pixel production database status p. netchaeva - infn genova 13 february 2003
DESCRIPTION
Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003. Sensors. PDB readiness : Item tables + java application for Wafer upload (with sub-structures) + Report with links to Items exist. Test tables (-last update) - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003](https://reader036.vdocument.in/reader036/viewer/2022083005/568136d2550346895d9e7030/html5/thumbnails/1.jpg)
Pixel Production Database Pixel Production Database STATUSSTATUS
P. Netchaeva - INFN GenovaP. Netchaeva - INFN Genova13 February 200313 February 2003
![Page 2: Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003](https://reader036.vdocument.in/reader036/viewer/2022083005/568136d2550346895d9e7030/html5/thumbnails/2.jpg)
Pixel Week - Production update - 13 February 2003 - P.Netchaeva INFN GenovaPixel Week - Production update - 13 February 2003 - P.Netchaeva INFN Genova 2
SensorsSensors
PDB readiness:
Item tables + java application for Wafer upload (with sub-structures) + Report with links to Items exist.Test tables (-last update) + java applications for upload data and download data file + Reports exist.
Missing: Last update of test tables.
Data:
236 wafers: 201 CiS and 35 Tesla are registered.121 wafers are with Visual inspection test results. 44 wafers are with Planarity test results. 24 wafers are with SCR test results. 0 wafers are with Thickness test results.
Tiles: 478 IV tested (of 708) 36 ITS tested
![Page 3: Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003](https://reader036.vdocument.in/reader036/viewer/2022083005/568136d2550346895d9e7030/html5/thumbnails/3.jpg)
Pixel Week - Production update - 13 February 2003 - P.Netchaeva INFN GenovaPixel Week - Production update - 13 February 2003 - P.Netchaeva INFN Genova 3
ElectronicsElectronics
PDB readiness:
Item tables + java application for Wafer upload (with sub-structures) + Report with links to Items exist.
FE and MCC “colours” + java applications for their upload + Reports for colour representation of these Items exist.
Missing: New reticle layout will not change Item table, but will change java application for Wafer upload.
Test definitions, as a consequence:Tables + java applications + Reports for tests.
Data:
34 wafers with FEs and MCCs.
![Page 4: Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003](https://reader036.vdocument.in/reader036/viewer/2022083005/568136d2550346895d9e7030/html5/thumbnails/4.jpg)
Pixel Week - Production update - 13 February 2003 - P.Netchaeva INFN GenovaPixel Week - Production update - 13 February 2003 - P.Netchaeva INFN Genova 4
Bare ModulesBare Modules
PDB readiness:
Item tables + java application for Tile + 16 FE assembling+ Report with links:
to Items,to Bare Module Assembly sub-Items with link to future tests,to X-ray test data
exist.
Missing:
Test definitions, as a consequence:Tables + java applications + Reports for tests.
Data:
33 Bare Modules.
![Page 5: Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003](https://reader036.vdocument.in/reader036/viewer/2022083005/568136d2550346895d9e7030/html5/thumbnails/5.jpg)
Pixel Week - Production update - 13 February 2003 - P.Netchaeva INFN GenovaPixel Week - Production update - 13 February 2003 - P.Netchaeva INFN Genova 5
Flex ObjectsFlex Objects
PDB readiness:
Item tables + java applications for Flex+components, Flex+MCC assembling+ Report with links to Items exist.
Test tables + java application for upload + Reports exist.
Missing: Our Flex Items all are called “Prototypes”. The PDB Item structure for production Items does not exist.
Data:
166 FlexLoadedPrototype Items 46 FlexMCCPrototype Items.
Missing:Test data.
![Page 6: Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003](https://reader036.vdocument.in/reader036/viewer/2022083005/568136d2550346895d9e7030/html5/thumbnails/6.jpg)
Pixel Week - Production update - 13 February 2003 - P.Netchaeva INFN GenovaPixel Week - Production update - 13 February 2003 - P.Netchaeva INFN Genova 6
Flex Objects: ModulesFlex Objects: ModulesPDB readiness:
The Modules are Flex Object Items, so as for Flex Objects:Item tables + java applications for Flex with MCC + Bare Module assembling+ Report with links
to Items to Module Assembly sub-Items with link to future tests
exist.
Test IV + Report exist.
Missing: Our Module Item is called “ModuleFEIPrototype”. The PDB structure for production Item “Module” does not exist.
Test definitions, as a consequence:Tables + java applications + Reports for tests.
Data:
23 ModuleFEIPrototype Items with substructures.
![Page 7: Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003](https://reader036.vdocument.in/reader036/viewer/2022083005/568136d2550346895d9e7030/html5/thumbnails/7.jpg)
Pixel Week - Production update - 13 February 2003 - P.Netchaeva INFN GenovaPixel Week - Production update - 13 February 2003 - P.Netchaeva INFN Genova 7
23 ModuleFEIPrototype Items:23 ModuleFEIPrototype Items:
![Page 8: Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003](https://reader036.vdocument.in/reader036/viewer/2022083005/568136d2550346895d9e7030/html5/thumbnails/8.jpg)
Pixel Week - Production update - 13 February 2003 - P.Netchaeva INFN GenovaPixel Week - Production update - 13 February 2003 - P.Netchaeva INFN Genova 8
Mechanics + Assemblies with Mechanics + Assemblies with ModulesModules
PDB readiness:
Structures are defined. => the Items and Assemblies can be registered at least manually.
Local Support test tables + java applications + Reports exist.
Missing: java application to register Assemblies in the easy way.
To start to think about:Tests for Staves (Bi-staves) and Sectors with Modules on them.
Data:
200 Omegas are registered. 11 TMT-left are registered with CC test results.
Missing (of existing Items):Al tubes, TMT-right,Sector parts.
First Module is mounted on Sector:We need to accelerate… not registered…
![Page 9: Pixel Production Database STATUS P. Netchaeva - INFN Genova 13 February 2003](https://reader036.vdocument.in/reader036/viewer/2022083005/568136d2550346895d9e7030/html5/thumbnails/9.jpg)
Pixel Week - Production update - 13 February 2003 - P.Netchaeva INFN GenovaPixel Week - Production update - 13 February 2003 - P.Netchaeva INFN Genova 9
ShipmentsShipmentsPDB readiness:
java applications for:send and receive Wafer (sensor or electronics)send just received Items without changereceive an Assembly with the following update
of all components location
+ Report with links to Shipments exist.
Shipment statistics Report(Items shipped/time) exist.
The activity of the manufacturersseems to be well coveredby persons in charge.
Missing: Send Electronics Wafer with new reticle layout.
Data