Balfour Beatty Rail, Inc. The Transit Division of Balfour Beatty Rail has safelyThe Transit Division of Balfour Beatty Rail has safely delivered complex transit projects, proving expertise in track construction, electrification, signaling, communications and asset management.
2
RTD Eagle P3 ProjectRTD West Corridor ProjectRTD On-Call Services Contract
Transit Division
WAMT
ME
RTD On-Call Services ContractDenver
NH
WY RICT
OHNJNE
SD
ND
NV
ORME
NY
MI
VT
MA
IA
MN
WIID
PABARTSan Francisco
DEMDUT OH
NM OK
KS
NE
AZ
NV
KYVAWV
IL
SCAR
MO
IN
TN
GA
MTA Gold LineSCRRA-Metro Link
CA CO
NC TPGGoldsboro
TX LAGA
NM SCALMS
LA
GAMTA EXPO TrackTransit Division OfficeWest Covina
FLCorporate OfficeAtlanta
3
Mid-City Exposition LRT ProjectPROJECT START DATEPROJECT START DATE
January 2009PROJECT COMPLETION DATE
March 2011 (Forecast) ( )OWNER
Exposition Line Construction AuthorityPROJECT VALUE
$35 illi$35 millionPROJECT SCOPE
Installation of new direct fixation, embedded, and ballasted track for 7 mile LRT extension. Refurbish existing embedded track and tie in to the existing Metro Blue Line.
4
Metrolink Communication and Signal ProjectPROJECT START DATE
February 2009PROJECT COMPLETION DATE
February 2012 (Forecast) with 2 one-year optionsp
OWNER
Southern California Regional Rail Authority (SCRRA)
P VPROJECT VALUE
$45 millionPROJECT SCOPE
Install, modify, and test wayside electrical , y, ypower services and local distribution, wayside signal system, highway-rail guard crossing warning systems and pedestrian devices, wayside hazard detectors, and monitoring devices, communicationsmonitoring devices, communications systems.
5
Denver On-Call ProjectPROJECT START DATE
March 2009PROJECT COMPLETION DATE
July 2013 OWNEROWNER
Denver Regional Transportation District (RTD)
PROJECT VALUE
$56 millionPROJECT SCOPE
Retrofit the TREX project to install new traction power substations for 4 car trainstraction power substations for 4 car trains, upgrade the Elati Yard traction power substation and system plc upgrade.
6
Denver West Corridor ProjectPROJECT START DATE
September 2009PROJECT COMPLETION DATE
December 2012(Forecast) ( )OWNER
Denver Regional Transportation District (RTD)
PROJECT VALUEPROJECT VALUE
$62 millionPROJECT SCOPE
Provide ten (10) new 1500kW tractionProvide ten (10) new 1500kW traction power substations, catenary, signals and communication system for the West Corridor Project.
7
BART Walnut Creek ProjectPROJECT START DATEOJ C S
August 24, 2009PROJECT COMPLETION DATE
December 23, 2010OWNEROWNER
Bay Area Rapid Transit (BART)JV PROJECT VALUE
$28 millionPROJECT SCOPE
Track, system & signal work includes installing owner furnished special track work, train control equipment, 2 No. gap breaker stations complete with DC switchgear, 1000Vd f d d t ti 34 5KV EPR bl1000Vdc feeder and traction power 34.5KV EPR cables and raceways, contact rail system, modifications of existing train control rooms.
8
Eagle P3 ProjectPROJECT START DATE
SEPTEMBER 2010PROJECT COMPLETED (D/B)
JUNE 2016JUNE 2016OWNER
REGIONAL TRANSIT DISTRICT
Estimated P3 Project Value
$ 3.0 Billion for Design/Build and Operations and Maintenance for 40 years.Maintenance for 40 years.
BBRI is in a 50/50 Joint Venture with Fluor for the Design/Build and also holds 1/3 equity in the O & M Joint Venture.M Joint Venture.
9
Expo Mid-City/Exposition Corridor Light Rail Transit Project
C-5 Track/Train Power, Control & Communications
Farmdale Station/Parking Lot & Street Improvements
No. XP8901-841
Contract Between:Contract Between:• Exposition Metro Line Construction Authority• Balfour Beatty Joint Venture
Other Important Agencies: Culver City, City of Los Angeles
10
Project DescriptionJoint Venture with BBII and BBRI for StationsJoint Venture with BBII and BBRI for Stations3400’ of track, traction power, overhead catenary system, & communication systems for Culver City Station
11
Install TPSS8Building
Hanging OCS Wires Pouring Plinths
Project DescriptionFarmdale station: construct at-grade station g
Hotel DemolitionBefore After
Farmdale Platform
12
Project Description Option 1 - Bike Path (Complete May 1, 2012)
Construction of 180’ retaining wall2575” of bike path that includes 250 tons aggregate basePortland cement concrete (500 tons)( )IrrigationTrees Lightingg g
13Current Conditions at Bike Path Location
Project DescriptionOption 2 – Culver City Lot A (Complete May 1, 2012)p y ( p y , )
Clean up existing lotAdd concrete gutter and fencing
14
Current Conditions at Lot A
Project DescriptionOption 3 – Culver City Lot B
Construction of 30,000SF lot that consists of drainage, placement of “mix seal” (noplacement of mix seal (no asphalt), irrigation, landscape and lighting
15
Current Conditions at Lot B
Project DescriptionOption 4 – Street Improvements on Washington & National
Includes widening roadway with new underground drainageElectrical Lights and traffic signalsNew asphalt concreteNew asphalt concretePCC structural sections
16
Current Conditions on National Current Conditions on Washington
Expo Mid-City/Exposition Corridor Light Rail Transit Project
C-6 Venice Blvd Underpass: Bridge & Street Improvements
No. XP8901-828
Design Build Contract Between:• Exposition Metro Line Construction Authorityp y• Balfour Beatty Infrastructure, Inc.
Other Important Agencies• Culver City• City of Los Angeles• Cal trans
17
Additional Work for Expo AuthorityVenice Blvd Underpass: $15.7 Million, additional bridge over Venice Blvd –p gapproximately 500’Complete Date 2013