saic-h-2005 rev 0
TRANSCRIPT
-
7/27/2019 SAIC-H-2005 Rev 0
1/3
ACTUAL INSPECTION DATE & TIME
EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER
SAUDI ARAMCO USE ONLYSAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER
CONTRACTOR INSPECTION LEVELSAUDI ARAMCO INSPECTION LEVEL
ITEM
No.ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DA
MH's SP ENT TRAVEL TIMQUANTITY INSP.
WORK PERMIT REQUI
SCHEDULED INSPECTION DATE & TIME
LAYOUT DRAWING NUMBER
PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.
Pre-Application Inspection of Cement Lining SAIC-H-2005 25-May-05 MECH.
A. General:
A1
A2
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
01-SAMSS-005,Sec. III
References B
The free water content of the cement-mortar lining mix does not exceed
7'/2 gal (28.4L) per 94 lb (43 kg) of cement, (AWWA C205, Para. 4.4.1).
NOTE: Only enough water to obtain proper placement characteristics of
the batched cement mortar is used.
01-SAMSS-005,
Sec. III
References BA8
A9The cement mortar shall be mixed in batches,
(AWWA C205, Para. 4.4.3.2).
01-SAMSS-005,
Sec. III
References B
A10The amount of cement and sand entering into each batch is measuredby weight, (AWWA C205, Para. 4.4.3.2).
A7Cement mortar-lining consists of one part cement to not more than three
parts fine aggregate by weight, (AWWA C205, Para. 4.4.1).
01-SAMSS-005,
Sec. III
References B
01-SAMSS-005,
Para. 4.2.4
Mixing water does not contain more than 500 ppm of total dissolved
solids.
All surfaces to be cement mortar lined shall be cleaned in accordancewith St2 of SIS-05-59-00 at the time of application of the cement mortar.
01-SAMSS-005,Para. 4.3.1
Surfaces to be cement-mortar lined or cement-mortar coated are cleaned
to remove loose or other foreign matter that could interfere with the
adherence of the cement mortar, AWWA C205, Para. 4.3.1.
01-SAMSS-005,
Sec. III
References B
A4
The Portland Cement shall conform to the requirements of ASTM C150,
Type V including the optional chemical requirements of Table 1A and the
optional physical requirements of Table 2A, (se Attachment 1).
01-SAMSS-005,
Para. 4.2.2.1
A5
Sand shall be fine aggregate as defined in ASTM C136, (see
REMARKS). Deleterious substances do not exceed the following limits:
Clay Lumps and Friable Particles 3.00% by weight
Acid Soluble Chlorides {Cl}0.06% by weight
Acid Soluble Sulfates {SO3}0.40% by weight
01-SAMSS-005,
Para. 4.2.3
A6
A3
Satisfactory facilities shall be provided for identifying, inspecting, and
sampling cement at the mill, warehouse, and at the site of lining and
coating, (AWWA C205, Para. 4.2.2.2).
01-SAMSS-005,
Sec. III
References B
A11
The quantity of water entering the mixer is measured automatically by an
adjustable device, or otherwise so, to ensure that the correct quantity of
water is being added, (AWWA C205, Para.4.4.3.2).
01-SAMSS-005,
Sec. III
References B
Page 1 of 3
-
7/27/2019 SAIC-H-2005 Rev 0
2/3
Work Verified
*Person Responsible for Completion of Quality Work / Test Y =YES N =NO F =FA
T&I Witnessed QC Record Reviewed
Name, Sign and Date:
Quality Record Approved:Name, Organization,
Initials and Date:
T&I Witnessed QC Record Reviewed
SAUDI ARAMCO ID/PID - 2/19/0505 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER
PROJ ECT TITLE WBS / BI / J O NUMBER CONTRACTOR / SUBCONTRACTOR
Pre-Application Inspection of Cement Lining SAIC-H-2005 25-May-05 MECH-
Work Verified
PASS FAIL N/A RE-INSP DA
1. 01-SAMSS-005, Shop Applied, Internal Cement Mortar Lining of Steel Pipe, (31 October, 2004)
2. AWWA C205, Cement-Mortar Lining and Protective Coating for Steel Water Pipe, (May 1, 2001)
QC Supervisor Proponent and Others
Contractor / Third-Party
ATTACHMENTS:
1. ASTM C150, Table 1 & Table 2.
Saudi Aramco
ITEM
No.ACCEPTANCE CRITERIA REFERENCE
3. ASTM C150, Standard Specification for Portland Cement, (2004)
REMARKS:sand, nfine aggregate resulting from natural disintegration and abrasion of rock or processing of completely friable
sandstone, (ASTM 136/ASTM C125).
REFERENCE DOCUMENTS:
Construction Representative*
Name, Initials and Date:
Work is Complete and Ready for Inspection:
Name, Initials and Date:
PMT RepresentativeT&I Witnessed QC Record Reviewed
Name, Initials and Date:
Performed Inspection Work / Rework May Proceed
Name, Initials and Date:
QC Inspector PID Representative
Work Verified
Page 2 of 3
-
7/27/2019 SAIC-H-2005 Rev 0
3/3
Attachment 1 - ASTM C150 Table 1 & Table 2
Pre-Application Inspection of Cement Lining SAIC-H-2005 TESTING MECH.
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER