field test. If necessary the sand shall be washed to make it clean.

6.2 Coarse Sand: The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed 3.0.

The sieve analysis or coarse shall be as under:

I.S. Sieve

Designation

Percentage by weight

Passing sieve

I.S. Sieve

Designation

Percentage by weight

Passing sieve

4.75 mm. 100 600 Micron 30-100

2.36 mm. 90 to 100 300 Micron 5-70

1.18 mm. 70-100 150 Micron 0-50

6.3 Fine Sand: The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall be as under:

I.S. Sieve

Designation

Percentage by weight

Passing through

I.S. Sieve

Designation

Percentage by weight

Passing through 4.75 mm. 100 600 Micron 40-85

2.36 mm. 100 300 Micron 5-50

1.18 mm. 70-100 150 Micron 0-10

Page 35: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

M-11: CEMENT MORTAR

11.1 Water: shall conform to specification M-1.

Cement: Cement shall conform to specification M-3.

Sand: Sand shall conform to M-6.

11.2 Proportion of Mix: Cement and sand shall be mixed to specified proportion, sand being measured by measuring boxes. The proportion of cement will be by volume on the basis of 50 Kg. /Bag of cement being equal to 0.0342 Cu. M. The mortar may be hand mixed or machine mixed as directed.

11.3 Preparation of Mortar: In hand mixed mortar cement and sand in the specified proportions shall be thoroughly mixed dry on a clean impervious platform by turning over at least 3 times or more till a homogenous mixture of uniform color is obtained. Mixing platform shall be so arranged that no deleterious extraneous material shall get mixed with mortar or mortar shall flow out. While mixing, the water shall be gradually added and thoroughly mixed to form a stiff plastic mass of uniform color so that each particle of sand shall be completely covered with a film of wet cement. The water cement ratio shall be adopted as directed. The mortar so prepared shall be used within 30 minutes of adding water. Only such quantity of mortar shall be prepared as can be used within 30 minutes.

M-12: Stone Coarse Aggregate For Nominal Mix Concrete:

12.1 Coarse aggregate shall be machine crushed stone of black trap or equivalent and be hard, strong, dense, durable, clean and free from skin and coating likely to prevent proper adhesion of mortar.

12.2 The aggregate shall generally be cubical in shape. Unless special stones of particular quarries are mentioned aggregates shall be machine crushed from the best black trap or equivalent hard stone as approved. Aggregate shall have no deleterious reaction with cement. The size of the coarse aggregate for plain cement concrete and ordinary reinforced cement concrete shall generally be as per the table given below, However in case of reinforced cement concrete the maximum limit may be restricted to 6 mm. Less than the minimum lateral clear distance between bars or 6 mm. Less than the cover, whichever is smaller.

TABLE I.S. Sieve Designation

Percentage passing for single sized aggregates of nominal

size

I.S. Sieve Designation

Percentage passing for single sized aggregates of

Nominal size

40 mm. 20 mm. 16 mm. 40 mm. 20 mm. 16 mm.

80 mm. -- -- -- 12.5 mm. -- -- --

63 mm. 100 -- -- 10 mm. 0.5 0.02 0.30 40 mm. 85-100 100 -- 4.75 mm. -- 0.5 0.5

20 mm. 0-20 85-100 100 mm.

2.35 mm. -- --

16 mm. -- -- 85-100

Note: This percentage may be varied somewhat by Engineer-in-charge when considered necessary for obtaining better density and strength of concrete.

12.3 The grading test shall be taken in the beginning and at the change of source of materials. The necessary test indicated in I. S. 383-1970 and I.S. 456-1978 shall have to be carried out to be carried out to ensure the acceptability.

The aggregates shall be stored separately and handled in such a manner as to prevent the intermixing of different aggregates. If the aggregates are covered with dust, they shall be washed with water to make them clean.

M-15: BRICKS

15.1 The bricks shall be hand or machine molded and made from suitable soils and klin-burnt. They shall be free from crack and nodules of free lime. They shall have smooth rectangular faces with sharp corners and shall be of uniform color.

The bricks shall be molded with a frog of 100 mm x 40 mm. and 10 mm. to 20 mm. Deep on one of its flat sides. The bricks shall not break when thrown on the ground from a height of 600 mm.

15.2 The size of modular bricks shall be 190 mm. X 90 mm. X 90 mm.

Page 36: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

15.3 The size of the conventional bricks shall be as under: (9” x 4 ⅜ “x 2 ¾ “) 225 x 110 x 75 mm.

15.4 Only bricks of one standard size shall be used on one work. The following tolerances shall be permitted in the conventional size adopted in a particular work. Length: 1.8(3.0 mm.) Width: 1/6” (1.51 mm.) Height: 1/6” (1.50 mm.)

15.5 The crushing strength of the bricks shall not be less than 70 Kg./Sq. Cm. The average water absorption shall not be more than 20 percent by weight. Necessary tests for crushing strength and water absorption etc. Shall be carried out as per I. S. 3495 (Part-I to IV) 1976.

ITEM NO. 1. Demolition of brick work and stone masonry including stacking of serviceable materials and disposal of un-serviceable materials with all lead and lift in Cement Mortar.

(A) Workmanship:

The demolition shall consist of demolition of brick work and stone masonry as specified or shown in the drawings. Demolition implies taking up or down or breaking up. This shall consist of demolishing whole or part of work including all relevant items as specified or shown in the drawings.

The demolition shall always be planned before hand and shall be done in reverse order of the one in which the structure was constructed. This scheme shall be got approved from the Engineer-in-charge before starting the work. This however will not absolve the contractor from the responsibility of proper and safe demolition.

Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work or property, which is to be left intact, before dismantling and demolishing is taken up and the work shall be carried out in such a way that no damages is caused to the adjoining property.

Wherever required, temporary enclosures or partitions shall also be provided. Necessary precautions shall be taken to keep the dust nuisance down as and where necessary.

Dismantling shall be commenced in a systematic manner. All materials which are likely to be damaged by dropping from a height or demolishing, masonry etc. Shall be carefully dismantled first. The dismantled articles shall be properly stacked as directed.

All materials obtained from demolition shall be the property of Government unless otherwise specified and shall be kept in safe custody until handed over to the Engineer-in-charge.

Any serviceable material, obtained during dismantling or demolition shall be separated out and stacked properly as directed, with all lead and loft. All unserviceable materials, rubbish etc. Shall be stacked as directed by the Engineer-in-charge.

On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.

(B) Mode of measurements & payment:

Measurements of all work except hidden work shall be taken before demolition or no allowance for increase in bulk shall be allowed. Specification for deduction for voids openings etc. shall be on same basis as that employed for construction of work.

All work shall be measured in decimal system as fixed in its place subject to the following limits, unless otherwise stated hereinafter: (a) Dimensions shall be measured to the nearest 0.01 mt. (b) Area shall be worked out to the nearest 0.01 sq. Mt (c) Cubical connection shall be worked out to the nearest 0.01 Cu. M.

The rate shall include cost of all labour involved and tools used in demolishing and dismantling in including scaffolding. The rate shall also include the charges for separating out and stacking the serviceable materials properly and disposing the unserviceable materials with all lead and lift. The rate also includes for temporary storing for the safety of the portion not required to be pulled down or of adjoining properly and providing temporary enclosures or partitions where considered necessary. The rate excludes scraping straightening of reinforcement but includes cutting of reinforcement.

The measurements shall be made for Demolition of brick work and stone masonry will be paid in Cubic Meter basis on actual work done.

The rate shall be for a unit of one Cubic meter.

Page 37: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

ITEM NO. 2. Dismantling by chipping the reinforced concrete of any grade and age of old foundation, slab/wall for mass heavy concrete structure of power house etc. making hole, slot of any size and shape by manually with pneumatic air compressor breaker at any height/depth, cutting the reinforcement, as required and disposing the chopped out stuff within lead of 500 Mts. Etc. complete as per requirement and as directed by E.I.C.

Dismantling by chipping the reinforced concrete of any grade and age of old foundation, slab/wall for mass heavy concrete structure of power house etc. making hole, slot of any size and shape by manually with pneumatic air compressor breaker at any height/depth, cutting the reinforcement, as required and disposing the chopped out stuff within lead of 500 Mts. Etc. complete as per requirement and as directed by E.I.C

Required tools & tackles and other required materials are to be brought by contractor at his own cost.

The rate shall be for a unit of one Cubic meter.

ITEM NO. 3. Brick work using common burnt clay building bricks having crushing strength not less than 35Kg./Sq. Cm. extra for brick work In super structure in Cement Mortar 1:6 (1- Cement : 6 – fine sand) (B)Conventional….up to floor two level & above floor two level (G+2)

Brick work using common fly ash bricks having crushing strength not less than 35 Kg./Sq. Cm. for SUPER STRUCTURE in cement mortar 1 : 6 (1 cement : 6 fine sand) conventional bricks. (A) Materials: Water, Sand, Cement & graded hand broken stones aggregate of 40 mm. nominal sizes shall conform to standard specifications as per relevant BIS. Codes. Further details specifications of Materials are as under:

(1) Water: Shall be as per M1. (2) Cement: Shall be as per M3.

(3) Sand: Shall be as per M6.

(4) Brick: Shall be as per M15. (B) Workmanship:

Proportion: The proportion of the cement mortar shall be 1: 6 (1 cement: 6 fine sand) by volume. Wetting of bricks: The bricks required for masonry shall be thoroughly wetted with clean water for about two hours before use or as directed. The cessation of bubbles, when the bricks are wetted with water is an indication of through wetting of bricks. Laying: Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used except where necessary to complete to bond closers in such case shall be cut to required size and used near the ends of walls.

A layer of mortar shall be spread on full width for suitable length of the lower course, Each brick shall first be properly bedded and set home by gently tapping lapping with handle of trowel or wooden mallet. It side face shall be flushed with mortar before the next brick is laid and pressed against it. On completion of course, the vertical joints shall be fully filled from the top with mortar.

The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical joint shall be truly vertical. Vertical joints in alternate course shall generally be directly one over the other. The thickness of brick course shall be kept uniform.

The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges, mason‟s sprit level, square half meter rub, and pins, string and plumb, shall be kept on the site of work for frequent checking during the progress of work.

Both the faces of walls of thickness greater than 23 cms. Shall be kept in proper place. All the connected brick work shall be kept not more than one meter over the rest of the work. Where this is not possible the work shall be raked back according to bond (and not left toothed) at an angle not steeper than 45 degrees.

All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. Which are required to be built in wall shall be embedded in cement mortar.

Joints: Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joints shall not exceed 12 mm. The face joints shall be raked out as directed by taking tools daily during the progress of work, when the mortar is still green so as to provide key for plaster or pointing to done.

Page 38: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

The face of brick shall be cleaned the very day on which the brick work is laid and all mortar dropping removed.

Curing: Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for a period of seven days. The top of masonry work shall be kept well wetted at the close of the day.

Preparation of foundation bed: If the foundation is to be laid directly on the excavated bed the bed shall be leveled, cleared of all loose materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete footing the top of concrete shall be cleaned and moistened. The contractor shall obtain the engineer‟s approval for the foundation bed, before foundation masonry is started. When puccas flooring is to be provided flush with the top to plinth the inside plinth offset shall be kept lower than the outside plinth top by the thickness of the flooring.

(C) Mode of measurements and payment :

The measurements of this item shall be taken for the brick masonry fully completed in foundation up to plinth. The limiting dimensions not exceeding those shown on the plans or as directed shall be final. Battered, tapered and curved portions shall be measured net.

No deduction shall be made from the quantity of brick work, nor any extra payment made for embedding in masonry or making holes in respect of following item:

a. Ends of joints, beams, posts, girders, rafters, purlin, trusses, corbel steps etc. Where cross sectional area does not exceed 500 Sq. Cm.

b. Opening not exceeding 1000 Sq. Cm.

c. Wall plates and bed plates, bearing of slabs, chhajjas and the like whose thickness does not exceed 10 Cms. And the bearing does not extend to the full thickness of wall.

d. Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows etc.

e. Iron fixtures, pipes up to 300 mm. Dia, hold fasts and doors and windows built into masonry and pipes etc. For concealed wiring.

f. Forming chases of section not exceeding 350 Sq. Cm. in masonry.

Apertures for fireplaces shall not be deducted nor shall extra labor required to make splaying of jambs, threading and making Arches over the aperture be paid for separately.

The rate shall be for a unit of one cubic meter.

The payment shall be made on actual Cmt. of brick masonry work.

ITEM NO. 4: Excavation for foundation up to 1.5m depth including sorting out and stacking of useful materials and disposing of the excavated stuff up to 50M.lead for Dense or Hard soil.

The contractor will, at his own expense, clear the Site set out all works and provide all necessary labor, pegs, string etc. to enable Engineer to check all setting out and contractor will correct all error. Foundation trenches must be checked by the Executive Engineer or by the authorized representative before any concrete is placed. The bottom of foundation trenches must be accurately excavated as shown in the drawing and leveled thoroughly, if dry, shall be watered and consolidated before concrete work is started. If was meet with, the contractor will have to dewater the foundation and provide necessary shoring and shuttering, for which nothing extra will be paid. If differences of levels have to be provided, it shall be done by means of vertical steps unless otherwise directed by the Engineer-in-charge. The excavation for foundation shall be excavated to the depths shown on the drawing or to suit ground or less depth, as the character of the ground, necessitates to ensure stable and solid foundation and will be as directed by the Engineer-in-charge. For extra depth of foundation so excavated, no higher rates will be paid. The contractor is held responsible that the foundations are excavated as nearly as possible to the correct width and depth as directed by the Engineer-in-charge. If any excess excavation is done owing to mistake on the part of the contractor or his staff, the extra excavation will not be paid

Page 39: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

for, and this extra excavation will have to be filled up with cement concrete as specified for foundation, at this cost. Under no circumstances the extra depth excavated will be allowed to be filled up, with any other material. All excavated stuff, if approved, will have to be filled up in the side trenches of the foundation and plinth, in layers, by breaking clods and watering, after the foundation and plinth masonry is checked and approved by the Engineer-in-charge. The surplus earth will have to be spread, to make up the adjacent ground (if necessary) or otherwise shall be removed from the site and disposed of, as directed by the Engineer-in-charge, within a lead of 50 meters. No extra payment will be made for doing this work. The excavated stuff shall be stacked at the place shown by the Engineer-in-charge or his authorized agent; so that no surcharge is created on the excavated trench edge and sliding may not take place. In case the stuff is found not usable, the same shall be stacked separately away, so that it may not get mixed with the selected material for backfilling. Safety code for excavation I.S. 3764 shall be followed. If excavation is done during rainy season, Contractor shall make pali of earth around excavated area, to see that the excavated pit is not filled up with water Contractor may make allowance in the rate, if he thinks that side slopes will be required, keeping in mind nature of the soil and safety of excavation. The rate quoted shall be inclusive of all labour, materials, tools, tackles, machinery etc. for all operation mentioned above. Payment shall be made for excavated net quantity as per plan, plus permissible sides slope/benching wherever necessary as per I.S. The contractor shall do the necessary shoring and shuttering or providing necessary slopes to a safe angle, at his own cost. The payment shall be made on actual Cmt. of work.

ITEM NO. 5: Providing H.Y.S.D. bar reinforcement as per I.S. Standard for R.C.C. work including bending, binding and placing in position complete Up to floor two level.

All reinforcement H.Y.S.D. bar specified in item shall conform to relevant IS standard 1786 for H.Y.S.D. bars, wherever tested brands to be used, certificate for the same from manufacture shall be submitted. If Executive Engineer instructs it, contractor shall have to arrange for testing of bars at the laboratory or institution, suggested by GSECL at his cost. Bars shall be bent as per bar bending schedule supplied with drawing. If bar bending schedule is not supplied contractor shall prepare it and get it approved at the site before cutting for fabrication. Bars shall be clean, free form rust, dust, mud etc. if coils are there, they shall be first straightened. Bars shall be cut according to the cutting length specified/approved by department. Bars shall be bent gradually. Bars having crack or spits shall be rejected. Bars shall be bent cold, unless otherwise specified in case of higher diameter bars. If bar is bended wrongly, it should be straightened and reset such that it does not injure the materials. Laps and splices shall be got approved. They shall be staggered and shall be at location shown/ approved. Lapping shall be avoided when full-length bars are available. All laps, hooks, bends etc. shall be provided as per IS standards. Reinforcement bars shall be place in position as per drawing or details given. It shall be tied with annealed black wire/G.I. wire of 18 gauges. Blocks, spacers, chairs etc., shall be provided as per IS. 2502 at places instructed. Bars shall be provided with clear cover as shown in drawing or as instructed on site. Cover shall be provided with cement mortar cover block prepared of specified thickness with binding wire embedded to fix cover in position and tie with the reinforcement so that it may not get disturbed. Minimum clear cover shall be less than 13 mm or diameter of bars for slabs. For beam and columns depending on size it shall be 20mm to 25mm. Cover shall be provided depending on structure, weather condition, location of structure etc., as per ISI. After the reinforcement is tied and checked by contractor himself it shall be got checked by GSECL authorized representative and Okayed for pouring of concrete. Quantity of reinforcement bars in M.T. embedded in concrete shall be paid. Weight shall be computed on cutting length approved or given multiplied by standard weight of particular diameter of bars as per IS standards. Work shall to be carried out at all levels. “Rate quoted shall inclusive of wastages, cost of binding wire, etc., No separate payment will be made for binding wire. However laps, dowels etc., shall be paid as per drawing or as approved in site. For the purpose of payment, the bar shall be measured correct up to 100 mm length and weight payable worked out at the rate specified below:

Page 40: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

Diameter of Bars (in mm) Weight (kg/R. meter) 6 0.22

8 0.39

10 0.62

12 0.89

14 1.21

16 1.58

18 2.00

20 2.47

22 2.98

25 3.85

28 4.83

32 6.31 36 7.99

40 9.86

The payment shall be made in KG only.

ITEM NO. 6: Providing and Laying cement concrete 1:4:8(1-Cement: 4-Coarse sand:8-Hand broken stone aggregate 40MM nominal size) and curing complete excluding cost of form work in Foundation and plinth.

The cement concrete 1:4:8 (1cement: 4coarse sand: 8 Hand broken Stones) in Foundation and plinth for foundation and flooring at any depth shall be carried out in true line and level and have the width and depth as shown in the drawing or as directed including sorting out and stacking of useful materials and disposing of excavated stuff up to 50M. Lead for loose or soft soil. The contractor shall do the necessary shoring and shuttering to a safe angle, at his own cost.

(A) Materials: Water, Sand, Cement & graded hand broken stones aggregate of 40 mm. nominal sizes shall conform to standard specifications as per relevant BIS. Codes. Further details specifications of Materials are as under:

(1) Water: Shall be as per M1.

(2) Cement: Shall be as per M3. (3) Sand: Shall be as per M6.

(4) Stone Coarse Aggregate For Nominal Mix Concrete: Shall be as per M12.

(B) Workmanship: General: Before starting concrete, bed of foundation trenches shall be cleared of all loose materials, leveled, watered and rammed as directed.

Proportion of Mix: The Proportion of cement, sand and coarse graded bricks bats aggregate shall be one part of cement, 4 parts of sand, 8 parts of graded aggregates and shall so measure by volume.

Mixing: The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may however be allowed for smaller quantity of work if approved by the Engineer-in-charge. When hand mixing is permitted by the Engineer-in-charge in case of break-down of machineries and in the interest of the work, it shall be carried out on a water tight platform and care shall be taken to ensure that mixing is continued until the mass in uniform in color and consistency. However in such cases 10% more cement than otherwise required shall have to be used without any extra cost. The mixing in mechanical mixer shall be done for a period 1 to 2 minutes. The quantity of water shall be sufficient to produce a dense concrete of required workability for the purpose. Transporting & placing the concrete: The concrete shall be handled from the place of mixing to the final position in not more than 15 minutes by the method as directed and shall be placed into its final position, compacted and finished within 30 minutes of mixing with water i.e. before the setting commences. The concrete shall be laid in layers of 15 cms. to 20 cms or as directed.. Compacting: The concrete shall be rammed with heavy iron rammers and rapidly to get the required compaction and to allow all the interstices to be filled with mortar.

Curing: After the final set, the concrete shall be kept continually wet, if required by pounding for a period of not less than 7 days from the date of placement.

Mode of measurement and Payment: The concrete shall be measured for its length breadth and depth, limiting dimensions to those specified on plan or as directed The rate shall be for a unit of one cubic meter. The payment shall be made on actual Cmt. of cement concrete work.

Page 41: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

ITEM NO. 7: Providing and laying ordinary cement concrete 1:2:4(1-Cement:2-Coarse sand:4-Graded stone aggregate 20MM nominal size) and finishing smooth with curing etc. complete including the cost of form work but excluding the cost of reinforcement.

The cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 Hand broken stone aggregate (20 mm size)] in Foundation, coping and flooring at any depth or level shall be carried out in true line and level and have the width and depth as shown in the drawing or as directed including sorting out and stacking of useful materials and disposing of excavated stuff up to 50M. Lead for loose or soft soil. The contractor shall do the necessary shoring and shuttering to a safe angle, at his own cost.

(A) Materials: Water, Sand, Cement & graded hand broken stones aggregate of 20 mm. nominal sizes shall conform to standard specifications as per relevant BIS. Codes. Further details specifications of Materials are as under:

(B) Water: Shall be as per M1.

(C) Cement: Shall be as per M3. (D) Sand: Shall be as per M6.

(E) Stone Coarse Aggregate For Nominal Mix Concrete: Shall be as per M12.

(F) General: The concrete mix is not required to be designed by preliminary tests. The proportion of the concrete mix shall be 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm. Nominal size) by volume. Concrete work shall have exposed concrete surface or as specified in the item. The designation ordinary M-100, M-150, M-200, M-250 specified as per I. S. Corresponding approximately to 1 : 3 : 6, 1 : 2 : 4, 1: 1 ½ : 3 and 1 : 1 : 2 nominal mix of ordinary concrete by volume respectively. The ingredients required for ordinary concrete containing one beg of cement of 50 Kg. By weight (0.0342 Cu. M.) For different proportions of mix shall be as under :

Grade of concrete

Total quantity of dry aggregate by volume per 50 kgs. Of cement to be taken as the sum of individual of fine and coarse aggregates, maximum

Proportion of fine aggregate to coarse aggregate

Quantity of water per 50 Kgs. Of cement maximum

1 2 3 4

M-100 (1 : 3 : 6) 300 Liters Generally 1 : 2 for fine aggregate to coarse aggregate by volume but subject to and upper limit of 1:1 1/2 and lower limit 1 : 3

34 liters

M-150 (1 : 2 : 4) 220 Liters --Do--- 32“

M-200 (1 : 1 1/2 : 3) 160 Liters --Do--- 30 “

M-250 (1 : 1 : 2) 100 Liters --Do--- 27 “

The water cement ratio shall not more than those specified in the above table. The cement content of the mix specified in the Table shall be increased if the quantity of water in a mix has to be increased to overcome the difficulties of placement and compaction so that the water-cement-ratio specified in the Table is not exceeded. Workability of the concrete shall be controlled by maintaining a water-cement-ratio that is bound to give a concrete mix which is just sufficiently wet to be placed and compacted without difficulty with the means available. The maximum size of coarse aggregate shall be as large as possible within the limits specified but in no case greater than one fourth of the minimum thickness of the member, provided that the concrete can be placed without difficulty so as to surround all reinforcement thoroughly and to fill the corners of the form. For reinforced concrete work, coarse aggregates having a nominal size of 20 mm. are generally considered satisfactory. For heavily reinforced concrete members as in the case of ribs of main beams, the nominal maximum size of coarse aggregate should usually be restricted to 5 mm. Less than the minimum clear distance between the main bars, or 5 mm. Less than the minimum cover to the reinforcement whichever is smaller. Where the reinforcement is widely spaced as in solid slabs, limitations of size of the aggregate may not be important and the nominal maximum size may sometimes be as great as or greater than the minimum cover.

Page 42: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

Admixture may be used in concrete only with approval of Engineer-in-charge upon the evidence that with the passage of time, neither the compressive strength of concrete is reduced nor are other requisite qualities of concrete and steel impaired by the use of such admixtures.

(G) Workmanship:

a) Proportioning: proportioning shall be done by volume, except cement which shall be measured in terms of bags of 50 Kg. Weight. The volume of one such bag being taken as 0.0342 Cu. Meter Boxes of suitable sizes shall be used for measuring sand aggregate. The size of the boxes (internal) shall be 35 cms. X 25 cms and 40 cms deep. While measuring the aggregate and sand, the box shall be filled without shaking ramming or hammering. The proportioning of sand shall be on the basis of its dry volume and in case of damp sand; allowances for bulk age shall be made.

b) Mixing: For all work, Concrete shall be mixed in a mechanical mixer which along with other accessories shall be kept in first class working condition and so maintained throughout the construction. Measured quantity of aggregate, sand, cement required for each batch shall be poured into the drum of the mechanical mixer while it is continuously running. After about half a minute of dry mixing, measured quantity of water required for each batch of concrete mix shall be added gradually and mixing continued for another one and a half minute. Mixing shall be continued till materials are uniformly distributed and uniform color of the entire mass is obtained and each individual particle of the coarse aggregate shows complete coating of mortar containing its proportionate amount of cement. In no case shall the mixing be done for less than 2 minutes after all ingredients have been put into the mixer. When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain other reasons, it shall be done on the smooth watertight platform large enough to allow efficient turning over the ingredients of concrete before and after adding water. Mixing platform shall be so arranged that no foreign materials get mixed with concrete nor does the mixing water flow out. Cement in required number of bags shall be placed in a uniform layer on top of the measured quantity of fine and coarse aggregate, which shall also be spread in a layer of uniform thickness on the mixing platform. Dry coarse and fine aggregate and cement shall then be mixed thoroughly by turning over to get a mixture to uniform color. Specified quantity of water shall then be added gradually through a rose-can and the mass turned over till a mix of required consistency is obtained. In hand mixing, quantity of cement shall be increased by 10 percent above that specified. Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge the first batch of concrete from the mixture shall contain only two thirds of normal quantity of coarse aggregate. Mixing plant shall be thoroughly cleaned before changing from one type of cement to another. c) Consistency: The degree of consistency which shall depend upon the nature of the work and methods of vibration of concrete shall be determined by regular slumps tests in accordance with I. S. 1199-1959. The slumps of 10 mm. To 25 mm. shall be adopted when vibrators are used and 80 mm. when vibrators are not used. d) Inspection: Contractor shall give the Engineer-in-charge due notice before placing any concrete in the forms to permit him to inspect and accept the false work and forms as to their strength, alignment, and general fitness but such inspection shall not relive the contractor of his responsibility for the safety of men, machinery, materials and for results obtained. Immediately before concreting, all forms shall be thoroughly cleaned. Centering design and its erection shall be got approved from the Engineer-in-charge. One carpenter with helper shall invariably be kept present throughout the period of concreting. Movement of labor and other persons shall be totally prohibited for reinforcement laid in position. For access to different parts, suitable mobile platforms shall be provided so that steel reinforcement in position is not disturbed for ensuring proper cover; mortar blocks of suitable size shall be cast and tied to the reinforcement. Timber, kapachi or metal pieces shall not be used for this purpose.

e) Transporting and laying: The method of transporting and placing concrete shall be as approved. Concrete shall be so transported and placed that no contamination, segregation or loss of its constituent material takes place. All formwork shall be cleaned and made free from standing water, dust show or ice immediately before placing of concrete. No concrete shall be placed in any part of the structure until the approval of the Engineer-in-charge has been obtained. Concerting shall proceed continuously over the area between construction joints. Fresh concrete shall not be placed against concrete which has been in position for more than 30 minutes unless a proper construction joints is formed. Concrete shall be compacted in its final position within 30 minutes of its discharge from the mixer. Except where otherwise agreed to by the Engineer-in-charge concrete shall be deposited shall be deposited in horizontal layers to a

Page 43: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

compacted depth of not more than 0.45 meter when internal vibrators are used and not exceeding 0.30 meter in all other cases. Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into place from a height exceeding 2 meters. When trucking or chutes are used they shall be kept close and used in such a way as to avoid segregation. When concreting has to be resumed on a surface which has hardened, it shall be roughened, swept clean, thoroughly wetted and covered with a 13 mm. Thick layer of mortar composed of cement and sand in the same ratio as in the concrete mix itself. This 13 mm. Layer of mortar shall be freshly mixed and placed immediately before placing of new concrete. Where concrete has not fully hardened, all laitance shall be removed by scrubbing the wet surface with wire or bristle brushes, care being taken to avoid dislodgement of any particles of coarse aggregate. The surface shall then be thoroughly wetted all free water removed and then coated with neat cement grout. The first layer of concrete to be placed on his surface shall not exceed 150 mm. In thickness and shall be well rammed against old work, particular attention being given to corners and close spots. All concrete shall be compacted to produce a dense homogeneous mass with the assistance of vibrators, unless otherwise permitted by the Engineer-in-charge for exceptional cases, such as concreting under water, where vibrators cannot be used. Sufficient vibrators in serviceable condition shall be kept at site so that spare equipment is always available in the event of breakdowns. Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse aggregate and begins to cream up to form an even surface. Compaction shall be completed before the initial setting starts i.e. Within 30 minutes of addition of water to dry mixture. During compaction, it shall be observed that needle vibrators are not applied on reinforcement which is likely to destroy the bond between concrete and reinforcement.

f) Curing: Immediately after compaction, concrete shall be protected from weather, including rain, running water, shocks, vibration, traffic, rapid temperature changes, frost and drying out process. It shall be covered with wet sacking, hessian or other similar absorbent material approved soon after the initial set and shall be kept continuously wet for a period of not less than 14 days from the date of placement. Masonry work over foundation concrete may be started after 48 hours of its laying but curing of concrete shall be continued for a minimum period of 14 days.

g) Sampling and Testing of concrete: Samples from fresh concrete shall be taken as per I. S. 1199-1959 and cubes shall be made, cured and tested at 7 days or 28 days as per requirements in accordance with I. S. 516-1959. A random sampling procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of being tested i.e. The sampling should be spread over the entire period of concreting and cover all mixing units. The minimum frequency of sampling of concrete of each grade shall be in accordance with following:

Quantity of concrete in the work

No. Of samples Quantity of concrete in the works

No. Of samples

1-5 Cmt. 1 16-30 Cmt. 3

6-15 Cmt. 2 31-50 4

51 and above + one additional for each additional 50 M. Or part thereof. NOTE: At least one sample shall be taken from each shift. Ten test specimens shall be made from each sample, five for testing at 7 days and the remaining five at 28 days. The samples of concrete shall be taken on each day of the concreting as per above frequency. The number of specimens may be suitably increased as deemed necessary by the Engineer-in-charge when procedure of tests given above reveals a poor quality of concrete and in other special cases. The average strength of the group of cubes case for each day shall not be less than the specified cube strength of 150 kg/Cm2 at 28 days. 20% of the cubes cast for each day may have value less than the specified strength provided the lowest value is not less than 85% of the specified strength. If the concrete made in accordance with the proportions given for a particular grade, does not yield the specified strength, such concrete shall be classified as belonging to the appropriate lower grade. Concrete made in accordance with the proportions given for a particular grade shall not however, be placed in a higher grade on the ground that the test strength are higher than the minimum specified. h) Stripping: The Engineer-in-charge shall be informed in advanced by the contractor of his intention to strike the form work. While fixing the time for removal of form work due consideration shall be given to local conditions, character of the structure the weather and other condition that influence the setting of concrete and of the materials used in the mix in normal circumstances (generally where temperatures are above 20ºc) and where ordinary concrete is used forms may be struck after expiry of periods specified in item No. 9.1 (A) for respective item of form work. All formwork shall be removed without causing any shock or vibration as would damage the concrete. Before the soffits and struts are removed the concrete surface shall be exposed where necessary in order to ascertain that the concrete has sufficiently hardened. Centering shall be gradually and uniformly lowered in such manner as to permit the concrete to take stresses due

Page 44: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

to its own weight uniformly and gradually. Where internal metal ties are permitted they or their removable parts shall be extracted without causing any damage to The concrete and remaining holes filled with mortar. No permanently embedded metal part shall have less than 25 mm cover to the finished concrete surface. Where it is intended to re-use the formwork, it shall be cleaned and made good to the satisfaction of the Engineer-in-charge. After removable of form work and shuttering the Executive Engineer shall inspect the work and satisfy by random checks that concrete produced is of good quality. Immediately after the removal of forms all exposed bolts etc., passing through the cement concrete member and use for shuttering or any other purpose shall be cut inside the cement concrete members to a depth of at least 25 mm. Below the surface of the concrete and the resulting holes be filled by cement mortar. All fine caused by form joints, all cavities produced by the removal of forms ties and all other holes and depressions honeycomb spots broken edges or corners and other defects shall be thoroughly cleaned, saturated with water and carefully pointed and rendered true with mortar of cement and fine aggregate mixed in the proportion used in the grade of concrete that is being finished and of as dry consistency as is possible to use. Considerable pressure shall be applied in filling and pointing to ensure through filling in all voids. Surfaces which are pointed shall be kept moist for a period of 24 hours. If rock pockets honeycombs in the opinion of the Engineer-in-charge are of such an extent or character as to affect the strength of the structure materially or to endanger the life of the steel reinforcement he may declare the concrete defective and require the removal and replacement of the portions of the structure affected.

(H) Mode of measurement and payment: The consolidated cubical contents of concrete work as specified in item shall be measured the concrete laid in excess of section shown on drawings or as directed shall not be measured. No deduction shall be made for, 1. Ends of dissimilar materials such as joints, beams, posts, girders, rafters, purling trusses, corbels and steps etc. Up to 500 Sq. Cm. In section. 2. Opening up to 0.1 Sq. M. The rate includes cost of all materials, labor, tools and plant required for mixing, placing in position, vibrating and compacting, finishing as directed curing and all other incidental expenses for producing concrete of specified strength. The rate excludes the cost of form work. The rate shall be for a unit of one cubic meter. For reinforced concrete work as specified in this item in addition the following stipulations shall be followed if applicable. The bars shall be kept in position by the following methods: 1. In case of beam and slab construction sufficient number of precast cover blocks in cement mortar 1: 2 (1 cement: 2 coarse sand) about 4 cms. X 4 cms. Section and of thickness equal to the specified cover shall be places between the bars and shuttering as to secure and maintain the requisite cover of concrete over the reinforcement. 2. In case of cantilevered or doubly reinforce beams of slabs the main reinforcing bars shall be held in position by introducing chain spacers or supports bars at 1.0 to 1.0 meters centers. 3. In case of columns and walls the vertical bars shall be kept in position by means of timber templates with slots accurately out in them. The tempts shall be removed after concreting has been done below it. The bars may also be suitably tied by means of annealed steel wires to the shuttering to maintain their position during concreting. 4. All bars projecting from pillars, columns beams, slabs etc to which other bars and concrete are to be attached or bounded to later on shall be protected with a coat of thin neat cement grout, if the bars are not likely to be incorporated with succeeding mass of concrete within the following 10 days. This coat of thin neat cement shall be removed before concreting. 5. Mode of measurement and payment: The volume occupied by reinforcement shall not be deducted from R.C.C. work. The rate shall be for a unit of one cubic meter.

ITEM NO.8 Providing formwork of ordinary timber planking so as to give a rough finish including centering, shuttering, strutting and proppimg etc. height of propping and centering below supporting floor to celing not exceeding 4 M and removal of the same for in sity reinforced concrete and plinth concrete work in [A] Foundations, Footings, Bases of columns etc and mass concrete.

1.0 Materials :

1.1 The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.

1.2 The dimensions of scantlings and battens shall conform to the design. The strength of the wood shall not be less than that assumed in the design. 2.0 Workmanship : 2.1 The form work shall conform to the shape lines and dimensions as shown on the plans and be so constructed as to remain sufficiently rigid during the placing and

Page 45: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

compacting of the concrete. Adequate arrangements shall be made by the contractor to safe-guard against any settlement of the form work during the course of concreting and after concreting. The form work of shuttering, centering, scaffolding bracing etc. Shall be as per design.

2.2 Cleaning & Treatment of forms : 2.2.1 All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the form before the concrete is placed and the form work in contact with concrete shall be cleaned and thoroughly wetted or treated. The surface shall be then coated with soap solution applied before concreting is done. Soap solution for the purpose shall be prepared by dissolving yellow soap in water to get consistency of paint. Alternatively a coat of raw linseed oil or form oil of approved manufacture may be applied in case steel shuttering us used. Soap solution or raw linseed oil shall be applied after thoroughly cleaning the surface. Care shall be taken that the coating does not get on construction joints surface and reinforcement bars.

2.3 Stripping time : 2.3.1 In normal circumstance and where ordinary cement is used forms may be struck after expiry of following periods :

(a) Sites of walls columns and vertical faces of beam 24 to 48 hours. (b) Beam soffits. (Props left under) – 7 days. (c) Removal of props slabs. (i) Slabs spanning upto 4.5 m. – 7 days (ii) Spanning over 4.5 mm. – 14 days.

(d) Removal of props to beams and Arches. (i) Spanning upto 6 m. – 14 days. (ii) Spanning over 6 m. – 21 days.

2.4 Procedure when removing the form work : 2.4.1 All form work shall be removed without such shock or vibrations as would damage the reinforced concrete surface. Before the soffit formwork and struts are removed the soffits and the concrete surface shall be exposed where necessary in order to ascertain that the concrete has sufficiently hardened.

2.5 Centering : 2.5.1 The centering to be provided shall be got approved. It shall be sufficiently strong to ensure absolute safely of the formwork and concrete work before during and after pouring concrete. Watch should be kept to see that behavior of centering and formwork is satisfactory during concreting. Erection should also be such that it would allow removal of forms in proper sequence without damaging either the concrete or the forms to be removed.

2.5.2 The props of centering shall be provided on firm foundation or base of sufficient strength to carry the loads without any settlement.

2.5.3 The centering and formwork shall be inspected and approved by the Engineer-in-charge before concreting. But this will not relive the contractor of his responsibility for strength, adequacy and safety of form work and centering. If there is a failure of formwork or centering, contractor shall be responsible for the damages to the work, injury to life and damage to property.

2.6 Scaffolding :

2.6.1 All scaffolding, hoisting arrangements and ladders etc. Required for the facilitating of concreting shall be provided and removed on completion work by contractor at his own expense. The scaffolding, hoisting arrangements and ladders etc. Shall be strong enough to withstand all live, dead and impact loads expected to act and shall be subject to the approval of the Engineer-in-charge. However, contractor shall be solely responsible for the safety of the scaffolding, hoisting arrangement, ladders, work and workman etc.

2.6.2 The scaffolding, hoisting arrangement and ladders shall allow easy approach to the work spot and afford easy inspection.

2.6.3 The rate is applicable to all conditions of working and height upto 4 mts. The rate shall include the cost of materials and labor for various operations involved such as : (a) Splayed edges, notching, allowance for overlaps and passing at angles, battens centering, shuttering, strutting, propping Bolting, nailing, wedging, easing, striking and removal.

(b) Filleting to form stop chamfered edges or played external angles not exceeding 20 mm. Width to beams, columns and the Like.

(c) Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.

(d) Dressing with oil to prevent adhesion of concrete with shuttering and

(e) Raking or circular cutting.

2.7 Re-Use : 2.7.1 Before re-use all forms shall be inspected by Engineer-in-charge and their suitability ascertained. The forms shall be scarred, cleaned and joints gone over, repaired where required. Inside surface shall be retreated to prevent adhesion of concrete.

Page 46: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

3.0 Mode of measurements & payment :

3.1 Form work shall be measured as the area in square meters of shuttering in contract with concrete except in the case of inclined member and portion of curved pro-file and upper side in which case only area of underside shall be measured for payment.

3.4 Form work to secondary beams shall be measured up to the sides of main beams but no deduction shall be made from the form work of the main beam at the inter section point. No deduction shall be made from the form work of a column at inter section of beams.

3.5 The rate is for the completed item.

3.6 The rate shall be for a unit of one Sq. Meter.

ITEM NO. 9: Providing 15 mm thick cement plaster in single coat on brick/concrete walls for interior plastering upto floor two level and finished even and smooth in [I] Cement Mortar 1:3 [1-Cement : 3-Sand].

Materials:

1. Water: Shall be as per M1.

2. Cement mortar: Shall be as per M11. 3. Workmanship :

Scaffolding: Wooden bellies, bamboos, planks, treadles and other scaffolding shall be sound. These shall be properly examined before erection and use. Stage scaffolding shall be provided for ceiling plaster which shall be independent of the walls.

Preparation of back-ground: The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, efflorescence and other foreign matter by water or by brushing. Smooth surface shall be roughened by wire brushing if it is not hard and by racking if it is hard. In case of concrete surface, if a chemical retarder has been applied to the form work, the surface shall be roughened by wire brushing and all the resulting dust and loose particles cleaned off and care shall be taken that none of the retarders is left on the surface. Trimming of projections on brick/concrete surface where necessary shall be carried out to get an even surface. Racking of joints in case of masonry where necessary shall be allowed to dry out for sufficient period before carrying out the plaster work. The work shall not be soaked but only damped evenly before applying the plaster. If the surface becomes dry such area shall be moistened again. For external plaster, the plastering operation shall be started from top floor and carried downwards. For internal plaster, the plastering operations may be started whenever the building frame and cladding work are ready and the temporary supporting ceiling resting on the wall of the floor have been removed. Ceiling plaster shall be completed before starting plaster to walls.

Applications of plaster: The plaster about 15 x 15 cm shall be first applied horizontally and vertically at not more than 2 meters intervals over the entire surface to serve as gauge. The surfaces of these gauges shall be truly in plane of the finished plastered surface. The mortar shall then be applied in uniform surface slightly more than the specified thickness, and then brought to a true surface by working a wooden straight edge reaching across the gauges with small upward and sideways movement at a time. Finally, the surface shall be finished off true with a trowel or wooden float according as a smooth or a sandy granular texture is required. Excessive trowel ling or overworking the float shall be avoided. All corners, arises, angles and junctions be truly vertical or horizontal as the case may be and shall be carefully finished. Rounding or chamfering corners, arises junctions etc. shall be carried out with proper templates to the size required. Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster which is partially set shall be rejected and removed forthwith from the size. In suspending the work at the end of the day, the plaster shall be left out clean to the line both horizontally and vertically. When recommending the plaster, the edges of the old work shall be scraped clean and wetted with cement putty before plaster is applied to the adjacent areas to enable the two to properly join together. Plastering work shall be closed at the end of the day on the body of the wall and nearer than 15 cm. To any corners or arises. Horizontal joints in plaster work shall not also occur on parapet tops and copings as these invariably load to leakage. No portion of the surface shall be left out initially to be packed up later on. Each coat shall be kept damp continuously till the next coat is applied or for a minimum period of 7 days. Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of walls shall be avoided and only as much water as can be readily absorbed shall be used, excessive evaporation on the sunny or windward side of building in hot air or dry weather

Page 47: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

shall be prevented by handing matting‟s or gunny bags on the outside of the plaster and keeping them wet.

Mode of measurements & payment: The rate shall include the cost of all materials, labour and scaffolding etc. Involved in the operations described under workmanship. All plastering shall be measured in square meters unless, otherwise specified, Length, breath or height shall be measured correct to a centimeter. Thickness of the plaster shall be exclusive of the thickness of the key i.e. Grooves or open joints in brick work, stone work etc. Or space between laths. Thickness of plaster shall be average thickness with minimum 10 mm. at any point on this surface. This item includes plastering up to floor two levels. The measurement of wall plastering shall be taken between the walls or partition (dimensions before plastering being taken) for length and from the top of floor or skirting to ceiling for height. Depth of cover of cornices if any shall be deducted. Soffits of stairs shall be measured as plastering on ceilings. Flowing soffits shall be measured separately. For jambs, soffits, sills etc. For openings not exceeding 0.5 sq.mt. Each in area for ends of joints, beams, posts, girders, steps, etc. Not exceeding 0.5 sq. Mt. Each in area and for openings exceeding 0.5 sq. Mt. And not exceeding 3.00 sq. Mt. In each area deductions and additions shall be made in the following manner: 1. No deductions shall be made for ends of joints, beams, posts etc. And openings not exceeding 0.5 sq.mt. Each and no addition shall be made for reveals, jambs, soffits, sills etc. Of these opening for finish to plaster around ends of joints, beams, posts etc. 2. Deduction for openings exceeding 0.5 sq.mt. But not exceeding 3 sq.mt. Each shall be made as follows and no addition shall be made for reveals, jambs, soffits, sills etc. Of these openings. a. When both faces of all walls are plastered with same plaster, deduction shall be made for one face only. b. When two faces of wall are plastered with different types of plaster or if one faces is plastered and the other pointed, deductions shall be made from the plaster or pointing on the side of frame for door, window etc. On which width of reveals is less than that on the other side but no deductions shall be made on the outer side. Where widths of reveals on both faces of wall are equal, deductions of 50% of area of opening on each face shall be made from area of plaster and/or pointing as the case may be. For openings having door frames equal to projecting beyond the thickness of wall, full deduction for opening shall be made from each plastered face of the wall. In case of openings of area above 3 sq.mt, each deduction shall be made for opening but jambs, soffits and sills shall be measured. The rate shall be for unit of one sq. Metre.

ITEM NO. 10: White washing with lime on wall surface [two coats] to give an even shade including thoroughly booming the surface to remove all dirt, dust, mortar drops and other foreign matter.

(A) Materials: The clear collie shall be made from glue and boiling water by Mixing 1 kg. Mixture shall be suitably tinted where required for use under colored distemper if directed. Glue shall conform to I.S. 852-1969 (Specifications for animal glue). 1.2. Line used shall be freshly burnt class „C‟ Lime (fat lime) and white in colour conforming to I.S. 712-1973/ Water shall conform to M-1 Best quality of gum shall be used in the preparation of white wash. Ultramarine blue or Indigo: This shall conform to I.S. 55-1970 for points, and shall be used for preparation of white wash. Pigments: Mineral colours, not affected by lime shall be used in preparing colour wash. (B) Workmanship:

Preparation of white wash solution: Surface already white or colour. The fat lime shall be slaked at site and shall be mixed and stirred with about five litres of water for 1 kg of un slaked lime to make a thin cream. This shall be allowed to stand for a period of 24 hours and then shall be screened through a clean coarse cloth, 4 kg. Of gum dissolved in hot water shall be added to each cubic metre of lime cream. Small quantity of ultramarine blut (Up to 3 gms. Per kg. Of lime) shall also be added to the last two coats of white wash solution and the whole solution shall be stirred thoroughly before use.

Preparation of surface: The surface shall be thoroughly cleaned of all dust, dirt, mortar cropping and other foreign matter before white wash is to be applied. The surface spoiled by smoke soot shall be scraped with steel wire brushes or steel scrapers or shall be rubbed with over-burnt surkhi or brick bats. The surface shall be then broomed to remove all dust, dirt and shall be washed with clean water. Oil or grease spots shall be removed by suitable chemical and smooth surface shall be rubbed with wire brushes.

Page 48: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

All unsound portion of the surface plaster shall be removed to full depth of plaster in rectangular patches and plastered again after raking the masonry joints properly. Such portion shall be wetted and allowed to dry. They shall then be given one coat of white wash. All unnecessary nails shall be removed; the holes cracks patches etc. shall be made good with materials similar in composition to the surface to be prepared.

Scaffolding: Wherever scaffolding is necessary it shall be erected in such a way that as far as possible on part of scaffolding shall rest against the surface to be white or colour washed. A properly secured strong and well tied suspended platform (Zoola) may be used for white washing of ceilings proper stage scaffolding shall be erected where necessary.

(C)Application of white wash: On the surface so prepared the white wash shall be applied with “Moon” brush. The first stoke of the brush shall be from top downwards, another from bottom upwards over the first stroke and similarly one stoke from the right another from the left, over the first stroke brush before it dries. This will from one coat. Each coat shall be allowed to dry before next coat is applied. Number of coats as specified in item shall be applied. It shall present smooth and uniform finish free from brush marks and it should not come off easily when rubbed with finger. Splashing and dropping if any on the doors and windows, ventilators etc. Shall be removed and the surface cleaned. Priming and Alkali resistant treatments, scraping of surface washing etc. Surface spoiled by smoke soot removed of oil and great spots treatment for infection with efflorescence molds moss, fungi algae and lichen and patch repairs to plaster wherever done shall not be paid extra.

(D)Mode of measurements & payment: All the work shall be measured in the decimal system as under: (a) Dimensions shall be measured to the nearest 0.01 M. (b) Area in individual items shall be worked out to the nearest 0.01 Sq.mt. All the work shall be measured in sq.mt. Deductions for jambs, soffits, sills etc. for opening not exceeding 0.5 sq.mt. each in area for ends of joints, posts, beams, girders, steps etc. not exceeding 0.5 sq.mt. each in area and for opening exceeding 0.3 sq.mt. and not exceeding 3.0 sq.mt. each in area deductions and additions shall be made as under: a. No deductions shall be made for ends of joints beams, posts etc. and openings not exceeding 0.5 sq. mt each. No addition shall be made for reveals, jambs, soffits, sills etc. of these openings: b. When both the faces of walls are provided with finish, deduction shall be made for one face only. c. When each face of walls are provided with different finish deduction shall be made for that side of frame for door, windows etc. on which width of reveals is less than that of the other side, where width of reveals on both faces of wall are equal, deduction of 50% of area of opening on each face shall be made from total area of finish. d. When only one face of wall is treated and the other face is not treated, full deduction shall be made if the width of reveal on the treated side is less than that on the untreated side, but if the width of the reveal is equal or more than on the untreated side neither deductions nor additions be made for reveals, jambs, soffits, sills etc. e. In case of area of opening exceeding 3 sq.mt, each deduction shall be made for openings but jambs, soffits, shall be measured. f. No deduction shall be made for attachment such as casing, conducts, pipe, electric wiring and the like. g. Corrugated surfaces shall be measured flat as fixed and not girth. The quantities so measured shall be increased by the following percentage and the resultant shall be included with the general areas. (a) Corrugated steel sheets 14% (b) Corrugated A.C. sheets 20% (c) Semi Corrugated A.C. sheets 10% (d) Nainital pattern roof (Plain sheeting with rolls) 10% (e) Nainital pattern roof (with corrugated sheets) 25% h. Cornices and other wall features, when they are not picked out in a different finish/ colour shall be girthed and included in the general area. i. The rate shall include the cost of all materials, labour, scaffolding, protective measures etc. involved in all the operations described above. j. The rate shall be for a unit of one sq.mt.

ITEM NO. 11: Execution of any item of SOR as per instruction of Engineer in charge.

Detail specification shall be adhered as per item description and general specification booklet of R&B G.o.G. Contractor is bound to execute any Item of R & B S.O.R. as per site requirement and instruction of E.I.C. All materials required to execute any item shall be brought by contractor at his own cost.

Page 49: GUJARAT STATE ELECTRICITY CORPORATION LTD. Office/Sikka...GUJARAT STATE ELECTRICITY CORPORATION LTD. THERMAL POWER STATION, SIKKA-361141 (DIST. JAMNAGAR) PHONE NO.: (0288) 2344106

The payment shall be made as per unit of respective item only. Note: - General specification of latest edition of PWD Handbook Vol – I & II is also applicable for all items & Contractor are bound accordingly.

Chief Engineer (Gen) GSECL, SIKKA TPS.