nhai.org.innhai.org.in/spw/iereport/mpr-for the month of august 2014... · web viewthe project...

80
Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – AUGUST 2014 INDEX S. No DESCRIPTION P.No . 1 INDEX MAP 2 2 EXECUTIVE SUMMARY 3-5 3 PROJECT BACKGROUND 6 4 CONTRACT DATA 7-8 5 SALIENT FEATURES OF THE PROJECT 9 6 SUBMISSION OF RELEVANT MANUAL & DOCUMENTS BY CONCESSIONAIRE 10 7 STATUS OF PERMITS 11 8 TECHNICAL MAN POWER- INDEPENDENT ENGINEER 12 9 TECHNICAL MAN POWER- CONCESSIONAIRE 13 10 TECHNICAL MAN POWER- SUB CONTRACTOR 14-17 11 PRE CONSTRUCTION ACTIVITIES 18-19 12 DETAILS OF CORRESPONDENCE FROM IE 20-27 13 STATUS OF PLANT & MACHINERY 28 14 STATUS OF DRAWING (Structures/Highways) 29-39 15 CONSTRUCTION PROGRAMME BY THE CONCESSIONAIRE, S-CURVE 40 16 PROJECT WORK PROGRESS 41-42 17 DETAILS STATUS OF STRUCTURE 43-52 18 BAR CHART 53-55 19 E EMERGENCY SERVICE 56 20 QUALITY ASSURANCE & QUALITY CONTROL 57-67 21 SAFETY AND ROAD MAINTENANCE 68 22 WEATHER REPORT 69 Page | 1

Upload: vankhanh

Post on 10-Apr-2018

224 views

Category:

Documents


6 download

TRANSCRIPT

INDEX

S.No

DESCRIPTION

P.No.

1

INDEX MAP

2

2

EXECUTIVE SUMMARY

3-5

3

PROJECT BACKGROUND

6

4

CONTRACT DATA

7-8

5

SALIENT FEATURES OF THE PROJECT

9

6

SUBMISSION OF RELEVANT MANUAL & DOCUMENTS BY CONCESSIONAIRE

10

7

STATUS OF PERMITS

11

8

TECHNICAL MAN POWER- INDEPENDENT ENGINEER

12

9

TECHNICAL MAN POWER- CONCESSIONAIRE

13

10

TECHNICAL MAN POWER- SUB CONTRACTOR

14-17

11

PRE CONSTRUCTION ACTIVITIES

18-19

12

DETAILS OF CORRESPONDENCE FROM IE

20-27

13

STATUS OF PLANT & MACHINERY

28

14

STATUS OF DRAWING (Structures/Highways)

29-39

15

CONSTRUCTION PROGRAMME BY THE CONCESSIONAIRE,

S-CURVE

40

16

PROJECT WORK PROGRESS

41-42

17

DETAILS STATUS OF STRUCTURE

43-52

18

BAR CHART

53-55

19

E

EMERGENCY SERVICE

56

20

QUALITY ASSURANCE & QUALITY CONTROL

57-67

21

SAFETY AND ROAD MAINTENANCE

68

22

WEATHER REPORT

69

23

PHOTOGRAPHS

70

EXECUTIVE SUMMARY

BACKGROUND:

Ministry of Road Transport and Highways (MORT&H) has embarked on a staged up gradation programme of various National Highway. The widening is necessary to develop National Highway corridors where traffic intensity has increased significantly and there is requirement of augmentation of capacity for safe and efficient movement of traffic. MORT&H has authorized National Highway Authority of India (NHAI) to implement the development projects for six laning of Barwa Adda to Panagarh section of National Highway No.-2 in the state Jharkhand and West Bengal by way of Public-Private Partnership (PPP) mode.

The project corridor on NH-2, a part of Golden Quadrilateral is passing through plains of Gangetic region of landlocked states of Bihar & Jharkhand and connects the National Capital with Kolkata traversing almost 1465 km, passing through the states of west Bengal, Bihar, Jharkhand, Uttar Pradesh, Haryana & Delhi. Apart from cutting across several other NFs it traverses through major towns of Durgapur-Asansol, Dhanbad, Aurangabad, Varanasi, Allahabad, Kanpur, Agra, Faridabad, thereby catering to traffic with East West spectrum within the country.

The project road of NH-2 starts from Barwa-Adda in Dhanbad district in the State of Jharkhand Km 398.240 and ends at Panagarh in Bardhaman district of West Bengal km 521.120. Total length of stretch is 122.88 km passes through Barwaadda, Ponrki, Bhitiya, Kaladih, Amarpur, Govindpur Bajar, Fakirdih,Phufwadih, Gopalganj, Nirsa, Belchahri in the district of Dhanbad in Jharkhand State and Salanpur, Niyamatpur, Asansol, Bogra Chatti, Palas danga, Raniganj More, Mangalpur, Andal More, Kada Road, Durgapur, Muchipara, Rajbandh Chati, Panagarh in the district of Bardhman in West Bengal.

NHAI have awarded the task of Feasibility and Detailed engineering for improvement of this section of NH-2 to M/s ICT, India.

NHAI has awarded the work of Design, Build, Finance, Operate and Transfer of Km. 398.240 to Km. 521.120 including a bypass of length 8.120 Km. and service road of length 149.09 at selected locations to M/s Barwa Adda Expressway Ltd. (Mumbai).

NHAI has awarded the Independent Consultancy for the project to M/s SA Infrastructure Consultants Pvt. Ltd. in association with Sugam Technocarts Pvt. Ltd.

The Project Road

The concessionaire has divided the entire project road length into the following 3 Sections:

Sections

Chainage

From

Chainage

To

Total Length

(Km)

Sub-Contractor

Section-I

398.240

441.565

43.325

M/s APCO Infratech Ltd.

Section-II

441.565

471.150

29.585

M/s APCO Infratech Ltd.

Section-III

471.150

521.120

49.970

M/s Oriental Structural Engineers Pvt. Ltd

Project Milestones

Mile

stone

Description

Scheduled Time Period

Current Status

1

Construction of Project Highway shall have commenced.

(Expended not less than 10% of the total capital cost set forth in Financial Package)

27th September 2014 ( 180th day from Appointed Date)

Five months completed

2

Construction of all bridges shall have commenced.

(Expended not less than 25% of the total capital cost set forth in Financial Package)

31st March 2015 (365th day from Appointed Date)

-

3

Construction of all Project Facilities shall have commenced.

(Expended not less than 75% of the total capital cost set forth in Financial Package)

30th March 2016 (730th day from Appointed Date)

-

4

The scheduled Six Laning Date

26th September 2016 (910th day from Appointed Date)

-

CONDITION PRECEDENT

S. N.

Compliance

Responsible Authority

Execution date

Current Status

1

ROW Handing Over

NHAI

28/03/2014

16/05/2014

27/05/2014

06/06/2014

10/06/2014

14/06/2014

01/07/2014

10/07/2014

21/08/2014

NHAI has handed over EROW of 534.80 Ha +12.286 Ha + 5.076 Ha +4.456 Ha+10.816Ha+ 4.138 ha = 571.572 Ha + 4.801 +1.612 Ha +1.962 Ha= 579.947Ha

79.28 %

2

Permission of Environment Protection & Conservation of Site

NHAI

-

Received.

3

Escrow Agreement

BDU

Nov 01, 2013

Executed

4

Substitution Agreement

BDU

Nov 01, 2013

Executed

5

Performance Security to Client

BDU

Oct 29, 2013

Submitted

6

Delivery of Financial Model to Client

BDU

Nov 01, 2013

Executed

7

Delivery of Warranties from All Consortium Member to client

BDU

Apr 23, 2013

Executed

8

Delivery to the client a legal opinion from the legal counsel of the Concessionaire

BDU

Apr 30, 2013

Executed

9

Appointment of Independent Engineer

NHAI

19.02.2014

M/s S.A. Infrastructure Consultants Pvt. Ltd. in association with Sugam Technocrats Pvt. Ltd.

10

State Support Agreement

NHAI

Jharkhand-13.04.2010

West Bengal 13.04.2010

Available for both the States.

11

Approval from Railway Authorities in form of GAD for construction of ROB

NHAI

08.06.2012

09.09.2011

GADs for both the ROBs have been approved.

PROJECT DETAILS :-

The Project Road is 122.88 KM Long consisting of 1-Bypass of Length 8.120 Km for Congested Area at Panagarh including structures as under:-

A. HIGHWAYS:-

(a) Total Length of Existing Carriage Way = 121.990 Km.

(b) Total No. of lane = 2*3 lane

(c) Total length of Service Road = 149.09 Km.

(d) Width of Service Road = 7m

(c) Bypass Details:-

. Panagarh Bypass = 8.120km

B. STRUCTURES:-

(a) Major Bridges= 3 Nos.

(b) Minor Bridges = 20 Nos. (11 New & 9 Widening)

(c) Grade Separator = 12 Nos.

(d) ROBs= 2 Nos.

(e) VUPs and PUPs=20/11 Nos.

(f) Box Culverts /Hume Pipe/Slab Culverts=202 Nos.

(g) Over Pass/ Under Pass = 2/2 Nos

CONTRACT DATA

CONCESSIONAIRE:

Name of Project :Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Employer:National Highways Authority of India

Concessionaire:Barwa Adda Expressway Limited,

Plot No. C-22, G Block, Bandra Kurla

Complex, Mumbai-400051

Project Developer : IL&FS Transportation Networks Limited

Construction Contractor:M/s Apco Infratech Pvt. Ltd. &

M/s Oriental Structural Engineers Pvt.Ltd.

Date of Agreement:May 08, 2013

Development Period:From 08/05/2013 to 31/03/2014

Financial closure : 01/11/2013

Appointed Date:01/04/2014

Project Cost/ Premium :Rs. 1665 Crore

Premium of Rs. 42 Crore on appointed date and shall be increased by 5% as compared to the immediately preceding year.

Construction Period:910 days.

Scheduled Date of Project Completion:26/09/2016

Concession Period:20 Years Including 30 months of Construction Period.

Performance Security :Rs. 107.19 Crore

INDEPENDENT CONSULTANT/ENGINEER:

Engineer (Consultants):M/s SA Infrastructure Consultants Pvt. Ltd in Association with Sugam Technocrats Pvt.Ltd.

Head Office Address :C/o S.A. Infra Structure Consultants Pvt. Ltd.101-102, CS-1 Gyandkhand-II, Indrapuram, Ghaziadad (UP) 201014. Ph.No.: 0120-2607756,

[email protected]

Office Address :Plot No.16/14, Bengal Ambuja, City Center, Durgapur, Dist:- Burdwan (W B), Pin-713216

Phone No.: 0343-2546115

[email protected]

Date of Agreement :19.01.2014

Commencement date :19.02.2014

Contract Period :36 months

Scope of Consultancy:Independent Engineer

SALIENT FEATURES OF THE PROJECT :-

THE PROJECT ROAD

The Project road comprises off from 398.240 to Km.521.120 Km of existing road of NH-2. The Salient Features of the project are as under:-

S.No.

Description

Quantity

1

Length of Project

122.88 KM

2

(a) By Pass

Total Length 8.120 Km

(b) Existing Carriageway

Length 121.990 Km.

3

Width of carriageway

2*12.25=24.50M

4

Service Road

149.09 Km.

5

Width of service road

7 M

6

ROBs

2 Nos at Km 443+710 & Km 520+373

7

Grade Separator

12 Nos. at km.398+811,407+538,408+326,456+312,464+185,475+670,476+050,496+609,501+996,504+287,506+200,515+983

8

Major Bridges - (3 Nos)

MJB 3 Nos. at Km.464+674,517+095,518+829

9

Minor Bridges (20 Nos)

MNB 11 Nos. at Km. 405+330,409+876,415+120,429+973,437+047,450+140,461+652,464+903,468+620,497+840,509+953, Widening 9 Nos. at Km. 445+596,462+895,463+091,463+710,471+006,485+002,492+871,495+735,507+503

10

Vehicular Under Passes

VUP 20 Nos. at Km. 403+440,411+374,413+886,421+400,428+208,433+563,447+771,451+153,460+036,467+115,469,750,473+340,479+109,486+427,489+702,491+451,494+430,509+559,518+221,519+349

11

Pedestrian Underpasses

PUP 11 Nos. at Km. 398+495,399+230,407+400,409+088,417+953,424+400,476+430,504+555,510+700,512+920,514+900

12

Box /HP/Slab Culverts

202 Nos.

13

BUS Lay Byes

LHS 20 Nos.

RHS 20 Nos.

14

Truck Lay Byes

LHS 10 Nos.

RHS 04 Nos.

15

Toll Plaza

2 Nos. at Km. 438+500,507+000.

16

Truck Parking Places

2 Nos. at Km. 398+250 to Km 398+750 & Km 441+800 to Km 442+300.

Submission of Relevant Manual & Documents by Concessionaire:-

SI. No

Description

Remarks

1

QAP

Received

2

Work Methodology

Received

3

Work Schedule

Received

4

EMP

Not received

5

Material Report of Borrow areas

Received

6

Quarry location

Received

7

Safety Manual

Not received

Status of Permits:-

SI . No

Descriptions

Applied Date

1

Permits for extraction of boulder from quarry from Additional District Magistrate (ADM) Mines

15.06.2012

2

Permit for installation of crusher from village Panchayat and State/Central Pollution Control Board

25.11.2013

3

License for explosives from the office of Explosive controller

09.02.2013

4

NOC consent/Clearance required from village panchayat & State/Central Pollution Control Board/Dept.

Vill Panchayat - 25.11.13West Bengal Pollution Control Board - 20.12.13

5

Clearance required from village panchayat & State/Central Pollution Control Board

Vill Panchayat - 25.11.13West Bengal Pollution Control Board - 20.12.13

6

Permission required from village panchayat and ADM mines for Government & private land

Vill. Panchayat - 25.11.13

7

Permission from Forest Department and other applicable agencies

Dhanbad (Jh) - 08.11.11Burdwan (WB) - 23.09.13, 25.09.13, 30.09.13,30.09.13, 03.10.13

List of Technical Man Power of I.E.:-

Technical Manpower- Independent Engineer

PROFESSIONAL STAFF

Sl.

Name

Designation

Date of

Joining

1

Mr. Vinod Prasad Jaiswal

Team Leader cum Sr. Highway Engineer

2

Mr. A. N. Dhodapakar

Sr. Bridge Design Engineer

06.03.2014

3

Mr. Manoj Kumar Jaiswal

Resident cum Highway Engineer I

19.02.2014

4

Mr. Saroj Kumar Singh

Resident cum Highway Engineer II

20.03.2014

5

Mr. Yogendra Prasad

Highway Design Engineer I

02.06.2014

6

Nityanand Kumar

Highway Design Engineer I

19.02.2014

7

Mr. R.K.Rai

Bridge / Structural Engineer

19.02.2014

8

Mr. Kedar Paswan

Sr. Pavement Specialist

19.05.2014

9

Mr. Vijay Kumar Singh

Sr. Quality cum Material Expert

19.02.2014

10

Mr. Satyendu Sinha

Traffic & Transportation Expert

20.5.2014

11

Mr. R. S. Sharma

Road Safety Expert

12

Mr. Upendra Kumar Singh

Financial Expert

13.05.2014

13

Mr. Rajeshwar Kumar Singh

Legal Expert

22.05.2014

SUB PROFESSIONAL STAFF

1

Mr. Binash Ranjan Das

Survey Engineer I

2

TBN

Survey Engineer II

3

Mr. Nitai Satapathy

Survey Engineer III

26.03.2014

4

Mr. Santosh Sharma

Survey Engineer IV

28.03.2014

5

Mr. Lalmani Pratap Singh

Asst. Highway Engineer I

13.08.2014

6

Mr. Amit Kumar Basu

Asst. Highway Engineer II

03.03.2014

7

Mr. Ajoy Banerjee

Asst. Highway Engineer III

07.04.2014

8

Mr. Sachin Kumar

Asst. Highway Engineer IV

08.04.2014

9

Mr. Aniruddha Chatterjee

CADD Expert I

15.05.2014

10

TBN

CADD Expert II

11

TBN

Environmental Engineer

12

TBN

Asst. Bridge Engineer I

13

Mr. Hasan Faraz

Asst. Bridge Engineer II

09.08.2014

14

Mr. Kumar Kaushal

Asst. Bridge Engineer III

26.03.2014

15

Mr. Inderpal Singh

Asst. Bridge Engineer IV

16

Mr. Rakesh Kumar Chakarborthy

Asst. Quality cum Material Engineer I

13.08.2014

17

Mr. Asim Kumar Mahapatra

Asst. Quality cum Material Engineer II

03.03.2014

18

Mr. Anup Mahadani

Asst. Quality cum Material Engineer III

07.04.2014

19

Mr. Tuna Behera

Asst. Quality cum Material Engineer IV

28.04.2014

20

TBN

Electrical Engineer I

21

TBN

Electrical Engineer II

22

TBN

HTMS / Toll Expert I

23

TBN

HTMS / Toll Expert II

24

TBN

Quantity Surveyor I

25

TBN

Quantity Surveyor II

26

Mr. R.K.Singh

Horticulture cum Landscaping Expert I

27

TBN

Horticulture cum Landscaping Expert II

List of Tech. Man Power of Concessionaire:-

Sl. No.

Name

Designation

Remarks

Concessionaire Durgapur (Km. 398.240 to Km. 521.120)

1.

Mr. V.P.KATTI

PROJECT DIRECTOR

2.

Mr. Anil Kumar Mishra

Sr. Planning Engineer

3.

Mr. Vimlesh Kumar

Sr. Quantity Surveyor

4.

Mr. Piyush Jain

Assistant Planning

5.

Mr. Kaushal Mehta

Finance and Accounts

6.

Mr. Abdesh Jha

Administration

7.

Mr. I. Nagaraju

Q.A./Q.C. Head

8.

Mr. Bipad Bhaanjan Ghosh

Sr. Surveyor/CAD

9.

Mr. Vikram Dutta

L.A. Officer

10.

Mr. Amit Garg

L.A. Officer

11.

Mr. S.P.Singh

Utility Shifting (Electrical)

12.

Mr. U C Srivastav

Sr. Manager O & M Tolling

13.

Mr. Praveen Jindal

Manager - Tolling

14.

Mr. Abhishek Anand

Trainee (Highway)

15.

Mr. Krishnendu

Technician

Concessionaire I Dhanbad (Km. 398.240 to Km. 441.565)

16.

Mr. Sanjiban Dutta

Section In-Charge

17.

Mr. Santosh Kumar

Highway/Bridge Engineer

18.

Mr. Naresh Chandra Sao

Assistant Bridge Engineer

19.

Mr. Umesh Sharma

Assistant Material Engineer

20.

Mr. Uttam Kumar Gayan

Assistant Surveyor

21.

Mr. Raj Kumar Ghosh

Lab Technician

Concessionaire II Asansol (Km. 398.465 to Km. 471.150)

22.

Mr. Malay Dutta

Section In-Charge

23.

Mr. Pramod Kumar Pandey

Assistant Highway Engineer

24.

Mr. Himanshu Bushan Panda

Bridge Engineer

25.

Mr. Suresh R

Assistant Bridge Engineer

26.

Mr. Pravin Kumar Sharma

Assistant Material Engineer

27.

Mr. Manoj Kumar Yadav

Assistant Surveyor

28.

Mr. Somnath Chatterjee

Lab Technician

Concessionaire III Durgapur (Km. 471.150 to Km. 521.120)

29.

Mr. Zulfequar Ahmed

Bridge Engineer

30.

Mr. Rajesh Kumar

Assistant Highway Engineer

31.

Mr. Aman Sachdeva

Assistant Bridge Engineer

32.

Mr. Jyoti Prakash

Lab Technician

List of Tech. Man Power of the Sub-Contractor :-

(APCO Infratech Limited) Section I

Sl. No.

Name

Designation

Remarks

Sr. Project Manager

1.

Mr. Satpal Singh

Sr. General Manager

Highway

2.

Mr. Umesh Chand Singh

AGM Highway

3.

Mr. Sanjiv Kumar

Sr. Manager

4.

Mr. Neeraj Pandey

Jr. Engineer

Structure

5.

Mr. Amitabh Kumar

Sr. Engineer

6.

Mr. Jai Prakesh Tiwari

Sr. Project Engineer

7.

Mr. Abhishek Pratap Singh

DET

8.

Mr. Ajit Kumar Yadav

Engineer

9.

Mr. Raju Kumar Singh

Sr. Foreman

Planning & Billing

10.

Mr. Krishan Murari Varma

Sr. Engineer - Billing

11.

Mr. Krishan Chand

Document Controller

12.

Mr. Vanu Pratap Gupta

GET

13.

Mr. Jatin Sharma

Billing Engineer

Quali1ty Control Engineers

14.

Mr. Sarad Kumar Singh

Asst. Engineer

15.

Mr. Natwar Batra

Jr. Engineer

16.

Mr. Pravin Kumar Singh

GET

17.

Mr. Sashi Bhusan Kumar

Lab Technician

18.

Mr. Shayam Prakash Das

Lab Technician

19.

Mr. Pankaj Kumar

Lab Technician

Surveyor

20.

Mr. Praveen K Srivastav

Sr. Supervisor

21.

Mr. Sarya Pratap Kunwar

Sr. Supervisor

22.

Mr. Uttam Kumar Verma

Sr. Supervisor

23.

Mr. Ashish Kumar Mishra

Asst. Supervisor

Mechanical Engineer

24.

Mr. B. Anjaneyulu

Manager

25.

Mr. Mahamad Rashid

Sr. Engineer-Plant

26.

Mr. Umesh Bisht

Mechanical Engineer

27.

Mr. Rajat Singh

GET

28.

Mr. Brajesh Kumar Sharma

Data Entry Operator

Civil Supervisor

29.

Mr. Bineshwar Singh

Supervisor

30.

Mr. Pradip Kumar Singh

Supervisor

31.

Mr. Dharmendra Singh

Civil Supervisor

32.

Mr. Ranjeet Singh

Supervisor

33.

Mr. Shahrukh Khan

Supervisor

34.

Mr. Babu Kumar Singh

Supervisor (Borrow Area)

35.

Mr. Digvijay Singh

Civil Supervisor

Store

36.

Mr. Pradip Kumar Mishra

Sr. Store Officer

37.

Mr. Munna Kumar Singh

Store Officer

Admin & Accounts

38.

Mr. Partha Majumber

Dy. Manager

39.

Mr. S.R. Srivastav

Sr. Manager ( (P & A)

40.

Mr. Rajneesh Kumar

Accountant

41.

Mr. Raj Kumar Sharma

Officer

42.

Mr. Ram Mahajon

Supervisor (Admin)

43.

Mr. Indra Bhusan Kumar

Manager

IT Dept.

44.

Mr. Bipin Kumar Sharma

IT Executive

(APCO Infratech Limited) Section II

Sl. No.

Name

Designation

Remarks

Project Manager

1.

Mr. Manish Mishra

Project Manager

Highway

2.

Mr. R. P.Chowdhury

Manager

3.

Mr. Mukesh Kumar Singh

Engineer

4.

Mr. Chandra Prakash Singh

Supervisor

Structure

5.

Mr. Jagadish Srivastava

Manager

6.

Mr. Suresah Prasad Singh

Manager

7.

Mr. Yogesh Chandra

Jr. Engineer

8.

Mr. Jitendra Kumar Singh

Jr. Engineer

9.

Mr. Rajindar Kumar

Asst. Engineer

10.

Mr. Amresh Singh

Asst. Engineer

11.

Mr. Satosh Kumar Srivastav

Supervisor

Planning & Billing

12.

Mr. Bijay Kumar Sahoo

Engineer

Quality Control Engineers

13.

Mr. Suman Sanyal

Manager

14.

Mr. Chandan Singh

Jr. Engineer

15.

Mr. Md. Shakil

Sr. Lab Technician

16.

Mr. Raj Kamal Tiwari

Lab Technician

Surveyor

17.

Mr. Ashutosh Kumar Singh

Sr. Surveyor

18.

Mr. Santosh Kumar Tripathi

Sr. Surveyor

19.

Mr. Sunil Kumar Yadav

Surveyor

20

Mr. Atul Kumar

Asst. Surveyor

21.

Mr. Sandip Mishra

Asst. Surveyor

Mechanical & Mining Engineer

22.

Mr. Kishan Mahon Kushwaha

Manager

23.

Mr. Gautam Kumar Paul

Asst. Manager

24.

Mr. P Bhaskar Reddy

Engineer

25.

Mr. Jitendra Kumar

Manager - Mining

Store

26.

Mr. P. P. Rajan

Manager

27.

Mr. Sanu Lal Verma

Sr. Store Keeper

28.

Mr. Atul Kumar Debey

Officer Store

29.

Mr. Shailendra Kumar Singh

Operator

Admin & Accounts

30.

Mr. Anil Kumar Singh

Manager Admin

31.

Mr. Sailendra Pattanayak

Dy. Manager Admin

32.

Mr. M. Srinivasa Rao

Dy. Manager Accounts

33.

Mr. Arun Kumar Singh

Executive Admin

34.

Mr. Gagan Kumar Gandhi

Accountant

35.

Mr. Chinmay Nayak

Officer Admin

36.

Mr. Pravat Kumar Rout

Accounts officer

Safety

37.

Mr. Manoj Kumar Giri

Safety Officer

(Oriental Structural Engineers Pvt. Ltd.) Section III

Sl. No.

Name

Designation

Remarks

Chief Project Manager

1.

Mr. V. K. Chauhan

Chief Project Manager

Highway

2.

Mr. N. K. Singh

Sr. Project Manager

3.

Mr. Praveen Srivastava

Project Manager

4.

Mr. Shio Kr. Singh

Sr. Project Manager

5.

Mr. Krishna Kumar Singh

Sr. Project Manager

6.

Mr. Arindam Das

Project Engineer

7.

Mr. Arijit Mittal

Sr. Manager

8.

Mr. S. S. Negi

Dy. Manager

9.

Mr. Chandra Mani Kishore

Sr. Engineer

10.

Mr. B. Shankar Rao

Sr. Engineer

11.

Mr. Abhinav Singh

Sr. Engineer

12.

Mr. Avimunyu Pal

Dy. Manager

13.

Mr. Suresh Kushwh

Asst. Manager

14.

Mr. Ummed Singh

Asst. Manager

15.

Mr. U.K.Jha

Jr. Officer

16.

Mr. Saurabh Kumar

Sr. Supervisor

17.

Mr. K.K. Jha

Sr. Supervisor

18.

Mr. Manor Gautam

Supervisor

19.

Mr. Vinod Kumar Sharma

Sr. Supervisor

20.

Mr. Sanjay Kumar Bharti

Sr. Supervisor

21.

Mr. Shivaji Suryanvanshi

Sr. Supervisor

22.

Mr. Jitendra Kumar Yadav

Supervisor

23.

Mr. Pravesh Kumar Yadav

Supervisor

Structure

24.

Mr. Rajeev Naryal

Sr. Project Manager

25.

Mr. Surendra Chhabra

Project Manager

26.

Mr. Ramavatar Sharma

Dy. Project Manager

27.

Mr. Ashok Kumar Singh

Dy. Project Manager

28.

Mr. S. N. Mondal

Dy. Project Manager

29.

Mr. Chandan Rikhi

Project Engineer

30.

Mr. Pawan Kumar

Project Engineer

31.

Mr. Manish Kumar Singh

Sr. Engineer

32.

Mr. Shivram Mishra

Sr. Engineer

33.

Mr. Shiv Prakash Mourya

Asst. Engineer

34.

Mr. G. Haribabu

Asst. Engineer

35.

Mr. Arjun Kumar

Jr. Engineer

36.

Mr. Vijay Kr. Rai

Jr. Engineer

37.

Mr. Ambrish Kr. Rai

Jr. Engineer

38.

Mr. Rajeev Kumar

Foreman

39.

Mr. Ugrasen Singh

Asst. Manager

40.

Mr. Durga Prasad Gautam

Officer

41.

Mr. Amit Kumar Singh

Asst. Officer

42.

Mr. Krishna Kumar Tripathi

Supervisor

43.

Mr. Baidhnath Upadhyay

Supervisor

Planning & Billing

44.

Mr. Sumanta Chakraborty

Jt. GM

45.

Mr. Faishal Rizwan Siddqui

Sr. CAD Engineer

46.

Mr. Pawan Kumar

Asst. Engineer (Design)

47.

Mr. Avijit Mahanto

Asst. Manager

48.

Mr. Brijesh Kumar Mishra

Officer

49.

Mr. Abhist Narayan Singh

GET

Quality Control Engineers

50.

Mr. Anil Kumar

Project Manager

51.

Mr. Hari Singh

Dy. Manager

52.

Mr. Mukesh Kumar Singh

Asst. Engineer

53.

Mr. Sanjay Kumar Paul

Asst. Engineer

54.

Mr. Ravish Kumar

GET

55.

Mr. Manik Kumar Jha

Sr. Lab Technician

56.

Mr. Sunil Kumar Jha

Lab Technician

57.

Mr. Jay Prakash

Lab Technician

58.

Mr. Vinod Kumar Ray

Lab Technician

59.

Mr. Rajendra Pratap Singh

Lab Assistant

Surveyor

60.

Mr. Janmejay Rai

Project Engineer

61.

Mr. Vijay Kumar

Sr. Surveyor

62.

Mr. Santosh Kumar Pradhan

Surveyor

63.

Mr. Hardev Singh

Surveyor

64.

Mr. Ravindra Tiwari

Surveyor

65.

Mr. Biswanath Mondal

Surveyor

66.

Mr. Ashok Kumar Singh

Asst. Surveyor

Mechanical & Mining Engineer

67.

Mr. B.B. Singh

Project Manager (P&M)

68.

Mr. J. S. Virdhi

Project Manager (Crusher)

69.

Mr. Man Mohan Sharma

Jt. AGM

70.

Mr. L. K. Sharma

AGM

71.

Mr. D. P. Singh

Sr. Engineer

72.

Mr. Sailesh Kr. Dixit

Asst. Engineer

73.

Mr. Hazari Lal Prasad

Foreman (elect.)

74.

Mr. Ram Raj Yadav

Foreman (Plant)

75.

Mr. Salil Das Gupta

Dy. Manager

76.

Mr. S N. Mishra

Dy. Manager (Production)

77.

Mr. Arun Kumar Singh

DEO

78.

Mr. Kaladharan

Supervisor

Safety/HSE

79.

Mr. Jadav Akhtar

Officer

80.

Mr. Manoj Kumar Singh

Officer

Store

81.

Mr. Shubrata Ghoshal

Manager

82.

Mr. R. Bhattachrarya

Asst. Manager

83.

Mr. B.D.Tiwari

Asst. Manager

84.

Mr. Veer Singh

Asst. Manager

85.

Mr. Sabir Khan

Manager

86.

Mr. Dependra Kulshresta

Officer

87.

Mr. Bipadtaran Singha

Sr. Officer

88.

Mr. Surendra Pratap Sharma

Officer

89.

Mr. Moti Upadhyay

Sr. Supervisor

90.

Mr. Jay Chand Jha

Supervisor

91.

Mr. Vishwajit Singh

Supervisor

92.

Mr. Chandan Singh

Supervisor

HR/Admin

93.

Mr. Sandipan Dev Ray

Jt. GM

94.

Mr. Shailesh Sharma

Manager

95.

Mr. Sachin Kumar

Dy. Manager

96.

Mr. Anubhav Pandey

Dy. Manager

97.

Mr. Ujjaval Kumar

Officer (Liaison)

98.

Mr. Rajesh Tiwari

Asst. Officer

99.

Mr. Ajit Kumar

Asst. Officer

Accounts

100.

Mr. Dipak Kr. Dutta

Jt. AGM

101.

Mr. N. K. Srivastava

Manager

102.

Mr. Devendra Saptsishi

Manager

103.

Mr. Manas Kumar Mohanty

Asst. Manager

PRE CONSTRUCTION ACTIVITIES :-

SUB HEAD

STATUS OF LAND ACQUISITIONS:-

Description

Jharkhand

West Bengal

Total

Remarks

Length

43.16 km

79.72 km

122.880 km

Total land required

259.00 Ha

472.56 Ha

731.56 Ha

Handed over

185.00 Ha

394.947 Ha

579.947Ha

79.28%

To be handed over

74.00 Ha

77.613 Ha

151.613 Ha

20.72%

STATUS OF UTILITIES SHIFTING:-

S. N.

Activity

Unit

Total

Attended till this month

Balance

Remarks

1

Tree Cutting

Nos.

26670

12685

13985

52.44% balance

2

Electric Poles

Nos.

7194

Nil

7194

Work in progress (JSEB , DPL &WBSEDCL)

3

Electric Towers

Nos.

12

Nil

12

4

Water Pipe lines

RM

82379

Nil

82379

5

Gas Pipe Lines (GEECL)

RM

52100

Nil

52100

6

Petroleum Pipe line

RM

837

Nil

837

STATUS OF ENCUMBRANCES:-

SI. N.

Descriptions

Side

Units

(affected length)

Total

Attended till this month

Balance

Remarks

1.

Pucca Buildings

LHS

RHS

M

M

971

944

Nil

Nil

971

944

2.

Semi Pucca Buildings

LHS

RHS

M

M

991

1033

Nil

Nil

991

1033

3.

Kachha Buildings

LHS

RHS

M

M

409

381

Nil

Nil

409

381

4.

Religious Structures

LHS

RHS

M

M

41

43

Nil

Nil

41

43

DETAILS OF CORRESPONDENCE FROM IEs OFFICE-DURGAPUR

(AUGUST, 2014)

Correspondence with PD, NHAI PIU-Durgapur:

1. OUTGOING CORRESPONDENCE

Sl.

Ref. No.

Date

Subject

1

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/233

01.08.2014

Repair & Maintenance of Entrusted Highways Stretches.

2

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/236

01.08.2014

Verification & Certification of estimate for utility shifting received from Drinking water & sanitation Deptt. Jharkhand

3

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/238

02.08.2014

Submission of Monthly Accident Report

4

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/239

04.08.2014

Installation of CCTV Camera At Toll Plazas

5

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/240

04.08.2014

Submission of weekly status report for tree filling

6

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/241

04.08.2014

Submission of Invoice for the month of July 2014

7

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/247

06.08.2014

Proposal for development of way side amenities along National Highways

8

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/249

07.08.2014

Inspection report of Independent Engineer

9

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/251

09.08.2014

Estimate for cutting and transportation of trees from Km. 398.240 (Barwa Adda) to Km. 441.400 (Barakar) for six laning of NH-2.

10

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/252

11.08.2014

Submission of Weekly status reports for tree felling

11

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/256

14.08.2014

Reference received from PMO

12

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/260

14.08.2014

Compliance to the decision of executive committee held on 30.07.2014

13

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/261

16.08.2014

Repair and maintenance of entrusted highway stretches

14

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/263

19.08.2014

Submission of weekly status report for tree felling

15

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/265

19.08.2014

Repair and maintenance of Entrusted highways

16

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/266

19.08.2014

Fixing of 2 Nos. signed board 200 m away both side from Kalla More

17

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/268

19.08.2014

MPR-6 for the month of July 2014

18

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/270

21.08.2014

The Durgapur Projects Ltd. Proposal submitted vide letter no. DPL/ETD/CD/NHAI/579 dated 26.07.2014

19

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/279

23.08.2014

Condition of road between Asansol to Panagarh

20

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/280

25.08.2014

Submission of Weekly status reports for tree felling

21

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/282

25.08.2014

Estimate for cutting and transportation of trees from Km. 398.240 (Barwa Adda) to Km. 441.400 (Barakar) for six laning of NH-2.

22

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/291

26.08.2014

Vehicle Tracking System (VTS) with facility of Global Positioning System (GPS) to track Ambulance / Route Patrol vehicles.

23

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/303

28.08.2014

Joining report

24

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/304

29.08.2014

Verification of utility shifting estimate of DVC

25

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/308

30.08.2014

Construction of Road Under Bridge (RUB) for crossing NH-2 at Km. 430.200 in the state of Jharkhand to establish Railway Siding for Coal Transportation for 2 x 25MV Maithon Right Bank Thermal Power Station located at Maithon

2. INCOMING CORRESPONDECE

Sl.

Ref. No.

Date

Subject

1

15018/1/2013/PIU(DUP)/1988

02.08.2014

Meeting agenda on 30.07.2014 at Dhanbad

2

15018/1/2012/PIU(DUP)/1992

02.08.2014

Installation of CCTV cameras at all Toll Plazas

3

15018/1/2013/PIU(DUP)/2021

07.08.2014

Design and drawings for ROB at Km. 520.385

4

15018/1/2013/PIU(DUP)/2038

08.08.2014

Complaint received regarding tolling operations at Beliyad Toll Plaza

5

15018/1/2012/PIU(DUP)2074

11.08.2014

Reference received from prime minister office

6

13021/1/2001/PIU(DUP)2075

11.08.2014

Verification of proposal of DPL.

7

15018/1/2012/PIU(DUP)2079

11.08.2014

Estimate for cutting and transporting of tree from barwa adda (km.398.240)to barakar (km.441.400)for 6-laning of NH-2

8

15018/1/2013/PIU(DUP)/2081

11.08.2014

Maintenance of NH-2 from Main Gate to Bhiringi More durgapur toward burdwan bounds lane/DVC more,kajora bridge near chitadanga which has became dangerous due to broken/path holes.

9

15018/1/2013/PIU(DUP)/2082

11.08.2014

Construction of ROB's by NHAI- clearance/approval by railway

10

11020/7/2000/PIU(DUP)-TDS/2066

08.08.2014

Issue of TDS Certificate (Form No. 16A) for Qtr. 1 for the FY 2014-15

11

15017/1/2013/PIU(DUP)/2105

12.08.2014

Environment Clearance

12

15018/1/2013/PIU(DUP)/2098

12.08.2014

Tree felling from Barwa Adda to Barakar

13

15018/1/2013/PIU(DUP)/2100

12.08.2014

Fixing of 2 Nos. Signed Board 200mtr. Away both side from Kalla More

14

15016/1/2012/PIU(DUP)/2113

13.08.2014

Discrepancy in Land Acquisition proposal

15

15018/1/2012/PIU(DUP)/2114

12.08.2014

Compliance to the decision of Executive Committee held on 30.07.2014

16

15018/1/2012/PIU(DUP)/2115

13.08.2014

O & M of 4/6 laned corridors

17

15018/1/2013/PIU(DUP)/2119

13.08.2014

Providing protective culverts at IOCL pipeline crossings at malakhola (pipeline Ch.225.415) and Dhadka (pipeline Ch.236.327) & Rajbandh.

18

15018/1/2013/PIU(DUP)/2135

14.08.2014

Repair and maintenance of entrusted highways stretches

19

15018/1/2013/PIU(DUP)/2170

21.08.2014

Discrepancy in Land Acquisition proposal

20

15018/1/2013/PIU(DUP)/2172

21.08.2014

Regarding condition of road between Asansol to Panagarh

21

15018/1/2012/PIU(DUP)/2187

22.08.2014

MPR-6 for the month of July 2014

22

15018/1/2012/PIU(DUP)/2186

22.08.2014

Reg. Manpower for the month of July & August 2014

23

15018/1/2013/PIU(DUP)/2211

26.08.2014

Project specific websites

24

15018//2012/PIU(DUP)/2222

26.08.2014

Representation of the villagers of Shitla

25

15017/1/2012/PIU(DUP)/2238

27.08.2014

Verification of utility shifting estimate of DVC

26

15018/1/2013/PIU(DUP)/2240

27.08.2014

Inspection of materials against estimate no. 51/DESA/2013-14 and W.O. no. 10/ESE/ESC/DHN/D.H./2014-15

27

15018/1/2013/PIU(DUP)/2241

27.08.2014

Condition of road between Asansol to Panagarh

28

15017/1/2008/PIU(DUP)/1880

18.07.2014

Electrical Utility Shifting pertaining to JSEB/JUVNL./ Regarding Return of Measurement Book

29

15018/1/2013/PIU(DUP)/2248

28.08.2014

Verification of IPC-II for shifting of electrical utility of JUVNL.

30

15017/1/2008/PIU(DUP)/2252

28.08.2014

Minutes of meeting held 05 Aug 2014 at Hon,ble Minister of RT&H reg-Issues related to ROBs/RUBs constructed on NHs.

31

15018/1/2013/PIU(DUP)/2255

28.08.2014

Fixing of 2 Nos. Signed Board 200mtr. away both side from Kalla More

32

15018/1/2013/PIU(DUP)/2264

29.08.2014

Prayer for repairing of pot holes and patches on NH-2 at DVC More, DMC More, near Bajaj show room in between Bhiringi more and old court more and kada road more under Durgapur P.S.

33

15018/1/2013/PIU(DUP)/2265

29.08.2014

Guideline of MoEF for diversion of forest land

34

15018/1/2013/PIU(DUP)/2266

29.08.2014

Redressal of grievances of Shri Subrata Roy, Asansol, West Bengal

35

15018/1/2013/PIU(DUP)/2267

29.08.2014

Construction of Box culvert at IOCL pipeline crossing under Asansol jurisdiction at Melakhola (Pipe line Ch. 225.415) and Dhadka (Pipeline Ch. 236.327) during extension of 4 lane to 6 lane of NH-2

36

15018/1/2013/PIU(DUP)/2268

29.08.2014

Minutes of meeting of the monitoring committee to monitor the implementation of the provisions of the notification on Fly Ash Utilization

Correspondence with Concessionaire:

1. OUTGOING CORRESPONDENCE

Sl.

Ref. No.

Date

Subject

1

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/234

01.08.2014

Estimate of Cutting and transportation of tress from km 398.240 (Barwa-adda) to Km 441.400 (Barakar) for six laning of NH-2.

2

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/235

01.08.2014

Review of the GFC Drawings

3

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/237

02.08.2014

Review of Grade Separator at Chainage 501+985 & 515+983

4

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/242

05.08.2014

Borrow area test reports (B.A.-1)

5

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/243

05.08.2014

Approval of Concrete Mix Design of M-15 (PCC), M-20 (PCC), M-25(RCC), M-30 (RCC) & M-35 (Pile)

6

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/244

05.08.2014

Approval of Concrete Mix Design of M-25 (RCC), M-30 (RCC) of M/s India Cements Ltd for of OPC - 43 grade

7

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/245

05.08.2014

Review of Pavement Design

8

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/246

06.08.2014

Review of Pavement Design

9

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/248

06.08.2014

Review of Box Culverts, PUPs & VUPs

10

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/250

07.08.2014

Method statement of initial load test

11

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/253

14.08.2014

O & M of 4/6 laned Corridors

12

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/254

14.08.2014

Review of design and drawing of widening of existing Minor Bridges at Km. 445+595, Km. 471+006 (C.A. Ch. 471+000), Km. 495+735 (C.A. Ch. 495+725), Km. 507+503(C.A. Ch. 507+510), Km. 485+002 (C.A. Ch. 484+990), Km. 492+871(C.A. Ch. 492+860), Km. 462+895, Km. 463+091(C.A. Ch. 462+090) & Km. 463+710

13

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/255

14.08.2014

Maintenance of NH-2 road from Main Gate to Bhiringi More Durgapur toward Burdwan bound lane/DVC More, Kajora Bridge near Chitadanga which has became dangerous due to Broken / Pot holes

14

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/257

14.08.2014

Complaints received regarding tolling operations at Beliyad Toll Plaza

15

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/258

14.08.2014

Construction of Public facility i.e. Medical Aid Post and Washroom at Beliyad Toll Plaza, Maithan

16

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/259

14.08.2014

Trees from Km. 398.240 (Barwa Adda) to Km. 441.400 (Barakar) for six laning of NH-2

17

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/262

16.08.2014

Review of Plan and Profile drawings

18

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/267

19.08.2014

Discrepancy in Land Acquisition proposal

19

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/269

19.08.2014

Submission of progress report of the month July-Discrepancies in the status of drawings approval.

20

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/271

21.08.2014

Route Patrol Vehicle, Ambulance & Crane Reg.

21

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/272

21.08.2014

Review of Typical GADs of Pipe Culverts (Singal, Double and Multi cell)

22

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/273

21.08.2014

Submission of drawing in Auto Cad format

23

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/274

21.08.2014

Review of Plan and Profile drawings for Panagarh Bypass

24

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/275

21.08.2014

Review of detailed drawing for concrete edge drain

25

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/276

21.08.2014

Review of working drawing for various structures

26

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/277

22.08.2014

Review of Design and drawing of Grade Separator at Km. 501+996 & Km. 515+983.

27

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/278

23.08.2014

Review of Over Pass cross section Drawing.

28

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/281

25.08.2014

Vehicle Tracking System (VTS) with facility of Global Positioning System (GPS) to track Ambulance / Route Patrol vehicles.

29

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/283

25.08.2014

Use of steel reinforcement of 10mm dia in vertical walls @506+185

30

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/284

25.08.2014

Bottom steel exposed and soffit of slab badly damaged of existing VUP at Ch. 500+120

31

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/285

25.08.2014

Shifting of rising main along NH-2 under RCFA Pt-II W/S Scheme

32

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/286

25.08.2014

Shoulder repairing works

33

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/287

25.08.2014

Water Pipe line leakage at km 480+500(LHS) on road

34

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/288

25.08.2014

Shifting of 1m dia DW&SD water pipe line on Jharkhand state from km 405+350 to km 456+700

35

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/289

26.08.2014

Procurement of steel

36

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/290

26.08.2014

Review of Minor Bridge (Retaining and Widening) at Km. 445+595, km 471+006, km 495+735, km 507+503, km 485+002, km 492+871, km 462+895, km 463+091, 463+710

37

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/292

26.08.2014

In Liew of the major issues hampering taken off the project

38

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/293

26.08.2014

Site Inspection on 30.08.2014

39

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/294

26.08.2014

Review of plan & profile drawing from km.507+000 to km 512+000

40

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/295

26.08.2014

Safety arrangment at ongoing structures work from km 471.000 to km 521.000

41

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/296

26.08.2014

Approval of Concrete Mix Design of M-20 (RCC), M-35(RCC) & M-35 (R.E.Panel)

42

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/297

26.08.2014

Third party test report of Maheshpur and Jangalpur Quarry proposed to be used for Bituminous and concrete works for the project stretch from Km 398+240 to Km 471+150-source approval

43

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/298

26.08.2014

Borrow Area Test Report (B.A-2)

44

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/299

26.08.2014

Third party test report of Ajay river, Damodar River and Barakar River for source approval-

45

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/300

26.08.2014

Third party test report of fly ash proposed to be used for concrete works for the project stretch-source approval

46

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/301

27.08.2014

Shifting of rising main along NH-2 under RCFA Pt-II W/S Scheme

47

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/302

28.08.2014

Maintenance works

48

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/305

29.08.2014

GSB Mix Design

49

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/306

29.08.2014

Borrow Area Test Reports

50

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/307

30.08.2014

Fixing of 2 Nos. signed board 200 m away both side from Kalla More

51

SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/309

30.08.2014

Redressal of grievances of Shri Subrata Roy, Asansol, West Bengal

2. INCOMING CORRESPONDECE

Sl.

Ref. No.

Date

Subject

1

BAEL/PRJ/TEC/IEO/0219

02.08.2014

Submission of Monthly Fee statement schedule-M for the month of July-2014

2

BAEL/PRJ/TEC/IEO/0220

04.08.2014

Method Statement for Initial Vertical Load Test.

3

BAEL/PRJ/TEC/IEO/0221

04.08.2014

Submission of monthly accident report for the month of July 2014

4

BAEL/PRJ/TEC/IEO/0222

04.08.2014

Submission of weekly traffic census report

5

BAEL/PRJ/TEC/IEO/0223

05.08.2014

Submission of Borrow area test reports (B.A-2)

6

BAEL/PRJ/TEC/IEO/0224

06.08.2014

Submission of weekly accident report

7

BAEL/PRJ/TEC/IEO/0225

07.08.2014

Submission of Revised Plan and Profile Drawings from Km. 506.000 to 511.000

8

BAEL/PRJ/TEC/IEO/0226

07.08.2014

Submission of Pavement Design.

9

BAEL/PRJ/TEC/IEO/0227

07.08.2014

Independent Laboratory Testing Agency Approval.

10

BAEL/PRJ/TEC/IEO/0228

07.08.2014

Submission of Typical drawing for widening of Slab Culvert and Design and Analysis of Box culvert and VUP

11

BAEL/PRJ/TEC/IEO/0229

07.08.2014

Submission of Drawings and Design and Analysis of ROB at Km. 443+710

12

BAEL/PRJ/TEC/IEO/0230

07.08.2014

Third party test reports of Fine Aggregate of Ajay River, Damodar River and Barakar River proposed to based for concrete production from Km. 398+240 to 471+150 - Source approval.

13

BAEL/PRJ/TEC/IEO/0231

08.08.2014

Review of Pavement design.

14

BAEL/PRJ/TEC/IEO/0232

09.08.2014

Submission of GADs structural drawings (Foundation) and Design and Analysis of Grade Separator at Km. 464+185, Km. 504+287 & Km. 506+200 for the project

15

BAEL/PRJ/TEC/IEO/0233

11.08.2014

Submission of progress report for the month of July.

16

BAEL/PRJ/TEC/IEO/0234

12.08.2014

Submission of weekly traffic census report.

17

BAEL/PRJ/TEC/IEO/0235

12.08.2014

Submission of weekly accident report.

18

BAEL/PRJ/TEC/IEO/0236

13.08.2014

Compliance to your observations on Grade Separator at Km. 501+985 to Km. 515+983 submitted by us

19

BAEL/PRJ/TEC/IEO/0237

14.08.2014

Mix design for package III from Km. 471.150 to Km. 521.120.

20

BAEL/PRJ/TEC/IEO/0239

18.08.2014

Submission of Overpass GAD

21

BAEL/PRJ/TEC/IEO/0238

18.08.2014

Source approval for Bitumen Emulsion and modified bitumen

22

BAEL/PRJ/TEC/IEO/0240

19.08.2014

Design and drawing of widening of existing Minor Bridge at Km.. 445+595, Km. 471+006 (C.A. Ch. 471+000), Km. 495+735 (C.A. Ch. 495+725), Km. 507+503(C.A. Ch. 507+510), Km. 485+002 (C.A. Ch. 484+990), Km. 492+871(C.A. Ch. 492+860), Km. 462+895, Km. 463+091(C.A. Ch. 462+090) & Km. 463+710 compliance to the observations on the Minor Bridges.

23

BAEL/PRJ/TEC/IEO/0241

19.08.2014

Submission of working drawing for various structures

24

BAEL/PRJ/TEC/IEO/0242

19.08.2014

Submission of weekly accident report

25

BAEL/PRJ/TEC/IEO/0243

19.08.2014

Submission of weekly traffic census report

26

BAEL/PRJ/TEC/IEO/0244

19.08.2014

Submission of GSB Mix Design

27

BAEL/PRJ/TEC/IEO/0245

19.08.2014

Review of GADs of New Minor Bridge drawing

28

BAEL/PRJ/TEC/IEO/0247

20.08.2014

Compliance to your observations on the TCS drawing submitted by us.

29

BAEL/PRJ/TEC/IEO/0248

22.08.2014

Submission of various structural drawings and design and analysis

30

BAEL/PRJ/TEC/IEO/0249

23.08.2014

Submission of Wet Mix Macadam Mix design

31

BAEL/PRJ/TEC/IEO/0250

23.08.2014

Compliance of plan and profile drawing from Km. 507+000 to 521+000

32

BAEL/PRJ/TEC/IEO/0251

23.08.2014

Submission of various structural drawings and design and analysis of foundation of abutment A1 & A2 (Geotech Capacity) of Minor Bridge at Km. 464+912

33

BAEL/PRJ/TEC/IEO/0252

23.08.2014

Source approval for modified Bitumen

34

BAEL/PRJ/TEC/IEO/0254

25.08.2014

Relocation of existing culvert at Km. 496+749

35

BAEL/PRJ/TEC/IEO/0255

25.08.2014

Source approval for Bitumen Emulsion and modified bitumen

36

BAEL/PRJ/TEC/IEO/0256

25.08.2014

Submission of Borrow area Test Report (B.A.-12)

37

BAEL/PRJ/TEC/IEO/0257

26.08.2014

Submission of revised GAD of VUP at Km. 489+702 and compliance to your observations on Box Structures submitted by us

38

BAEL/PRJ/TEC/IEO/0258

26.08.2014

Vehicle Tracking system (VTS) with facility of Global Positioning system (GPS) to track Ambulance / Route Patrol vehicles

39

BAEL/PRJ/TEC/IEO/0259

26.08.2014

Submission of weekly Accident report

40

BAEL/PRJ/TEC/IEO/0260

26.08.2014

Submission of weekly traffic census report

41

BAEL/PRJ/TEC/IEO/0261

26.08.2014

Rate analysis for change of scope items

42

BAEL/PRJ/TEC/IEO/0263

27.08.2014

Shifting of rising main NH-2 under RCFA Pt-II W/S Scheme

43

BAEL/PRJ/TEC/IEO/0262

27.08.2014

DW&SD water pipe line of Jharkhand state from Km. 405+350 to Km. 456+700

44

BAEL/PRJ/TEC/IEO/0264

27.08.2014

Submission of working drawing for pipe culvert at Km. 439+709

45

BAEL/PRJ/TEC/IEO/0265

28.08.2014

Submission of GFC drawings

46

BAEL/PRJ/TEC/IEO/0266

28.08.2014

Discrepancy in land acquisition proposal from Km. 503+700 to 505+300 (LHS)

47

BAEL/PRJ/TEC/IEO/0267

29.08.2014

Submission of Borrow area test report (B.A. - 4)

48

BAEL/PRJ/TEC/IEO/0268

30.08.2014

Submission of design of approach slab and GFC drawings of Grade Separators at Km. 501+985 & Km. 515+983

STATUS OF PLANTS AND MACHINERY:-

The details of major plants and equipment deployed are mentioned below;

A. PLANTS

SI.No.

Description of Items

Unit

Total

Remarks

1.

Crusher Plant

Nos.

3

Installation in progress (Each 300 TPH)

2.

WMM Plant

Nos.

3

1.Commissioned 1 No. (200 TPH)

2.Ready for Calibration 1 no. (200 TPH),

3. Installation in Progress 1 No. (300 TPH)

3.

Batching plant

Nos.

3

1. Commissioned 1 No. (60 cum/hr)

2. Installation in progress 1 No (30 cum/hr).

2. Installation in progress 1 no. (60 cum/hr.)

4.

Hot mix Plant

Nos.

3

1. Mobilization in progress- 1 No.(200TPH)

2. Installation in progress 2 Nos.

(1 No. 200 TPH & 1 No. 160 TPH)

5.

Weight Bridge

Nos.

5

1. Commissioned = 3 Nos.

2. Installation in Progress 2 No.

(Each 100 MT Capacity)

B. MACHINERY

1.

Dozer

Nos.

3

2.

Excavator(1-1.2 cu.m bucket)

Nos.

7

3.

Motar Grader (135-195HP)

Nos.

7

4.

Vibr. Soil Compactor(8-10 t)

Nos.

12

5.

Tendam Roller

Nos.

3

6.

PTR

No

1

7.

Front Wheel Loader (3.0 cu.m)

Nos.

5

8.

Tipper (10T/25T)

Nos.

40

9.

Water tanker (10kl)

No

4

10.

JCB loader

Nos.

6

11.

Hydra Crane (14 MT)

Nos.

6

12.

Air Compressor

No.

2

13.

Diesel Tanker

No.

2

14.

DG (25-750KVA)

Nos.

24

15.

Transit Mixture

Nos.

10

16.

Broomer

No.

1

17.

Trailor

No.

1

C. SURVEY EQUIPMENTS

1.

Total station

Nos.

6

2.

Auto level

Nos.

16

STATUS OF DESIGN AND DRAWING:-

Sl No.

Chainage No. as per Drawing

Name of Structure

Description

Status

398.240 to 521.120

Plan and Profile

Km. 398.240 to 399.000(R1)

Km. 399.000 to 405.000(R2)

Km 405.000 to 407.000(R1)

Km. 407.000 to 410.000(R0)

Km 410.000 to 422.000(R1)

Km422.000 to 434.000(Ro)

Km 435.000 to 469.000(R2)

Km 471.000 to 507.000(R2)

Km507.000 to 513.000(R1)

Km513.000 to 516.000(R1)

Km 516.000 to 518.000(R2)

Km 518.000 to 519.000(R1)

Km 519.000 to 520.000(R4)

Km 520.000 to 521.000(R3)

Km 521.000 to 521.120(R2)

Commented for km 507+000 to km 521.120.

Under review

398.240 to 521.120

TCS

62 No TCS submitted

26 No. TCS Reviewed

398.240 to 521.120

Pavement Design

Design submitted

Commented

&

Under review

1

464+674

MAJOR BRIDGE

GAD Submitted

Under review

2

517+095

GAD & Design Submitted

Commented

&

Under review

3

518+829

GAD & Design Submitted

Under review

4

398+811

Grade Separator

GAD & Design(only super structure) Submitted

Under review

5

407+538

GAD Submitted

Under review

6

408+326

GAD & Design(only super structure) Submitted

Under review

7

456+312

GAD & Design(only super structure) Submitted

Under review

8

464+185

GAD Submitted

Under review

9

475+670

GAD & Design(only super structure) Submitted

Under review

10

476+050

GAD Submitted

Under review

11

496+609

GAD Submitted

Under review

12

501+996

GAD & Design Submitted

Under review

13

504+287

GAD & Design(only super structure) Submitted

Under review

14

506+200

GAD & Design(only super structure) Submitted

Under review

15

515+983

GAD & Design Submitted

Under review

16

405+330

MINOR BRIDGE (NEW)

GAD Submitted

Under review

17

409+876

GAD Submitted

Under review

18

415+120

GAD Submitted

Under review

19

429+973

GAD Submitted

Under review

20

437+047

GAD Submitted

Under review

21

450+140

GAD Submitted

Under review

22

461+652

GAD Submitted

Under review

23

464+903

GAD Submitted

Under review

24

468+620

25

497+840

GAD Submitted

Under review

26

509+953

GAD Submitted

Under review

27

445+596

MINOR BRIDGE (WIDENING)

GAD & Reinforcement Details

Reviewed

28

462+895

GAD & Reinforcement Details

Reviewed

29

463+091

GAD & Reinforcement Details

Reviewed

30

463+710

GAD & Reinforcement Details

Reviewed

31

471+006

GAD & Reinforcement Details

Reviewed

32

485+002

GAD & Reinforcement Details

Reviewed

33

492+871

GAD & Reinforcement Details

Under Reviewed

34

495+735

GAD & Reinforcement Details

Reviewed

35

507+503

GAD & Reinforcement Details

Reviewed

36

520+373

ROB

Design Submitted

GADs for both the ROBs have been approved

37

443+710

38

403+440

VEHICULAR UNDERPASS

GAD & Reinforcement Details

Reviewed

39

411+374

GAD & Reinforcement Details

Reviewed

40

413+886

GAD & Reinforcement Details

Reviewed

41

421+400

GAD & Reinforcement Details

Reviewed

42

428+208

GAD & Reinforcement Details

Reviewed

43

433+563

GAD & Reinforcement Details

Reviewed

44

447+771

GAD submitted

Under review

45

451+153

GAD submitted

Under review

46

460+036

GAD & Reinforcement Details

Reviewed

47

467+115

GAD & Reinforcement Details

Reviewed

48

469+750

Not submitted

49

473+340

GAD & Reinforcement Details

Reviewed

50

479+109

GAD submitted

Under review

51

486+427

GAD & Reinforcement Details

Reviewed

52

489+702

GAD submitted

Under review

53

491+451

GAD & Reinforcement Details

Reviewed

54

494+430

GAD & Reinforcement Details

Reviewed

55

509+559

GAD & Reinforcement Details

Reviewed

56

518+221

GAD & Reinforcement Details submitted

Under review

57

519+349

GAD & Reinforcement Details submitted

Under review

58

398+495

PEDESTRIAN UNDERPASS

GAD & Reinforcement Details

Reviewed

59

399+230

GAD & Reinforcement Details

Reviewed

60

407+400

GAD & Reinforcement Details submitted

Under review

61

409+088

GAD & Reinforcement Details

Reviewed

62

417+953

GAD & Reinforcement Details

Reviewed

63

424+400

GAD & Reinforcement Details

Reviewed

64

476+430

GAD & Reinforcement Details

Reviewed

65

504+555

GAD & Reinforcement Details

Reviewed

66

510+700

GAD & Reinforcement Details

Reviewed

67

512+920

GAD & Reinforcement Details

Reviewed

68

514+900

GAD & Reinforcement Details

Reviewed

69

398+519

BOX CULVERT

GAD & Design submitted

Under review

70

398+782

GAD & Design submitted

Under review

71

403+335

GAD & Design submitted

Under review

72

407+212

GAD submitted

Under review

73

407+422

GAD & design submitted

Under review

74

407+657

GAD submitted

Under review

75

408+867

GAD & Design submitted

Under review

76

409+060

GAD & Design submitted

Under review

77

409+366

GAD & Design submitted

Under review

78

411+332

GAD & Design submitted

Under review

79

411+391

GAD & Design submitted

Under review

80

413+926

GAD & Design submitted

Under review

81

415+216

82

417+933

GAD & Design submitted

Under review

83

421+327

84

421+497

GAD submitted

Under review

85

424+467

GAD submitted

Under review

86

427+882

GAD & Design submitted

Under review

87

428+025

GAD & Design submitted

Under review

88

443+615

GAD submitted

Under review

89

443+931

GAD submitted

Under review

90

444+047

GAD submitted

Under review

91

448+029

GAD & design submitted

Under review

92

450+883

GAD & Design submitted

Under review

93

451+334

GAD & Design submitted

Under review

94

456+131

GAD & Design submitted

Under review

95

456+175

GAD & Design submitted

Under review

96

456+355

GAD & Design submitted

Under review

97

461+940

GAD & Design submitted

Under review

98

467+300

GAD & Design submitted

Under review

99

470+025

GAD submitted

Under review

100

475+615

GAD submitted

Under review

101

486+816

GAD submitted

Under review

102

489+549

GAD & Design submitted

Under review

103

489+860

GAD submitted

Under review

104

494+593

GAD submitted

Under review

105

496+719

GAD submitted

Under review

106

496+749

GAD submitted

Under review

107

502+182

GAD submitted

Under review

108

502+372

GAD & Design submitted

Under review

109

502+538

GAD & Design submitted

Under review

110

505+934

GAD & Design submitted

Under review

111

506+169

GAD & Design submitted

Under review

112

509+255

GAD submitted

Under review

113

512+635

GAD submitted

Under review

114

512+997

GAD submitted

Under review

115

515+180

GAD & Design submitted

Reviewed

116

516+290

GAD submitted

Under review

117

518+180

GAD & Design submitted

Under review

118

519+690

GAD & Design submitted

Reviewed

119

399+140

PIPE CULVERT

GAD

Reviewed

120

400+070

GAD

Reviewed

121

400+450

GAD

Reviewed

122

401+625

GAD

Reviewed

123

404+115

GAD

Reviewed

124

405+204

GAD

Reviewed

125

405+777

GAD

Reviewed

126

408+207

GAD

Reviewed

127

409+125

GAD

Reviewed

128

409+707

GAD

Reviewed

129

410+140

GAD

Reviewed

130

410+760

GAD

Reviewed

131

414+040

GAD

Reviewed

132

414+240

GAD

Reviewed

133

414+750

GAD

Reviewed

134

418+107

GAD

Reviewed

135

418+748

GAD

Reviewed

136

420+178

GAD

Reviewed

137

425+330

GAD

Reviewed

138

425+900

GAD

Reviewed

139

426+935

GAD

Reviewed

140

429+325

GAD

Reviewed

141

429+449

GAD

Reviewed

142

430+200

GAD

Reviewed

143

431+110

GAD

Reviewed

144

433+265

GAD

Reviewed

145

433+600

GAD

Reviewed

146

434+231

GAD

Reviewed

147

435+200

GAD

Reviewed

148

435+750

GAD

Reviewed

149

435+915

GAD

Reviewed

150

436+127

GAD

Reviewed

151

436+655

GAD

Reviewed

152

438+313

GAD

Reviewed

153

438+605

GAD

Reviewed

154

438+860

GAD

Reviewed

155

438+966

GAD

Reviewed

156

439+370

GAD

Reviewed

157

439+710

GAD

Reviewed

158

440+015

GAD

Reviewed

159

440+095

GAD

Reviewed

160

440+660

GAD

Reviewed

161

440+850

GAD

Reviewed

162

441+010

GAD

Reviewed

163

444+420

GAD

Reviewed

164

444+595

GAD

Reviewed

165

444+897

GAD

Reviewed

GAD

Reviewed

166

446+015

GAD

Reviewed

167

447+048

GAD

Reviewed

168

448+397

GAD

Reviewed

169

449+080

GAD

Reviewed

170

450+505

GAD

Reviewed

171

450+690

GAD

Reviewed

172

450+970

GAD

Reviewed

173

451+070

GAD

Reviewed

174

452+452

GAD

Reviewed

175

452+350

GAD

Reviewed

176

453+453

GAD

Reviewed

177

453+940

GAD

Reviewed

178

454+740

GAD

Reviewed

179

456+460

GAD

Reviewed

180

457+530

GAD

Reviewed

181

459+750

GAD

Reviewed

182

460+000

GAD

Reviewed

183

460+120

GAD

Reviewed

184

460+410

GAD

Reviewed

185

460+495

GAD

Reviewed

186

460+652

GAD

Reviewed

187

460+775

GAD

Reviewed

188

461+505

GAD

Reviewed

189

462+175

GAD

Reviewed

190

462+300

GAD

Reviewed

191

462+360

GAD

Reviewed

192

462+735

GAD

Reviewed

193

463+015

GAD

Reviewed

194

463+345

GAD

Reviewed

195

463+530

GAD

Reviewed

196

467+040

GAD

Reviewed

197

473+415

GAD

Reviewed

198

473+980

GAD

Reviewed

199

476+446

GAD

Reviewed

200

477+500

GAD

Reviewed

201

478+570

GAD

Reviewed

202

478+611

GAD

Reviewed

203

478+990

GAD

Reviewed

204

479+325

GAD

Reviewed

205

485+790

GAD

Reviewed

206

486+075

GAD

Reviewed

207

511+920

GAD

Reviewed

208

406+115

SLAB CULVERT

GAD & design submitted

Under review

209

406+475

GAD & design submitted

Under review

210

409+525

GAD & design submitted

Under review

211

411+755

GAD & design submitted

Under review

212

412+325

GAD & design submitted

Under review

213

412.616

GAD & design submitted

Under review

214

412+836

GAD & design submitted

Under review

215

413+356

GAD & design submitted

Under review

216

413+555

GAD & design submitted

Under review

217

415+830

GAD & design submitted

Under review

218

416+283

GAD & design submitted

Under review

219

416+985

GAD & design submitted

Under review

220

420+790

GAD & design submitted

Under review

221

422+485

GAD & design submitted

Under review

222

422+645

GAD & design submitted

Under review

223

423+026

GAD & design submitted

Under review

224

423+592

GAD & design submitted

Under review

225

423+986

GAD & design submitted

Under review

226

432+316

GAD & design submitted

Under review

227

432+749

GAD & design submitted

Under review

228

432+989

GAD & design submitted

Under review

229

439+900

GAD & design submitted

Under review

230

441+850

GAD & design submitted

Under review

231

442+567

GAD & design submitted

Under review

232

442+745

GAD & design submitted

Under review

233

444+675

GAD & design submitted

Under review

234

446+410

GAD & design submitted

Under review

235

446+655

GAD & design submitted

Under review

236

449+421

GAD & design submitted

Under review

237

449+821

GAD & design submitted

Under review

238

452+685

GAD & design submitted

Under review

239

453+580

GAD & design submitted

Under review

240

455+705

GAD & design submitted

Under review

241

457+130

GAD & design submitted

Under review

242

457+260

GAD & design submitted

Under review

243

465+060

GAD & design submitted

Under review

244

465+087

GAD & design submitted

Under review

245

465+525

GAD & design submitted

Under review

246

465+765

GAD & design submitted

Under review

247

468+375

GAD & design submitted

Under review

248

469+220

GAD & design submitted

Under review

249

472+225

GAD & design submitted

Under review

GAD & design submitted

250

474+862

GAD & design submitted

Under review

251

481+930

GAD & design submitted

Under review

252

484+030

GAD & design submitted

Under review

253

487+904

GAD & design submitted

Under review

254

488+660

GAD & design submitted

Under review

255

489+128

GAD & design submitted

Under review

256

491+970

GAD & design submitted

Under review

257

493+834

GAD & design submitted

Under review

258

495+445

GAD & design submitted

Under review

259

497+040

GAD & design submitted

Under review

260

497+367

GAD & design submitted

Under review

261

499+890

GAD & design submitted

Under review

262

500+278

GAD & design submitted

Under review

263

501+260

GAD & design submitted

Under review

264

501+562

GAD & design submitted

Under review

265

502+863

GAD & design submitted

Under review

266

503+456

GAD & design submitted

Under review

267

505+226

GAD & design submitted

Under review

268

505+700

GAD & design submitted

Under review

269

506+723

GAD & design submitted

Under review

270

507+738

GAD & design submitted

Under review

271

512+383

GAD & design submitted

Under review

PROJECT WORK PROGRESS :-

Road Works Progress:-

Linear Progress (Road Works)

Main Carriageway

Activity Description

Unit

Total Length/Qty

Completed

% progress

Main Carriageway Six lane

C & G

Km.

Ha

122.88

306.53

5.645

18.55

4.60%

6.05%

Embankment

Km.

cum

122.88

1897473

-

10981.10

Work in progress

0.58%

Sub-Grade

Km.

cum

122.88

1544213

-

GSB/ CT sub base

GSB

CT sub-base

Km.

cum

cum

122.88

881086

291830

-

WMM /CT Base

WMM

CT Base

Km.

cum

cum

122.88

192599

120889

-

AG Layer

Km.

cum

42.93

187020

-

DBM

Km.

cum

122.88

250351

-

BC

Km.

cum

122.88

152516

-

Service Road

Activity Description

Unit

Total Length/Qty

Completed

% progress

C & G

Km.

Ha

149.09

141.97

4.70

3.29

3.15%

2.32%

Embankment

Km.

cum

149.09

655085

-

4622.40

Work in progress

0.71%

Sub-Grade

Km.

cum

149.09

644416

-

CT Sub base

Km.

cum

149.09

290445

-

CT Base

Km.

cum

149.09

73124

-

AG Layer

Km.

cum

149.09

103876

-

BC

Km.

cum

149.09

40192

-

Structure Work Progress:-

Type of structures

Total

Completed

In progress

Not yet started

ROB

2

1

1

Major bridge

3

3

Minor bridge

20

20

Grade Separator

12

2

10

Over pass

2

2

Under pass

2

2

Vehicular underpass

20

2

18

Pedestrian Underpass

11

11

Box culverts

47

5

42

Slab culverts

67

2

65

Pipe culverts

88

1

7

80

Total

274

1

19

254

DETAIL STATUS OF STRUCTURE :-

Sl No.

Chainage No. as per Drawing

Name of Structure

Status

Remarks

1

464+674

MAJOR BRIDGE

NYS.

2

517+095

NYS.

3

518+829

NYS.

4

398+811

Grade Separator

NYS.

5

407+538

NYS.

6

408+326

NYS.

7

456+312

NYS.

8

464+185

NYS.

9

475+670

NYS.

10

476+050

NYS.

11

496+609

NYS.

12

501+996

NYS.

13

504+287

NYS.

14

506+200

Work in progress

15

515+983

Work in progress

16

405+330

MINOR BRIDGE (NEW)

NYS.

New 3 Lane Bridge on LHS

17

409+876

NYS.

New 3 Lane Bridge on LHS

18

415+120

NYS.

New 3 Lane Bridge on LHS

19

429+973

NYS.

New 3 Lane Bridge on LHS

20

437+047

NYS.

New 3 Lane Bridge on LHS

21

450+140

NYS.

New 3 Lane Bridge on LHS

22

461+652

NYS.

New 3 Lane Bridge on LHS

23

464+903

NYS.

New 3 Lane Bridge on RHS

24

468+620

NYS.

New 3 Lane Bridge on LHS

25

497+840

NYS.

New 3 Lane Bridge on LHS

26

509+953

NYS.

New 3 Lane Bridge on LHS & Existing LHS Replaced by New 2 Lane Bridge

27

445+596

MINOR BRIDGE (WIDENING)

NYS.

GAD & Reinforcement details approved

28

462+895

NYS.

Widening on both Side

29

463+091

NYS.

Widening on both Side

30

463+710

NYS.

Widening on both Side

31

471+006

NYS.

Widening on both Side

32

485+002

NYS.

Widening on both Side

33

492+871

NYS.

Widening on both Side

34

495+735

NYS.

Widening on both Side

35

507+503

NYS.

Widening on both Side

36

520+373

ROB

Work in progress (Test pile).

GADs for both the ROBs have been approved

37

443+710

NYS.

38

403+440

VEHICULAR UNDERPASS

NYS.

39

411+374

NYS.

40

413+886

NYS.

41

421+400

NYS.

42

428+208

NYS.

43

433+563

NYS.

44

447+771

NYS.

45

451+153

NYS.

46

460+036

NYS.

47

467+115

NYS.

48

469+750

NYS.

49

473+340

NYS.

50

479+109

NYS.

51

486+427

NYS.

52

489+702

NYS.

53

491+451

NYS.

54

494+430

NYS.

55

509+559

NYS.

56

518+221

Work in progress

57

519+349

Work in progress

58

398+495

PEDESTRIAN UNDERPASS

NYS.

59

399+230

NYS.

60

407+400

NYS.

61

409+088

NYS.

62

417+953

NYS.

63

424+400

NYS.

64

476+430

NYS.

65

504+555

NYS.

66

510+700

NYS.

67

512+920

NYS.

68

514+900

NYS.

69

398+519

BOX CULVERT

NYS.

Reconstruction

70

398+782

NYS.

Reconstruction

71

403+335

NYS.

Reconstruction

72

407+212

NYS.

Reconstruction

73

407+422

NYS.

Reconstruction

74

407+657

NYS.

Left side widening & Right side Reconstruction

75

408+867

NYS.

Reconstruction

76

409+060

NYS.

Reconstruction

77

409+366

NYS.

Reconstruction

78

411+332

NYS.

Reconstruction

79

411+391

NYS.

Reconstruction

80

413+926

NYS.

Retained with widening but change to Reconstruction

81

415+216

NYS.

Existing Retained (RHS) New slab (LHS)

82

417+933

NYS.

Reconstruction

83

421+327

NYS.

Reconstruction

84

421+497

NYS.

Reconstruction

85

424+467

NYS.

Reconstruction

86

427+882

NYS.

Reconstruction

87

428+025

NYS.

Reconstruction

88

443+615

NYS.

Reconstruction

89

443+931

NYS.

Reconstruction

90

444+047

NYS.

Reconstruction

91

448+029

NYS.

Retained with widening but change to Reconstruction

92

450+883

NYS.

Reconstruction

93

451+334

NYS.

Reconstruction

94

456+131

NYS.

Retained with widening but change to Reconstruction

95

456+175

NYS.

Retained with widening but change to Reconstruction

96

456+355

NYS.

Retained with widening but change to Reconstruction

97

461+940

NYS.

Retained with widening but change to Reconstruction

98

467+300

NYS.

Reconstruction

99

470+025

NYS.

Reconstruction

100

475+615

NYS.

Reconstruction

101

486+816

NYS.

Reconstruction

102

489+549

NYS.

Reconstruction

103

489+860

NYS.

Reconstruction

104

494+593

NYS.

Reconstruction

105

496+719

Work in progress

Reconstruction

106

496+749

NYS.

Reconstruction

107

502+182

NYS.

Reconstruction

108

502+372

NYS.

Reconstruction

109

502+538

NYS.

Reconstruction

110

505+934

NYS.

Left side widening & Right side Reconstruction

111

506+173

Work in progress

Left side widening & Right side Reconstruction

112

509+255

NYS.

Reconstruction

113

512+635

NYS.

Reconstruction

114

512+997

Work in progress

Reconstruction

115

515+180

NYS.

New

116

516+290

NYS.

New

117

518+180

Work in Progress

New

118

519+690

Work in progress

New

119

399+140

PIPE CULVERT

NYS.

Retained with widening

120

400+070

NYS.

Retained with widening

121

400+450

In progress

Retained with widening

122

401+625

NYS.

Retained with widening

123

404+115

NYS.

Retained with widening

124

405+204

NYS.

Retained with widening

125

405+777

NYS.

Retained with widening

126

408+207

NYS.

Retained with widening

127

409+125

NYS.

Retained with widening

128

409+707

NYS.

Existing Retained (RHS) New Pipe (LHS)

129

410+140

NYS.

Retained with widening

130

410+760

NYS.

Retained with widening

131

414+040

NYS.

Retained with widening

132

414+240

NYS.

Retained with widening

133

414+750

NYS.

Retained with widening

134

418+107

NYS.

Retained with widening

135

418+748

NYS.

Retained with widening

136

420+178

NYS.

Retained with widening

137

425+330

NYS.

Retained with widening

138

425+900

NYS.

Retained with widening

139

426+935

NYS.

Retained with widening

140

429+325

NYS.

Retained with widening

141

429+449

NYS.

Retained with widening

142

430+200

NYS.

Retained with widening

143

431+110

NYS.

Retained with widening

144

433+265

NYS.

Retained with widening

145

433+600

NYS.

Retained with widening

146

434+231

NYS.

Retained with widening

147

435+200

NYS.

Retained with widening

148

435+750

NYS.

Retained with widening

149

435+915

NYS.

Retained with widening

150

436+127

NYS.

Retained with widening

151

436+655

NYS.

Retained with widening

152

438+313

NYS.

Retained with widening

153

438+605

NYS.

Retained with widening

154

438+860

NYS.

Retained with widening

155

438+966

NYS.

Retained with widening

156

439+370

NYS.

Retained with widening

157

439+710

NYS.

Retained with widening

158

440+015

NYS.

Retained with widening

159

440+095

NYS.

Retained with widening

160

440+660

NYS.

Retained with widening

161

440+850

NYS.

Retained with widening

162

441+010

NYS.

Retained with widening

163

444+420

NYS.

Retained with widening

164

444+595

NYS.

Retained with widening

165

444+897

In progrss

Retained with widening

166

446+015

In progress

Retained with widening

167

447+048

NYS.

Retained with widening

168

448+397

NYS.

Retained with widening

169

449+080

NYS.

Retained with widening

170

450+505

NYS.

Retained with widening

171

450+690

NYS.

Retained with widening

172

450+970

NYS.

Retained with widening

173

451+070

NYS.

Retained with widening

174

452+452

NYS.

Retained with widening

175

452+350

In progress

Retained with widening

176

453+453

NYS.

Retained with widening

177

453+940

NYS.

Retained with widening

178

454+740

NYS.

Retained with widening

179

456+460

NYS.

Retained with widening

180

457+530

NYS.

Retained with widening

181

459+750

NYS.

Retained with widening

182

460+000

NYS.

Retained with widening

183

460+120

NYS.

Retained with widening

184

460+410

NYS.

Retained with widening

185

460+495

NYS.

Retained with widening

186

460+652

NYS.

Retained with widening

187

460+775

N