pwi: plasma wave instrument. past major events: october 13: pwi 6th kyoto meeting ( kyoto univ.)...

15
AM 2 LF-SC D B-SC D B-SC M EFISTO-S W PT-S SC -Pre SC -Pre W PT-Pre W PT D rive M EFISTO PW IB lock D iagram M EFISTO -E EFD OFA/ W FC SORBET AM 2 P-E W PT-E AM 2 P-S MDP (C PU / RAM) PW I-E LF-SC D B-SC D B-SC M EFISTO-S W PT-S SC -Pre SC -Pre W PT-Pre W PT D rive M EFISTO D rive FPGA x 2 (for E ,and B ) PW IB lock D iagram WI: Plasma Wave Instrument

Upload: clifford-craig

Post on 17-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

MEFISTO-E

EFD

OFA/WFC

SORBET

AM2P-E

WPT-E

AM2P-S

MDP(CPU/RAM)

PWI-E

LF-SC

DB-SC

DB-SC

MEFISTO-S

WPT-S

SC-Pre

SC-Pre

WPT-PreWPT Drive

MEFISTO Drive

FPG

x 2 (for E, and B)

PWI Block Diagram

MEFISTO-E

EFD

OFA/WFC

SORBET

AM2P-E

WPT-E

AM2P-S

MDP(CPU/RAM)

PWI-E

LF-SC

DB-SC

DB-SC

MEFISTO-S

WPT-S

SC-Pre

SC-Pre

WPT-PreWPT Drive

MEFISTO Drive

FPG

x 2 (for E, and B)

PWI Block Diagram

PWI: Plasma Wave Instrument

Page 2: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

Past major events:

October 13: PWI 6th Kyoto meeting ( Kyoto Univ.)

Discussion of the electrical interface and

EMC

October 18: EMC board meeting (ISAS)November 21:   EGSE Meeting ( Meudon )

PWI Common GSEDecember 6: EMC tests of TWTA (Kanazawa)

Update of the PWI status (after the previous SWG)

Page 3: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

EWO

•BBM Development & Tests: DC CAL/BIAS 、 Loop gain controlLPF of WFC/OFA/EFD-E & B

AM2P

•Power supply :•Voltage conversion- Usage of -12V ->-5V

-> increase of power consumption• Under the discussion of the size and weight

considering the additional functions(To be discussed this week in Kanazawa)

Page 4: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

Whole SCMSCM has been fully tested at Kanzawa University,

LF-x (JAPAN)LF-y (JAPAN)LF-z (FRANCE)HF-z (FRANCE)

Gain

Phase

Frequency [Hz]1 1M

Gain

Phase

Frequency [Hz]1 1M

SC-LF/SC-DB

Page 5: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

TiAlN probe 40 mm diameter

MEFISTO update 22 March 2006

Sensor wire, 0.1-0.3 mm

“puck” Boom, connected to s/c ground

• Max. amplitude (LF) 500 mV/m• Bit resolution 0.015 mV/m• Spacecraft potential -100 to +100 V• Frequency range DC – 3 MHz

1-2 m 13-14 m

Page 6: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

Second-Surface Mirror Development

Work is on-going to develop an SSM, mainly for the boom wire. Goal is to achieve:

• Mechanical flexibility• Electrical conductivity, to keep all satellite

surface potentials within ~1V• Temperature below 150°C to avoid damage to

wire insulator material

Page 7: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

Thermal Modelling

• Thermal model of MEFISTO “stand-alone” has been developed and run

• All temperatures within acceptable limits for all mission phases

• Model has been supplied to JAXA, for integration with spacecraft level model

• Currently model details are being discussed and iterated with JAXA thermal engineers

Page 8: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

Electronics

• Design and development of flight electronics is proceeding as planned

• Co-ordinated EGSE development in Europe is progressing

Mechanics

• Design and development of flight machannics is proceeding as planned

Page 9: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

Funding status

• Swedish National Space Board

• Royal Institute of Technology

• Swedish Institute of Space Physics

have signed funding commitments

Page 10: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

Requests (reminder)

• Normal sun angle > 92 deg, i.e., 93 +/- 1 deg, if possible

• Maximum potential difference on external surfaces of order 1 V, i.e., all external surfaces must be (reasonably) conductive

Page 11: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

SORBET instrument bloc diagram

S ea rch C o il D B

to /fr o m

D P U

+ E x

-E x

+ E y

F P G A

A G C

A G C

P A

P A

P A

1 0 k-4 0k

2 .5 k-1 0 k

1 6 0 k-64 0 k

4 0 k-1 60 k

1 0 k-4 0k

2 .5 k-1 0 k

1 6 0 k-64 0 k

4 0 k-1 60 k

R O M

-E yP A

S O R B E TIn stru m en t

+

-

+

-

C a l

C a l

C a l

Bz

T N R (T h erm a l N o ise R ece iver )

IF F ilter2 1 .4 2 5 M

L O2 1 .2 8 5 M

S y n th2 1 .9 2 5 M3 1 .6 2 5 M

H F R (H ig h F req u en cy R ece iver )D ig ita l

u n it

+

-

A D C

V ref

V ref

+

-

Page 12: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

New ASIC design (January 2006)Analogue functions on a single chip :– Specific design (Full Custom)

– Thin CMOS technology (AMS 0.35um)

– 2 logarithmic amplifiers (AGC)

– 2 low noise mixers

– 1 selective band-pass filter

– 1 low noise operational amplifier

Functional testing showed :– Good performances

– Improvement of the dynamic range

– Less power needed

Future actions– Thermal testing (soon)

– Radiation evaluation (2Q/2006)

– Decision to continue the ASIC solution (3Q/2006)

2.6mm

2.6mm

ELISA_0110/14 2.5V

Vref (3.5V)

AOP

In+ In-

IBIAS

Out

Clock driver

Clk_In

p_Clk

n_Clk

Mixer_1

Mixer_2

1

245 10

8

7

6

11121314 17 18

1921 25

2930

31

33

34

36 37 38 39 4042

IBIAS

RF-

RF+

OL+OL-

IF+

IF-

IBIAS

IF+

RF-

RF+

LO+LO-

IF-

AGC_1 Out

In

V CM

V AGC

IBIAS+

IBIAS -

V REF

R FBK

AGC_2Out

In

V CMV AGC

R FBK

IBIAS+

IBIAS -

V REF

4445

46

47

Band-Pass

SC-Filter

IBIAS

In Com

Out

p_Phi

n_Phi

Amp+

-

Amp-

+

M ix_Bias

IF_O

ut1

LO

1+

LO

1 -

RF1+

RF1 -

AG

C_O

ut1

Rfb

k1

Vc1

Vcm

1

AG

C_I

n1

Fil

t_O

ut

Fil

t_B

ias

AO

P_I

n+

AO

P_I

n -

AOP_Out

Fil

t_C

lk

Fil

t_C

om

Fil

t_In

AG

C_B

ias

-

Vcm

2

AG

C_I

n2

Vc2

Rfb

k2

AG

C_B

ias+

RF2+

RF2 -

LO

2+

LO

2 -

AG

C_O

ut2

IF_O

ut2

Page 13: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

Major Events in the future

March, 2006:PWI local meeting in Kanazawa

March 2006:EMC tests of the MSASI motor

Page 14: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

● エレキEWO-EFD: 回路設計

DC CAL/BIAS 、 Loop gain control

EWO-WFC/OFA: 回路設計センサとのインタフェース、 AC CAL

レベルダイアグラム

SORBET: EWO とのインタフェースAM2P:

LVDS: +20g 、電力 3 倍?MEFISTO レングスモニタ検討中CMD&STATUS

CAL 信号 → EWO へ観測シーケンス検討

BBM 製作・特性試験(富山県大)( BIAS/CAL 、 LGC 、 FPGA )

フィルタ BBM 製作( MHI )        特性試験(京大)

PWI前回設計会議からの進捗状況 今後の予定

Page 15: PWI: Plasma Wave Instrument. Past major events: October 13: PWI 6th Kyoto meeting ( Kyoto Univ.) Discussion of the electrical interface and EMC October

● その他Software / operation:

データ取得シーケンス検討(金沢大)各センサ/受信機 ⇔ MDP

EMC:

MMO EMC Meeting ( 10/18:ISAS )→ EMC ver.1.11

TWTA EMC 試験( 12/6 :金沢大)RE-02 / RE-04 (電界 / 磁界)CDC (電流)

MDP-2 内接地方式: 1 点接地を基本アナログ観測信号は差動受渡   cf. multiple ground: for clean E

   single ground: for clean B

基本案確定( 3 月: PWI+MDP )

MSASI モータ EMC 試験( 3 月:金沢大)

具体的議論( 3 月)

PWI前回設計会議からの進捗状況 今後の予定