Page 1: New Prebid Policy and Procedure Division of Construction Management

New Prebid Policy and Procedure

Division of Construction Management

Page 2: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

The New Prebid Process

• 2010 C&MS distributed 1/30/2010• Revised section 102.05• Revised section 102.07• New Policy• New Procedure

2

Page 3: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

2010 C&MS 102.05

102.05 Examination of Bid Documents and Project Site  and Submission of Prebid Questions. 

Should a question arise at any time during the examination of Bid Documents or investigation of the site the Bidder may seek clarification by submitting a Prebid Question.  Submit all Prebid Questions in writing via the Department’s website. 

3

Page 4: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

2010 C&MS 102.05Continued…

The Department will post a response on its website to all questions submitted before a deadline of 10:00 am four working days prior to the public opening of Bids.  Responses to Prebid Questions posted on the Department’s website are not  revisions to the Bidding Documents and are not binding. 

4

Page 5: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

2010 C&MS 102.05Continued…

The Department is not obligated to respond to, or otherwise act upon, a Prebid Question submitted after this deadline, but reserves the right to act upon any information received.  

5

Page 6: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

2010 C&MS 102.07 

Notify the Department of errors and omissions in the Bid Documents.  Make notification by submitting a question in the manner described in 102.05.  The Contractor’s duty to disclose errors and omissions is not only a bidding requirement but is also a legal requirement that cannot be ignored. 

6

Page 7: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

2010 C&MS 102.07 Continued…

Failure to provide the required notification prior to the opening of bids shall constitute a waiver by the Contractor and does not obligate the Department for any costs based upon any apparent or patent ambiguity arising from insufficient data or obvious errors in the Bid documents.  Knowingly withholding information regarding an error or omission in the Bid Documents, or intentionally misrepresenting an item of Work for financial or competitive gain may result in civil or criminal penalties in excess of the value of the item bid.

7

Page 8: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

27-020 Prebid Policy 

Policy Statement:

The Ohio Department of Transportation (ODOT) is authorized to contract with the lowest competent and responsible bidder for work described by Bid Documents prepared for construction projects. All Bid documents become part of the contract between ODOT and the successful bidder, therefore, all information contained therein is deemed to be correct unless otherwise revised by addenda. Bidders are required to notify the Department of errors and omissions in the Bid Documents by the timely submission of a written Prebid Question.

8

Page 9: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

27-020 Prebid Policy 

Policy Statement (Continued): An Addendum is used to make modifications to the

Bid Documents including corrections when errors and omissions are discovered. Prebid Questions that only require the clarification of facts already in the Bid Documents do not require an Addendum, and may be answered in the form of a written response posted for public viewing and do not become a part of the contract.

9

Page 10: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

27-020 Prebid Policy 

Policy Statement (Continued):

It is the policy of the Department to answer Prebid Questions and to issue Addenda in a uniform and timely manner.

The Department will follow the detailed instructions in the Prebid Question and Addenda Process Standard Procedure as published by the Division of Construction Management.

10

Page 11: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

510-020 Prebid Procedure

Prebid Responsibilities:

The Central Office Prebid Coordinator will be responsible for:

• Ensuring the timely response to all Prebid Questions

• Monitoring Prebid Questions and answers.• Ensuring the publication of addenda created and

posted on the system.• Ensuring the publication of any notices issued to

Bidders.

11

Page 12: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

510-020 Prebid Procedure

Prebid Responsibilities:

• The Office of Contracts is responsible for creating and maintaining the Prebid Question Tracking System (PQTS) and publishing addenda and notices issued to Bidders.

• The Office of Estimating is responsible for analyzing addenda, coordinating the update of all specific item changes via the Trns*Port computer system and creating an updated EBS file.  

12

Page 13: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference 13

Office of Contracts Website

Page 14: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

510-020 Prebid Procedure

Prebid Responsibilities:

• The District Deputy Director is responsible for appointing the District Prebid Coordinator who will monitor PQTS for Prebid Questions applicable to the District.

• The District Production Office is responsible for responding to all Prebid Questions submitted for all district projects within the allowable timeframes.

14

Page 15: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

510-020 Prebid Procedure

Deadlines:• Contractors must submit no later than 10:00 AM, 4 days prior to

the Public Opening of Bids Date. • The District will provide a response to all properly submitted

Prebid Questions as soon as possible but no later than two working days after receiving the question.

• Prebid meeting minutes with the scanned or digitized signature sheets should be e-mailed to the Office of Contracts IT section as an Adobe Acrobat document within 1 week of the prebid meeting.

• Districts must submit addenda to the Central Office Prebid Coordinator by 8:00 AM, 3 working days prior to the public opening of bids.

• The deadline for posting addenda is 10:00 AM, 3 working days prior to the public opening of bids.

15

Page 16: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

510-020 Prebid Procedure

Addenda:

• Plan sheets being revised and included with the addendum will denote changes by “clouding” the revised text and/or drawing to clarify. The District Production Office remains responsible for submitting corrected/revised sheets along with any clouded sheet submittal.

16

Page 17: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

510-020 Prebid Procedure

17

Example Plan Sheet Clouding

Page 18: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference

510-020 Prebid Procedure

Addenda:

• When an Addendum is issued in response to a Prebid Question, do not include the text of the Prebid Question in the Addendum.

18

Page 19: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference 19

510-020 Prebid Procedure

Office Of Contracts Website:

https://extranet.dot.state.oh.us/groups/contracts/Lists/ConstructionBiddingDocs/Links.aspx

Page 20: New Prebid Policy and Procedure Division of Construction Management

2010 Conaway Conference 20

New Prebid Procedure

• Gary Angles, Prebid / Addendum Coordinator: – 614.644.7175

• Jeff Hisem, EBS and estimate changes: – 614.644.6388

• Tina Collins, Prebid Web, database: – 614.466.2314

Page 21: New Prebid Policy and Procedure Division of Construction Management

Questions?

2010 Conaway Conference 21