otf101202 optix rtn 600 routine maintenance issue 1.02

28
www.huawei.com Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. OptiX RTN 600 Routine Maintenance

Upload: engrdandayo1

Post on 27-Apr-2017

228 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

www.huawei.com

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved.

OptiX RTN 600 Routine Maintenance

Page 2: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page3Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

References “Routine Maintenance Guide” and “Common

Maintenance Operation Guide” in the OptiX RTN 600 Radio Transmission System Maintenance Guide.

Page 3: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page4Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Objectives Upon completion of this course, you will be able to:

List the routine maintenance items of OptiX RTN 600 Implement the maintenance operation of OptiX RTN

600 Judge the common faulty in OptiX RTN 600

Page 4: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page5Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Contents1. Routine Maintenance

2. Common Maintenance Operations

Page 5: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page6Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Contents1. Routine Maintenance

1.1 IDU maintenance items

1.2 Out door units maintenance items1.3 Maintenance Items on NM system

Page 6: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page7Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Observing The Indicators SRV indicator on all boards: indicates status of services

Red color: critical or major alarm Yellow color: minor or remote alarm Green color: no alarm Off: no service configured or power off

STAT indicator on all boards: indicates status of the boards

Green color: board running normally Red color: board has hardware fault Off: board not running, not be created in NMS or power off

Page 7: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page8Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Observing The Indicators (cont.) BER indicator on IF board: indicates bit errors on

microwave Yellow color: bit errors exceed the threshold Off: bit error is ok

ODU indicator on IF board: indicates status of the ODU Green color: ODU running normally Red color: ODU has hardware fault

Link indicator on IF board: indicates status of MW link Green color: MW link is normal Red color: MW link is abnormal

Page 8: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page9Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Testing The Orderwire Phone Making a call to other site.

The dial tone should be clear after pick up the phone.

The ringing tone should be clear after dial the number.

If remote site answered the call, the voice should be clear without noise.

Page 9: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page10Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Cleaning the Air Filter It is recommend to clean

the air filter once every two months.

Cleaning the air filter is necessary only for the IDU 620 that is configured with fans.

Page 10: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page11Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Cleaning the Equipment Room It is recommend to clean the equipment room once

every two months. 1. Temperature: –5℃ to 45℃. 2. Humidity: 5% to 95%. 3. Disaster protection. 4. Clean the equipment room.

Page 11: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page12Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Contents1. Routine Maintenance

1.1 IDU maintenance items1.2 Out door units maintenance items

1.3 Maintenance Items on NM system

Page 12: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page13Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

ODU Maintenance Items It is recommend to perform the operations in every

half year or after a fresh gale. Checking the ODU Checking the hybrid coupler Checking the antenna Checking the IF cable

Page 13: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page14Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Checking the ODU Protection area of the

lightning arrester. Connections between

ODU to hybrid coupler and antenna.

Water-proof checking for the interfaces.

Status of protection grounding cable.

Surface of ODU.

Page 14: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page15Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Checking the Hybrid Coupler Protection area of the lightning arrester. Connections between hybrid coupler to ODU and

antenna. Water-proof checking for the interfaces.

Page 15: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page16Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Checking the Antenna Protection area of the lightning ar

rester. Connections between antenna to

pole. Antenna radome should be intact. Water accumulation in antenna. Position and direction of antenna.

Page 16: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page17Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Checking the IF Cable Appearance of the IF cable. Cable connectors. Cable grounding.

Page 17: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page18Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Contents1. Routine Maintenance

1.1 IDU maintenance items1.2 Out door units maintenance items1.3 Maintenance Items on NM system

Page 18: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page19Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Maintenance Via LCT or NMS When the T2000 Web LCT is available on site or

equipment is managed by T2000: Querying alarms Querying performance Querying abnormal events Querying the receiving power of the ODU Testing protection functions once every half year

Page 19: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page20Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Summary IDU maintenance items

Observing the indicators in IDU Testing the orderwire phone Cleaning the air filter Cleaning the equipment room

ODU maintenance items Observing the indicators in IDU Testing the orderwire phone Cleaning the air filter Cleaning the equipment room

Maintenance operations via LCT and NMS: alarm, performance, power querying

Page 20: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page21Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Contents1. Routine Maintenance2. Common Maintenance Operations

Page 21: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page22Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Replacing an ODU ODU power off. Disconnect cable. Uninstall ODU. Install the new ODU.

New ODU consistent with the previous one. Polarity.

Connect back the cables. Carry out the waterproof measures for the IF interface of

the ODU. Turn on the ODU-PWR switch on the panel of the IF board. Check status of new ODU by Web LCT.

Page 22: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page23Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Plugging Out a Board

Step 1: Loosen the screws on the front panel.

Step 2: Unlock the ejector levers of the board so that the board is disconnected from the backplane.

Step 3: Draw out the board along the guiding rail.

Page 23: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page24Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Plugging In a Board

Step 1: Slowly inserting the board along the guiding rail.

Step 2: Lock the ejector levers of the board.

Step 3: Fasten the screws on the front panel.

Page 24: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page25Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Replacing an IF Board Active/standby board switch or SNCP switch. ODU power off and IF cable disconnect. Replace the new IF board and connect IF cable. Observe the indicators. Turn on ODU power. Restore active/standby board or SNCP service. Monitor status of the new IF board.

Page 25: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page26Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Replacing an SCC Board Remove the SCC board and

make sure the spare SCC board is consistent with it.

Replace the removable memory card on spare SCC.

Install the spare board. Monitor the indicators, and

check the status of the running SCC board by Web LCT.

Page 26: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page27Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Abbreviations and Acronyms IDU In Door Unit ODU Out Door Unit BER Bit Error Rate IF Intermediate Frequency NMS Network Management System SNCP Sub-Network Connection Protection LCT Local Craft Terminal SCC System Control and Communication Unit

Page 27: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Page28Copyright © 2009 Huawei Technologies Co., Ltd. All rights reserved.

Summary Routine maintenance operations of the OptiX RTN

600, including: Replacing an ODU Precautions for replacing a board Replacing an IF board Replacing an SCC board

Page 28: OTF101202 OptiX RTN 600 Routine Maintenance ISSUE 1.02

Thank youwww.huawei.com