PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT PI No.: 0007414, Camden County PROJECT NUMBER: CSSTP-0007-00(414) Widening/Reconstruction – CR 90/Colerain Road INSPECTION DATE: October 4, 2012 REPORT DATE: March 14, 2013 RESPONSE DATE: March 25, 2013 This inspection was requested by Genetha Rice-Singleton, P.E., State Program Delivery Engineer. The Project Manager is Matt Bennett. The plans were prepared by Moreland Altobelli Associates, Inc. The report was prepared by John Kopotic, Design Review Engineer II, and approved by Lisa L. Myers, State Project Review Engineer, Office of Engineering Services. / Victor Dang, Federal Highway Administration. The NEPA document was not approved prior to the PFPR; however a waiver to conduct the PFPR prior to NEPA approval was granted. The NEPA document was subsequently approved on March 12, 2013. The Project Manager is reminded that as of the PFPR date of October 4, 2012, NEPA evaluations were still underway and were not completed until March 12, 2013. The Project Manager is advised that the information contained in this report was based on incomplete environmental condition studies and possible commitments as were known at the time. The PFPR inspection team’s review was limited to these incomplete environmental condition studies and possible commitments. Verify that all commitments from the completed approved NEPA document have been incorporated into the plan set and Special Provisions. This report is being distributed via E-mail. Final plan preparation can now begin. The Inspection Plans were reviewed in Camden County Annex Building prior to the site inspection. All comments marked with an arrow symbol () should be addressed with a written response by the Project Manager. Responses dated March 25, 2013 are in bold red italics. Projects Let to construction after July 1, 2013 will require the use of the 2011 AASHTO “GREEN BOOK”, GDOT Design Manual, 2011 Roadside Design Guide, 2012 Guide for the Development of Bicycle Facilities and the 2001 Georgia Standard Specifications. Please revise all notes that make reference to previous GDOT Revised 9-5-2012

Upload: lykhanh

Post on 27-Apr-2018

225 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT

PI No.: 0007414, Camden CountyPROJECT NUMBER: CSSTP-0007-00(414)

Widening/Reconstruction – CR 90/Colerain Road

INSPECTION DATE: October 4, 2012REPORT DATE: March 14, 2013

RESPONSE DATE: March 25, 2013

This inspection was requested by Genetha Rice-Singleton, P.E., State Program Delivery Engineer. The Project Manager is Matt Bennett.

The plans were prepared by Moreland Altobelli Associates, Inc.

The report was prepared by John Kopotic, Design Review Engineer II, and approved by Lisa L. Myers, State Project Review Engineer, Office of Engineering Services. / Victor Dang, Federal Highway Administration.

The NEPA document was not approved prior to the PFPR; however a waiver to conduct the PFPR prior to NEPA approval was granted. The NEPA document was subsequently approved on March 12, 2013.

The Project Manager is reminded that as of the PFPR date of October 4, 2012, NEPA evaluations were still underway and were not completed until March 12, 2013. The Project Manager is advised that the information contained in this report was based on incomplete environmental condition studies and possible commitments as were known at the time. The PFPR inspection team’s review was limited to these incomplete environmental condition studies and possible commitments. Verify that all commitments from the completed approved NEPA document have been incorporated into the plan set and Special Provisions.

This report is being distributed via E-mail. Final plan preparation can now begin.

The Inspection Plans were reviewed in Camden County Annex Building prior to the site inspection.

All comments marked with an arrow symbol () should be addressed with a written response by the Project Manager. Responses dated March 25, 2013 are in bold red italics.

Projects Let to construction after July 1, 2013 will require the use of the 2011 AASHTO “GREEN BOOK”, GDOT Design Manual, 2011 Roadside Design Guide, 2012 Guide for the Development of Bicycle Facilities and the 2001 Georgia Standard Specifications. Please revise all notes that make reference to previous GDOT Design Manuals and Specifications. Any substandard features that cannot be complied with due to project restraints will require the submission of a design exception/variance to the State Design Policy and Support Engineer.

PROJECT DESCRIPTION

The proposed project will widen and improve the existing two-lane Colerain Road to a four-lane divided roadway with 20-foot raised median and auxiliary lanes at major intersections. The project has a total project length of 5.85 miles. This project has a Management R/W of December 14, 2012.

APPROVED: ___VICTOR DANG__________ ___03/14/2013___Federal Highway Administration Date

Revised 9-5-2012

Page 2: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 2 CAMDEN COUNTY

Add the station number for relocation service road #2.Will add Limit of Const on cover sheet

Page 5-07 to 5-10, ‘BIKE LANE’ is not the correct name since it doesn’t have a 2’ curb and gutter, please see GDOT Standard S-8.Will delete “Bike Lane” and add “shoulder” to 10’ and 6’-6” paved dimensions shown TS 14 to TS17

FHWA COMMENTS:

Page 3: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 3 CAMDEN COUNTY

DESIGN DATA

CURRENT TRAFFIC ADT: 16,900 (2017)

DESIGN TRAFFIC ADT: 28,200 (2037)

PERCENT TRUCKS: 6.4% (24 hour = 7.5%)

CURRENT POSTED SPEED: 45 MPH

SPEED DESIGN: 45 MPH

FUNCTIONAL CLASSIFICATION: Urban Minor Arterial

The Concept Report was approved on 3/12/09.

The Project Manager states that the project has been designed in accordance with the TIP/STIP.

ENVIRONMENTAL

ENVIRONMENTAL COMMITMENTS: See Appendix “A” for Green Sheet

GENERAL ENVIRONMENTAL COMMENTS:

The Environmental Resources Impact Table (Environmental Resources Impact Table) will be coordinated with the project's Environmental Commitments Table and other plan notes to illustrate the restrictions associated with various environmental resources. The responsibility for inserting the table into the plans will rest with the designer, and its content and accuracy will be confirmed by the NEPA analyst who is responsible for environmentally certifying the project. The table shall be included in the General Notes section of all plans beginning with projects that have field plan reviews scheduled for September 1, 2010, and later and/or projects that are scheduled to be let in November 2010 or later.  All Environmentally Sensitive Area (ESA) flags on plan sheets shall be changed to read "ESA - See Environmental Resources Impact Table in General Notes for construction restrictions."  The ESA notes shall be placed on ALL plan sheets where an ESA exists.Will update the ERIT table shown in the PFPR plans per approved environmental document.

RIGHT OF WAY

NUMBER OF PARCELS: 94 APPRAISED: 0

ACQUIRED DEEDS: 0

ACQUISITION BY: LOC

TYPE ACCESS CONTROL: By permit

GENERAL RIGHT OF WAY COMMENTS:

DESIGN EXCEPTIONS

DESIGN EXCEPTIONS REQUIRED: Curve #9 superelevation exceeds AASHTO maximum Approved January 29, 2013

DESIGN EXCEPTIONS REQUESTED: None

DESIGN EXCEPTIONS APPROVED: None

DESIGN VARIANCES

Page 4: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 4 CAMDEN COUNTY

DESIGN VARIANCES REQUIRED: None

DESIGN VARIANCES REQUESTED: None

DESIGN VARIANCES APPROVED: None

SPECIAL PROVISIONS

PROJECT SPECIFIC SPECIAL PROVISIONS FURNISHED FOR THE INSPECTION:

Section 107.22 – Legal Regulations and Responsibility to the Public (Hazardous and/or Toxic Waste)

Section 108.08.C – Prosecution and Progress (Intermediate Contract time)Section 150.11 – Traffic Control (Special Conditions)Section 520.3.05.B. – Piling (Drill Pilot Holes)Section 615 – Jacking or Boring Pipe (Directional Boring)Section 682 – Electrical Wire, Cable, and ConduitSection 881 – Fabrics

ADDITIONAL PROJECT SPECIFIC SPECIAL PROVISIONS REQUIRED:

Section 209 – Subgrade ConstructionWill include Sect 209 Subgrade Construction

GENERAL SPECIAL PROVISION COMMENTS:

Contracts Administration should include the Special Provision adding the Fine Grader because this is widening project with at least one mile of continuous full width lanes.

Restrictions to traffic interruptions are recommended.

A. The contractor shall not install lane closures; perform flagging, or move equipment or materials on the travel way that interferes with traffic flow between the hours of 6:00 A.M. to 9:00 A.M. and 2:00 P.M. to 6:00 P.M. Monday through Friday.

B. Interstate lane closures:

Single lane closures:

1. Single lane closures will be allowed between the hours of 9:00 P.M. to 5:00 A.M. Sunday through Saturday.

Double lane closures:

2. Double lane closures and pacing are allowed to be installed on I-95 between the hours of 12:00 A.M. to 5:00 A.M. Monday through Friday and 12:00 A.M. to 10:00 A.M. Saturday to Sunday.

3. The Contractor shall notify Camden County prior to closing side street(s) and or making adjustments to the existing Colerain Road/Marsh Harbour Parkway/N. Gross Road and/or Colerain Road/Kings Bay Road traffic signals.

Please submit the Section 108 and Section 150 Special Provisions to the Office of Construction for their review. This should be done after the Preliminary Field Plan Review, but prior to the assembly of the Final Plan Documents.Will submit Special Provisions Sections 108 & 150 prior to Final Plans

Page 5: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 5 CAMDEN COUNTY

The District 5 Construction Office states they will meet with Designer and Camden County, City of St. Marys, and City of Kingsland to develop more accurate time restrictions. The Project Manager should ensure SP 105.11 is rewritten to reflect revised time restrictions.Will coordinate with State, County, and Cities to set time restrictions for project

ESTIMATED CONTRACT TIME: The Inspection Team recommends 36 months.

VALUE ENGINEERING

Total Project Programmed Cost: $34,355,808.45

VE Study Date: June 8 to June 11, 2009

VE Implementation Approval Date: 9/30/09

General VE Comments: None

CONSTRUCTION PLANS

A Quality Assurance Check of Electronic Files from Consultant was performed by the Office of Design Policy and Support. Overall, the Consultant’s electronic files are not at an acceptable level of compliance with the GDOT Electronic Data Guidelines standards. See Appendix “B” for the Compliance Report. Correct the electronic CADD files and ensure they comply with GDOT Electronic Data Guidelines standards.Will correct the naming discrepancies in electronic file and provide subfiles prior to submittal of final plans. CAD levels will continue to match the 2007 EDG.

01-XXX COVER SHEET

Remove the dash (-) behind 4 of the PI #. PI # is 0007414.Will remove “dash”

Please add route numbers (CR # or CS#) in accordance with the Plan Presentation Guide (PPG) Section 01.002 Required Information.Will add CR # or CS # to applicable roadways shown on plan view

Verify the spelling of Marsh Harbor Parkway which is spelled differently in several locations.Will correct spelling in plans to Marsh “Harbour” Parkway

Several notes do not show station numbers. Revise the notes to show correct station number.Will add Sta number to Limit of Construction

The project will become temporary state route while being constructed. Determine if State Route number should be shown on cover sheet.Will label State Route: “Temporary #” and add “#” when provided

02-XXX INDEX

Ensure that all sheets are numbered using the three digit numbering system in accordance with the Plan Presentation Guide (PPG). For example: Typical Section Drawings are listed as section No. 05 of the plan assembly sequence. If you have 4 Typical Section Drawings, then they will be labeled as drawings 05-001, 05-002, 05-003, and 05-004. This drawing should be 02-001. Revise all drawing to use correct numbering.Will revise drawing numbers to xx-xxx

Add GDOT Construction Detail M-2 Subbases for Approach Slabs.Will add Const Detail M-2 to index and final plans

Page 6: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 6 CAMDEN COUNTY

Add GDOT Construction Detail P-7 Pavement Edge Treatment Asphalt and Concrete Pavement.Will add Const Detail P-7 to index and final plans. Will reference detail on all applicable typical sections

Remove GDOT Construction Details TS-10, TS-11, and TS-12B. Add GDOT Construction Details TS03 CABINET BASE DETAIL and TS03a PEDESTRIAN FACILITIES INSTALLATION DETAILS.Will delete details listed and add Const Detail TS03 & TS03a to index and final plans

Add GDOT Construction Standard 4948C Concrete Side Barrier Types 6, 6-A, 6-B, and 6-C.Will add Const Details for Concrete Side Barrier Types 2-SA, 2-SB and 2-SC to index and final plans. The “S” slant face barrier which provides a 3’-6” parapet for pedestrians/ bicyclists’ is used in lieu of barrier face barrier.

Ensure the latest revision for all Georgia Standards and Details are provided. Some of the dates listed are outdated, for example many of the Erosion Control Details were updated 01/2011.Will review and update all revision dates prior to final plan submittal

04-XXX GENERAL NOTES

Add the following General Note: All borrow and waste sites for this project shall be environmentally approved prior to construction activities. All common fill or excess material disposed outside the project right of way shall be placed in either a permitted solid waste facility, a permitted inert waste landfill or in an engineered fill.Will add note

Add the following General Note: There is no suitable place to bury existing bridge and/or construction debris within the project’s limits. The Contractor shall provide an environmentally approved site to dispose of existing bridge and/or construction debris at no additional cost to the Department.Will add note

Revise Note 2 by striking Concrete Valley Gutter from the Asphalt Drives.Will delete “Conc Valley Gutter” reference under asphalt drives

Note 3 states the Contractor shall clear Right of Way to Right of Way. Verify that the environmental document has been pursued for this clearing.Note #3 stating “The Contractor shall clear right-of-way to right-of-way and/or easements in advance of utility relocation” will be deleted to avoid exceptions such as in Environmentally Sensitive Area(s) (ESA) designated in the plans where the contractor shall clear to the limits of the orange barrier fence or in the heavily wooded infield areas of the interchange where the contractor shall clear to the construction limits shown in the plans.

Notes 5 & 6 are the same note, strike one.Will delete duplicate note regarding contractor responsible for acquiring borrow and waste pits

The Pipe Culvert Materials Alternates does not match the chart in the Approved Soil Survey. If the District 5 Construction Office and/or Camden County want to use the provided chart, a letter should be written to GDOT Office of Materials and Research (Ian Rish) for approval.Will revise pipe culvert materials alternates to match chart in approved soil survey

The Approved Soil Survey contained a Filter Fabric Placement Detail containing station numbers for its use. Please add this detail to the notes.Will add Filter Fabric Placement Detail to general notes

Page 7: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 7 CAMDEN COUNTY

05-XXX TYPICAL SECTIONS

GDOT has defined the Safety Edge as the standard treatment for the outside edge of all uncurbed pavements whether edge of travel lane or shoulder (excluding pavement behind guardrail). If it is not practical to provide the Safety Edge, then a decision to omit shall require a comprehensive study by an engineer and the prior approval of a Design Variance from the GDOT Chief Engineer. The Safety Edge placement should be noted on the construction plan typical sections, with reference to GDOT Construction Detail P-7 for details and method of quantity calculation. Verify that Safety Edge treatment is referenced throughout Typical Sections accordingly.

Will add Const Detail P-7 to index and final plans. Will reference detail on all applicable typical sections

In accordance with the PPG Section 05.002 Required Information, Minimum and maximum dimensions of variable-width features shall be labeled.Will add min and max dimensions to variable widths

Per the GDOT Pavement Design Manual, if paving material is supplied from Florida or soil cement, top soil or other soil bases are used, then show a Square Yard measure for payment if weighing is inconvenient. If Square Yard measurement is specified, the typical section shall be clearly dimensioned along the top finished surface and dimensions noted as the “Width of Payment.”

Will coordinate with others to determine “if weighing is inconvenient” prior to dimensioning and labeling Width of Payment along the top finished surface of roadway typical(s) per GDOT Pavement Design Manual. According to the Design Manual, Appendix I, soil-cement is not to be used in hatched area which encompasses Camden County.

Due to the very granular native soils found in this region, District 5 Construction Office recommends that the graded aggregate base be deleted underneath the proposed curb & gutter. Curb and gutter constructed in this region of Georgia is normally installed directly on the subgrade.Will delete GAB under and behind curb and gutter

Revise the typical sections to clearly define the paving and base courses. Remove the flags “Pavement Section No. 1” and “Pavement Section No. 2”. Revise the Pavement Legend by adding a “callout” for each course. Flag each course with appropriate callout.Will delete GAB under and behind curb and gutter

Include Pavement Reinforcement Fabric for area where you’re widening existing. Add the Pavement Reinforcement Fabric detail.

Will reference to applicable typical sections and add Pavement Reinf Fabric Details

Drawing 05-001

Provide the stationing for Typical Section No. 1. It appears this typical section begins at STA 16+00.

Will add STA 16+00 to TS N0. 1

Drawing 05-005

Revise Typical Section No. 9 to show removal of the existing pavement from the face of the curb and gutter to under the raised median.Will show and label existing pavement removal

Page 8: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 8 CAMDEN COUNTY

The District 5 Construction Office recommends showing areas within Typical Section No. 10 and Typical Section No. 11 as Mill and Inlay resurfacing.Will show and label mill and inlay on typical sections and x-sections

Drawing 05-009

Verify the Profile Grade location. It appears it should be located at the right side of the median as shown in the cross sections.The profile grade is shown on the construction centerline of the rural section. The 2’ gutter and 2’ additional pavement width for the turn lane left of the PGL slopes the same as the eastbound thru lanes for sheet flow away from the proposed median. The elevation difference between the proposed median pavement and the existing surrounding ground cannot accommodate an outfall from a median drainage structure which would intercept the runoff prior to crossing Colerain Road as concentrated flow.

Drawing 05-011

The current ramps are in bad condition. Consider upgrading ramps to PCC.In the August 31, 2009 Value Engineering Study-Responses number 13, Value Engineering Recommendation RD-19- Overlay existing Ramps and widen to the inside, it was noted that District 5 representatives commented in the Value Engineering introduction meeting that “There are no visible problems with the existing ramp pavement. Therefore it is recommended that the existing ramps be milled or leveled, overlayed and widened where feasible within the limits of reconstruction.” An e-mail dated September 29, 2009 stated that the “PDC concurs with the District to overlay the existing ramps and reconstruct the interchange to current standards in a future Widening and Interchange Improvement Project.” The September 30, 2009 Value Engineering Implementation Approval Letter recommended implementing the VE Study Alternative RD-19, Overlay existing Ramps and widen to the inside.

The construction plans currently show the southbound off-ramp to be overlayed and widened, the northbound off-ramp to be overlayed and widened with minimum reconstruction to tie to the proposed Colerain Road and the southbound and northbound on-ramps to be reconstructed to tie to the proposed Colerain Road.

The June 17, 2009 correspondence from the GDOT Office of Materials & Research regarding Pavement Type Selection and Pavement Design Recommendation recommended an asphalt pavement section in lieu of concrete for any required full depth reconstruction.

Drawing 05-012

Verify if there we be any work along I-95. Typical Section No. 20 shows no work to be performed on I-95 but Drawing 15-002 & 35-0001 appears to have widening and a TP 7W wall along the face of the columns. Please clarify.Will show and label 4” concrete slope paving at bridge end rolls and median ditch per 15-002. Proposed roadway template on bridge P&E drawing 35-001 will be revised match drawing 15-002 versus ultimate I-95 build out.

Drawing 05-015

Revise the Rural Shoulder w/Guardrail Detail to show full depth shoulder to the face of guardrail, then topping to the shoulder break point, add Asphalt Curb.Will revise typical per comment and add asphalt concrete spillways Ga Const Detail D-26 where required

Page 9: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 9 CAMDEN COUNTY

The new 31-inch guardrail standards use a 12” offset block instead of the 8” offset block used on the 27” guardrail. Revise the shoulder width dimension to account for the additional 4 inches. If 2’ distance from back of post to shoulder break is not provided a 9’ post is required. Ensure 9’ posts are noted as required for guardrail.Will increase rural shoulder with guardrail width from 15’-6” (10’+2’+3’-6”) to 15’-10” (10’+2’+3’-10”) and urban shoulder with guardrail from 19’-6” to 19’-10” on drawing 5-15 and cross-sections.

06-XXX SUMMARY OF QUANTITIES

Please ensure correct pay items and quantities are entered into CES (Cost Estimation System) after the plans have been revised according to the PFPR Inspection comments.Will update CES upon completing PFPR comments

10-XXX TRAFFIC DIAGRAM SHEETS

Specify year for PHF diagrams.Will add applicable year and “Hour” where omitted to Peak Hour in legend. MAAI will add “ADT” where omitted in legend and revise title block to read Year “2017” & 2037 Average Daily Traffic

11-XXX CONSTRUCTION LAYOUT/STAKE-OUT SHEET

No comment.

13-XXX MAINLINE ROADWAY PLAN SHEETS

General Comments

Ensure when text needs to be vertical, it is placed on the plan sheet parallel to the right edge of the sheet, reading from the bottom of the sheet to the top of the sheet.Will evaluate comment on sheet by sheet basis

Ensure that the ESA notes are placed on ALL plan sheets where an ESA exists.Will add ESA note to cover sheet and WL #5 drawing 13-08

Callout type of curb cut ramps/wheelchair ramps (WCR) proposed.Will label all WCR Types

Add the structure number to all drainage structures. Add TP. 3 Rip Rap at all outlets.Will label all drainage structure numbers on plans and add TP 3 riprap at all outlets

Flag the end of curb and gutter station on side streets, in accordance with the PPG Section 13.002 Required Information.Will label all end C & G stations on side streets and mainline

There are many drainage structures in the median, it does not appear drainage will enter these boxes. Verify the need for these boxes. The District 5 Construction Office recommends sloping all pavement from the median toward the outside.The profile grade is shown on the construction centerline of the urban section. At locations with normal crown the 2’ gutter and 2’ additional pavement width for the turn lane left of the PGL slopes down towards the proposed median. The elevation difference between the proposed median and outside edge of pavement can accommodate a pipe from the median drainage structure. Sloping said gutter and pavement away from the median would result in exceeding the max 8’ gutter spread therefore requiring additional catch basins along the outside edge of pavement. The proposed pavement cross slope would require warping to match the normal crown through the width of the median opening.

Page 10: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 10 CAMDEN COUNTY

Flag all R/W Markers with station and offset. Ensure R/W Markers are provided at each PC, PT.Will label Sta/ Offsets for all changes in r/w alignment

Several un-signalized locations show multi-lane approaches to Colerain, redesign w/ 75’R, concrete island, etc.Will evaluate comment on intersection by intersection basis

Ensure the proposed 4 ft/2 ft flat bottom ditches is located within right of way (throughout).Will revise required r/w width to include roadway longitudinal ditches

Flag begin and end location for all sidewalk, curb, guardrail and walls.Will label all begin/end sidewalk, curb guardrail and wall Sta/ Offsets.

Flag the type of all concrete islands.Will label all concrete island types

Drawing 13-000

Flag begin curb and gutter & concrete sidewalk LT & RT.Will label all begin curb & gutter and sidewalk Sta/ Offsets

Drawing 13-001

Driveways should be shown perpendicular to the edge of pavement and of consistent width until reaching the required R/W line. Determine if the drive shown at STA 28+05 can be straightened closer to 90 degrees.Will revise proposed driveway angle and width

Determine if easement should be added, STA 26+60+/- to STA 27+50 +/- RT, between the driveway easement and the required right of way for Service Road # 2.Will add Easement for the Construction and Maintenance of Slopes

Drawing 13-002

Flag the Limit of Construction on Relocated Service Road #2.Will label the Limit of Construction

It appears 2 TP A WCRs are shown in the nose of the median, STA 35+03 +/-. Verify there is room for 2 WCRs or use cut-thru ramps. All TP A ramps require a 5’ diameter maneuvering room at the top, i.e. ramps cannot join each other in islands.Will revise WCR’s to cut-thru ramp

WCR should be parallel to crosswalks, i.e. direct pedestrians into crosswalk. An additional WCR is needed in the SW quadrant for the EB travel crossing the I-95 SB On Ramp.An additional WCR will be added to the sw quadrant for the x-walk across I-95 on-ramp

No acquisition is indicated for Parcel 8, but it appears required right of way and LA should be added for the proposed 4 ft flat bottom ditch along the southbound on ramp. It is unclear whether right of way will be needed for Service Road #2.Will label, correct line weight and add r/w monuments to the required R/W & L/A line shown on Parcel 8 approx. Sta 51+60 to Sta 53+00. Will also label Parcel 8 property line from Local Service Rd # 2 to Colerain Rd as “existing r/w”.

Determine if the L/A fence in the NW quadrant in the area of the new acquired R/W should be replaced. If so, please add to plans and quantities.Will label “6’ L/A fence” on all Reqd R/W and L/A lines and “Tie to exist L/A fence” at appropriate locations

Drawing 13-003

Page 11: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 11 CAMDEN COUNTY

Place the note at the top left of the page concerning contaminated soil on parcels 9, 10, and 14 in Section 4 Project Specific Notes. In addition, move the note down to the bottom right of this sheet so that it is more prominent.Will copy note to section 4 under Project Specific Notes and add “Parcel 46”. Will move to bottom right corner drawing 13-04, 14-05, 14-06 and 13-12.

It appears that additional WCRs are needed in the NE & SE quadrants for the crosswalks crossing the I-95 ramps.Will modify or add WCRs to conform to the crosswalk layout

It appears 2 TP A WCRs are shown in the nose of the median, STA 51+30 +/-. Verify there is room for 2 WCRs or use cut-thru ramps. All TP A ramps require a 5’ diameter maneuvering room at the top, i.e. ramps cannot join each other in islands.Will revise WCR’s to cut-thru ramp

Add WCRs or cut-thru ramps for the islands located at STA 56+10 +/- LT & RT. Provide information for construction of ramp, type, type face, etc.Will add type, Sta/ Off/ Radii and WCR’s or cut-thru ramp to rt in/rt out islands

Required L/A should be added to the REQ’D R/W bump out for the NB off ramp drainage structure on Parcel 13. The 30 inch pipe should also be extended to allow installation of L/A fencing.Will add “& L/A” to Reqd R/W box-out and label “6’ L/A fence” and “Tie to exist L/A fence” at appropriate locations

Shift the REQ’D L/A line to coincide with the REQ’D R/W line on Parcel 12.Will revise Reqd R/W through Parcel 12 and along property line Parcel 12 & 14 to read Reqd R/W & “L/A”, label “6’ L/A fence” and “Tie to exist L/A fence” at appropriate locations

It appears that the REQ’D R/W line on Parcels 14, 15, & 16 should be shifted southward to accommodate and include the proposed 4 ft flat bottom ditch and the driveway piping under the driveway for Parcel 14. Will revise required r/w width to include roadway longitudinal ditches and side drain pipes

The header curb proposed between the two driveways for Parcel 10 should be located just inside the right of way, not in temporary easement.Will reconstruct face of header curb 6” inside existing R/W and revise driveway radius returns accordingly

Drawing 13-004

Delete Parcels 22 & 25 as no acquisition is indicated.Will delete Parcel 22 & 25 as shown

It appears Jimmy Lane is not a public R/W, but is instead the flag stem portion of a larger interior parcel for which it provides access to Colerain Road. It appears a parcel number should be assigned.Will add Parcel

Drawing 13-005

Determine if the drive at STA 76+47 LT is residential or commercial. WCRs and crosswalk are not placed on residential drives.

Page 12: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 12 CAMDEN COUNTY

Camden County tax records indicate Parcel 26 is commercial

Delete Parcel 25 as no acquisition is indicated.Will delete Parcel 25 as shown

Drawing 13-006

Flag the existing chain link fence located on parcels 35 and 36. Any replacement should be a part of R/W negotiations.Will label exist fence

Drawing 13-007

Add driveway easement on Parcel 40 at Wildcat Blvd (the reconstruction of the east side of the driveway extends beyond the permanent easement).Will add Easement for Construction of Driveway (Wildcat Blvd)

Show existing gate and fence at drive STA 115+10 RT.Will verify topo for and label exist fence & gate across existing driveway Parcel 41

Show College of Coastal Georgia Camden Center sign located at STA 116+00 +/-.Will verify topo for and label exist sign Parcel 41 approx. Sta 116+35 Rt

Drawing 13-008

Determine if ESA Wetland #5 Boundary should continue onto this drawing.Will label ESA WL 5 and add buffer and ESA note from drawing 13-07

Determine the need for the extravagant drive at STA 130+00 LT. Drive does not have to align with median opening.The proposed driveway is located to eliminate the need for a westbound eyebrow to accommodate u-turns that would be required to access the existing drive. According to the approved Access Plan provided to MAAI there will be no future driveway access permitted on Colerain Road between Wildcat Drive Sta 119+99 and this median opening.

Change rip rap at STA 126+95 LT to TP. 3 instead of TP. 1.Will revise to TP 3 Riprap

Drawing 13-009

Add WCRs to the island, STA 141+25 RT.Will add WCR’s or cut thru to island, or redesign crosswalk

Drawing 13-010

Consider beginning the full depth construction (Typical Section No. 5) outside of the Settlers Hammock Way radius returns, STA 155+00 +/-.Radius returns are Sta 154+60 Lt and 154+57 Rt. The max overlay and variable depth leveling is approximately 12” at cross sections Sta 154+50 and Sta 155+00. If this pavement section is acceptable to we will revise the “End Overlay and Widening and Begin Full Depth Pavement” station beyond the radius returns.

Settlers Hammock Way appears to be a private road. The project proposes to install 30 inch pipe and other drainage structures along the private road, within temporary easement. The proposed drainage structures appear to conduct stormwater runoff into the public drainage system. The drainage structures and pipe should be placed in permanent easement at a minimum, preferably in right of way. Driveway easement may also be required to accommodate the tie-in.The proposed relocated pipe and drainage structures along Settlers Hammock Way, a private road, replace in kind the existing system which serves as detention for the site.

Page 13: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 13 CAMDEN COUNTY

Once constructed the responsibility for maintenance of the system should remain with the existing authority(s). The Easement for Construction of Drainage shown provides a sufficient width of approximately 20’ beyond the limit of pavement.

Appears the existing sign for Settlers Hammock will be damaged. Note the location of sign on plans.Will label sign with station (sign between two brick pillars w/ lights) to be acquired

Flag to tie to existing V gutter for Settlers Hammock Way.Will label Sta/ Offsets and tie to existing curb

Show Headwall to be removed for cross drain at STA 157+00 +/-.Will label “Remove exist 54” HW” at outlet and “Exist 54” HW to remain” at inlet

Drawing 13-011

Suggest resurfacing by Mill and Inlay beginning at STA 169+12.52.Will show and label mill and inlay on typical sections and x-sections

Drawing 13-012

Consider adding an additional WCR to both the NE & NW quadrants to better align with 2 crosswalks.Will evaluate crosswalk alignments with respect to WCR’s. The WCR’s are located to avoid impacting the existing signal mast arm poles to remain

Curb and island at drive STA 182+50 RT will be damaged during construction. Show to repair and tie to existing.Will show driveway reconstruction for proposed pipe and add Easement for Construction of Driveway as required

Drawing 13-013

End resurfacing by Mill and Inlay ending at STA 186+21.36.Will show and label mill and inlay on typical sections and cross-sections

Show existing gate in drive at STA 191+96 LT.Will label exist fence & Gate on Parcel 69

Drawing 13-014

Verify the Curve #111 superelevation which is shown as 2.5% on the cross sections.Will revise the 2.6% SE rate shown in the curve data tables to match the 2.50% SE rate on the plans and cross sections.

There’s an existing drive with gate at STA 207+00 RT that has been shown to close access. Also, there is currently an existing nonfunctional concrete pipe under drive.Will verify topo for and label exist gate across and pipe under existing driveway Parcel 47. Will evaluate access off Camden Woods Pkwy by others.

Drawing 13-018

Flag end curb and gutter & concrete sidewalk LT & RT.Will label all begin curb & gutter and sidewalk Sta/ Offsets

Drawing 13-019

Page 14: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 14 CAMDEN COUNTY

Change TP. 1 Rip Rap to TP. 3 Rip Rap at STA 270+95 LT.Will revise to TP 3 Riprap.

Determine how the existing sidewalk at church is to be handled, STA 267+50 +/-. There is no sidewalk proposed for this section for it to join.The impacted portion of existing sidewalk runs approximately 16’ to 18’ off and parallel to the existing driveway from the front of the building to the existing R/W of the rural roadway which currently provides no sidewalk tie. The existing sidewalk would be saw-cut at the proposed construction limit. Further disposition of the sidewalk could be handled in the R/W Phase for Parcel.

There is an existing drive with gate being closed off, STA 271+50 +/- LT. Verify that this drive is no longer needed.Will verify if relocated driveway shown Sta 283+56 Lt can access the area currently served by driveway Sta 271+50 Lt. If not then we will add a proposed driveway to maintain access

Drawing 13-020

The plans indicate an existing right of way for a drainage ditch right of Station 288+00(+/-). The acquisition of a permanent easement within the existing right of way is indicated, but is not necessary if in fact the existing ditch right of way is public right of way.Will delete the proposed Easement for Construction and Maintenance of Slopes shown within the existing R/W limits

Access to drainage easement closed off both sides of roadway.Will develop and submit for approval an access plan to the City’s existing r/w for drainage ditch as graphically provided on the City’s existing water and sewer plans received August 7, 2006.

There is no median break between Winding Road & Kings Bay Road, 5412 LF. Consider adding a break on this sheet.Will develop and submit for approval a median break between Winding Rd and Kings Bay Rd.

Drawing 13-023

Add Parcel 85A as permanent easement acquisition is indicated left of Station 324+15(+/-).Will add Parcel, number to be determined during R/W plan phase

14-XXX CROSSROAD/SIDE STREET/FRONTAGE ROAD/RAMP PLAN SHEETS

Drawing 14-005

The Concrete Header Curb, TP 2 on the north side of Relocated Brazell Road is shown off of R/W and in easement. Move the Concrete Header Curb, TP 2 to the R/W line.Will show the proposed face of header curb 6” inside Reqd R/W south as well as north side of Reloc Brazell Rd

Drawing 14-006

The proposed realigned/relocated Brazell Road on the north side of Colerain Road and the associated right of way acquisition appears to be legally defensible due to Brazell Road being an existing public right of way that serves multiple property owners besides just the two gas station sites located in the northeast quadrant of I-95 and Colerain Road. However, the service road proposed for the southeast quadrant does not appear to be legally defensible from a right of way acquisition standpoint as it primarily serves and benefits only one property - Parcel 14. The perceived access impairment on Parcel 14 by limiting access to right-in/right-out is not compensable under Georgia law so there is no damage to "cure". In addition, the law does not allow government to condemn one property to "cure" an impact on another property. In this

Page 15: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 15 CAMDEN COUNTY

instance, the County would potentially have to condemn three properties, two of which could include severance damages, in order to provide median break access to Parcel 14. Specific comments on the SE quadrant and service road include: Add a barricade or cul-de-sac at the southern terminus of Access Road A.Access Rd A and Access Rd B as shown at the PIOH and PHOH will remain on the plans until otherwise instructed by GDOT or Camden County to remove or revise. Will add a GaStd 9039 Permanent Timber Type Barricade at the end of Access Rd A Sta 3+30 .

It appears the western terminus of Access Road B should be reconfigured to include a cul-de-sac entirely within right of way, with a driveway off of the cul-de-sac to tie to Parcels 14's parking lot. Driveway easements are temporary (the property owner could tear it all out once the project is completed and the easement expires), not compensable and normally not condemned. Also, the proposed 4 ft flat bottom ditch and associated drainage structures within the driveway easement would not be maintainable.Will add a cul-de-sac on Access Rd B entirely on Reqd R/W within Parcel 14. The remaining Access RD B as shown will remain as the driveway off the cul-de-sac. Will revise required r/w width to include roadway longitudinal ditches and drainage structures.

15-XXX MAINLINE ROADWAY PROFILE SHEETS

No comment.

16-XXX CROSSROAD/SIDE STREET/FRONTAGE ROAD/RAMP PROFILE SHEETS

No comment.

17-XXX DRIVEWAY PROFILE SHEETS

No comment.

18-XXX SPECIAL GRADING – N/A

19-XXX CONSTRUCTION STAGING & STAGING CROSS-SECTION PLAN SHEETS

The District 5 Construction Office requests full cross sections at each stage of construction.Staging cross sections as well as plan sheets are currently included to verify traffic control and interim grading/drainage between areas under construction and existing pavement. Plan sheets are included to verify traffic control on newly constructed pavement and to show remaining roadway template under construction. Adding cross sections for these latter stages which only complete the proposed roadway template would result in the addition of approximately 100 sheets to the plan set.

20-XXX CONSTRUCTION STAGING DETAILS

No comment.

21-XXX DRAINAGE AREA MAP

No comment.

22-XXX DRAINAGE PROFILES

Determine how many of the median drains can be removed by eliminating the crown break-over in the turn lane and continue the 2% grade toward the outside.The profile grade is shown on the construction centerline of the urban section. At locations with normal crown the 2’ gutter and 2’ additional pavement width for the turn lane left of the PGL slopes down towards the proposed median. The elevation difference between the proposed median and outside edge of pavement can accommodate a pipe from the median drainage structure. Sloping said gutter and pavement away from the

Page 16: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 16 CAMDEN COUNTY

median would result in exceeding the max 8’ gutter spread therefore requiring additional catch basins along the outside edge of pavement. The proposed pavement cross slope would require warping to match the normal crown through the width of the median opening.

23-XXX CROSS SECTIONS

The Project Manager should furnish electronic earthwork files to the District Construction Office. This should be done as soon as accurate information can be provided, but no later than one month prior to the FFPR request. This will allow enough time for the District Earthwork Coordinators to verify the earthwork.

Will furnish electronic earthwork files no later than one month before FFPR request

Numerous cross sections do not match mainline plans. (i.e. STA 36+00 to 40+00 is a turn lane with a narrow median but is not shown in earthwork cross sections.) Please verify all cross sections match mainline plans and typical sections.Will check typical sections, construction plans and cross section templates for continuity

Determine if the type of median changed, STA 105+00 to 121+00. This appears to be doweled median.Proposed integral versus curb and gutter medians are shown in areas where median pavement is used for traffic control during construction staging. Will show and/or label median types on typical sections, construction plans and cross section.

24-XXX UTILITY PLANS

Electrical: Georgia Power – DistributionGeorgia Power – TransmissionOkefenokee EMC

Gas: Atlanta Gas Light

Sewer: City of KingslandCity of St. Marys

Water: City of KingslandCity of St. Marys

Telephone: TDS/Camden Telephone

Railroad: None

Cable TV: Kingsland CableComcast

Other: None

Utility location was performed by Utility Owner Mark-ups.

Plans have been sent to Utility Companies.

Marked Plans have been received from Utility Companies.

The Public Interest Determination (PID) Procedure (in accordance with Policy 6863-12) for the relocation, removal, and adjustment of Utility facilities is applicable to this project.

The PFPR team PID Procedure Assessment: Low Risk Assessment.

Page 17: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 17 CAMDEN COUNTY

The PFPR (FFPR if authorized) team recommended Utility Risk Management Plan: Risk Acceptance.

General Utility Comments:

Include Special Provision Section 107.21 Contractor's Worksite Utility Coordinator Supervisor (WUCS).

Will submit Section 107.21

Show the underground utility crossings on drainage profiles.Utility submission is in accordance with the GDOT Plan Development Process. First Utility Submission for identifying existing facilities consisted of cover, roadway typicals, profiles and cross sections, major Colerain Road cross culvert profiles and utility plans. The second utility submission will include proposed drainage profiles for utility companies to show underground crossings.

Provide a legend defining each line code and symbol used in the utility plans.Will add standard GDOT utility legend to plans

Delete the names of property owners from the utility plans.The property names and parcel numbers are on the same level. Therefore we would have to put info on separate levels in order to turn off names.

25-XXX LIGHTING PLANS & DETAILS – N/A

26-XXX SIGNING AND MARKING PLANS & DETAILS

General Comments

Verify all curb ramps are in alignment per FHWA & GDOT guidelines.Will verify WCR alignments meet guidelines

Add “Eyebrows expansions” on CR 90 @ U turn locations (to ease U turns for larger vehicles).Will verify if U-turn movements permissible and add eyebrow expansions accordingly

Remove (W2) intersection signage and (W16) road name signs in Urban area per MUTCD and GDOT guidelines.W2 and W16-8 signs will remain in place. The character of this area is rural. Per the Signing and Marking guidelines, W16-8 signs are required. If the Department desires no signs in specific areas, please specify exactly which signs to remove.

A 10’ width multi-use trail is specified on the North side of Colerain Road, crosswalk minimum width should be 10’ but no more than 12’. 10’ multi-use path shall have a 12’ crosswalk, this allows for the 8” bar to be outside the width of the path.Will verify width of crosswalk and change where necessary

Remove all W3-3 (signal ahead) signs where minimum sight distance is obtained approaching traffic signals.Per discussion with District 5 Traffic Ops on 10-18-12, W3-3 signs will be removed where sight distance is adequate and span wire cross-road signs are provided

Adjust LANE DROPS at the Approach (STA 15+00 – 25+00) and Departure (STA 310+00 – 325+00) of the divided median(s), refer to Figure B-1 of the GDOT Signing and Marking Guidelines for Signing of Divided Highway Approach and Departure(s).Will correct striping per Figure B-1

Change all R6-2 (one way) signs @ interchange ramps to R6-1.Will change signs

Page 18: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 18 CAMDEN COUNTY

Remove all stripping quantities from plans.Striping Quantities should remain to assist itemized callout by sheet no.

There are existing special signs located throughout the project that have not been addressed. Add note to remove and reset if applicable.Will note all existing special signs where applicable

Drawing 26-002

Relocate W4-2R (Lane Ends) to STA 28+90 LT.Will relocate sign

Remove 5” White Skip Markings from STA 21+25 to 26+90 westbound lane drop. See MUTCD Section 2B.09, Figure 2B-14.Will remove striping

Drawing 26-003

Delete R560-5 (State Law Stop of Pedestrians) @ STA 34+63.Will delete sign

Extend stop bar across all lanes on Colerain Rd.Will extend stop bar as requested

Extend sidewalk; add Type B ramps, STA 33+95 RT.Will extend sidewalk and add Type B ramps

Remove R3-8 and place on signal span, STA 34+80.Will remove and place sign as requested

Extend Stop Bar across right turn lane, STA 34+80 RT.Will extend stop bar as requested

Show turn template for dual left turn movements of WB-67 trucks, STA 35+60.Will confirm turning movement for WB-67 is sufficient. Template will not be shown on plans.

Place R5-1a (Wrong Way), STA 46+05 LT/RT.Will add signs

Place R3-4 (No U-Turn), STA 36+15.Will verify the need of sign at the requested location

Place R5-1 (Do Not Enter), STA 36+90 LT.Will add sign

Remove R3-1 (No Right Turn) and place on signal span, STA 37+00.Will remove and place sign as requested

Place R5-1a (Wrong Way), STA 39+60 LT.Will add sign

Add W9-1L (Right Lane Ends), STA 41+00 LT.Sign is not necessary. A W9-1R sign is placed at Sta. 25+00 Lt

Begin preformed plastic striping, correct STA 41+78 and flag, STA 41+47.19 LT.Will correct station

Page 19: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 19 CAMDEN COUNTY

End preformed plastic striping, correct STA 44+70 and flag, STA. 45+00.19 LT.Will correct station

Remove Yield sign at STA 35+09 RT and place stop bar in turn lane as per new policy at signals.Will remove sign and correct striping

Drawing 26-004

Delete R5-10a (Pedestrians Bicycles, Motor-Driven Cycles Prohibited) @ STA 48+00 on I-95 off ramp.Sign is necessary to inform drivers that specific types of traffic are prohibited from using freeways or expressway ramps

Verify and ensure curb ramps are in alignment with ped crossing.Will verify curb ramps

Place R5-1a (Wrong Way), STA 47+05 RT.Will add sign

Place R5-1 (Wrong Way), STA 49+20 RT.Will add sign

Add a concrete island with regulatory signs, STA 50+50 RT.Will verify and add island, if necessary

ADA ramps shown, no crosswalk, remove center ramps, STA 51+40.Will remove ramps

Ramps not shown in islands and hatching incomplete, islands should have 4 foot offset from travel lane, STA 56+20 LT/RT.Will correct island and striping

Drawing 26-005

Add a concrete island to separate vehicles, and painted island to separate right turn from thru left, STA 63+15 LT/RT.Will verify and add island, if necessary

Add R560-5 (State Law Stop of Pedestrians), STA 70+25 RT.Sign is not necessary. Only add this particular sign at signalized intersections.

Add R560-5 (State Law Stop of Pedestrians), STA 71+75 LT.Sign is not necessary. Only add this particular sign at signalized intersections.

Drawing 26-007

Stage for “school flasher signal” removal when signal is operational, STA 102+36.Will correct

Stage for “school flasher signal” removal when signal is operational, STA 138+00.Will correct

Drawing 26-008

Add W1-5 (Winding Road) @ STA18+00 +/- facing SB traffic.Will add sign

Place R4-7 (Keep Right), STA 108+50 RT.

Page 20: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 20 CAMDEN COUNTY

Will add sign

Add Concrete to separate left, thru traffic and paint islands right turn lanes, STA 108+50 LT.Will verify and add island, if necessary

Concrete island 4 foot offset, (show 2-4 ramps) hatching incomplete. Remove stop bar and sign (R1-1) add R1-2 (Yield) and R560-1 (Lights On When Raining), STA 115+00 RT.Will correct

Remove W3-3(Signal Ahead), STA 115+64.Per discussion with District 5 Traffic Ops on 10-18-12, W3-3 signs will be removed where sight distance is adequate and span wire cross-road signs are provided.

Drawing 26-009

Shift type 2 arrow from wheel path, STA 117+40 RT.Will correct

Separate R5-1 (Yield) and R560-1 (Lights On When Raining), STA 119+00 RT.Will correct

Add R9-3a (No Pedestrian Crossing (symbol)) plus R9-3b (Use Crosswalk) R left side and R9-3b (Use Crosswalk) L right side, STA 119+75 LT/RT.Will add signs

Increase concrete island (4 foot offset) for 45mph zone show 7 ramps, STA 120+00 RT.Will evaluate and increase island, if necessary

Remove W3-3 (Signal Ahead) STA 125+50 LT.Per discussion with District 5 Traffic Ops on 10-18-12, W3-3 signs will be removed where sight distance is adequate and span wire cross-road signs are provided.

Add Type 7 arrows; add eyebrows to accommodate u turns, STA 130+00 LT/RT.Will verify U-turn movements and add eyebrow expansions accordingly

Drawing 26-010

Show curb ramps or cut-through island @ STA 141+25 +/- RT.Will add ramps

Add R560-5 (State Law Stop of Pedestrians), STA 140+75 RT.Sign is not necessary. Only add this particular sign at signalized intersections.

Remove stop bar and R1-1 (Stop), add R1-2 (Yield) for yield condition with R560-5 (State Law Stop of Pedestrians), STA 141+40.Will correct striping and signs. R560-5 sign is not necessary. Only add R560-5 sign at signalized intersections.

Drawing 26-011

OTO - Add W3-1 (Stop Ahead) ahead of stop signs on Settler Hammock Way & Driveway (opposite side of CR 90).Will add sign at Settler Hammock Way. W3-1 sign not necessary at private driveway

D5 TO - Add R560-5 (State Law Stop of Pedestrians), STA 153+00.Sign is not necessary. Only add this particular sign at signalized intersections.

Page 21: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 21 CAMDEN COUNTY

D5 TO - Add R560-5 (State Law Stop of Pedestrians), STA 154+80.Sign is not necessary. Only add this particular sign at signalized intersections.

Drawing 26-012

Add Type 7 arrows, add eyebrows to accommodate u turns, STA 162+00.Will verify U-turn movements and add eyebrow expansions accordingly.

Drawing 26-013

Provide crosswalks at all crossings.Will evaluate crosswalk alignments with respect to WCR’s as shown on signal plan 27-07. The WCR’s are located to avoid impacting the existing signal mast arm poles to remain.

Drawing 26-014

Increase drive to 20’ wide, STA 191+34 RT.Will increase drive width 16’ to 20’

Drawing 26-016

Add R560-5 (State Law Stop of Pedestrians), STA 213+65 LT.Sign is not necessary. Only add this particular sign at signalized intersections

Drawing 26-019

Add note (Type 3 red/clear rpm’s @20’ spacing), STA 7+50 RT.Will add note

Place concrete island to separate right / thru traffic w/ R1-1 (Stop), add R1-2 (Yield) shorten stop bar, STA 255+40 LT/RT.Will add island, if necessary, and correct signs/striping

Add R560-5 (State Law Stop of Pedestrians), STA 254+65.Sign is not necessary. Only add this particular sign at signalized intersections.

Place painted island to separate right turn mainline from left turn, thru movement, STA 255+40 LT/RT.Will add striping

Begin rural shoulder, no curb & gutter, STA 256+00.Will verify end C&G / begin rural shoulder station with respect to radius returns and curb height transition

Add R560-5 (State Law Stop of Pedestrians), STA 256+36.Sign is not necessary. Only add this particular sign at signalized intersections.

Drawing 26-020

Add to drive a 5” solid double yellow line, R1-1 (Stop) sign, and 24” solid white stop bar, STA 267+90 LT.Will add striping and sign

Add to drive a 5” solid double yellow line, R1-1 (Stop) sign, and 24” solid white stop bar, STA 275+15 RT.Will add striping and sign

Drawing 26-023

Page 22: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 22 CAMDEN COUNTY

Add ‘cut through’ on median 8’ min. on King Bay Rd for ped crossing. Cut through ramps should maintain the same width as a sidewalk, 5’. If an 8’ cut through is used than the crosswalk would be 10’. Refer to Detail A4.Will correct

Increase the size of the concrete island; maintain 4 foot offset, STA 10+60 LT/RT.Will correct

Relocate W4-2R (Lane Ends) from STA 316+00 RT to STA 313+00 RT and extend travel lane(s) to accommodate minimum 775’ from W4-2R.Will relocate sign

Drawing 26-027

Add W1-2 (Curve) @ STA 20+00 +/- LT.Will add sign

Add W1-2 (Curve) @ STA 13+00 +/- RT.There is a W1-2 sign at Sta. 12+95 Rt

Add Type 3 object marker (OM-3L), STA 22+55 RT.Will add object marker

Add W1-7 (Large Arrow (2-directions)), STA 22+60 RT.Will add sign

Add Type 3 object marker (OM-3R), STA 22+65 RT.Will add object marker

Drawing 26-028

Remove object marker (OM-3L) and object marker (OM-3R), place OM4-1 (End Of Road) LT/RT, STA 3+23.Will correct

Place object marker (OM-3R), STA 3+90 RT.Will add object marker

Place W1-6L (Large Arrow (1-direction)), STA 3+92 RT.Will add sign

Place object marker (OM-3R), STA 3+94 RT.Will add object marker

Drawing 26-032 Miscellaneous Sign Details

Add Sign Detail for D- Spec. Signs which are included on Signal Plans (Colerain Road, Wildcat Drive, Kings Bay Road, Etc.).Will add signs

27-XXX TRAFFIC SIGNAL PLANS

GDOT requires that all traffic and intersection control devices (stop and go traffic signals, flashing beacons, school flashers) on the State Highway system be permitted. The Project Manager shall ensure that all proposed traffic control devices have approved permits issued by the State Operations Engineer and Chief Engineer, prior to the devices being included as a contract item in the plans. The following locations, as shown in the plans, will require permitting and/or permit revisions:

Page 23: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 23 CAMDEN COUNTY

Existing Signalization

Colerain Road @ N. Gross Road/Marsh Harbor Pkwy (Off system)Colerain Road @ Kings Bay Road (Off system)

Proposed Signalization

Colerain Road @ I-95 Southbound RampColerain Road @ Wildcat DriveColerain Road @ N. Gross Road/Marsh Harbor PkwyColerain Road @ Kings Bay Road

General Comments:

The Project Manager shall consult with TMC and District Traffic Operations to ensure that all signalized locations are permitted prior to submission of the final plan package to Contracts Administration.The District Traffic Operations shall be consulted to ensure that all signalized locations are permitted prior to submission of the final plan package to Contracts Administration.

Ensure to place type 3 PB adjacent to poles.Type 3 pull boxes will be placed adjacent to strain poles

See 2009 MUTCD, Pages 502 & 503 for proper placement of ped signal pole location. Ped push buttons and signals will be placed per 2009 MUTCD

Do not install pull boxes strain poles etc in drainage areas.Pull boxes and poles will not be placed in drainage areas

Pulse loops, use distance line from stop bar to trailing edge of loop. Remove distance call out note.Advance loop distance from stop bar will be dimensioned and removed from call out

Install one 2” type 3 conduit to each island, correct call out note.Only one 2” conduit will be installed to islands, and callouts will be updated

Change bore size to 3”, remove the 5”.5” bores will be changed to 3”

Pedestrian signal display, show size on the left side, remove width measurement.For pedestrian signal illustrations, the 16’ height dimension will be shown on the left side rather than the 18” width dimension on the top

Show R1-2 (Yield) and R560-5 (State Law Stop of Pedestrians) on signal designs sheets.R1-2 and R560-5 sign locations will be indicated on the signal plans

Use main line stations for pole locations.Main line stations are used for all strain poles

Change strain pole pay item to 639-5000 and specify “concrete”.Pay item 639-5000 will be used for strain poles, and call outs will specify concrete

Use type 2 conduits where directional bore is not required.Type 2 conduits will be used where directional bore is not required

Ensure pedestrian poles are not blocking access to ramp/landing pads.Pedestrian poles will not block access to ped ramps

Page 24: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 24 CAMDEN COUNTY

Use Actra/Sepac for input assignments.Actra/Sepac format will be added to Input Assignment Tables

Remove the 9”x15” push button station adaptor from materials list. This is covered in the details.9" x 15", Double Push Button Station Adapter for 4" Dia Pedestrian Pole, Adjustable will be retained in the Lists of Materials, per GDOT spreadsheet revision 10-02-2012

Conduit, 1” and 2” specify type 2.Conduit, 1” and 2”, description will include “TP 2”

Include 1” GRS conduit for power.1” GRS conduit will be included in the Lists of Materials

Verify all conduit quantities for changes.Conduit quantities will be updated

Stain pole and pull boxes, pull boxes should be shown behind poles in line with load.Pull boxes will be shown at 0º orientation behind poles in line with load where feasible (e.g., to avoid placing the pull box within a slope). Pull boxes will otherwise be placed at 90º orientation in line with the poles other underground conduit entrance.

Verify D-spec roadway name, Colerain. Correct size, see 2009 MUTCD.Colerain street name will be verified. 12” D series letters on 24” height signs will be used.

Proposed strain poles, ensure level is turned on in section 24.Strain pole level will be turned on in section 24

Drawing 27-001

Include legend for directional bore.Directional bore line style will be included in the legend

Drawing 27-002

Note # 5, contractor shall maintain all traffic signals from NTP.Note #5 will require contractor to maintain signals from NTP

Drawing 27-003

Phasing diagram, change phase 4 movement to show left turn.Phase 4 will be shown as a left turn movement in the phasing diagram

Signal head display, phase 4 show with arrows.The Phase 4 signal heads will be changed to RLA/YAL/GLA

Show R3-1 (No Right Turn) and R3-2 (No Right Turn Across Tracks) signs and location on signal span.Will place R301 (No Right Turn) and R3-2 (No Left Turn) on signal span

Show R10-12 (Left Turn Yield On Green Ball) to the left of the 5-section signal head.R10-12 will be shown at left of 5-section signal head

Show R9-3 series signs on signal sheet, location and sign is for information.Will indicate location of R9-3 signs on signal sheet

Install phase 4 loop homeruns from the back of loop to leading edge of island, install type two pull box next to edge of island.Phase 4 saw cut loop lead-ins will run from the rear of the loops

Page 25: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 25 CAMDEN COUNTY

We will supply the PCC loop detail to include in the plans. Call out note for phase 4, include “see PCC loop detail”.Phase 4 loop call out will include “See PCC loop detail”

Phase 5, install loop homerun to median, install bore and pull box in median.Will run Phase 5 saw cut loop lead-in to the median, and bore conduit for loop lead-in cable from median

Correct loop labels for phase 2, L2A inside, L2B outside.L2A, L2B loop labels will be switched

Install BBS system, correct call-out note for cabinet location.Will add BBS system and add to cabinet call out

Drawing 27-004

Include external BBS system (k).Will add BBS system and add to cabinet call out

Cabinet base, include “w/BBS extension”.Will include “w/BBS extension” to cabinet base description

Signal conductor, change quantity from 3 to 2.Will verify signal cable quantity

Pull box 2, verify quantity.Will verify TP 2 pull box quantity

Drawing 27-005

Flag required R/W.R/W will be labeled

Phasing diagram, phase 2, remove omit. Omit phase 4.Phasing diagram will show Phase 2 and omit Phase 4

Pedestrian display signal, remove P4, remove P4 signal and crosswalk.Will delete the P4 pedestrian movement

Show and install the R9-3 series signs.Will indicate R9-3 sign locations

Increase concrete island size, use 4’ offset from Colerain.Will evaluate increasing existing island size

Southwest quadrant, may need additional R/W for strain pole.Will place pole further from R/W corner

Shift phase 8 signal heads to the right 8 feet.Will shift Phase 8 signal heads 8 feet to the right

Phase 5, install loop homerun to median, install bore and pull box in median.Will run Phase 5 saw cut loop lead-in to the median, and bore conduit for loop lead-in cable from median

Add note to remove school flasher when the signal becomes operational.Will add note to remove school flasher when signal becomes operational

Page 26: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 26 CAMDEN COUNTY

Drawing 27-006

Correct switch pack quantity.Will update switch pack quantity

Correct DC isolator quantity.Will update DC isolator quantity

Change 3-pair cable quantity to 2.Will change loop/ped lead-in cable quantity to 2

Correct pedestrian signal quantity. Will update pedestrian signal and pushbutton station quantities

Correct pedestrian mounting hardware quantity.Will update pedestrian signal mounting hardware and pedestal pole quantities

Drawing 27-007

Call out detail of poles & mast arm location & size.Will call out existing mast arm poles

See general comments. Will change to TP 2 conduit and dimension loop setback

Drawing 27-008

Remove 3-pair cable.Will delete 3-pair cable

Include type 2 conduit.Will add TP 2 conduit

Remove type 3 conduit. ill delete TP 3 conduit

Drawing 27-009

Expand width of sidewalk around curb ramp.Existing concrete landing pads will remain as shown. No sidewalk is existing or proposed in this area.

Show curb ramps on sidewalks @ edge of side streets (intersections approach on Colerain Rd NB).No curb ramps are necessary. No sidewalk is existing or proposed in this area.

Install pulse loops on all approaches and show speed limit on Kings Bay Rd.Will add setback loops and show speed limit on Kings Bay Road

Label loops on Kings Bay at the stop bar as “C” and “D”.Will label Kings Bay stop bar loops as “C” and “D”

Install pedestrian signals in median, install sidewalk across median.Will install sidewalk and ped ramps across the Kings Bay medians. Will install pedestrian signals in the median.

Bore all 6’x40’ quad loops to median and install bore and pull box to the median.

Page 27: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 27 CAMDEN COUNTY

6’ x 40’ loops on Colerain are shown routed to median. 6’ x 40’ loops on Kings Bay are routed to the islands.

Correct phasing on signal span for 4/7.Will label the 5-section signal head “4/7” on the signal span and “7/4” on the illustration

Increase island size, use 4 foot offset.Will evaluate increasing island size, however, island sizes are constrained by turning vehicle requirements.

Phase 2, 4, 6, 8 outside signal heads, shift to the right about 4 feet.Will place signal heads 2, 4, 6, 8 over the center of the right through lane

Drawing 27-010

Adjust materials list for all changes.Will update Lists of Materials

28-XXX ATMS / ITS PLANS – N/A

29-XXX LANDSCAPING PLANS & DETAILS – N/A

30-XXX MITIGATION PLANS (Wetland, Streams) – N/A

31-XXX RETAINING WALL ENVELOPES

No comment.

32-XXX RETAINING WALL PLANS

No comment.

33-XXX NOISE BARRIER ENVELOPES

No comment.

34-XXX NOISE BARRIER PLANS

No comment.

35-XXX BRIDGE PLANS

Existing Bridge ID No.: 039-0020-0

Proposed Bridges: 4 span 293’ X 96.92’ concrete bridge

General Bridge Comments: None

36-XXX BRIDGE CULVERT PLANS – N/A

37-XXX MISCELLANEOUS STRUCTURES - N/A

38-XXX SPECIAL CONSTRUCTION DETAILS – N/A

39-XXX SPECIAL DESIGN BOX CULVERTS – N/A

44-XXX UTILITY RELOCATION PLANS – N/A

EROSION CONTROL PLANS

Page 28: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 28 CAMDEN COUNTY

Items proposed in plans:

PermanentSTN DUMPED RIP RAPEROSION CONTROL MATS, SLOPES

TemporaryTEMPORARY GRASSINGMULCHCONSTRUCTION EXITCONSTRUCT AND REMOVE TEMPORARY SEDIMENT BARRIER OR BALED STRAW CHECK DAMCONSTRUCT AND REMOVE INLET SEDIMENT TRAPTEMPORARY SILT FENCE, TYPE ATEMPORARY SILT FENCE, TYPE CBARRIER FENCE (ORANGE), 4 FT

Additional items recommended: Will include items/ quantities in final plans

PermanentPLASTIC FILTER FABRICPERMANENT GRASSINGAGRICULTURAL LIMEFERTILIZER MIXED GRADEFERTILIZER NITROGEN CONTENT

TemporaryMAINTENANCE OF TEMPORARY SILT FENCE, TP AMAINTENANCE OF TEMPORARY SILT FENCE, TP CMAINTENANCE OF CHECK DAMS - ALL TYPESMAINTENANCE OF SEDIMENT BARRIER – BALED STRAWMAINTENANCE OF SILT CONTROL GATE, TP 3MAINTENANCE OF CONSTRUCTION EXITMAINTENANCE OF INLET SEDIMENT TRAPWATER QUALITY MONITORING AND SAMPLINGWATER QUALITY INSPECTIONS

General Erosion Control Comments:

50-XXX EROSION CONTROL PLANS – COVER SHEET

Please add the County Number in accordance with the PPG Section 50.002 Required Information.Will add “Camden County No 039” and label State Route: “Temporary #” and add “#” when provided

Please add the GDOT Chief Engineer‘s signature, stamp, and GSWCC Level II number in accordance with the PPG Section 50.002 Required Information.Will add GDOT Chief Engineer signature line for info to be completed in final plans

Ensure the Design Professional‘s signature, P.E. stamp (or R.L.S., P.G., R.L.A., R.A., R.F., C.P.E.S.C. stamp), and GSWCC Level II certification number in addition to the GDOT Chief Engineer‘s signature, stamp, and GSWCC Level II number are provided when the plans are prepared by a consultant.Will add Design Professionals info on final plans

Page 29: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 29 CAMDEN COUNTY

51-XXX EROSION CONTROL PLANS – EROSION, SEDIMENTATION, & POLLUTION CONTROL GENERAL NOTES SHEET

Remove the bold notes in the box on the right side of the page.The notes shown were required on GDOT Project NHIM0-0075-02(213) let in January 2012. Will delete notes if no longer required.

Ensure the checklist is dated January 1 of the year in which the land-disturbing activity was permitted.Will ensure checklist is the latest version when submitting final plans for construction

52-XXX EROSION CONTROL PLANS – EROSION CONTROL LEGEND & UNIFORM CODE SHEET

53-XXX EROSION CONTROL PLANS – DRAINAGE AREA MAP

This map should not be the same as the drainage area map. This map is required for projects that disturb one acre or more. This map is similar to the drainage area map (Section 21) but is prepared specifically to meet the requirements of the GAR 100002 NPDES Permit. On this map, the drainage areas are delineated with respect to the project stormwater outfalls; while on the map of Section 21, the drainage areas are delineated with respect to the stormwater infrastructure inlets. For each outfall, tabulate a summary (or otherwise summarize) of the hydrologic and hydraulic data specified in the PPG on the map or on a following sheet as drawing space permits. All area calculations shall be in acres.Will revise drawing to show required info outlined in Section 53.002 of the PPG.

54-XXX EROSION CONTROL PLANS – BEST MANAGEMENT PRACTICES (BMP) LOCATION DETAILS

No comment.

55-XXX EROSION CONTROL PLANS – EROSION CONTROL WATERSHED MAP & SITE MONITORING LOCATION

No comment.

56-XXX EROSION CONTROL PLANS – CONSTRUCTION STANDARDS & DETAILS

Ensure all GDOT Construction Standards & Details required for construction of BMPs are provided.Will include in final plans all GDOT Construction Standards & Details which were listed in index but omitted for PFPR.

60-XXX RIGHT OF WAY PLANS – N/A

FIELD INSPECTION

The City of St. Marys is maintaining the drainage canal, STA 287+20 +/- LT & RT. Access is not provided for the City to get into this area. Revise the plans to provide a drive on the north & south side of the project for maintenance of canal.Will develop and submit for approval an access plan to the City’s existing r/w for drainage ditch as graphically provided on the City’s existing water and sewer plans received August 7, 2006.

LLM/ jmk

Page 30: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 30 CAMDEN COUNTY

Page 31: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 31 CAMDEN COUNTY

PERSONNEL PRESENT

Page 32: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 32 CAMDEN COUNTY

PERSONNEL SUBMITTING E-MAIL COMMENTS

Chris Needham District 5 Traffic OperationsGreg Wasdin District 5 Traffic OperationsKen Werho Office of Traffic OperationsMack Cravey District 5 PreconstructionLee Sheffield District 5 Construction OfficeBrian Scarbrough District 5 Area OfficeBilly Smith District 5 Traffic OperationsCynthia Phillips District 5 Traffic OperationsJohn Royal District 5 Utilities Office

c: Victor DangRussell McMurry Matt BennettWill MurphyCory KnoxLee SheffieldBrian ScarbroughBrad SaxonMack CraveyRobert McCallStephen ThomasChad HartleyLarry BarnesMichael GarnerCharles HastyDavid PattersonEric PittsMike BoldenKathy ZahulKen WerhoAngela WhitworthAndy Casey Ben RabunTheresa HolderHoward CopelandCindy VanDykeGail D’AvinoRich WilliamsEric DuffGlenn WilliamsTommy SlatonSteve MatthewsEugene HopkinsChristy LovettTed CrabtreeJohn Kopotic

Page 33: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 33 CAMDEN COUNTY

APPENDIX “A”

Page 34: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 34 CAMDEN COUNTY

Page 35: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 35 CAMDEN COUNTY

Page 36: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 36 CAMDEN COUNTY

APPENDIX “B”

Page 37: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 37 CAMDEN COUNTY

SCORING RESULTS PER TOPPS 2440-2Project Number: County: PI No.: Project Designed By:

CSSTP-0007-00(414) CAMDEN 0007414 DOT Office: Office of Program DeliveryProject Manager: Matt Bennett

Date FPR Held:

10/04/12 Preliminary Final Consultant/Design Office:

Moreland Altobelli Associates, Inc.

Project Type:Choose appropriate project type: Bridge Replacement Intersection Improvement Design-Build

Rural Widening & Reconstruction Interchange Reconstruction New Location Roadway

Urban Widening & Reconstruction Rural Interstate Reconstruction Traffic Signal Upgrades Maintenance Resurfacing Urban Interstate Reconstruction ATMS/ITS

Major Minor

Urban Rural

FOCUS AREAS SCORE RESULTS

Presentation 100 Did not follow PDP Missing information Incorrect quantities Did not follow PPG Conflicting information Missing pay items Unclear requirements Incorrect information Incorrect pay items

Notes:

Judgment 100 Did not follow Concept Report Did not follow GDOT policy Did not follow AASHTO requirements Did not perform adequate QA/QC procedures

Notes:

Environmental

100 Not consistent with Environmental Document Did not address environmental commitments Not consistent with Environmental Permits Unreasonable environmental

commitments/requirements ESA’s not shown/incorrect on plans

Notes:

Right of Way 100 Did not provide adequate Right of Way/Easements Was not consistent with constraints to accessing

property Did not show physical characteristics of property

Notes:

Utility 100 Did not show existing Utilities on plans Utility Legend discrepancies Did not define all conflicts Did not show Strain Pole locations Did not show all relocations Did not show

Contract itemsNotes:

Constructability

100 Did not provide Staging Cross Sections Did not include Intermediate Completion Dates Did not address Temporary Drainage Did not address Side Road Staging Staging will not

work as shownNotes:

Page 38: (PRELIMINARY)(FINAL) FIELD PLAN REVIEW ...mydocs.dot.ga.gov/info/publicdownloads/Downloads/0007414... · Web viewPRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007 414

PRELIMINARY FIELD PLAN REVIEW INSPECTION REPORT: P.I. NO. 0007414PAGE 38 CAMDEN COUNTY

Schedule 100 Submitted late for Scheduled Let Date Incomplete Initial Submittal FPR w/out NEPA approval Submitted late for R/W Authorization Additional Field Plan Review required Extensive Re-do work

Notes: