NATIONAL HIGHWAYS AUTHORITY OF INDIA (Ministry of Shipping, Road Transport & Highways) NATIONAL HIGHWAY PROJECT PHASE II CONSULTANCY CONTRACT NO: IE Independent Engineer Services for four Lining of Chenani to Nashri (New Alignment) of NH 1A including 9 KM Long Tunnel (2 Lane) with Parallel Escape Tunnel on BOT (Annuity) basis in the State of Jammu & Kashmir (Package no. IE/NHDP-Phase-II/BOT/V/J&K) QUARTERLY PROGRESS REPORT NO: 22 SEPTEMBER 2016 TO NOVEMBER 2016 Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd.

Upload: dinhnhu

Post on 03-Jul-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

NATIONAL HIGHWAYS AUTHORITY OF INDIA

(Ministry of Shipping, Road Transport & Highways)

NATIONAL HIGHWAY PROJECT PHASE – II

CONSULTANCY CONTRACT NO: IE

Independent Engineer Services for four Lining of Chenani to Nashri (New Alignment) of NH 1A including 9 KM Long Tunnel (2 Lane) with Parallel Escape Tunnel on BOT (Annuity) basis in the State of Jammu & Kashmir

(Package no. IE/NHDP-Phase-II/BOT/V/J&K)

QUARTERLY PROGRESS REPORT NO: 22

SEPTEMBER 2016 TO NOVEMBER 2016

Euroestudios S. L. Spain

in Association with

Segmental Consulting & Infrastructure Advisory (P) Ltd.

Page 2: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 1

TABLE OF CONTENTS

1. PROJECT OVERVIEW ...................................................................................................................................... 3

1.1. INTRODUCTION ...................................................................................................................................... 3

1.2. THE PROJECT ROAD ............................................................................................................................. 3

1.3. THE PROJECT ROAD CONSTRAINTS .................................................................................................. 3

1.4. PROPOSED PATNITOP TUNNEL ALIGNMENT .................................................................................... 4

1.5. PROJECT MAP ........................................................................................................................................ 5

2. PROJECT ASSIGNMENT .................................................................................................................................. 6

2.1. BACKGROUND ........................................................................................................................................ 6

3. MOBILIZATION OF AGENCIES ........................................................................................................................ 6

3.1. INDEPENDENT ENGINEER .................................................................................................................... 6

3.2. ROLE AND FUNCTIONS OF IE .............................................................................................................. 6

3.3. ORGANISATION CHART AND STAFF LIST........................................................................................... 7

3.4. DRAWL OF AGREEMENT WITH C0NCESSIONAIRE ........................................................................... 9

3.5. PIU............................................................................................................................................................ 9

4. PRE-CONSTRUCTION ACTIVITIES ................................................................................................................. 9

4.1. SHIFTING OF UTILITIES ......................................................................................................................... 9

4.2. UTILITIES SHIFTING & OTHER HINDRANCES ................................................................................... 10

4.2.1 STATUS OF UTILITY SHIFTING ........................................................................................................... 10

4.2.2 HINDRANCES ........................................................................................................................................ 10

5. CONSTRUCTION SCHEDULE ........................................................................................................................ 11

5.1. CONSTRUCTION SHEDULE AS PER MILESTONE TARGET ............................................................ 11

5.2. INAUGURATION .................................................................................................................................... 11

5.3. TUNNEL BREAKTHROUGH’S .............................................................................................................. 11

6. CONTRACTOR´S RESOURCES .................................................................................................................... 12

7. MEETINGS/SITE VISIT/REVIEW OF DOCUMENTS ...................................................................................... 13

7.1. MEETINGS ............................................................................................................................................. 13

7.2. SITE VISITS ........................................................................................................................................... 13

7.3. REVIEW OF DOCUMENTS/DRAWINGS ............................................................................................. 15

8. INVOICES PAYMENT & REIMBURSEMENT ................................................................................................. 23

Page 3: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 2

9. EXECUTING AGENCIES AND CONTRACT DATA ....................................................................................... 23

9.1 AGENCIES ........................................................................................................................................ 23

9.2 CONTRACT DATA ............................................................................................................................ 23

9.2.1 PROJECT COST .............................................................................................................................. 23

9.2.2. CIVIL WORKS CONTRACT DETAILS ............................................................................................. 24

9.2.3 SCOPE OF WORK ........................................................................................................................... 24

10. WEATHER REPORT ....................................................................................................................................... 25

11. PROGRESS OF THE PROJECT ..................................................................................................................... 28

11.1 ESTIMATION OF PHYSICAL PROGRESS IN GLOBAILITY ........................................................... 28

11.2 TUNNEL WORKS MONITORING ..................................................................................................... 29

11.3 PHYSICAL PROGRESS CHART .................................................................................................... 31

12 QUALITY CONTROL AND TESTING OF MATERIALS ................................................................................ 38

12.1 UP TO DATE STATUS OF TEST ..................................................................................................... 38

12.2 TEST RESULT OF CONCRETE CORE & CUBES .......................................................................... 39

13 SAFETY REPORT ........................................................................................................................................... 69

14 MINUTES OF MONTHLY PROGRESS MEETING......................................................................................... 70

15 PHOTOGRAPHIC REPORT ............................................................................................................................ 71

Page 4: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 3

1. PROJECT OVERVIEW

1.1. INTRODUCTION

The Ministry of Road Transport and Highway (MORT&H) has taken a strategic decision to develop the

North-South corridor connecting Srinagar (J&K) to Kanya Kumari (Tamilnadu). The National Highways

Authority of India (NHAI) has been appointed by MORT&H, to implement this development.

NHAI have appointed the Louis Berger Group, Inc., USA, in Joint Ventures with LRP Consultants,

India and in association with L&T Ramboll, India, and D2 Consultant for Tunnel as consultants to carry

out the detailed design, for the Patnitop Tunnel of the NH-1A, between Udhampur and Banihal (Km 66

to Km. 188) in the state of Jammu and Kashmir.

1.2. THE PROJECT ROAD

The NH-1A National Highway will be upgraded from its present two-lane layout, to a four-lane divided

carriageway configuration. The design of the road between Udhampur and Banihal, Km 67 to Km. 188

is being carried out in five separate packages. The project will require the construction of numerous

structures, including one approx. 9 Km. long Tunnel (Patnitop Tunnel) and six short Tunnels (Tunnels

with length below 1 km).

1.3. THE PROJECT ROAD CONSTRAINTS

The existing road alignment of the NH-1A between Km 67 and Km 188 is typified by sub-standard, and

often steep curves and gradients, in the horizontal and vertical planes. The proposed improvement will

entail widening towards the valley side along most of the road, which will also involve the construction

of many new structures, including viaducts, bridges, retaining walls and Tunnels.

The project road area is within a region that is prone to frequent earthquakes of sizeable magnitude.

Much of the rock in the area is well jointed and highly fragmented. Combining seismic activity, with the

extreme prevailing weather conditions, also means the area experiences constant landslides.

The Kashmir region, with its exceptional scenic landscapes, abundant wildlife, culture diversity and

profuse number of historic and religion building, is a ‘Mecca’ for tourists from every corner of the globe.

The NH-1A being the main route between the principal cities of Jammu and Srinagar carries most of

the tourist for the entire area. Tourism peaks during the summer months of July and August, but spring

and autumn, can also be busy.

Page 5: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 4

1.4. PROPOSED PATNITOP TUNNEL ALIGNMENT

In previous design stages different alternatives have been investigated for Tunnel, crossing of the

Patnitop range in approx. station Km 90 to Km 130 of the existing NH-1A. Five Tunnel alternatives

varying from 1.2 Km length have been assessed and presented in earlier design stages. As the

optimum alternative, the longest one, a base Tunnel at elevation of approx. 1220 m a.s.l. was

approved for further investigation and elaboration of the Tunnel civil tender design documents.

Concerned section Km. 67 to Km. 188 is being carried out in five separate packages 1 – 5.

Patnitop Tunnel is designed as a base Tunnel. Passing under the Patnitop mountain range with

overburden more than 1 Km and belongs to NHDP Phase- II. This contract package start at existing

road starts from Km 89 and ends at Km 130 of existing road. Tunnel mined portals are located at

approx. start of Km 90 (southern portal) close to village of Chenani and Km 130 (northern portal) close

to township of Batote of existing road at elevations 1230 m and 1210 m respectively. Tunnel profile

grade is of a roof character with 0.5 % longitudinal profile grade. Tunnel horizontal alignment starts

and ends with curves of 300 m radius, and the rest of mid-section is straight. Main Tunnel direction is

South to North. Travel distance will be reduced for more than 30 Km and climbing and descending of

approx. 1000 m shall be avoided. Tunnel shall be 2-lane, bidirectional tunnel with parallel escape

Tunnel and cross connections into escape Tunnel for emergency exit.

The Existing road (2-lane, bidirectional) will be utilized to accommodate the local traffic in the area as

well as over-sized and other vehicles non-suitable for tunnel operation. The existing carriageway will

be upgraded with minor improvement to both the horizontal and vertical alignment.

Page 6: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 5

1.5. PROJECT MAP

Page 7: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 6

2. PROJECT ASSIGNMENT

2.1. BACKGROUND

NHAI have appointed the Louis Berger Group, Inc., USA, in Joint Venture with LRP Consultants, India

and in association with L&T Ramboll, India, as consultant to carry out the Feasibility Study and DPR

for 4-Laning of the section Udhampur to Banihal, Km. 66 to Km 188 of NH-1A in the State of Jammu

and Kashmir. The Complete project length is divided into 5 packages.

3. MOBILIZATION OF AGENCIES

3.1 INDEPENDENT ENGINEER

It was decided that Independent Engineer may be invited to participate for project management so as

to have proper management and quality assurance. Accordingly Bids were invited from pre-qualified

and shortly listed consultants and the work was allotted to M/s Euroestudios.S.L. In Association with

M/s Segmental Consulting and Infrastructure Advisory (Pvt.) Ltd. In an agreement for Independent

Engineer, services were entered into between National Highways Authority of India, Plot No. G-5 and

G-6, Sector No.10, Dwarka, New Delhi- 110045 and M/s M/S Euroestudios.S.L., Castelló 128, E-

28006 MADRID, ESPAÑA in Association with M/s Segmental Consulting and Infrastructure Advisory

(P) Ltd., Unit No. 419A-421, Spaze I Tech Park, Tower B-4.Sector 49, Sohna Road Gurgaon-122002–

India, by Letter No. NHAI/12015/GM (N-1)/CS-88-92/JK/2010/512 dated 05th April 2011 for

commencement of service and accordingly mobilization of Key/ Sub Key Personnel was done. M/S

Euroestudios, S.L. in Association with M/s Segmental Consulting and Infrastructure Advisory (P) Ltd.,

as Independent Engineer in accordance with the terms of the agreement in MOU, have deployed

personnel to look after the project.

Office Building for Team has been hired at Ekta Vihar, Near M.H. Hospital, Udhampur (J&K) and office

is fully operational.

3.2 ROLE AND FUNCTIONS of IE

The role of IE has been described in schedule “Q” of Concession Agreement between NHAI and CNTL

(SPV created by IL&FS) the main points are described below.

Review of Drawings & Documents.

Review, Inspection and Monitoring of construction work.

Conducting testing on completion of construction & issuing completion/ provisional certificate.

Review, Inspection & Monitoring of Divestment requirements.

Determining as required under the Agreement, the costs of any works or services and / or their

reasonableness.

Determining, as required under the Agreement, the period or any extension thereof, for

performing any duty or obligation.

Assisting the parties in resolution of disputes.

Undertaking all other duties and functions in accordance with Agreement.

Page 8: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 7

3.3 ORGANIZATION CHART AND STAFF LIST

Key Staff S.No Position Name Date of Joining Remarks

1 Team Leader cum Sr. Tunnel Expert Mr. Valentín Salcedo 25.05.2011

2 Tunnel Design Engineer 31.05.2011 Completed

3 Sr. Geologist 01.06.2011 Completed 4 Sr. Geotechnical Engineer Mr. Cesar Andia 11.08.2011 5 Sr. E & M Expert Mr. José Manuel Pineda 28.04.2012 6 Tunnel Safety Expert Mr. Sanjay Kr. Sharma 02.06.2011 7 Tunnel Ventilation Expert Mr. Ajit Kumar Swain 18.02.2015 8 9

10 11 12 13 14 15

Tunnel Excavation Expert Tunnel Lining Expert Tunnel Lighting Expert Senior Quality Cum Material Expert Bridge / Structural Engineer Financial Expert Legal Expert

Mr. Subash Chander Mr. Mihir Kumar Sahu Mr. Manish Kr. Sharma

01.06.2011 13.08.2015 30.06.2011 03.06.2011 03.06.2011 30.03.2016 28.06.2011

Completed

Completed Completed Completed

Tunnel Engineer-1 25.05.2011 Completed 16 Tunnel Engineer-2 Mr. Neeraj Singh Datta 01.06.2011

Sub-Professional Staff S.No Position Name Date of Joining Remarks

1 Tunnel Fire Fighting Expert Mr. Z.K. Khaishagi 04.04.2016

2 Environmental Expert 01.09.2011 Completed

3 4

Hydrologist/Drainage Expert Hydrologist/Drainage Expert

01.09.2011 15.09.2011

Completed Completed

5 Geologist 12.09.2011 Completed 6 Geo-technical Engineer 13.07.2011 Completed

7 Material Engineer 08.07.2011 Completed 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23

Material Engineer Quantity Surveyor Highway Engineer Bridge Engineer Traffic & Transportation Expert Survey Engineer Survey Engineer Assist. Tunnel Excavation Expert Assist. Tunnel Excavation Expert Assist. Tunnel Lining Expert Assist. Tunnel Lining Expert Horticulturalist Lab. Technician Lab. Technician HTMS/Toll Expert CAD Expert

Mr. Vikas Gupta Mr. Rajesh Mishra Mr. Bharat Goel

03.10.2011 02.01.2012 01.10.2013 03.01.2014 15.07.2013 02.04.2012 01.08.2011 01.11.2014 13.06.2011 17.06.2011 20.06.2011 14.07.2014 01.01.2013 24.06.2011 21.09.2015 02.01.2012

Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed Completed

Completed

Support Staff S.No Position Name Date of Joining Remarks

1 Office Manager Ms. Kameshwar Verma 16.09.2016

2 Accountant Mr. Pankaj Gupta 01.10.2013

3 Cashier Mr. J.S. Jaswal 12.04.2012

4 Steno Mr. Akash Anand 01.08.2016

5 Computer Operator Mr. Sahil Gupta 01.08.2016

6 Photocopier Mr. Sanat Kr. Mishra 25.05.2011

7 Office Boy Mr. Subash Chander 01.07.2011

8 9

Security Guard Security Guard

Mr. Kewal Singh Mr. Jeevan Lal

01.02.2015 01.07.2016

Page 9: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 8

ORGANISATION CHART

Page 10: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 9

3.4 DRAWL OF AGREEMENT WITH CONCESSIONAIRE

Agreement was drawn by NATIONAL HIGHWAY AUTHORITY OF INDIA (NHAI) with Chenani

Nashri Tunnel way Limited. (CNTL) on 28th July 2010. For this project IL&FS Transportation

Networks Ltd has formed a Special Purpose Vehicle (SPV) by the name of Chenani Nashri Tunnel

way Limited (CNTL) (hereinafter referred as the “Concessionaire”).

3.5 PIU

PROJECT DIRECTOR.

National Highway Authority of India – PIU

315/1, 2nd Floor, Channi Himmat

Jammu (J&K) 180015

4. PRE-CONSTRUCTION ACTIVITIES

4.1. SHIFTING OF UTILITIES

Km.89.00 to 90.20

(0.00-1.20)

Hilly Section

Revenue Land /Private Land

Km 00.00 to Km 00.300

Land Handed over, however

compensation for trees

pending payment by ADC.

Km 00.300 to 1.20

Compensation for Land,

Structures & Trees pending

payments by ADC.

Km. 90.20 to 130 Hilly Section

Forest Land

Km 1.20-10.70

Land Handed Over. Forest

Diversion Cost Deposited.

Page 11: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 10

4.2. UTILIES SHIFTING & OTHER HINDRANCES

4.2.1. STATUS OF UTILITY SHIFTING

North Portal

S. No. List of Utilities Chainage Unit Total Status

1 OFC Pillar 129.100-129.500 & 129.500- 130.00 Nos. 11 Completed

2 Electrical Pole 129.100-129.500 & 129.500-130.00 Nos. 41 Completed

3 Transformer 129.100-129.500 Nos. 2 Completed

4 Hand Pump 129.500- 130.00 Nos. 2 Completed

5 Shops 129.500- 130.00 Nos. 6 Completed

South Portal

S. No. List of Utilities Chainage Unit Total Status

1 OFC Pillar 89.000-90.000 Nos. 8 Completed

2 Electrical Pole 89.050-90.00 Nos. 15 Completed

3 Transformer 89.950 Nos. 1 Completed

4 33KVA ELECTRICAL POLE at Km 89.500 Nos. 18 Completed

5 HT Tower 89.680 Nos. 1 Completed

6 440 VA line near Toll Plaza 89+850 Completed

7 Electrical Pole Line 89.600-90.000 Nos. 5 Completed

8 Water Line 89.900-90.000 Nos. 2 Completed

9 House 89.650-89.700, 89.900-90.000 Nos. 6 Completed

10 Shops 89.000-89.300,89.350- 89.400,89.950-90.000

Nos. 17 Completed

11 Religious Structure 89.100,89.400,89.800 Nos. 3 Completed

12 Telephone Pole 89.050-89.200,89.750- 89.900,89.950-90.000

Nos. 7 Completed

13 Hand Pump 89.100 Nos. 1 Completed

14 PMGSY/Public Path Nos. 1 Completed

15 House beyond Km 89.0 Nos. 1 Completed

15 Telephone Tower 89.100 Nos. 1 Completed

4.2.2. HINDRANCES

NIL

Page 12: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 11

5. CONSTRUCTION SCHEDULE

5.1 CONSTRUCTION SHEDULE AS PER MILESTONE TARGETS.

Milestone Financial Percentage

Date of Achievement of Milestone as envisaged

in Concession Agreement

Remarks

Appointed Date (As per Agreement)

0% 23-05-11 Appointed Date of the Project

Project Milestone 1 10% 23-11-11 Achieved

Project Milestone 2 20% 23-05-12 Achieved

Project Milestone 3 30% 23-11-12 Achieved

Project Milestone 4 40% 23-05-13 Achieved

Project Milestone 5 50% 23-11-13 Achieved

Project Milestone 6 60% 23-05-14 Achieved

Project Milestone 7 70% 23-11-14 Achieved

Project Milestone 8 80% 23-05-15 Achieved

Project Milestone 9 90% 23-11-15 Achieved

Project Milestone 10 100% 23-05-16

5.2 INAUGURATION

Escape Tunnel (South Portal) First blast taken on 8th August 2011

Main Tunnel (South Portal) First blast taken on 18th August 2011

Escape Tunnel (North Portal) First blast taken on 8th October 2011

Main Tunnel (North Portal) First blast taken on 22nd October 2011

5.3 TUNNEL´S BREAK THROUGHS

Escape Tunnel 2nd June 2014

Main Tunnel 13th July 2015

Page 13: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 12

6. CONTRACTOR´S RESOURCES

Description Model

Quantity

Brought From South Portal

North Portal

Boomer Drill E2C with Protection Roof(ROPS) 02 01 IMPORTED-SWEDEN

Boomer Drill XE3C with Protection Roof(ROPS) 02 01 IMPORTED-SWEDEN

Shotcrete Machine Aliva 263/Aliva 265 01/01 00/00 LOCAL-INDIA

Shotcrete Machine Spraymec 7110 / Spraymec 8100 00/01 02/00 IMPORTED-FINLAND

Shotcrete Machine Aliva 264 01 00 LOCAL-INDIA

Concrete Spraying Machine SIKA PM 500PC 01 01 LOCAL-INDIA

Plat Form Ashok Leyland 01 00 LOCAL-INDIA

Wheel Loader 2021Z 01 01 LOCAL-INDIA

Wheel Loader 500 Mega with 4.8 Bucket 00 01 IMPORTED

Wheel Loader 980H 01 01 IMPORTED

Tunnel Trucks 05 05 IMPORTED-GERMANY

Rock Header / Cutting Machine TC-E Hydraulic (140 KW max) 02 00 IMPORTED-USA

Crane-Truck Mounted HB120E3M 01 01 LOCAL-INDIA

Fuel Bowser Tanker 12000 Ltr. / 8000 Ltr/ 950 Ltr. 00/01/01 01/01/00 LOCAL-INDIA

Transit Mixers 13 00 LOCAL-INDIA

Air Compressor 05 07 LOCAL-INDIA

Generator Set 11 10 LOCAL-INDIA

Concrete Static Pump SP 1400 with Leaf Spring & 100 Mtr 01 01 LOCAL-INDIA

Batching Plant 03 03 LOCAL-INDIA

Main Tunnel Form-Gantry 02 02 LOCAL-INDIA

Main Tunnel Membrane Carrier Platform

02 02 LOCAL-INDIA

Main Tunnel Layby Form 01 01 LOCAL-INDIA

Main Tunnel Layby Membrane Carrier Platform

01 01 LOCAL-INDIA

Escape Tunnel Form-Gantry 01 01 LOCAL-INDIA

Escape Tunnel Membrane Carrier Platform

02 02 LOCAL-INDIA

Cross Passages Form-Gantry 01 01 LOCAL-INDIA

Cross Passage-Membrane Carrier Platform

02 02 LOCAL-INDIA

Ventilation Slab Platform 03 03 LOCAL-INDIA

Ventilation Slab Carrier 01 01 LOCAL-INDIA

Partion Walls Form Work 01 01 LOCAL-INDIA

LV Separation Walls Form Work 01 01 LOCAL-INDIA

LV Niches Form 01 01 LOCAL-INDIA

Niches Single 01 01 LOCAL-INDIA

Niches-Double 02 02 LOCAL-INDIA

Collar Form-ET 01 01 LOCAL-INDIA

Collar Form-MT 01 01 LOCAL-INDIA

Side Wall Member Form-MT 01 01 LOCAL-INDIA

Side Wall Panel-MT 01 01 LOCAL-INDIA

Page 14: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 13

7. MEETINGS /SITE VISITS / REVIEW OF DOCUMENTS

7.1 MEETINGS

Team Leader attended meeting with PD NHAI at PD office Jammu on dated: 12.09.2016

regarding extension of IE, progress and PQC works.

Team Leader attending meeting at Conference Hall CNTL South Portal on dated 20-09-2016

and 27-09-2016 regarding pending issues on ground and compliances.

Team Leader held meeting with PD NHAI at PD office Jammu on dated: 03.10.2016 and

21.10.2016 regarding progress of Construction, PQC works, pending activities and Agenda for

Visit of NHAI Officers and meetings.

Team Leader attended meeting at Conference Hall CNTL South Portal on dated 27.10.2016

regarding compliances for pending issues on ground and progress (PQC North Portal and

others).

Team Leader attended meeting at South Portal CNTL Conference Hall with Honorable Chief

Secretary of J & K Gov. and other J & K Government Officers regarding support required from

local Authorities and Project Completion date, after Project presentation from CNTL Team dated

on 28.10.2016.

Team Leader attended meeting led by CGM Tech NHAI HQ at PIU Jammu, RO room along with

the PD NHAI, RO NHAI and Concessionaire, on 5.11.2016

IE Team held meeting with CNTL MEP Team at South Portal Office on dated: 07.11.2016

regarding Permanent Power Supply estimate

Team Leader attended meeting along MEP staff at Conference Hall CNTL South Portal on

dated 08.11.2016 regarding compliances for pending issues. Minutes registered

Team Leader attended meeting at PIU Jammu office with PD NHAI regarding User Fee Display

Boards, MEP Program for pending activities, on date 25.11.2016

7.2 SITE VISITS

IE Team visited South side Main and Escape Tunnels at night shift on dated: 02.09.2016

Team Leader visited Main Tunnel & Ventilation Buildings South and North Portal, also North

dumping yard on dated: 07.09.2016.

Team Leader visited Main Tunnel, Ventilation ducts South and Ventilation Building NP, North

Toll Plaza slopes on dated: 10.09.2016.

Team Leader visit to SAR Landslide, PQC and MEP works, Main Tunnel and North Ventilation

Bldg. on dated: 16.09.2016.

Team Leader visited South Toll Plaza, Main Tunnel drainage, North Approach road and

Dumping Yard on dated: 22.09.2016.

Team Leader visit to South Approach Road Rotary, Toll Plaza and Tunnels on dated:

30.09.2016.

IE Team visited Main Tunnels for drainage, cable trenches and status of Wirtgen paver, also

NAR & N Toll Plaza Area for rotary marking of location, culverts on dated: 04.10.2016

Page 15: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 14

Acting Team Leader visited to supervise the PQC and other activities at South Portal on dated

06.10.2016.

Acting Team Leader visited to check the arrangements of BridgeB1 load test at South Portal on

dated 14.10.2016.

Acting Team Leader visited monitoring, ultrasonic test on Bridge B1 at South Portal on dated

15.10.2016.

Acting Team Leader visited to check the monitoring load test of Bridge B1 at South portal on

dated 17.10.2016.

Team Leader visited North Approach Road and North Toll Plaza slopes in the stretch of

landslide along with CNTL Geologists on dated: 20.10.2016.

Team Leader visit to SAR PQC and Tunnels (Wirtgen paver), before visit of Honorable Chief

Secretary of J & K Government starting North Portal dated on 28.10.2016.

Team Leader visited NAR to check progress and supervise works on dated: 03.11.2016

Team Leader visited South Portal along with CGM HQ, PD & Officer on Special Duty NHAI, and

the Concessionaire on dated 04.11.2016

Team Leader visited North Approach Road through Main Tunnel and North Dumping yard on

dated 09.11.2016

Team Leader visited South Toll Plaza, Portal and Main Tunnels (PQC) on dated 11.11.2016.

Team Leader visited SAR marking and Main Tunnel PQC, MEP works and North MEP Buildings

on dated 15.11.2016 and 16.11.2016

Team Leader visited SAR signage/marking, Toll Plazas work progress and NAR on 24.11.2016.

Team Leader developed visit to SAR-South Toll Plaza to see pending works and feasible

locations for User Fee Display Boards on 29.11.2016 along with H&S road CNTL representative

Page 16: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 15

7.3 REVIEW OF DOCUMENTS / DRAWINGS:

Concessionaire has submitted documents regarding Firefighting System (MCC and pumps),

EOT Crane in Ventilation Building, MEP Project Program, NCR for tunnel drainage, for C0

sections, for F5 finish, for QAP & for edge PQC on surface drain, Environmental Monitoring,

Drain Culverts NP, NAR & SAR Rotaries, ITCS and Subsystems, Toll Collection System, Load

Test on Bridges and Wearing coat South Bridge B1, Documents required to process Provisional

Certificate, Power Supply System, MPR from CNTL for August, Drainage System, Concrete Mix

designs, WMS for Semi-mechanized PQC (Screed-fixed form), Bus Bay and shelter, crash

barrier and antiglare.

Most of these documents have been reviewed and sent back to the Concessionaire after

reviewing. Below it can be found the documents which have been reviewed and inspection

reports after visits, along with some reminders

Concessionaire has submitted documents and replies to our observations (marked with R)

which have been reviewed by IE, regarding: Compliance Reports for earlier visits developed by

IE Team, Details for Metal Beam crash Barrier and Antiglare, User Fee Display Boards, NOC to

be obtained by Local Authorities having jurisdiction (R), Emergency Response Plan, EOT Crane

Material Test Certificates and documents (R), Fire Doors, Load Test and Wearing Coat (R) at

Bridge B1 & B2, North & South Rotary Drawings and Typical Section of Rotary Wall, Plan and

Profile NAR, Use of Semi-mechanized Technology for PQC at SAR (R), FFS (R) (MCC,

expansion bellows and arrangements for lateral movement, Drawings authentication, Notes &

Legends), PSS Technical study for fault level discrimination (R) and Fire Rated Isolators (R),

RFI of 132 KV Transmission, ITCS System (ACS, EFS and ECS Drawings (R), Reaction Matrix

and Signaling Plans) Toll Collection System (R) and Equipment Layout North Toll Plaza, North

Toll Plaza Building foundations, Toll Plaza Lighting Drawings, Main Tunnel Sidewalk Lights,

Inspection & Test Plan (EFS, TCS, ECS and VSS), QAP (MEP). IE reviewed also in first

instance, Force Majeure proposal from CNTL due to Landslides, and MPR from CNTL for

September 2016, as it has been stipulated in CA.

Additionally, IE have replied observations regarding submission of documents, compliances and

procedures after intimation from CNTL, and before Issuance of “Provisional Certificate” in some

letters, like MEP works pending design compliances, submission of Contractual documents like

Emergency response plan, Updated procurement and shop drawing schedule, Safety manual,

etc.

From the Authority side, IE have reviewed documents concerning to Audited Accounts for FY

2015-2016, also regarding Change of Scope for Resurfacing of existing Highway, and submitted

to the Authority a proposal for replacement of our E&M Expert, vide letters S-PD-AD.EM-3801

dated on 04.10.2016 and S-PD-AD.EM-3796 dated on 30.09.2016, which has been responded

by the Authority vide letter PD/JMU/F&A/2015-16/12015/2609 dated on 21.10.2016. IE are in

process to prepare reply to the PD NHAI regarding this subject. Concessionaire has submitted

documents and replies to our observations (marked with R) which have been reviewed by IE,

regarding: Technical submission of MEP documents for ITCS system and related subsystems

Page 17: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 16

(R), MEP components like Fire Rated Isolators (R), Stainless Steel Expansion Bellows (R), FFS

Arrangements for linear expansion and lateral movement of the firefighting piping (R), MEP

works Emergency Response Plan, NOC to be obtained from Competent Authorities for MEP

systems and equipment (R), MPR from Concessionaire for October’16, Minutes of MEP meeting

on 8th November regarding pending compliances, Environmental Monitoring Report for

September’16, Tunnels Drainage layout between S Portal entrance and Nallah, Toll Collection

System, GSB Test reports, Plan and Profile of NAR, User Fee Display Boards, Reminder for

Pending Inspection for Civil Works inside Tunnels, and Plan of Road Signs and Marking.

IE have submitted to the Concessionaire also some reminders regarding pending compliances,

like: pending submission of technical study/proposal to achieve the discrimination in case of

current fault level (MCC FFS), pending Inspection for rectification of Concrete Lining Surface,

concluding discussion on Toll Collection System, and pending Inspection for Civil Works inside

Tunnels. Concessionaire still has not submitted a clear schedule for inspections related to

finishing of activities like surface lining cable trench walls, adjustment of covers, thickness of

edge PQC above surface drain and surface drainage performance as per level/gradient and

through pipe. It is pending also the submission of a clear MEP Test Schedule, which has been

solicited several times.

In this sense, IE have replied observations regarding submission of documents, compliances

and procedures after intimation from CNTL, and before Issuance of “Provisional Certificate” in

some letters, like MEP works pending design compliances, submission of Contractual

documents like Emergency response plan, Updated procurement and shop drawing schedule,

Safety manual among others, whose reply is still awaited from the Concessionaire.

It has to be kept in mind that there are still pending compliances and acceptances by IE Team

regarding works executed and design details or technical justifications in several subjects,

almost all concerning to MEP Works. ANNEXURE-1 shows status of compliances.

From the Authority side, IE have attended also some letters from PIU NHAI Jammu, regarding

Change of Scope Notice for Pups and Additional Culverts, which is in process of compilation,

CTE Observations regarding Use of Shyam Steel, which is in process of compilation also, reply

regarding Replacement of E&M Expert, Non Compliance of instructions regarding North Site

muck dumping and provision of Protection Works, ROW Permission for Laying of OFC, Entry

Tax Exemption for Earth moving Equipment 59th list, Visit of Safety Auditors, Stoppage of all

works at NAR, Proposal for Alternate Solution in LIEU of Concrete Lining at Cross Passages,

and Details in respect of Bituminous/Rigid concrete Pavement in Projects.

In the table of following page it is provided the relation of main letters submitted by the Independent Engineer:

Page 18: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 17

Letter Date Subject

S-CO-TE.EM-3726 01.09.2016 FFS Technical Submission of Fire Pumps.

S-CO-TE.EM-3727 01.09.2016 Fire Fighting System MCC Drawings.

S-CO-TE.SF-3731 02.09.2016 Environmental Monitoring report for the month of July 2016

S-CO-TE.VT-3732 03.09.2016 EOT Crane Material Test Certificate

S-CO-TE.TU-3733 03.09.2016 NCR regarding blockade of transverse PVC pipe outlet (right side) in Manhole P1 Main Tunnel and Manhole P2 in CP & ET junction

S-CO-TE.TU-3735 03.09.2016 Non Confirmatory Report No. 6.

S-CO-TE.TU-3736 03.09.2016 NCR-09, regarding invert lining for C0 section, RD 449.5-487 Main tunnel south Portal

S-CO-TE.EM-3738 05.09.2016 Toll Plaza CNTL- Toll Collection System & Equipment Layout- North Portal

S-CO-TE.TW-3740 05.09.2016 Drain Culverts North Portal

S-CO-TE.TW-3741 05.09.2016 North and South Rotary Drawings

S-CO-TE.EM-3742 05.09.2016 Submission of ITCS, TCS, ECS, EFS, VSS & ACS Drawings

S-CO-TE.QL-3743 05.09.2016 Mix Design of Contact Grouting.

S-CO-TE.QL-3744 05.09.2016 Failure of Gradation of GSB

S-CO-TE.QL-3745 05.09.2016 Reminder for Accuracy of the measuring devices of batching Plant.

S-CO-TE.QL-3748 06.09.2016 NCR Regarding Non submission of Quality Assurance plan

S-CO-TE.PC-3749 06.09.2016 Intimation for Issuance of "Provisional completion certificate"

S-CO-TE.EM-3750 08.09.2016 Submission of ITCS, TCS, ECS, EFS, VSS & ACS Drawings

S-CO-TE.EM-3751 06.09.2016 Technical submission of Sidewalk Lights

S-CO-TE.BG-3752 06.09.2016 Review of Load test of bridge B1 & B2

S-CO-TE.EM-3754 08.09.2016 Technical Submission of Toll Collection System (Reminder).

S-CO-TE.VT-3758 13.09.2016 Drawings for AC & DC boards, yard illumination and battery charger

S-CO-TE.RW-3759 14.09.2016 Use of Semi-mechanised and Labour-oriented construction technique for PQC in SAR and limited patches in Main tunnel

S-CO-TE.TW-3761 14.09.2016 Arrangement of Drain Outlet –South Portal

S-CO-TE.BG-3762 14.09.2016 Wearing Coat of Bridge B1 & B2.

S-CO-TE.EM-3763 15.09.2016 Submission of ITCS, TCS, ECS, EFS, VSS & ACS Drawings

Page 19: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 18

Letter Date Subject

S-CO-TE.EM-3766 16.09.2016 Submission of ITCS, TCS, ECS, EFS, VSS & ACS Drawings (Approval of drawings-part III, i.e. EFS & Traffic Signage)

S-CO-TE.BG-3767 16.09.2016 Wearing Coat of Bridge B1.

S-CO-TE.QL-3771 19.09.2016 28 Days compressive strength of mix design with Ultratech/ Ambuja OPC 53 Grade of Cement

S-CO-TE.QL-3772

19.09.2016 Dry lean concrete mix design with ultratech OPC 53 grade of cement.

S-CO-TE.QL-3773 19.09.2016 Accuracy of the measuring devices of batching plant.

S-CO-TE.BG-3774 19.09.2016 WMS for Load Test

S-CO-TE.PC-3777 21.09.2016 Documents to be submitted before processing your application of “Provisional Completion Certificate"

S-CO-TE.PC-3778 23.09.2016 Intimation for Issuance of “Provisional Completion Certificate"

S-CO-TE.RW-3779 24.09.2016 Use of Semi-mechanized and Labor-oriented construction technique for PQC in SAR and limited patches in Main tunnel.

S-CO-TE.TU-3781 24.09.2016 NCR regarding blockade of transverse PVC pipe outlet (right side in Manhole P1 in Main tunnel & Manhole P2 in CP & ET junction

S-CO-TE.TU-3784 26.09.2016 NCR regarding placing in PQC in 925mm wide edge (left side) in Main tunnel

S-CO-TE.BG-3785 26.09.2016 Wearing coat of Bridge B1 & B2

S-CO-TE.SF-3789 28.09.2016 Review of Monthly Environmental monitoring Report for the month of August 2016

S-CO-TE.SF-3790 28.09.2016 CNTL, Bus Bay, Passenger Shelter & road Marking details.

S-CO-TE.QL-3791 28.09.2016 NCR regarding Non Submission of Quality Assurance Plan

S-CO-TE.TU-3799 03.10.2016 Filling of Invert concrete in CO Section for 7 numbers of steel ribs RD 933-964 left side

S-CO-TE.OT-3800 04.10.2016 Typical detail of Crash barrier & Antiglare

S-CO-TE.OT-3803 06.10.2016 The NOCs to be obtained from the local Authorities having the jurisdiction of process your application of “Provisional Completion Certificate”.

S-CO-TE.TW-3805 06.10.2016 Site Visit Main Tunnel North portal dated, 29.12.2015.

S-CO-TE.PC-3806 06.10.2016 Emergency Response plan

S-CO-TE.TU-3810 07.10.2016 Pouring of Concrete in Main Tunnel C0 section TM 1846 (South Portal)

S-CO-TE.VT-3813 07.10.2016 EOT Crane Material Test Certificate

S-PD-AD.FN-3815 08.10.2016 Audited Accounts for FY 2015-2016

Page 20: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 19

Letter Date Subject

S-CO-TE.PC-3816 08.10.2016 Documents to be submitted before processing your application of “Provisional Completion Certificate”

S-CO-TE.BG-3817 08.10.2016 Load test at Bridge B1 & B2

S-CO-TE.TU-3818 10.10.2016 Site Visit North Portal.

S-CO-TE.BG-3819 10.10.2016 Wearing coat of bridge B1 and B2

S-CO-TE.TW-3820 10.10.2016 North and South Rotary Drawings

S-CO-TE.TU-3822 12.10.2016 Site Visit report for South & North Portal regarding ET Lining

S-CO-TE.RW-3824 12.10.2016 Use of Semi Mechanized & Labour oriented construction technique for PQC in SAR and Ltd patches in Main Tunnel

S-CO-TE.PC-3826 13.10.2016 MEP Works-Pending Compliance and reply of our letter for MEP works

S-CO-TE.EM-3827 13.10.2016 Fire Fighting System: MCC Drawings and submission of technical study/proposal to achieve the discrimination in break operations to clear the fault

S-CO-TE.EM-3829 14.10.2016 MEP Works Technical submission of Stainless steel Expansion bellows

S-CO-TE.EM-3830 14.10.2016 MEP Works-FFS Technical Submission of Toll collection System

S-CO-TE.EM-3831 14.10.2016 MEP Works Submission of ACS, EFS & ECS drawings.

S-CO-TE.EM-3832 14.10.2016 FFS-Arrangement of linear expansion and lateral movement of the firefighting piping

S-CO-TE.EW-3833 14.10.2016 Toll Plaza Drawings

S-CO-TE.EM-3834 14.10.2016 MEP Works Technical submission of Sidewalk Lights

S-PD-TE.RO-3835 14.10.2016 Change of Scope for Resurfacing of existing Highway from km 89 to km 130

S-CO-TE.VT-3836 15.10.2016 Toll Plaza Lighting Drawings

S-CO-TE.EM-3837 15.10.2016 MEP Works PSS Approval of fire Rated isolators

S-CO-TE.EM-3838 15.10.2016 MEP Works- Submission of Updated material

S-CO-TE.TU-3840 15.10.2016 Plan and Profile of NAR

S-CO-TE.TU-3841 15.10.2016 Site inspection Report- Main tunnel (South portal)

S-CO-TE.VT-3843 18.10.2016 Technical submission of Inspection and Test Plans (EFS, TCS, ECS & VSS)

S-CO-TE.EM-3844 18.10.2016 MEP Works Toll Collection system

Page 21: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 20

Letter Date Subject

S-CO-TE.EM-3845 18.10.2016 MEP Works Fire Fighting System Drawings

S-CO-TE.EM-3846 18.10.2016 MEP Works PSS Approval of Fire rated isolators

S-CO-TE.TU-3848 18.10.2016 Main Tunnel Central Drain (South portal)

S-CO-TE.EM-3849 18.10.2016 MEP Works – Fire Fighting System Notes & legends

S-CO-TE.EM-3850 21.10.2016 MEP Works Technical submission of ITCS,TCS,ECS,EFS,VSS & ACS Drawings

S-CO-TE.QL-3851 21.10.2016 MEP works – Quality Assurance Plan

S-CO-TE.EM-3854 21.10.2016 Toll Plaza CNTL- Toll Collection system &Equipment Layout-North Portal

S-CO-TE.SF-3855 22.10.2016 Reminder for not Compliance HSE shortcomings inside tunnel

S-CO-TE.SF-3856 22.10.2016 Site visit at South and North Portal on dated 02.02.2016 regarding HSE

S-CO-TE.SF-3857 22.10.2016 Site visit at South Portal &North Portal on dated 11.02.2016 &12.02.2016 Regarding HSE

S-CO-TE.RO-3859 22.10.2016 Typical Section of Rotary wall of South & North Approach Road

S-CO-TE.EM-3860 22.10.2016 Documents to be submitted before processing your application of “Provisional Completion Certificate”

S-CO-TE.PC-3862 24.10.2016 Intimation for Issuance of “Provisional Completion Certificate”

S-CO-LE.FM.3864 24.10.2016 Force Majeure- Due to landslides

S-CO-TE.EM-3866 24.10.2016 Technical submission of ITCS Documents

S-CO-TE.EM-3868 25.10.2016 MEP Works – Fire Doors

S-CO-TE.EM-3869 25.10.2016 MEP Works- Site Visit

S-CO-TE.EM-3870 25.10.2016 MEP Works RFI of 132 KV Transmission

S-CO-TE.MR-3871 25.10.2016 Review of MPR’s from the Concessionaire for April’ 16 and September’16 also

S-CO-TE.RW-3872 25.10.2016 User Fee Display Boards

S-CO-TE.BG-3872 25.10.2016 Wearing coat of Bridge B1 & B2

S-CO-TE.EM-3878 01.11.2016

MEP Works Technical submission of ITCS, ECS, TCS, EFS, VSS & ACS Drawings

Page 22: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 21

Letter Date Subject

S-CO-TE.EM-3879 01.11.2016

MEP Works Technical submission of Toll Collection System

S-CO-TE.EM-3880 01.11.2016 MEP Work PSS approvals of Fire rated Isolators

S-CO-TE.TU-3883 02.11.2016 Site Inspection south Portal & North Portal dated 15.06.2016.

S-CO-TE.EM-3886

07.11.2016

MEP Works- FFS Technical submission of Stainless steel Expansion bellow

S-CO-TE.EM-3887

07.11.2016

Fire Fighting System: MCC Drawings and submission of technical study/proposal to achieve the discrimination

S-CO-TE.EM-3888

07.11.2016

MEP Works Emergency Response Plan

S-CO-TE.EM-3889

07.11.2016

FFS- Arrangement of linear expansion and lateral movement of the firefighting piping

S-CO-TE.EM-3890

07.11.2016

MEP Works - Submission of ACS, EFS & ECS Drawings

S-CO-TE.EM-3891

07.11.2016

MEP Works The NOC's to be obtained from the local Authorities having the Jurisdiction to process your application of Provisional Completion certificate

S-CO-TE.QL-3892

08.11.2016

Regarding CTE Observations

S-CO-TE.OT-3893 08.11.2016

Delay in laying of PQC inside Main Tunnel

S-CO-TE.EM-3897 10.11.2016 MEP Works- Firefighting System Drawings- (NOCs to be obtained from the Authorities having the jurisdiction)

S-CO-TE.DW-3901

12.11.2016

Issues to be complied with as per monitoring on ground before issuance of ''Provisional Certificate''

S-CO-TE.MR-3902

15.11.2016

Review of MPR from the Concessionaire for the month of October 2016

S-CO-TE.EM-3903

16.11.2016

MEP Works- Pending compliances and replies after Meeting on 8th November 2016. .

S-CO-TE.SF-3904

17.11.2016

Environmental monitoring report for the month of September 2016

S-CO-TE.TU-3905

17.11.2016

Tunnel Drainage Layout

S-CO-TE.EM-3906

17.11.2016

MEP Works- Pending compliances and replies after Meeting on 8th November 2016.

S-CO-TE.TU-3909 19.11.2016 Reminder- Inspection for rectification of Concrete Lining Surface.

S-CO-TE.EM-3911

21.11.2016

MEP Works- Toll Collection System

S-CO-TE.QL-3912

22.11.2016

Submission of GSB Material Test Reports- Verma Crusher Udhampur.

Page 23: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 22

Letter Date Subject

S-CO-TE.EM-3913

24.11.2016

MEP Works- Toll Collection System

S-CO-TE.MR-3914

24.11.2016

Plan and Profile of North Approach Road: Preliminary observations

S-CO-TE.EM-3915

25.11.2016

MEP Works- Submission of ACS, ECS & ECS Drawings

S-CO-TE.OT-3916

26.11.2016

CTE Observations

S-CO-TE.OT-3917

26.11.2016

Change of Scope notice for PUPS and Additional Culverts

S-CO-TE.RO-3918

26.11.2016

User Fee Display Board

S-CO-TE.TU-3919

28.11.2016

Pending Inspection for Civil Works inside Tunnels.

S-CO-TE.RO-3922 29.11.2016 Plan of Road Signs and Marking SAR & NAR and Toll Plaza

Page 24: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 23

8. INVOICES PAYMENT & REIMBURSEMENT

Invoice for the month of September 2016 has been submitted to Project Director NHAI (PIU Jammu) on

01.10.2016.

Invoice for the month of October 2016 has been submitted to Project Director NHAI (PIU Jammu) on

02.11.2016.

Invoice for the month of November 2016 has been submitted to Project Director NHAI (PIU Jammu) on

01.12.2016

9. EXECUTING AGENCIES AND CONTRACT DATA

9.1 AGENCIES

9.1.1 Developer:

M/s IL & FS Transportation Networks Ltd is the Developer.

9.1.2 Concessionaire:

They have created SPV in the name of M/s CNTL for this Project. CNTL is the Concessionaire

for this project; they have mobilized staff and established its office C/o Lower Mada Village

Gujjard Tehsil Chenani Distt. Udhampur. M/s CNTL is represented by Mr. J.S. Rathore Project

Director.

9.1.3 EPC Contractor:

M/s ITNL has demobilized M/s Leighton and Project highway and tunnel activities is divided into

three section and contractor has deployed the separate construction for following sections.

Section 1: Excavation Works From North Portal-M/s AIMPL-BCC(JV).

Excavation Works From South Portal-M/s Nagyan Construction.

Section 2: Lining Works South Portal: M/s New India Infra Build tech Pvt. Ltd.

Lining Works North Portal: M/s Savronik- BCC (JV).

Section 3 Surface Works:

M/s Vinay Construction

M/s Chudhary Construction

M/s Kamlashi Construction.

9.2 CONTRACT DATA

9.2.1 PROJECT COST Project Cost (As per Concession Agreement) – Rs. 2519 Crore.

Page 25: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 24

9.2.2 CIVIL WORKS CONTRACT DETAILS

a) Concessionaire Chenani Nashri Tunnel way Ltd.

b) Contract Section Chenani to Nashri Section of NH 1A From Km. 89.00 to 130.00

c) Contract Length 10.800 Km

d) Agreement /MOU Date 28th July 2010

e) Agreement Amount Rs. 2519 Crs.

f) Commencement Date 23rd May 2011

g) Intended date of Completion 20th May 2016

h) Performance Security Released

i) Mobilization Advance and Date of payment (s) Nil

j) Equipment Advance and Date of Payment (s) Nil

k) Net Material Advance Nil

l) Retention Money upto date Nil

m) Liquidated damages, if any -

n) Defect Liability Period Nil

9.2.3 SCOPE OF WORK

Main Tunnel: 9.00 km (As per CA)

Escape Tunnel: 9.00 Km

Cross Passage: 29 nos.

Rigid Pavement: 18.000 km (including Main Tunnel, Escape Tunnel and Bridges)

Flexible Pavement: 1.800 km (four lane)

Rotary Junction: 02 Nos.

Minor Bridge: 02 nos.

Culvert: 07 Nos. Box Culvert

Toll Plaza: 02 Nos.

Drainage pipe in Main Tunnel: 9.0 km (3 nos.)

Drainage pipe in Escape Tunnel: 9.0 km (2 nos.)

Drainage pipe in Cross passages: 29 Nos. (On both the ends)

Slope Protection works at Valley Side: 1520 m

Slope Protection works at Hill Side: 1750 m

Lay bays: 14 nos.

Firefighting Niches: 58 nos.

Vehicular emergency exit: 07 nos.

Ventilation Building: 02 nos.

Tunnel Control Centre (Building): 02 nos

Traffic, Medical Aid Post: (01 No. Per Side)

Page 26: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 25

10. WEATHER REPORT

WEATHER REPORT FOR THE MONTH OF SEPTEMBER 2016

Max.

Temp.

(°C)

Min.

Temp.

(°C)

Max.

Humidity

(%)

Min.

Humidity

(%)

Rainfall

Max.

Temp.

(°C)

Min.

Temp.

(°C)

Max.

Humidity

(%)

Min.

Humidity

(%)

Rainfall

1 01.09.2016 37.4 22.8 86.0 45.0 NIL 30.1 20.3 87.0 51.0 NIL

2 02.09.2016 36.6 21.8 87.0 38.0 NIL 29.7 19.7 89.0 53.0 NIL

3 03.09.2016 37.1 22.4 88.0 36.0 NIL 30.2 19.9 92.0 61.0 NIL

4 04.09.2016 36.9 22.0 86.0 37.0 NIL 31.1 20.1 85.0 52.0 NIL

5 05.09.2016 36.7 21.8 88.0 38.0 NIL 31 20 88.0 57.0 NIL

6 06.09.2016 36.8 21.6 87.0 39.0 NIL 29.7 19.9 86.0 53.0 NIL

7 07.09.2016 37 22.2 89.0 37.0 NIL 29.3 19.8 81.0 50.0 NIL

8 08.09.2016 37.1 22.4 90.0 38.0 NIL 29.6 19.7 82.0 52.0 NIL

9 09.09.2016 36.5 21.8 87.0 36.0 NIL 29.9 19.9 79.0 49.0 NIL

10 10.09.2016 36.9 21.7 84.0 36.0 NIL 29.5 19.6 77.0 46.0 NIL

11 11.09.2016 36.4 20.9 89.0 38.0 4 29.7 19.7 73.0 49.0 0.2

12 12.09.2016 37.1 20.8 88.0 37.0 NIL 27.6 19.1 71.0 43.0 1.2

13 13.09.2016 37.6 20.4 88.0 39.0 6 29.6 19.2 75.0 47.0 NIL

14 14.09.2016 37.4 21.2 86.0 38.0 NIL 29.3 19 72.0 44.0 NIL

15 15.09.2016 37.2 22.5 88.0 37.0 NIL 30.7 19.3 77.0 52.0 NIL

16 16.09.2016 37 21.8 85.0 36.0 NIL 30.5 18.7 76.0 50.0 NIL

17 17.09.2016 37.4 22 86.0 37.0 NIL 29.7 18.1 73.0 47.0 NIL

18 18.09.2016 37.2 21.7 86.0 36.0 NIL 30.2 18.3 61.0 43.0 NIL

19 19.09.2016 38 22.1 88.0 35.0 NIL 30 17.6 71.0 45.0 NIL

20 20.09.2016 37.7 21.9 89.0 37.0 NIL 30.3 17.3 66.0 43.0 NIL

21 21.09.2016 38.4 22 88.0 36.0 NIL 30.1 17.1 70.0 44.0 NIL

22 22.09.2016 38.1 21.7 88.0 38.0 NIL 29.7 16.9 67.0 46.0 0.2

23 23.09.2016 37.8 22.4 89.0 378.0 NIL 29.3 16.7 69.0 43.0 NIL

24 24.09.2016 37.7 21.9 89.0 37.0 NIL 29.1 16.5 70.0 45.0 NIL

25 25.09.2016 38.4 22 88.0 36.0 NIL 29.3 16.3 69.0 47.0 NIL

26 26.09.2016 37.4 22.5 89.0 36.0 NIL 28.9 15.2 72.0 48.0 NIL

27 27.09.2016 36.6 21.8 88.0 35.0 NIL 29.2 15.8 86.0 53.0 NIL

28 28.09.2016 37.1 22 88.0 37.0 NIL 28.7 15.7 69.0 44.0 NIL

29 29.09.2016 36.9 21.7 86.0 36.0 NIL 28.6 15.5 67.0 42.0 NIL

30 30.09.2016 36.4 22.1 88.0 35.0 NIL 28.9 15.7 65.0 47.0 NIL

South Portal North Portal

DateSr.

No.

Page 27: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 26

WEATHER REPORT FOR THE MONTH OF OCTOBER 2016

Max.

Temp.

(°C)

Min.

Temp.

(°C)

Max.

Humidity

(%)

Min.

Humidity

(%)

Rainfall

Max.

Temp.

(°C)

Min.

Temp.

(°C)

Max.

Humidity

(%)

Min.

Humidity

(%)

Rainfall

1 01.10.2016 36.2 21.4 87.0 37.0 NIL 29.3 15.3 76.0 51.0 NIL

2 02.10.2016 37.1 21.8 89.0 38.0 NIL 29.7 15.1 77.0 49.0 NIL

3 03.10.2016 31.4 21.6 86.0 36.0 NIL 29.5 14.9 67.0 43.0 NIL

4 04.10.2016 32.2 20.4 89.0 38.0 NIL 29.3 14.7 72.0 47.0 NIL

5 05.10.2016 31.4 17.9 88.0 39.0 NIL 28.7 14.3 86.0 62.0 1.4

6 06.10.2016 30.8 19.4 82.0 36.0 NIL 29.1 14.5 79.0 49.0 NIL

7 07.10.2016 31 19.8 84.0 37.0 NIL 30.7 14.7 67.0 37.0 NIL

8 08.10.2016 31.4 20.8 85.0 35.0 NIL 30.2 14.3 71.0 31.0 NIL

9 09.10.2016 32.4 21.1 86.0 36.0 NIL 30.4 14.1 73.0 35.0 NIL

10 10.10.2016 32.9 21.6 80.0 33.0 NIL 29.7 14.0 72.0 32.0 NIL

11 11.10.2016 33.6 21.9 69.0 30.0 NIL 29.9 14.2 67.0 30.0 NIL

12 12.10.2016 32.8 22.4 74.0 31.0 NIL 29.7 14.1 72.0 25.0 NIL

13 13.10.2016 32.6 22.1 72.0 30.0 NIL 30.1 14.3 69.0 27.0 NIL

14 14.10.2016 32 21.7 70.0 31.0 NIL 30.4 14.0 62.0 25.0 NIL

15 15.10.2016 31.7 21.7 68.0 30.0 NIL 30.1 14.2 59.0 26.0 NIL

16 16.10.2016 31.9 20.5 68.0 33.0 NIL 29.7 14.4 71.0 32.0 NIL

17 17.10.2016 30.8 20.2 64.0 34.0 NIL 29.5 14.2 69.0 29.0 NIL

18 18.10.2016 29.9 20.8 67.0 32.0 NIL 28.6 14.0 59.0 28.0 NIL

19 19.10.2016 30.1 19.4 60.0 29.0 NIL 28.5 13.9 53.0 26.0 NIL

20 20.10.2016 32.4 19.8 62.0 31.0 NIL 28.3 13.7 63.0 29.0 NIL

21 21.10.2016 31.9 20 60.0 33.0 NIL 24.7 13.1 53.0 28.0 NIL

22 22.10.2016 30.6 21.4 63.0 32.0 NIL 24.9 12.7 51.0 34.0 NIL

23 23.10.2016 30.7 19.1 57.0 28.0 NIL 25.2 12.9 62.0 36.0 NIL

24 24.10.2016 31.9 19.8 60.0 33.0 NIL 22.5 12.3 66.0 41.0 NIL

25 25.10.2016 30.6 20 63.0 32.0 NIL 23.9 11.9 46.0 33.0 NIL

26 26.10.2016 31.4 22.1 60.0 36.0 NIL 23.8 12.0 42.0 29.0 NIL

27 27.10.2016 32.4 21.7 62.0 35.0 NIL 24.0 11.8 50.0 31.0 NIL

28 28.10.2016 32.9 21.7 60.0 37.0 NIL 23.7 11.9 47.0 27.0 NIL

29 29.10.2016 33.6 20.5 63.0 36.0 NIL 23.5 11.7 45.0 30.0 NIL

30 30.10.2016 32.8 20.2 57.0 35.0 NIL 23.7 11.6 49.0 32.0 NIL

31 31.10.2016 33.8 20.8 60.0 38.0 NIL 21.5 11.4 52.0 33.0 NIL

South Portal North Portal

DateSr.

No.

Page 28: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 27

WEATHER REPORT FOR THE MONTH OF NOVEMBER 2016

Max.

Temp.

(°C)

Min.

Temp.

(°C)

Max.

Humidity

(%)

Min.

Humidity

(%)

Rainfall

Max.

Temp.

(°C)

Min.

Temp.

(°C)

Max.

Humidity

(%)

Min.

Humidity

(%)

Rainfall

1 01.11.2016 32.9 21.7 47.0 29.0 NIL 22.3 15.3 76.0 51.0 NIL

2 02.11.2016 33.6 21.9 49.0 31.0 NIL 23.1 15.1 77.0 49.0 NIL

3 03.11.2016 32.2 21.5 59.0 35.0 NIL 23.7 14.9 67.0 43.0 NIL

4 04.11.2016 31.4 20.0 46.0 29.0 NIL 23.5 14.7 72.0 47.0 NIL

5 05.11.2016 30.2 19.7 52.0 31.0 NIL 22.9 14.3 86.0 62.0 1.4

6 06.11.2016 30.4 18.8 46.0 27.0 NIL 22.7 14.5 79.0 49.0 NIL

7 07.11.2016 30 18.5 51.0 28.0 NIL 22.6 14.7 67.0 37.0 NIL

8 08.11.2016 29.4 18.1 47.0 31.0 NIL 22.5 14.3 71.0 31.0 NIL

9 09.11.2016 29.8 19.7 44.0 26.0 NIL 22.7 14.1 73.0 35.0 NIL

10 10.11.2016 29.7 19.5 56.0 29.0 NIL 22.9 14.0 72.0 32.0 NIL

11 11.11.2016 29.4 19.4 62.0 32.0 NIL 22.3 14.2 67.0 30.0 NIL

12 12.11.2016 29.1 19.7 59.0 28.0 NIL 20.7 14.1 72.0 25.0 NIL

13 13.11.2016 29.5 19.9 61.0 31.0 NIL 21.1 14.3 69.0 27.0 NIL

14 14.11.2016 29 19.5 57.0 29.0 NIL 22.7 14.0 62.0 25.0 NIL

15 15.11.2016 28.9 19.2 62.0 30.0 NIL 23.2 14.2 59.0 26.0 NIL

16 16.11.2016 28.7 19.0 61.0 32.0 NIL 23.5 14.4 71.0 32.0 NIL

17 17.11.2016 28.6 19.4 56.0 28.0 NIL 23.7 14.2 69.0 29.0 NIL

18 18.11.2016 28.4 19.0 49.0 27.0 NIL 23.5 14.0 59.0 28.0 NIL

19 19.11.2016 28.8 19.4 52.0 31.0 NIL 23.2 13.9 53.0 26.0 NIL

20 20.11.2016 28.9 19.2 63.0 29.0 NIL 23.4 13.7 63.0 29.0 NIL

21 21.11.2016 27.9 18.8 62.0 31.0 NIL 23.9 13.1 53.0 28.0 NIL

22 22.11.2016 28.1 18.6 65.0 33.0 NIL 24.0 12.7 51.0 34.0 NIL

23 23.11.2016 28.2 18.7 61.0 30.0 NIL 23.7 12.9 62.0 36.0 NIL

24 24.11.2016 28.9 19.2 49.0 29.0 NIL 20.9 12.3 66.0 41.0 NIL

25 25.11.2016 27.9 18.8 58.0 31.0 NIL 23.5 11.9 46.0 33.0 NIL

26 26.11.2016 28.3 18.5 46.0 27.0 NIL 24.3 12.0 42.0 29.0 NIL

27 27.11.2016 29.2 19.4 57.0 29.0 NIL 24.5 11.8 50.0 31.0 NIL

28 28.11.2016 28.6 18.7 59.0 31.0 NIL 24.7 11.9 47.0 27.0 NIL

29 29.11.2016 29.8 19.2 65.0 29.0 NIL 24.9 11.7 45.0 30.0 NIL

30 30.11.2016 28.7 18.9 51.0 27.0 NIL 23.7 11.6 49.0 32.0 NIL

South Portal North Portal

DateSr.

No.

Page 29: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd. Page 28

11. PROGRESS OF THE PROJECT

11.1 ESTIMATION OF PHYSICAL PROGRESS IN GLOBALITY

Physical Progress has not to be taken as reference for financial progress, because it does not

include cost incurred (i) Construction of Labour camps, Batching plants and Labs (ii)

Procurement of machinery and advanced materials for construction.

Progress %

Progress

Overall

Progress

1 Portal Construction LS 4.00% 1.00 1.00 100.00% 4.00%

2 MEP work Portals LS 1.50% 1.00 0.97 97.00% 1.46%

3 Dump Area South LS 1.50% 1.00 1.00 100.00% 1.50%

4 Dump Area North LS 1.50% 1.00 0.95 95.00% 1.43%

5 Main Tunnel - Heading RM 23.40% 8980.00 8980.00 100.00% 23.40%

6 Main Tunnel - Benching RM 19.15% 8980.00 8980.00 100.00% 19.15%

7 Escape Tunnel - Heading RM 12.09% 8966.00 8966.00 100.00% 12.09%

8 Cross Passage - Heading RM 4.36% 945.38 945.38 100.00% 4.36%

9 Staging for Lining No. 1.40% 10.00 10.00 100.00% 1.40%

10 Water Proofing - Main tunnel RM 2.85% 8980.00 8980.00 100.00% 2.85%

11 Lining - Main Tunnel RM 5.35% 8980.00 8980.00 100.00% 5.35%

12 Water Proofing - Escape tunnel RM 1.21% 8966.00 8966.00 100.00% 1.21%

13 Lining - Escape Tunnel RM 2.25% 8966.00 8966.00 100.00% 2.25%

14 Lining - Cross Passage RM 0.84% 945.00 945.00 100.00% 0.84%

15 Ground Beam Works RM 1.68% 18879.00 18879.00 100.00% 1.68%

16 Pavement -Main Tunnel RM 1.55% 8980.00 8288.00 92.29% 1.43%

17 Pavement -Escape Tunnel RM 0.90% 8966.00 8966.00 100.00% 0.90%

18 MEP works - Main Tunnel RM 4.20% 8980.00 8000.00 89.09% 3.74%

19 MEP works - Escape Tunnel RM 2.33% 8966.00 8500.00 94.80% 2.21%

20 Approach Road Works - EW RM 1.07% 1820.00 1720.00 94.51% 1.01%

21 Approach Road Works -Granular RM 0.09% 1820.00 1720.00 94.51% 0.09%

22 Approach Road Works - PQC RM 0.15% 1820.00 1525.00 83.79% 0.13%

23 Misc work RM 0.46% 1.00 0.70 70.00% 0.32%

24 Bridges LS 0.55% 1.00 1.00 100.00% 0.55%

25 Toll Plaza LS 0.22% 1.00 0.50 50.00% 0.11%

26 Project Facilities LS 0.26% 1.00 0.50 50.00% 0.13%

27 Maintenance of Road LS 0.26% 1.00 0.95 95.00% 0.25%

29 Design LS 2.28% 1.00 0.96 96.00% 2.19%

30 Commercial Operations LS 2.60% 1.00 0.00 0.00% 0.00%

100.00% 96.01%

Physical Progress Percentage upto 30th November 2016

S. No. Item Unit WeightageTotal

Scope

Actual

Page 30: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 29

11.2 Tunnel works monitoring

SOUTH PORTAL

Tunnel Excavation in Mtrs.

S.No. Location

Tunnel Meter Cumulative

Remarks

Initial Final Targets* Achieved % age

Progress

1 MT (Heading) 4403.5 4403.50 4403.50 4403.50 100.00 Completed

2 MT (Benching) 4403.0 4403.0 4403.00 4403.00 100.00 Completed

3 ET 4573.0 4573.00 4573.00 4573.00 100.00 Completed

4 Cross Passage 459.1 459.10 459.10 459.10 100.00 14 No’s completed

Final Lining:

Monthly Monthly Monthly

Target Achieved%

ProgressMTs Target Achieved

%

ProgressMTs Target Achieved

%

ProgressMTs Target Achieved

%

Progress

1 MT 4506.00 4506.00 100 0 4773.50 4773.50 100.00 15 4800.00 4800 100.00 325 4800.00 4800.00 100.00

2 ET 4573.00 4573.00 100 0 4485.00 4485.00 100.00

3 CP 459.05 459.05 100 33 459.05 459.05 100.00

Sno. Location

Ground Beam (M)

Cum

Final Linnig Ventilation slab Partion wall

Cumulative Cumulative Cumulative

Tunnel Road Works:

TotalAchieved %

ProgressTotal Achieved % Progress

1 MT M 4500.00 4500.00 100.00 4500.00 4500.00 100.00

2 ET M 4485.00 4485.00 100.00 4500.00 4500.00 100.00

3 CP Nos 14.00 14.00 100.00 14.00 14.00 100.00

Sno. Location Unit

Progress PCC/ DLC (cum) Progress PQC (cum)

Tunnel Drainage Works

TotalAchieved %

ProgressTotal Achieved % Progress

1 MT M 4500.00 4500.00 100.00 4500.00 4500.00 100.00

Sno. Location Unit

Progress Surface Drain (cum) Progress Main Drain Collector (cum)

Page 31: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 30

NORTH PORTAL

Tunnel Excavation in Mtrs.

S.No Location

Tunnel Meter Cumulative Remarks

Initial Final Targets Achieved % age

Progress

1 MT (Heading) 4576.5 4576.5 4576.5 4576.5 100.0 Completed

2 MT

(Benching) 4576.0 4576.5 4576.5 4576.5 100.0 Completed

3 ET 4393.0 4393.0 4593.0 4593.0 100.0 Completed

4 Cross

Passage 486.40 486.4 486.4 486.40 100.0 15 No’s completed

Final Lining:

Monthly Monthly Monthly

Target Achieved%

ProgressMTs Target Achieved

%

ProgressMTs Target Achieved

%

ProgressMTs Target Achieved

%

Progress

MT 4473.00 4473.00 100 0 4205.50 4205.50 100.00 30 4179.00 4179 100.00 388 4179.00 4179.00 100.00

ET 4393.00 4393.00 100 0 4481.00 4481.00 100.00

CP 486.33 486.33 100 15 486.33 486.33 100.00

Location

Ground Beam (M)

Cum

Final Linnig

Cumulative

Ventilation slab

Cumulative

Partion wall

Cumulative

Tunnel Road Works:

TotalAchieved %

ProgressTotal Achieved % Progress

1 MT M 4479.00 4479.00 100.00 4479.00 4061.00 90.67

2 ET M 4481.00 4481.00 100.00 4466.00 4466.00 100.00

3 CP Nos 15.00 15.00 100.00 15.00 15.00 100.00

Unit

Progress PCC/ DLC (cum) Progress PQC (cum)

Sno. Location

Tunnel Drainage Works:

TotalAchieved %

ProgressTotal Achieved % Progress

1 MT M 4479.00 4479.00 100.00 4479.00 4479.00 100.00

Sno. Location Unit

Progress Surface Drain (cum) Progress Main Drain Collector (cum)

Page 32: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 31

11.3 PHYSICAL PROGRESS CHARTS

Main Tunnel

Page 33: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 32

Escape Tunnel

Page 34: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 33

Cross Passages

Page 35: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 34

STRIP CHART

SOUTH PORTAL

Page 36: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 35

MAIN TUNNEL

ESCAPE TUNNEL

Page 37: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 36

CROSS PASSAGE

PQC

DLC/PCC

Cross Passage Nos. CP-01 CP-02 CP-03 CP-04 CP-05 CP-06 CP-07 CP-08 CP-09 CP-10 CP-11 CP-12 CP-13 CP-14 CP-15 CP-16 CP-17 CP-18 CP-19 CP-20 CP-21 CP-22 CP-23 CP-24 CP-25 CP-26 CP-27 CP-28 CP-29

LH

S-M

CW

Co

stru

ctio

n

(N

orth

Bo

un

d)

Number of Structures NB

Status of Structures

Page 38: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 37

NORTH PORTAL

Page 39: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 38

12. QUALITY CONTROL AND TESTING OF MATERIALS.

12.1 UP TO DATE STATUS OF THE TESTS.

Total no.

of Tests

Required

No. of

Tests

Performed

No. of

Tests

Passed

No. of

Tests

Failed

Total no.

of Tests

Required

No. of

Tests

Passed

No. of

Tests

Failed

Action taken in case of

Failied Tests./Remarks

1

a 16 141 141 0 959 8067 34

b 8 13 13 0 496 1004 0

c 8 9 9 0 502 703 0

d 0 0 0 0 13 13 0

e 120 120 120 0 7507 10547 0

g 4 4 4 0 248 469 0

h 4 8 8 0 261 493 0

2

a 16 40 40 0 1115 3547 68

b 120 150 150 0 8277 12311 0

c 0 0 0 0 10 10 0

3

a 1 1 1 0 173 173 0

b 1 1 1 0 173 173 0

c 1 1 1 0 173 173 0

d 1 1 1 0 173 173 0

4

a 3 3 3 0 489 489 0

b 3 3 3 0 498 498 0

c 3 3 3 0 510 510 0

5

0 0 0 0 2594 2594 0

6

07 Days 33 60 60 0 1800 1800 0

28 Days 77 105 105 0 4617 4617 0

b M10 DLC 07 Days 135 288 288 0 1551 1551 0

07 Days 147 201 201 0 8025 8025 0

28 Days 288 435 435 0 19191 19191 0

07 Days 36 39 39 0 450 450 0

28 Days 39 48 48 0 447 447 0

07 Days 0 0 0 0 87 87 0

28 Days 0 0 0 0 345 345 0

07 Days 48 135 135 0 14853 14853 0

28 Days 102 687 687 0 62616 62616 0

07 Days 39 516 516 0 8559 8559 0

28 Days 519 780 780 0 15378 15378 0

07 Days 0 0 0 0 303 303 0

28 Days 0 0 0 0 1231 1231 0

07 Days 444 417 417 0 1773 1773 0

28 Days 387 397 397 0 1516 1516 0

07 Days Flexural

Strength444 417 417 0 1773 1773 0

28 Days Flexural

Strength387 397 397 0 1516 1516 0

07 Days 0 0 0 0 45 45 0

28 Days 0 0 0 0 111 111 0

7

0 0 0 0 5441 5441 0

M45

S.

No

For the month November 2016 Cumulative upto November 2016

Soundness

Specific gravity

Gradation

FI + EI

Moisture Content

Gradation

AIV

Log Angles

Crushing value

Fine Aggregate

M25

Cement Ambuja 53 Grade

Pullout Test for Rock Bolts at

North/South Portals

M15

Insitu Cores Compressive

Strengthat North/South

Portals

Insitu Cores Compressive Strength Test

a

h M40

f

k

c

M40 PQC

CUBE

UPTO DATE STATUS

Name of the Tests

Shortcrete / Concrete / Course Aggregate

IST & FST

Concrete Cube's Compressive Strength Test

07 days

Pullout Testing

28 days

Cement Cube Strength

Consistency

Moisture content

Specific Gravity

M10

M30

03 days

Fineness

M20

i

M40 PQC

BEAMj

M35

d

g

e

Page 40: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 39

12.2 TEST RESULT OF CONCRETE CORES AND CUBES.

FOR THE MONTH OF SEPTEMBER 2016

DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF SEPTEMBR 2016.

SOUTH PORTAL

DATE

INSITU CORES PANEL CASTED

Remarks Pass Fail 1 days 7 days 28 days

01.09.2016 00 00 00 00 00

02.09.2016 00 00 00 00 00

03.09.2016 00 00 00 00 00

04.09.2016 00 00 00 00 00

05.09.2016 00 00 00 00 00

06.09.2016 00 00 00 00 00

07.09.2016 00 00 00 00 00

08.09.2016 00 00 00 00 00

09.09.2016 00 00 00 00 00

10.09.2016 00 00 00 00 00

11.09.2016 00 00 00 00 00

12.09.2016 00 00 00 00 00

13.09.2016 00 00 00 00 00

14.09.2016 00 00 00 00 00

15.09.2016 00 00 00 00 00

16.09.2016 00 00 00 00 00

17.09.2016 00 00 00 00 00

18.09.2016 00 00 00 00 00

19.09.2016 00 00 00 00 00

20.09.2016 00 00 00 00 00

21.09.2016 00 00 00 00 00

22.09.2016 00 00 00 00 00

23.09.2016 00 00 00 00 00

24.09.2016 00 00 00 00 00

25.09.2016 00 00 00 00 00

26.09.2016 00 00 00 00 00

27.09.2016 00 00 00 00 00

28.09.2016 00 00 00 00 00

29.09.2016 00 00 00 00 00

30.09.2016 00 00 00 00 00

Total 00 00 00 00 00

Page 41: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 40

DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF SEPTEMBER 2016.

NORTH PORTAL

DATE

INSITU CORES PANEL CASTED

Remarks

Pass Fail 1 days 7 days 28 days

01.09.2016 03 00 00 05 05

02.09.2016 03 00 00 00 05

03.09.2016 00 00 00 00 00

04.09.2016 00 00 00 00 00

05.09.2016 00 00 00 00 00

06.09.2016 00 00 00 00 00

07.09.2016 03 00 00 00 05

08.09.2016 00 00 00 00 00

09.09.2016 03 00 00 00 05

10.09.2016 00 00 00 00 00

11.09.2016 03 00 00 00 05

12.09.2016 00 00 00 00 00

13.09.2016 00 00 00 00 00

14.09.2016 03 00 00 00 05

15.09.2016 00 00 00 00 00

16.09.2016 03 00 00 00 05

17.09.2016 00 00 00 00 00

18.09.2016 03 00 00 00 05

19.09.2016 00 00 00 00 00

20.09.2016 03 00 00 00 05

21.09.2016 00 00 00 00 00

22.09.2016 03 00 00 00 05

23.09.2016 00 00 00 00 00

24.09.2016 00 00 00 00 00

25.09.2016 00 00 00 00 00

26.09.2016 00 00 00 00 00

27.09.2016 00 00 00 00 00

28.09.2016 00 00 00 00 00

29.09.2016 00 00 00 00 00

30.09.2016 00 00 00 00 00

Total 30 00 00 05 50

Page 42: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 41

DETAILS OF CUBES TESTED IN THE MONTH OF SEPTEMBER 2016.

SOUTH PORTAL

DATE Grout Cube Testing

Remarks

3 days 7 days 28 days

01.09.2016 00 00 05

02.09.2016 00 05 05

03.09.2016 00 05 05

04.09.2016 00 05 00

05.09.2016 00 05 05

06.09.2016 00 05 05

07.09.2016 00 05 05

08.09.2016 00 05 05

09.09.2016 00 05 05

10.09.2016 00 05 05

11.09.2016 00 05 05

12.09.2016 00 05 00

13.09.2016 00 05 05

14.09.2016 00 05 05

15.09.2016 00 05 05

16.09.2016 00 05 05

17.09.2016 00 00 00

18.09.2016 00 10 10

19.09.2016 00 05 05

20.09.2016 00 05 05

21.09.2016 00 05 05

22.09.2016 00 05 00

23.09.2016 00 05 05

24.09.2016 00 00 05

25.09.2016 00 05 05

26.09.2016 00 05 05

27.09.2016 00 05 05

28.09.2016 00 05 05

29.09.2016 00 05 05

30.09.2016 00 05 05

Total 00 140 135

Page 43: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 42

DETAILS OF CUBES TESTED IN THE MONTH OF SEPTEMBER 2016.

NORTH PORTAL

DATE Grout Cube Testing

Remarks

3 days 7 days 28 days

01.09.2016 00 00 00

02.09.2016 00 00 00

03.09.2016 00 00 00

04.09.2016 00 00 00

05.09.2016 00 00 00

06.09.2016 00 00 00

07.09.2016 00 00 00

08.09.2016 00 00 00

09.09.2016 00 00 00

10.09.2016 00 00 00

11.09.2016 00 00 00

12.09.2016 00 00 00

13.09.2016 00 00 00

14.09.2016 00 00 00

15.09.2016 00 00 00

16.09.2016 00 00 00

17.09.2016 00 00 00

18.09.2016 00 00 00

19.09.2016 00 00 00

20.09.2016 00 00 00

21.09.2016 00 00 00

22.09.2016 00 00 00

23.09.2016 00 00 00

24.09.2016 00 00 00

25.09.2016 00 00 00

26.09.2016 00 00 00

27.09.2016 00 00 00

28.09.2016 00 00 00

29.09.2016 00 00 00

30.09.2016 00 00 00

Total 00 00 00

Page 44: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 43

DETAILS OF CUBES TESTED IN THE MONTH OF SEPTEMBER 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.09.2016 00 03 09 00 03 00 00 00 00 00 06 27

02.09.2016 06 06 09 00 09 09 00 00 00 00 06 45

03.09.2016 03 12 09 00 09 03 00 00 00 00 09 24

04.09.2016 03 09 09 00 06 00 00 00 00 00 09 06

05.09.2016 03 03 00 00 00 03 00 00 00 00 09 18

06.09.2016 03 06 09 00 03 09 00 00 00 00 09 18

07.09.2016 00 06 09 00 03 00 00 00 00 00 15 45

08.09.2016 00 00 09 00 00 09 03 00 00 00 06 24

09.09.2016 00 03 09 00 06 06 03 00 00 00 09 12

10.09.2016 00 03 18 00 00 06 00 00 00 00 09 48

11.09.2016 00 00 00 00 00 12 00 00 00 00 15 09

12.09.2016 00 00 09 00 06 00 06 00 00 00 03 00

13.09.2016 00 03 09 00 12 06 03 00 00 00 06 21

14.09.2016 00 03 09 00 12 03 00 00 00 00 06 18

15.09.2016 00 00 00 00 06 09 03 00 00 00 06 06

16.09.2016 00 09 09 00 00 09 03 00 00 00 06 24

17.09.2016 00 00 00 00 00 00 00 00 00 00 00 00

18.09.2016 06 00 18 00 12 15 09 00 00 00 12 48

19.09.2016 00 06 00 00 03 09 03 00 00 00 00 12

20.09.2016 00 09 00 00 06 15 00 00 00 00 03 18

21.09.2016 00 12 00 00 12 09 03 00 00 00 06 21

22.09.2016 00 00 09 00 00 09 03 00 00 00 09 09

23.09.2016 00 09 09 00 03 18 03 00 00 00 03 12

24.09.2016 00 09 00 00 00 12 00 00 00 00 00 24

25.09.2016 00 06 09 00 06 18 03 00 00 00 06 18

26.09.2016 03 06 18 00 03 00 03 00 00 00 00 30

27.09.2016 00 09 00 00 09 09 00 00 00 00 03 18

28.09.2016 00 00 09 00 06 03 00 00 00 00 06 27

29.09.2016 00 00 00 00 09 00 00 03 00 00 00 09

30.09.2016 00 00 00 00 12 09 00 03 00 00 09 09

Total 27 132 198 00 156 210 48 06 00 00 186 600

Page 45: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 44

DETAILS OF CUBES TESTED IN THE MONTH OF SEPTEMBER 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M35 M40 M40

PQC

M40

PQC Flexural Strength

M45

Remarks

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.09.2016 12 24 09 00 12 03 12 03 00 00

02.09.2016 15 24 03 00 06 03 06 03 00 00

03.09.2016 03 30 03 00 06 00 06 00 00 00

04.09.2016 09 09 06 00 09 00 09 00 00 00

05.09.2016 15 21 03 00 12 03 12 03 00 00

06.09.2016 15 24 09 00 06 03 06 03 00 00

07.09.2016 18 30 00 00 09 03 09 03 00 00

08.09.2016 18 30 15 00 03 03 03 03 00 00

09.09.2016 15 24 09 00 03 03 03 03 00 00

10.09.2016 09 21 09 00 03 03 03 03 00 00

11.09.2016 03 27 03 00 03 03 03 03 00 00

12.09.2016 12 00 09 00 03 00 03 00 00 00

13.09.2016 12 15 06 03 09 03 09 03 00 00

14.09.2016 09 27 03 03 03 03 03 03 00 00

15.09.2016 06 21 00 03 09 03 09 03 00 00

16.09.2016 12 27 03 03 03 09 03 09 00 00

17.09.2016 00 00 00 00 00 00 00 00 00 00

18.09.2016 21 33 06 12 18 06 18 06 00 00

19.09.2016 09 15 03 09 06 00 06 00 00 00

20.09.2016 09 30 03 09 09 06 09 06 00 00

21.09.2016 12 18 06 06 00 06 00 06 00 00

22.09.2016 12 12 03 09 09 12 09 12 00 00

23.09.2016 06 18 03 03 03 06 03 06 00 00

24.09.2016 00 06 00 03 00 06 00 06 00 00

25.09.2016 12 12 00 06 03 09 03 09 00 00

26.09.2016 12 30 03 06 09 12 09 12 00 00

27.09.2016 09 42 00 09 15 06 15 06 00 00

28.09.2016 15 27 03 00 12 09 12 09 00 00

29.09.2016 18 27 00 15 15 03 15 03 00 00

30.09.2016 15 21 00 09 09 03 09 03 00 00

Total 333 645 120 108 207 129 207 129 00 00

Page 46: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 45

DETAILS OF CUBES TESTED IN THE MONTH OF SEPTEMBER 2016.

NORTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

S

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.09.2016 00 06 09 00 00 00 00 00 00 00 06 42

02.09.2016 03 00 09 00 03 00 00 00 00 00 06 09

03.09.2016 03 00 09 00 06 00 00 00 00 00 03 24

04.09.2016 03 00 00 00 00 00 00 00 00 00 03 27

05.09.2016 00 06 09 00 00 00 00 00 00 00 09 24

06.09.2016 00 15 00 00 03 09 00 00 00 00 03 24

07.09.2016 03 06 09 00 06 00 00 00 00 00 03 21

08.09.2016 03 00 18 00 00 12 00 00 00 00 03 42

09.09.2016 03 00 09 00 00 00 00 00 00 00 06 54

10.09.2016 03 00 09 00 03 12 00 00 00 00 06 24

11.09.2016 03 00 09 00 00 00 00 00 00 00 03 21

12.09.2016 00 00 09 00 03 00 00 00 00 00 03 00

13.09.2016 03 12 00 00 03 00 00 00 00 00 03 18

14.09.2016 03 12 09 00 03 06 00 00 00 00 03 18

15.09.2016 03 00 09 00 06 03 00 00 00 00 03 18

16.09.2016 00 00 09 00 06 09 00 00 00 00 06 12

17.09.2016 00 00 00 00 00 00 00 00 00 00 00 00

18.09.2016 00 06 18 00 03 06 00 00 00 00 09 33

19.09.2016 00 00 09 00 00 00 00 00 00 00 06 18

20.09.2016 00 00 00 00 03 00 00 00 00 00 00 21

21.09.2016 00 06 09 00 03 00 00 00 00 00 03 24

22.09.2016 00 00 09 00 00 00 00 00 00 00 03 21

23.09.2016 00 03 09 00 00 18 00 00 00 00 03 21

24.09.2016 00 15 00 00 03 18 00 00 00 00 00 09

25.09.2016 00 15 09 00 00 00 00 00 00 00 06 09

26.09.2016 03 00 09 00 00 00 00 00 00 00 06 21

27.09.2016 00 00 00 00 00 06 00 00 00 00 03 06

28.09.2016 00 06 09 00 03 00 00 00 00 00 03 12

29.09.2016 00 09 09 00 03 09 00 00 00 00 00 09

30.09.2016 00 09 00 00 00 00 00 00 00 00 03 24

Total 36 126 216 00 60 108 00 00 00 00 114 606

Page 47: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 46

DETAILS OF CUBES TESTED IN THE MONTH OF SEPTEMBER 2016.

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

00

NORTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M35 M40 M40

PQC

M40

PQC Flexural Strength

M45

Remarks

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.09.2016 03 06 00 00 00 03 00 03 00 00

02.09.2016 03 06 00 00 00 03 00 03 00 00

03.09.2016 03 06 00 00 00 03 00 03 00 00

04.09.2016 03 06 00 00 00 03 00 03 00 00

05.09.2016 03 12 00 00 00 03 00 03 00 00

06.09.2016 03 06 00 00 00 00 00 00 00 00

07.09.2016 00 09 00 00 00 03 00 03 00 00

08.09.2016 03 09 00 00 00 00 00 00 00 00

09.09.2016 03 06 00 00 00 00 00 00 00 00

10.09.2016 03 06 00 00 03 00 03 00 00 00

11.09.2016 03 06 00 00 03 03 03 03 00 00

12.09.2016 03 00 00 00 03 00 03 00 00 00

13.09.2016 03 06 00 00 03 03 03 03 00 00

14.09.2016 03 06 00 00 03 00 03 00 00 00

15.09.2016 03 06 00 00 03 00 03 00 00 00

16.09.2016 03 06 00 00 03 00 03 00 00 00

17.09.2016 00 00 00 00 00 00 00 00 00 00

18.09.2016 06 12 00 00 03 00 03 00 00 00

19.09.2016 03 06 00 00 03 03 03 03 00 00

20.09.2016 00 09 00 00 00 03 00 03 00 00

21.09.2016 03 06 00 00 00 03 00 03 00 00

22.09.2016 03 06 00 00 00 00 00 00 00 00

23.09.2016 03 09 00 00 03 00 03 00 00 00

24.09.2016 00 06 00 00 00 00 00 00 00 00

25.09.2016 03 06 00 00 03 00 03 00 00 00

26.09.2016 03 06 00 00 03 00 03 00 00 00

27.09.2016 03 06 00 00 03 00 03 00 00 00

28.09.2016 03 00 00 00 03 00 03 00 00 00

29.09.2016 00 06 00 00 00 00 00 00 00 00

30.09.2016 03 09 00 00 03 00 03 00 00 00

Total 78 189 00 00 45 33 45 33 00 00

Page 48: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 47

FOR THE MONTH OF OCTOBER 2016

DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF OCTOBER 2016.

SOUTH PORTAL

DATE

INSITU CORES PANEL CASTED

Remarks Pass Fail 1 days 7 days 28 days

01.10.2016 00 00 00 00 00

02.10.2016 00 00 00 00 00

03.10.2016 00 00 00 00 00

04.10.2016 00 00 00 00 00

05.10.2016 00 00 00 00 00

06.10.2016 00 00 00 00 00

07.10.2016 00 00 00 00 00

08.10.2016 00 00 00 00 00

09.10.2016 00 00 00 00 00

10.10.2016 00 00 00 00 00

11.10.2016 00 00 00 00 00

12.10.2016 00 00 00 00 00

13.10.2016 00 00 00 00 00

14.10.2016 00 00 00 00 00

15.10.2016 00 00 00 00 00

16.10.2016 00 00 00 00 00

17.10.2016 00 00 00 00 00

18.10.2016 00 00 00 00 00

19.10.2016 00 00 00 00 00

20.10.2016 00 00 00 00 00

21.10.2016 00 00 00 00 00

22.10.2016 00 00 00 00 00

23.10.2016 00 00 00 00 00

24.10.2016 00 00 00 00 00

25.10.2016 00 00 00 00 00

26.10.2016 00 00 00 00 00

27.10.2016 00 00 00 00 00

28.10.2016 00 00 00 00 00

29.10.2016 00 00 00 00 00

30.10.2016 00 00 00 00 00

31.10.2016 00 00 00 00 00

Total 00 00 00 00 00

Page 49: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 48

DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF OCTOBER 2016.

NORTH PORTAL

DATE

INSITU CORES PANEL CASTED

Remarks

Pass Fail 1 days 7 days 28 days

01.10.2016 00 00 00 00 00

02.10.2016 00 00 00 00 00

03.10.2016 00 00 00 00 00

04.10.2016 00 00 00 00 00

05.10.2016 00 00 00 00 00

06.10.2016 00 00 00 00 00

07.10.2016 00 00 00 00 00

08.10.2016 00 00 00 00 00

09.10.2016 00 00 00 00 00

10.10.2016 00 00 00 00 00

11.10.2016 00 00 00 00 00

12.10.2016 00 00 00 00 00

13.10.2016 00 00 00 00 00

14.10.2016 00 00 00 00 00

15.10.2016 00 00 00 00 00

16.10.2016 00 00 00 00 00

17.10.2016 00 00 00 00 00

18.10.2016 00 00 00 00 00

19.10.2016 00 00 00 00 00

20.10.2016 00 00 00 00 00

21.10.2016 00 00 00 00 00

22.10.2016 00 00 00 00 00

23.10.2016 00 00 00 00 00

24.10.2016 00 00 00 00 00

25.10.2016 00 00 00 00 00

26.10.2016 00 00 00 00 00

27.10.2016 00 00 00 00 00

28.10.2016 00 00 00 00 00

29.10.2016 00 00 00 00 00

30.10.2016 00 00 00 00 00

31.10.2016 00 00 00 00 00

Total 00 00 00 00 00

Page 50: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 49

DETAILS OF CUBES TESTED IN THE MONTH OF OCTOBER 2016.

SOUTH PORTAL

DATE Grout Cube Testing

Remarks

3 days 7 days 28 days

01.10.2016 00 00 05

02.10.2016 00 00 00

03.10.2016 00 00 10

04.10.2016 00 00 05

05.10.2016 00 00 05

06.10.2016 00 00 05

07.10.2016 00 00 05

08.10.2016 00 00 05

09.10.2016 00 00 05

10.10.2016 00 00 05

11.10.2016 00 00 05

12.10.2016 00 00 05

13.10.2016 00 00 05

14.10.2016 00 00 05

15.10.2016 00 00 00

16.10.2016 00 00 05

17.10.2016 00 00 05

18.10.2016 00 00 05

19.10.2016 00 00 05

20.10.2016 00 00 00

21.10.2016 00 00 00

22.10.2016 00 00 00

23.10.2016 00 00 00

24.10.2016 00 00 00

25.10.2016 00 00 00

26.10.2016 00 00 00

27.10.2016 00 00 00

28.10.2016 00 00 00

29.10.2016 00 00 00

30.10.2016 00 00 00

31.10.2016 00 00 00

Total 00 00 90

Page 51: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 50

DETAILS OF CUBES TESTED IN THE MONTH OF OCTOBER 2016.

NORTH PORTAL

DATE Grout Cube Testing

Remarks

3 days 7 days 28 days

01.10.2016 00 00 00

02.10.2016 00 00 00

03.10.2016 00 00 00

04.10.2016 00 00 00

05.10.2016 00 00 00

06.10.2016 00 00 00

07.10.2016 00 00 00

08.10.2016 00 00 00

09.10.2016 00 00 00

10.10.2016 00 00 00

11.10.2016 00 00 00

12.10.2016 00 00 00

13.10.2016 00 00 00

14.10.2016 00 00 00

15.10.2016 00 00 00

16.10.2016 00 00 00

17.10.2016 00 00 00

18.10.2016 00 00 00

19.10.2016 00 00 00

20.10.2016 00 00 00

21.10.2016 00 00 00

22.10.2016 00 00 00

23.10.2016 00 00 00

24.10.2016 00 00 00

25.10.2016 00 00 00

26.10.2016 00 00 00

27.10.2016 00 00 00

28.10.2016 00 00 00

29.10.2016 00 00 00

30.10.2016 00 00 00

31.10.2016 00 00 00

Total 00 00 00

Page 52: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 51

DETAILS OF CUBES TESTED IN THE MONTH OF OCTOBER 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.10.2016 03 00 00 00 06 00 00 00 00 00 03 27

02.10.2016 00 00 00 00 00 00 00 00 00 00 00 00

03.10.2016 00 00 18 00 00 12 06 06 00 00 12 33

04.10.2016 00 00 09 00 06 24 00 03 00 00 09 12

05.10.2016 00 00 00 00 09 24 00 00 00 00 00 09

06.10.2016 00 00 09 00 00 09 00 03 00 00 03 33

07.10.2016 00 00 00 00 03 00 00 03 00 00 03 15

08.10.2016 00 09 09 00 03 24 00 00 00 00 06 06

09.10.2016 00 06 00 00 00 06 00 09 00 00 00 18

10.10.2016 03 00 00 00 03 06 00 03 00 00 03 00

11.10.2016 00 00 09 00 03 15 00 00 00 00 00 24

12.10.2016 00 00 09 00 03 18 03 03 00 00 00 09

13.10.2016 03 00 09 00 06 00 03 03 00 00 03 21

14.10.2016 03 00 00 00 03 09 00 03 00 00 00 03

15.10.2016 03 00 00 00 03 00 00 00 00 00 00 00

16.10.2016 03 00 09 00 03 18 00 03 00 00 00 27

17.10.2016 00 06 09 00 06 06 00 03 00 00 00 00

18.10.2016 00 00 09 00 06 09 00 00 00 00 00 06

19.10.2016 00 09 00 00 09 09 00 00 00 00 00 12

20.10.2016 00 00 09 00 03 12 00 00 00 00 00 00

21.10.2016 03 00 00 00 03 12 00 00 00 00 06 12

22.10.2016 00 06 18 00 03 15 00 00 00 00 00 03

23.10.2016 06 00 09 00 00 00 00 03 00 00 00 12

24.10.2016 00 00 00 00 06 00 03 03 00 00 00 06

25.10.2016 00 00 18 00 00 12 09 00 00 00 00 15

26.10.2016 03 00 00 00 03 15 06 00 00 00 00 00

27.10.2016 00 00 18 00 09 00 03 00 00 00 03 03

28.10.2016 03 00 00 00 15 06 00 00 00 00 00 09

29.10.2016 00 00 00 00 06 03 00 00 00 00 00 06

30.10.2016 00 00 00 00 00 00 00 00 00 00 00 00

31.10.2016 00 06 18 00 09 03 06 00 00 00 00 03

Total 33 42 189 00 129 267 39 48 00 00 51 324

Page 53: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 52

DETAILS OF CUBES TESTED IN THE MONTH OF OCTOBER 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M35 M40 M40

PQC

M40

PQC Flexural Strength

M45

Remarks

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.10.2016 15 18 00 00 09 12 09 12 00 00

02.10.2016 00 00 00 00 00 00 00 00 00 00

03.10.2016 27 24 00 00 24 18 24 18 00 00

04.10.2016 21 21 00 00 21 15 21 15 00 00

05.10.2016 15 18 00 00 09 06 09 06 00 00

06.10.2016 21 12 00 00 12 09 12 09 00 00

07.10.2016 09 21 00 00 15 06 15 06 00 00

08.10.2016 21 21 00 00 12 09 12 09 00 00

09.10.2016 00 18 00 00 00 15 00 15 00 00

10.10.2016 21 15 00 00 15 09 15 09 00 00

11.10.2016 24 18 00 00 12 12 12 12 00 00

12.10.2016 15 21 00 00 12 06 12 06 00 00

13.10.2016 21 27 00 00 15 12 15 12 00 00

14.10.2016 27 15 00 00 15 06 15 06 00 00

15.10.2016 12 00 00 00 03 00 03 00 00 00

16.10.2016 24 21 00 00 12 04 12 04 00 00

17.10.2016 30 21 00 00 09 12 09 12 00 00

18.10.2016 21 18 00 00 09 15 09 15 00 00

19.10.2016 18 24 00 00 12 15 12 15 00 00

20.10.2016 12 30 00 00 09 18 09 18 00 00

21.10.2016 09 24 00 00 15 09 15 09 00 00

22.10.2016 15 24 00 00 12 09 12 09 00 00

23.10.2016 12 21 00 00 18 06 18 06 00 00

24.10.2016 12 24 00 00 09 18 09 18 00 00

25.10.2016 12 30 00 00 12 21 12 21 00 00

26.10.2016 09 24 00 00 09 09 09 09 00 00

27.10.2016 09 33 00 00 09 12 09 12 00 00

28.10.2016 03 18 00 00 03 15 03 15 00 00

29.10.2016 03 30 00 00 06 12 06 12 00 00

30.10.2016 00 00 00 00 00 00 00 00 00 00

31.10.2016 09 30 00 00 24 15 24 15 00 00

Total 447 621 00 00 342 325 342 325 00 00

Page 54: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 53

DETAILS OF CUBES TESTED IN THE MONTH OF OCTOBER 2016.

NORTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

S

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.10.2016 00 06 09 00 03 00 00 00 00 00 03 21

02.10.2016 00 03 09 00 00 03 00 00 00 00 03 09

03.10.2016 00 00 09 00 00 00 00 00 00 00 03 06

04.10.2016 00 06 00 00 00 06 00 00 00 00 06 09

05.10.2016 00 09 09 00 06 06 00 00 00 00 03 15

06.10.2016 00 03 09 00 03 09 00 00 00 00 03 15

07.10.2016 03 00 09 00 00 18 00 00 00 00 03 21

08.10.2016 03 00 09 00 00 30 00 00 00 00 03 18

09.10.2016 00 00 00 00 00 18 00 00 00 00 00 12

10.10.2016 03 00 09 00 00 00 00 00 00 00 03 24

11.10.2016 03 00 09 00 03 00 00 00 00 00 06 00

12.10.2016 03 00 00 00 09 15 00 00 00 00 06 06

13.10.2016 03 00 00 00 06 18 00 00 00 00 00 12

14.10.2016 00 00 00 00 03 00 00 00 00 00 06 15

15.10.2016 00 00 00 00 03 00 00 00 00 00 00 00

16.10.2016 00 00 00 00 03 06 00 00 00 00 00 27

17.10.2016 00 06 00 00 03 00 00 00 00 00 00 27

18.10.2016 00 00 00 00 00 00 00 00 00 00 00 27

19.10.2016 00 00 00 00 06 00 00 00 00 00 06 18

20.10.2016 03 00 00 00 03 03 00 00 00 00 09 06

21.10.2016 00 00 00 00 06 03 00 00 00 00 03 06

22.10.2016 00 00 00 00 00 12 00 00 00 00 03 06

23.10.2016 00 00 00 00 03 00 00 00 00 00 00 06

24.10.2016 03 00 00 00 03 00 00 00 00 00 03 12

25.10.2016 00 00 00 00 00 00 00 00 00 00 00 12

26.10.2016 00 00 00 00 00 15 00 00 00 00 00 09

27.10.2016 00 00 00 00 00 06 00 00 00 00 00 06

28.10.2016 00 09 09 00 00 00 00 00 00 00 03 06

29.10.2016 00 12 00 00 03 00 00 00 00 00 03 06

30.10.2016 00 00 00 00 03 00 00 00 00 00 03 06

31.10.2016 03 09 09 00 03 00 00 00 00 00 00 00

Total 27 63 99 00 72 168 00 00 00 00 84 363

Page 55: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 54

DETAILS OF CUBES TESTED IN THE MONTH OF OCTOBER 2016.

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

00

NORTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M35 M40 M40

PQC

M40

PQC Flexural Strength

M45

Remarks

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.10.2016 03 06 00 00 03 03 03 03 00 00

02.10.2016 03 06 00 00 03 03 03 03 00 00

03.10.2016 03 06 00 00 03 03 03 03 00 00

04.10.2016 03 06 00 00 03 03 03 03 00 00

05.10.2016 03 06 00 00 03 03 03 03 00 00

06.10.2016 03 06 00 00 03 03 03 03 00 00

07.10.2016 03 06 00 00 03 03 03 03 00 00

08.10.2016 03 06 00 00 03 00 03 00 00 00

09.10.2016 00 06 00 00 00 03 00 03 00 00

10.10.2016 03 06 00 00 03 03 03 03 00 00

11.10.2016 03 00 00 00 03 00 03 00 00 00

12.10.2016 03 09 00 00 03 00 03 00 00 00

13.10.2016 03 06 00 00 03 00 03 00 00 00

14.10.2016 03 06 00 00 03 03 03 03 00 00

15.10.2016 03 00 00 00 03 00 03 00 00 00

16.10.2016 03 06 00 00 03 03 03 03 00 00

17.10.2016 03 06 00 00 03 03 03 03 00 00

18.10.2016 00 06 00 00 00 03 00 03 00 00

19.10.2016 03 06 00 00 03 03 03 03 00 00

20.10.2016 03 00 00 00 03 00 03 00 00 00

21.10.2016 03 06 00 00 03 03 03 03 00 00

22.10.2016 03 06 00 00 03 03 03 03 00 00

23.10.2016 00 06 00 00 03 03 03 03 00 00

24.10.2016 03 06 00 00 03 03 03 03 00 00

25.10.2016 00 06 00 00 00 03 00 03 00 00

26.10.2016 00 06 00 00 00 03 00 03 00 00

27.10.2016 00 06 00 00 00 03 00 03 00 00

28.10.2016 00 06 00 00 00 03 00 03 00 00

29.10.2016 00 03 00 00 03 03 03 03 00 00

30.10.2016 03 00 00 00 03 00 03 00 00 00

31.10.2016 03 03 00 00 03 03 03 03 00 00

Total 69 159 00 00 75 72 75 72 00 00

Page 56: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 55

FOR THE MONTH OF NOVEMBER

DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF NOVEMBER 2016.

SOUTH PORTAL

DATE

INSITU CORES PANEL CASTED

Remarks Pass Fail 1 days 7 days 28 days

01.11.2016 00 00 00 00 00

02.11.2016 00 00 00 00 00

03.11.2016 00 00 00 00 00

04.11.2016 00 00 00 00 00

05.11.2016 00 00 00 00 00

06.11.2016 00 00 00 00 00

07.11.2016 00 00 00 00 00

08.11.2016 00 00 00 00 00

09.11.2016 00 00 00 00 00

10.11.2016 00 00 00 00 00

11.11.2016 00 00 00 00 00

12.11.2016 00 00 00 00 00

13.11.2016 00 00 00 00 00

14.11.2016 00 00 00 00 00

15.11.2016 00 00 00 00 00

16.11.2016 00 00 00 00 00

17.11.2016 00 00 00 00 00

18.11.2016 00 00 00 00 00

19.11.2016 00 00 00 00 00

20.11.2016 00 00 00 00 00

21.11.2016 00 00 00 00 00

22.11.2016 00 00 00 00 00

23.11.2016 00 00 00 00 00

24.11.2016 00 00 00 00 00

25.11.2016 00 00 00 00 00

26.11.2016 00 00 00 00 00

27.11.2016 00 00 00 00 00

28.11.2016 00 00 00 00 00

29.11.2016 00 00 00 00 00

30.11.2016 00 00 00 00 00

Total 00 00 00 00 00

Page 57: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 56

DETAILS OF WSC CORES (M25) TESTED IN THE MONTH OF NOVEMBER 2016.

NORTH PORTAL

DATE

INSITU CORES PANEL CASTED

Remarks

Pass Fail 1 days 7 days 28 days

01.11.2016 00 00 00 00 00

02.11.2016 00 00 00 00 00

03.11.2016 00 00 00 00 00

04.11.2016 00 00 00 00 00

05.11.2016 00 00 00 00 00

06.11.2016 00 00 00 00 00

07.11.2016 00 00 00 00 00

08.11.2016 00 00 00 00 00

09.11.2016 00 00 00 00 00

10.11.2016 00 00 00 00 00

11.11.2016 00 00 00 00 00

12.11.2016 00 00 00 00 00

13.11.2016 00 00 00 00 00

14.11.2016 00 00 00 00 00

15.11.2016 00 00 00 00 00

16.11.2016 00 00 00 00 00

17.11.2016 00 00 00 00 00

18.11.2016 00 00 00 00 00

19.11.2016 00 00 00 00 00

20.11.2016 00 00 00 00 00

21.11.2016 00 00 00 00 00

22.11.2016 00 00 00 00 00

23.11.2016 00 00 00 00 00

24.11.2016 00 00 00 00 00

25.11.2016 00 00 00 00 00

26.11.2016 00 00 00 00 00

27.11.2016 00 00 00 00 00

28.11.2016 00 00 00 00 00

29.11.2016 00 00 00 00 00

30.11.2016 00 00 00 00 00

Total 00 00 00 00 00

Page 58: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 57

DETAILS OF CUBES TESTED IN THE MONTH OF NOVEMBER 2016.

SOUTH PORTAL

DATE Contact Grout Cube Testing

Remarks

3 days 7 days 28 days

01.11.2016 00 00 05

02.11.2016 00 00 00

03.11.2016 00 00 10

04.11.2016 00 00 05

05.11.2016 00 00 05

06.11.2016 00 00 05

07.11.2016 00 00 05

08.11.2016 00 00 05

09.11.2016 00 00 05

10.11.2016 00 00 05

11.11.2016 00 00 05

12.11.2016 00 00 05

13.11.2016 00 00 05

14.11.2016 00 00 05

15.11.2016 00 00 00

16.11.2016 00 00 05

17.11.2016 00 00 05

18.11.2016 00 00 05

19.11.2016 00 00 05

20.11.2016 00 00 00

21.11.2016 00 00 00

22.11.2016 00 00 00

23.11.2016 00 00 00

24.11.2016 00 00 00

25.11.2016 00 00 00

26.11.2016 00 00 00

27.11.2016 00 00 00

28.11.2016 00 00 00

29.11.2016 00 00 00

30.11.2016 00 00 00

Total 00 00 90

Page 59: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 58

DETAILS OF CUBES TESTED IN THE MONTH OF NOVEMBER 2016.

NORTH PORTAL

DATE Grout Cube Testing

Remarks

3 days 7 days 28 days

01.11.2016 00 00 00

02.11.2016 00 00 00

03.11.2016 00 00 00

04.11.2016 00 00 00

05.11.2016 00 00 00

06.11.2016 00 00 00

07.11.2016 00 00 00

08.11.2016 00 00 00

09.11.2016 00 00 00

10.11.2016 00 00 00

11.11.2016 00 00 00

12.11.2016 00 00 00

13.11.2016 00 00 00

14.11.2016 00 00 00

15.11.2016 00 00 00

16.11.2016 00 00 00

17.11.2016 00 00 00

18.11.2016 00 00 00

19.11.2016 00 00 00

20.11.2016 00 00 00

21.11.2016 00 00 00

22.11.2016 00 00 00

23.11.2016 00 00 00

24.11.2016 00 00 00

25.11.2016 00 00 00

26.11.2016 00 00 00

27.11.2016 00 00 00

28.11.2016 00 00 00

29.11.2016 00 00 00

30.11.2016 00 00 00

Total 00 00 00

01.11.2016 00 00 00

Page 60: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 59

DETAILS OF CUBES TESTED IN THE MONTH OF NOVEMBER 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.11.2016 00 00 00 00 03 03 03 00 00 00 03 00

02.11.2016 00 00 09 00 09 06 00 03 00 00 00 00

03.11.2016 00 06 03 00 06 09 00 03 00 00 00 03

04.11.2016 00 06 00 00 06 06 00 00 00 00 03 00

05.11.2016 00 03 00 00 00 06 00 00 00 00 00 00

06.11.2016 00 03 00 00 00 06 00 00 00 00 00 00

07.11.2016 00 00 00 00 00 09 00 00 00 00 00 00

08.11.2016 00 00 00 00 00 06 00 00 00 00 00 00

09.11.2016 00 00 09 00 00 12 00 00 00 00 00 00

10.11.2016 00 00 00 00 06 06 03 00 00 00 00 00

11.11.2016 03 09 00 00 06 06 03 00 00 00 00 09

12.11.2016 00 00 00 00 00 09 03 00 00 00 00 00

13.11.2016 00 06 00 00 06 00 06 00 00 00 00 00

14.11.2016 00 00 09 00 06 09 03 03 00 00 00 00

15.11.2016 00 00 00 00 03 00 03 12 00 00 03 00

16.11.2016 03 06 00 00 03 03 00 06 00 00 00 00

17.11.2016 00 00 00 00 06 15 03 03 00 00 00 06

18.11.2016 06 03 00 00 06 18 03 00 00 00 00 00

19.11.2016 00 00 00 00 09 12 03 00 00 00 00 00

20.11.2016 00 00 00 00 06 06 03 03 00 00 03 00

21.11.2016 00 00 00 00 06 15 00 03 00 00 03 00

22.11.2016 00 00 00 00 03 06 00 03 00 00 03 03

23.11.2016 00 00 00 00 00 18 00 00 00 00 00 00

24.11.2016 00 00 00 00 00 09 00 00 00 00 00 00

25.11.2016 00 00 00 00 00 09 00 00 00 00 00 03

26.11.2016 00 00 00 00 00 00 00 00 00 00 00 00

27.11.2016 00 00 00 00 00 00 00 00 00 00 00 00

28.11.2016 00 00 00 00 00 00 00 00 00 00 00 00

29.11.2016 00 00 00 00 00 00 00 00 00 00 00 00

30.11.2016 00 00 00 00 00 00 00 00 00 00 00 00

Total 12 42 36 00 90 204 36 39 00 00 18 24

Page 61: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 60

DETAILS OF CUBES TESTED IN THE MONTH OF NOVEMBER 2016.

SOUTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M35 M40 M40

PQC

M40

PQC Flexural Strength

M45

Remarks

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.11.2016 00 36 00 00 27 12 27 12 00 00

02.11.2016 00 24 00 00 18 12 18 12 00 00

03.11.2016 00 33 00 00 21 15 21 15 00 00

04.11.2016 03 36 00 00 09 15 09 15 00 00

05.11.2016 03 21 00 00 06 03 06 03 00 00

06.11.2016 00 33 00 00 00 12 00 12 00 00

07.11.2016 00 30 00 00 12 09 12 09 00 00

08.11.2016 00 33 00 00 06 09 06 09 00 00

09.11.2016 03 27 00 00 09 12 09 12 00 00

10.11.2016 03 21 00 00 06 09 06 09 00 00

11.11.2016 00 18 00 00 06 15 06 15 00 00

12.11.2016 00 24 00 00 12 12 12 12 00 00

13.11.2016 00 24 00 00 09 18 09 18 00 00

14.11.2016 00 24 00 00 12 09 12 09 00 00

15.11.2016 00 27 00 00 12 12 12 12 00 00

16.11.2016 00 15 00 00 18 09 18 09 00 00

17.11.2016 03 12 00 00 18 09 18 09 00 00

18.11.2016 03 03 00 00 24 03 24 03 00 00

19.11.2016 00 03 00 00 15 06 15 06 00 00

20.11.2016 00 06 00 00 18 15 18 15 00 00

21.11.2016 00 03 00 00 15 09 15 09 00 00

22.11.2016 00 00 00 00 12 27 12 27 00 00

23.11.2016 03 00 00 00 15 18 15 18 00 00

24.11.2016 00 00 00 00 00 21 00 21 00 00

25.11.2016 06 03 00 00 12 09 12 09 00 00

26.11.2016 00 03 00 00 09 06 09 06 00 00

27.11.2016 00 00 00 00 09 00 09 00 00 00

28.11.2016 00 00 00 00 15 12 15 12 00 00

29.11.2016 00 00 00 00 21 06 21 06 00 00

30.11.2016 00 03 00 00 21 09 21 09 00 00

Total 27 462 00 00 387 333 387 333 00 00

Page 62: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 61

DETAILS OF CUBES TESTED IN THE MONTH OF NOVEMBER 2016.

NORTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M10 M10 DLC M15 M20 M25 M30

Remark 7 Day

s

28 Day

s

7 Day

S

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.11.2016 03 09 00 00 03 06 00 00 00 00 03 15

02.11.2016 03 09 00 00 00 18 00 00 00 00 00 06

03.11.2016 00 06 09 00 03 06 00 00 00 00 09 00

04.11.2016 00 00 00 00 00 06 00 00 00 00 00 12

05.11.2016 00 00 00 00 03 09 00 00 00 00 03 00

06.11.2016 00 00 00 00 00 00 00 00 00 00 00 00

07.11.2016 00 00 00 00 00 00 00 00 00 00 00 00

08.11.2016 03 00 00 00 00 00 00 00 00 00 00 00

09.11.2016 00 00 09 00 00 09 00 00 00 00 00 00

10.11.2016 00 03 09 00 00 06 00 00 00 00 00 15

11.11.2016 00 00 09 00 00 18 00 00 00 00 00 00

12.11.2016 00 00 00 00 03 06 00 00 00 00 03 06

13.11.2016 00 00 09 00 00 00 00 00 00 00 03 00

14.11.2016 00 06 09 00 00 00 00 00 00 00 00 06

15.11.2016 00 00 00 00 00 00 00 00 00 00 03 00

16.11.2016 00 00 00 00 06 00 00 00 00 00 00 00

17.11.2016 03 00 00 00 00 00 00 00 00 00 00 00

18.11.2016 03 00 00 00 00 00 00 00 00 00 00 09

19.11.2016 03 00 00 00 00 00 00 00 00 00 00 09

20.11.2016 03 00 00 00 06 00 00 00 00 00 00 00

21.11.2016 00 00 00 00 03 00 00 00 00 00 00 00

22.11.2016 00 00 00 00 00 00 00 00 00 00 00 00

23.11.2016 00 00 00 00 00 00 00 00 00 00 00 00

24.11.2016 00 00 00 00 06 00 00 00 00 00 00 00

25.11.2016 00 00 09 00 00 00 00 00 00 00 00 00

26.11.2016 00 00 09 00 00 00 00 00 00 00 00 00

27.11.2016 00 00 09 00 03 00 00 00 00 00 00 00

28.11.2016 00 00 00 00 09 00 00 00 00 00 06 00

29.11.2016 00 00 09 00 06 00 00 00 00 00 00 00

30.11.2016 00 00 09 00 06 00 00 00 00 00 00 00

Total 21 33 99 00 57 84 00 00 00 00 30 78

Page 63: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 62

DETAILS OF CUBES TESTED IN THE MONTH OF NOVEMBER 2016.

DETAILS OF CUBES TESTED IN THE MONTH OF JUNE 2016.

00

NORTH PORTAL

DATE

Concrete Cube’s Compressive Strength

M35 M40 M40

PQC

M40

PQC Flexural Strength

M45

Remarks

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

7 Day

s

28 Day

s

01.11.2016 03 03 00 00 03 03 03 03 00 00

02.11.2016 03 06 00 00 00 03 00 03 00 00

03.11.2016 00 03 00 00 00 03 00 03 00 00

04.11.2016 00 03 00 00 00 03 00 03 00 00

05.11.2016 00 03 00 00 00 03 00 03 00 00

06.11.2016 00 03 00 00 00 03 00 03 00 00

07.11.2016 00 03 00 00 00 03 00 03 00 00

08.11.2016 00 00 00 00 00 00 00 00 00 00

09.11.2016 00 03 00 00 03 03 03 03 00 00

10.11.2016 00 06 00 00 03 03 03 03 00 00

11.11.2016 00 03 00 00 03 03 03 03 00 00

12.11.2016 00 03 00 00 03 03 03 03 00 00

13.11.2016 03 00 00 00 03 03 03 03 00 00

14.11.2016 00 03 00 00 03 03 03 03 00 00

15.11.2016 00 00 00 00 00 00 00 00 00 00

16.11.2016 00 00 00 00 00 00 00 00 00 00

17.11.2016 00 00 00 00 00 00 00 00 00 00

18.11.2016 03 00 00 00 00 00 00 00 00 00

19.11.2016 00 00 00 00 03 03 03 03 00 00

20.11.2016 00 06 00 00 03 03 03 03 00 00

21.11.2016 00 03 00 00 03 03 03 03 00 00

22.11.2016 00 03 00 00 03 03 03 03 00 00

23.11.2016 00 03 00 00 03 00 03 00 00 00

24.11.2016 00 00 00 00 03 00 03 00 00 00

25.11.2016 00 00 00 00 03 00 03 00 00 00

26.11.2016 00 00 00 00 03 00 03 00 00 00

27.11.2016 00 00 00 00 03 00 03 00 00 00

28.11.2016 00 00 00 00 03 00 03 00 00 00

29.11.2016 00 00 00 00 06 00 06 00 00 00

30.11.2016 00 00 00 00 03 03 03 03 00 00

Total 12 57 00 00 57 54 57 54 00 00

Page 64: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 63

12.3 DETAILS OF AGGREGATES TESTING

FOR THE MONTH OF SEPTEMBER

DETAILS OF TESTING IN THE MONTH OF SEPTEMBER 2016.

SOUTH PORTAL

MOISTURE CONTENT % GRADATION

DATE 10 & 20

mm Crusher

Dust Sand

10 mm

Crusher Dust

20 mm

Sand Combine

d F.I AIV

01.09.2016 04 01 02 01 01 01 01 01 00 00

02.09.2016 04 01 02 01 01 01 01 01 00 00

03.09.2016 04 01 02 01 01 01 01 01 00 00

04.09.2016 04 01 02 01 01 01 01 01 00 00

05.09.2016 04 01 02 01 01 01 01 01 00 00

06.09.2016 04 01 02 01 01 01 01 01 00 00

07.09.2016 04 01 02 01 01 01 01 01 00 00

08.09.2016 04 01 02 01 01 01 01 02 02 01

09.09.2016 04 01 02 01 01 01 01 01 00 00

10.09.2016 04 01 02 01 01 01 01 01 00 00

11.09.2016 04 01 02 01 01 01 01 01 00 00

12.09.2016 04 01 02 01 01 01 01 01 00 00

13.09.2016 04 01 02 01 01 01 01 01 00 00

14.09.2016 04 01 02 01 01 01 01 01 00 00

15.09.2016 04 01 02 01 01 01 01 01 00 00

16.09.2016 04 01 02 01 01 01 01 02 02 01

17.09.2016 00 00 00 00 00 00 00 00 00 00

18.09.2016 04 01 02 01 01 01 01 01 00 00

19.09.2016 04 01 02 01 01 01 01 01 00 00

20.09.2016 04 01 02 01 01 01 01 01 00 00

21.09.2016 04 01 02 01 01 01 01 01 00 00

22.09.2016 04 01 02 01 01 01 01 02 02 01

23.09.2016 04 01 02 01 01 01 01 01 00 00

24.09.2016 04 01 02 01 01 01 01 01 00 00

25.09.2016 04 01 02 01 01 01 01 01 00 00

26.09.2016 04 01 02 01 01 01 01 01 00 00

27.09.2016 04 01 02 01 01 01 01 01 00 00

28.09.2016 04 01 02 01 01 01 01 01 00 00

29.09.2016 04 01 02 01 01 01 01 01 00 00

30.09.2016 04 01 02 01 01 01 01 01 02 01

Total 116 29 58 29 29 29 29 32 08 04

Page 65: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 64

DETAILS OF TESTING IN THE MONTH OF SEPTEMBER 2016.

NORTH PORTAL

MOISTURE CONTENT % GRADATION

DATE 10 & 20

mm Crusher

Dust Sand

10 mm

Crusher Dust

20 mm

Sand Combined F.I AIV

01.09.2016 04 01 02 00 00 00 00 01 00 00

02.09.2016 04 01 02 01 01 00 01 01 01 01

03.09.2016 04 01 02 01 01 01 01 03 01 01

04.09.2016 04 01 02 00 00 00 00 02 00 00

05.09.2016 04 01 02 00 00 00 00 02 00 00

06.09.2016 04 01 02 00 00 00 00 00 00 00

07.09.2016 04 01 02 01 01 01 01 02 01 01

08.09.2016 04 01 02 00 00 00 00 02 00 00

09.09.2016 04 01 02 01 01 00 01 02 01 01

10.09.2016 04 01 02 00 00 00 00 01 00 00

11.09.2016 04 01 02 00 00 00 00 02 00 00

12.09.2016 04 01 02 01 01 01 01 02 01 01

13.09.2016 04 01 02 00 00 00 00 00 00 00

14.09.2016 04 01 02 00 00 00 00 01 00 00

15.09.2016 04 01 02 00 00 00 00 01 00 00

16.09.2016 04 01 02 01 01 01 01 02 01 01

17.09.2016 00 00 00 00 00 00 00 00 00 00

18.09.2016 04 01 02 00 00 00 00 02 00 00

19.09.2016 04 01 02 00 00 00 00 02 00 00

20.09.2016 04 01 02 01 01 01 01 02 01 01

21.09.2016 04 01 02 00 00 00 00 02 00 00

22.09.2016 04 01 02 00 00 00 00 00 00 00

23.09.2016 04 01 02 00 00 00 00 01 00 00

24.09.2016 04 01 02 01 01 01 01 02 01 01

25.09.2016 04 01 02 00 00 00 00 02 00 00

26.09.2016 04 01 02 00 00 00 00 02 00 00

27.09.2016 04 01 02 00 00 00 00 00 00 00

28.09.2016 04 01 02 00 00 00 00 02 00 00

29.09.2016 04 01 02 01 01 01 01 02 01 01

30.09.2016 04 01 02 00 00 00 00 02 00 00

Total 116 29 58 09 09 07 09 45 09 09

Page 66: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 65

FOR THE MONTH OF OCTOBER 2016

DETAILS OF TESTING IN THE MONTH OF OCTOBER 2016.

SOUTH PORTAL

MOISTURE CONTENT % GRADATION

DATE 10 & 20

mm Crusher

Dust Sand

10 mm

Crusher Dust

20 mm

Sand Combine

d F.I AIV

01.10.2016 04 02 02 01 01 01 01 01 00 00

02.10.2016 00 00 00 00 00 00 00 00 00 00

03.10.2016 04 02 02 01 01 01 01 01 00 00

04.10.2016 04 02 02 01 01 01 01 01 00 00

05.10.2016 04 02 02 01 01 01 01 01 00 00

06.10.2016 04 02 02 01 01 01 01 01 00 00

07.10.2016 04 02 02 01 01 01 01 01 00 00

08.10.2016 04 02 02 01 01 01 01 01 00 00

09.10.2016 04 02 02 01 01 01 01 01 02 01

10.10.2016 04 02 02 01 01 01 01 01 00 00

11.10.2016 04 02 02 01 01 01 01 01 00 00

12.10.2016 04 02 02 01 01 01 01 01 00 00

13.10.2016 04 02 02 01 01 01 01 01 00 00

14.10.2016 04 02 02 01 01 01 01 01 00 00

15.10.2016 04 02 02 01 01 01 01 01 00 00

16.10.2016 04 02 02 01 01 01 01 01 00 00

17.10.2016 04 02 02 01 01 01 01 01 02 01

18.10.2016 04 02 02 01 01 01 01 01 00 00

19.10.2016 04 02 02 01 01 01 01 01 00 00

20.10.2016 04 02 02 01 00 01 01 01 00 00

21.10.2016 04 02 02 01 00 01 01 01 00 00

22.10.2016 04 02 02 01 00 01 01 01 02 01

23.10.2016 04 02 02 01 00 01 01 01 00 00

24.10.2016 04 02 02 01 00 01 01 01 00 00

25.10.2016 04 02 02 01 00 01 01 01 00 00

26.10.2016 04 02 02 01 00 01 01 01 00 00

27.10.2016 04 02 02 01 00 01 01 01 00 00

28.10.2016 04 02 02 01 00 01 01 01 00 00

29.10.2016 04 02 02 01 00 01 01 01 00 00

30.10.2016 00 00 00 00 00 00 00 00 00 00

31.10.2016 04 02 02 01 00 01 01 01 02 01

Total 116 58 58 29 18 29 29 29 08 04

Page 67: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 66

DETAILS OF TESTING IN THE MONTH OF OCTOBER 2016.

NORTH PORTAL

MOISTURE CONTENT % GRADATION

DATE 10 & 20

mm Crusher

Dust Sand

10 mm

Crusher Dust

20 mm

Sand Combined F.I AIV

01.10.2016 04 02 02 00 00 00 00 02 00 00

02.10.2016 00 00 00 00 00 00 00 00 00 00

03.10.2016 04 02 02 01 01 01 01 03 01 01

04.10.2016 04 02 02 00 00 00 00 02 00 00

05.10.2016 04 02 02 00 00 00 00 01 00 00

06.10.2016 04 02 02 00 00 00 00 00 00 00

07.10.2016 04 02 02 00 00 00 00 01 00 00

08.10.2016 04 02 02 00 00 00 00 01 00 00

09.10.2016 04 02 02 01 01 01 01 02 01 01

10.10.2016 04 02 02 00 00 00 00 01 00 00

11.10.2016 04 02 02 00 00 00 00 00 00 00

12.10.2016 04 02 02 00 00 00 00 01 00 00

13.10.2016 04 02 02 00 00 00 00 01 00 00

14.10.2016 04 02 02 00 00 00 00 01 00 00

15.10.2016 04 02 02 01 01 01 01 02 01 01

16.10.2016 04 02 02 00 00 00 00 01 00 00

17.10.2016 04 02 02 00 00 00 00 01 00 00

18.10.2016 04 02 02 00 00 00 00 00 00 00

19.10.2016 04 02 02 00 00 00 00 00 00 00

20.10.2016 04 02 02 01 01 01 01 00 00 00

21.10.2016 04 02 02 00 00 00 00 01 00 00

22.10.2016 04 02 02 00 00 00 00 00 00 00

23.10.2016 04 02 02 00 00 00 00 01 00 00

24.10.2016 04 02 02 00 00 00 00 02 00 00

25.10.2016 04 02 02 01 01 01 01 02 01 01

26.10.2016 04 02 02 00 00 00 00 00 00 00

27.10.2016 04 02 02 00 00 00 00 01 00 00

28.10.2016 04 02 02 00 00 00 00 00 00 00

29.10.2016 04 02 02 01 01 01 01 01 01 01

30.10.2016 00 00 00 00 00 00 00 00 00 00

31.10.2016 04 02 02 00 00 00 00 00 00 00

Total 116 58 58 06 06 06 06 28 05 05

Page 68: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 67

FOR THE MONTH OF NOVEMBER 2016

DETAILS OF TESTING IN THE MONTH OF NOVEMBER 2016.

SOUTH PORTAL

MOISTURE CONTENT % GRADATION

DATE 10 & 20

mm Crusher

Dust Sand

10 mm

Crusher Dust

20 mm

Sand Combine

d F.I AIV

01.11.2016 02 00 01 01 00 01 01 01 00 00

02.11.2016 02 00 01 01 00 01 01 01 00 00

03.11.2016 02 00 01 01 00 01 01 01 00 00

04.11.2016 02 00 01 01 00 01 01 01 00 00

05.11.2016 02 00 01 01 00 01 01 01 00 00

06.11.2016 02 00 01 01 00 01 01 01 00 00

07.11.2016 02 00 01 01 00 01 01 01 02 01

08.11.2016 02 00 01 01 00 01 01 01 00 00

09.11.2016 02 00 01 01 00 01 01 01 00 00

10.11.2016 02 00 01 01 00 01 01 01 00 00

11.11.2016 02 00 01 01 00 01 01 01 00 00

12.11.2016 02 00 01 01 00 01 01 01 00 00

13.11.2016 02 00 01 01 00 01 01 01 00 00

14.11.2016 02 00 01 01 00 01 01 01 02 01

15.11.2016 02 00 01 01 00 01 01 01 00 00

16.11.2016 02 00 01 01 00 01 01 01 00 00

17.11.2016 02 00 01 01 00 01 01 01 00 00

18.11.2016 02 00 01 01 00 01 01 01 00 00

19.11.2016 02 00 01 01 00 01 01 01 00 00

20.11.2016 02 00 01 01 00 01 01 01 00 00

21.11.2016 02 00 01 01 00 01 01 01 02 01

22.11.2016 02 00 01 01 00 01 01 01 00 00

23.11.2016 02 00 01 01 00 01 01 01 00 00

24.11.2016 02 00 01 01 00 01 01 01 00 00

25.11.2016 02 00 01 01 00 01 01 01 00 00

26.11.2016 02 00 01 01 00 01 01 01 00 00

27.11.2016 02 00 01 01 00 01 01 01 00 00

28.11.2016 02 00 01 01 00 01 01 01 00 00

29.11.2016 02 00 01 01 00 01 01 01 00 00

30.11.2016 02 00 01 01 00 01 01 01 02 01

Total 60 00 30 30 00 30 30 30 08 04

Page 69: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 68

DETAILS OF TESTING IN THE MONTH OF NOVEMBER 2016.

NORTH PORTAL

MOISTURE CONTENT % GRADATION

DATE 10 & 20

mm Crusher

Dust Sand

10 mm

Crusher Dust

20 mm

Sand Combined F.I AIV

01.11.2016 02 01 01 00 00 00 00 00 00 00

02.11.2016 02 01 01 00 00 00 00 02 00 00

03.11.2016 02 01 01 00 00 00 00 02 00 00

04.11.2016 02 01 01 00 00 00 00 02 00 00

05.11.2016 02 01 01 01 01 01 01 02 01 01

06.11.2016 02 01 01 00 00 00 00 06 00 00

07.11.2016 02 01 01 00 00 00 00 02 00 00

08.11.2016 02 01 01 00 00 00 00 00 00 00

09.11.2016 02 01 01 00 01 01 01 00 01 01

10.11.2016 02 01 01 00 00 00 00 00 00 00

11.11.2016 02 01 01 01 00 00 00 01 00 00

12.11.2016 02 01 01 00 00 00 00 01 00 00

13.11.2016 02 01 01 00 00 00 00 01 00 00

14.11.2016 02 01 01 00 00 00 00 01 00 00

15.11.2016 02 01 01 00 01 01 01 01 01 01

16.11.2016 02 01 01 00 00 00 00 01 00 00

17.11.2016 02 01 01 01 00 00 00 02 00 00

18.11.2016 02 01 01 00 00 00 00 01 00 00

19.11.2016 02 01 01 00 00 00 00 02 00 00

20.11.2016 02 01 01 00 01 01 01 02 01 01

21.11.2016 02 01 01 01 00 00 00 02 00 00

22.11.2016 02 01 01 00 00 00 00 01 00 00

23.11.2016 02 01 01 00 00 00 00 02 00 00

24.11.2016 02 01 01 00 00 00 00 02 00 00

25.11.2016 02 01 01 00 01 01 01 01 01 01

26.11.2016 02 01 01 00 00 00 00 01 00 00

27.11.2016 02 01 01 01 00 00 00 02 00 00

28.11.2016 02 01 01 00 00 00 00 01 00 00

29.11.2016 02 01 01 00 01 01 01 02 01 01

30.11.2016 02 01 01 00 00 00 00 02 00 00

Total 60 30 30 05 05 05 05 41 05 05

Page 70: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 69

13. SAFETY REPORT

S.no. Particulars Up to last Month Current Month Cumulative

1 Total Man-hours Worked 15,291,992 2,97,623 15,589,615

2 Average No of Employees 1,88,455 6,250 1,94,705

3 Incidents 17 0 17

4 Environment Incidents 0 0 0

5 Training (Man Hours) 4,77,841 87 4,77,928

Page 71: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 70

14 MINUTES OF MONTHLY PROGRESS MEETING

No Meeting during Quarter (September 2016- November 2016)

Page 72: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 71

15 PHOTOGRAPHIC REPORT

02-09-2016_Dismantling Lining gantry at Escape Tunnel RD 5+000 approx.

07-09-2016_Electrical boards and MCC Ventilation Panels at Ventilation Building

North, ground floor

Page 73: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 72

10-09-2016_Partition wall additional anchors for ventilation slab support,at

approx. RD 5+000

16-09-2016_Approach slab-expansion joint and wearing coat recently executed at

South Portal Bridge B1

Page 74: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 73

04-10-2016_NAR excavation works ch. 10+600 to 10+720

04-10-2016_Drainage works in junction CP-16

Page 75: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 74

04-10-2016_North Dump site profile view

04-10-2016_Main body of Wirtgen paver at Main Tunnel near CP-20 (North side) during

mechanical fitting

Page 76: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 75

20-10-2016_Front view of macro-landslide North Toll Plaza at Hill side Protection Works

27-10-2016_View of SAR stretch chainage 0+140 to 0+300 with Gomaco paver

Page 77: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 76

3-11-2016_Foundation pillar for EDCS Gantry at South Toll Plaza

3-11-2016_Foundation work for Static Weight Bridge at S Toll Plaza, besides PQC

passes

Page 78: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 77

3-11-2016_North Approach road hill slopes with macro landslide

3-11-2016_North Approach_road hill slopes with macro landslide

Page 79: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 78

3-11-2016_PQC panel executed in Main Tunnel Lay bay by screed

9-11-2016_Cutting joint at PQC North side, near RD 6+200 right side

Page 80: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 79

9-11-2016_North Dumping yard panoramic, nose shaped with gabion walls and toe step

concrete walls

11-11-2016_South Switchyard installations commissioned during this month

Page 81: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 80

11-11-2016_South Toll Plaza Installations and civil works

15-11-2016_VFD Panel at Main Control room of Ventilation Building South

Page 82: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 81

24-11-2016_Installation of Weigh in motion sensors in TP lanes

24-11-2016_North Portal entrance (incl. Ventilation Building) PQC at Main Tunnel

Page 83: NATIONAL HIGHWAYS AUTHORITY OF INDIA - nhai.org.innhai.org.in/spw/IEReport/Quarterly Report for the Month of... · is being carried out in five separate ... with its exceptional scenic

Quarterly Progress Report September 2016 to November 2016

Euroestudios S. L. Spain in Association with Segmental Consulting & Infrastructure Advisory (P) Ltd Page 82

24-11-2016_SAR Rotary with parapet wall

29-11-2016_PQC in access road to Escape Tunnel South