INSTITUT KEMAHIRAN BELIA NEGARA BANTING, SELANGOR MALAYSIA VERTICAL DRAINS Category: Infrastructure: Road Client: Public Works Dept Malaysia Engineer: Jurutera Konsult Maju Contractor: Pembinaan Megah Ikhlas Sdn Bhd Area / Quantity: 121,400 m2 MY-PVD-LPT2 PACKAGE 12-REV.0 Page 1 PROJECT DESCRIPTION An Institute with buildings up to 5-storey high were to be constructed over soft clay. As the underlying soil was highly compressible, it was proposed that the soil be consolidated before construction of building foundations to minimize post-construction settlement. M astaka SEKOLAH REKABENTUK PENGELUARAN motorcycle parking SEKOLAH KEJURUTERAAN AWAM covered parking primary entrance post guard landscape visitor's parking covered parking visitor's parking chainlink fence BRICK FENCING walkway landscape landscape ASRAMA LELAKI ASRAMA PEREMPUAN ASRAMA LELAKI covered walkway BOUNDARY LINE reserve road 30m from centre road 40ft building setback BOUNDARY LINE 40ft building setback Site Layout Plan SOIL CONDITION / GEOTECHNICAL PROBLEM Project soil profile: Project specifications: Settlement: Total post construction settlement shall not exceed 10% of primary consolidation after completion of work. Seven (7) years post construction settlement shall not exceed 10% of the sum of the total theoretical primary consolidation settlement and secondary settlement. In addition, total post construction settlement shall not exceed 250 mm. Within the first seven (7) years of service, the differential settlement shall not exceed 100 mm within a length of 50 m in areas of transition between piled approach embankments and general low embankment or 100 mm within a length of 100 m in areas remote from structures and transition zones. MENARD SOLUTION Prefabricated Vertical Drain (PVD) + Surcharge (by others) was installed to accelerate rate of consolidation and improve soil undrained shear strength.

Upload: vuthu

Post on 29-Jan-2017

220 views

Category:

Documents


0 download

TRANSCRIPT

INSTITUT KEMAHIRAN BELIA NEGARA

BANTING, SELANGOR – MALAYSIA

VERTICAL DRAINS Category: Infrastructure: Road

Client: Public Works Dept Malaysia

Engineer: Jurutera Konsult Maju

Contractor: Pembinaan Megah Ikhlas Sdn Bhd

Area /

Quantity: 121,400 m2

MY-PVD-LPT2 PACKAGE 12-REV.0 Page 1

PROJECT DESCRIPTION

An Institute with buildings up to 5-storey high

were to be constructed over soft clay.

As the underlying soil was highly compressible,

it was proposed that the soil be consolidated

before construction of building foundations to

minimize post-construction settlement.

OK U

R uang Jem ur an

K o r i d o rL obi

Tangga 02

Tangga 03

Tangga

04

Tangga

01

Tan das / Bi lik Mandi

u ti lit yM &E

B il ik 0 6 B ili k 07

Bi li k Tam uB ili k Sakit

Bi li k 10

Bi li k 12

Bi li k 11

Bi li k 09

Bi li k 08

Bi li k 03

B ili k 01

Bi li k 02

Bi li k 04

Bi li k 05

B il ik

B asuh

B il ik

G osok

Set or

P ejabat

Penye lia A sr am a

OK U

K o r i d o rL obi

Tangga

02

Tangga

03

Tangga 04

Tangga 01

Tan das / Bi lik Mandi

u ti lit yM &E

B il ik 0 6 B ili k 07

Bi li k Tam uB ili k Sakit

Bi li k 10

Bi li k 12

Bi li k 11

Bi li k 09

Bi li k 08

Bi li k 03

B ili k 01

Bi li k 02

Bi li k 04

Bi li k 05

Set or

M

astaka

SEKOLAHREKABENTUK

PENGELUARAN

motorcycleparking

SEKOLAHKEJURUTERAAN

AWAM

covered parking

primaryentrance

post guard

OKU

R uang Jemur an

K o r i d o r L obi

Tang ga 02

Tang ga 03

Tang ga

04

Tang ga

0 1

Ta ndas / B ili k Ma ndi

uti li ty M &E

Bil ik 06Bi li k 07

B ili k Tamu Bil ik Saki t

B ili k 10

B ili k 12

B il ik 11

B ili k 09

B ili k 08

Bi li k 03

B ili k 01

Bi li k 02

Bi li k 04

Bi li k 05

Bil ik

Basuh

Bil ik

G osok

S etor

P ejab at

Pe nyeli a Asr ama

landscapevisitor's parkingcovered

parking

visitor's parking

chainlink fence BRICK FENCING

walkway

landscape

landscape

ASRAMA LELAKI

ASRAMA PEREMPUAN

ASRAMA LELAKI

covered walkway

BOUNDARY LINE

reserve road 30m from centre road

40f

t bu

ildin

g se

tbac

k

BO

UN

DA

RY

LIN

E

40ft building setback

Site Layout Plan

SOIL CONDITION / GEOTECHNICAL PROBLEM

Project soil profile:

Project specifications:

Settlement:

� Total post construction settlement

shall not exceed 10% of primary

consolidation after completion of work.

� Seven (7) years post construction

settlement shall not exceed 10% of

the sum of the total theoretical

primary consolidation settlement and

secondary settlement. In addition,

total post construction settlement shall

not exceed 250 mm.

� Within the first seven (7) years of

service, the differential settlement

shall not exceed 100 mm within a

length of 50 m in areas of transition

between piled approach embankments

and general low embankment or 100

mm within a length of 100 m in areas

remote from structures and transition

zones.

MENARD SOLUTION

Prefabricated Vertical Drain (PVD) +

Surcharge (by others) was installed to

accelerate rate of consolidation and

improve soil undrained shear strength.