A10A differential pressure gauge shall be installed to measure the
differential pressure across the strainer
SAES-K-403
Para 6.10
SAES-K-403
Para 6.9
ACTUAL INSPECTION DATE & TIME
EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER
SAUDI ARAMCO USE ONLYSAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER
CONTRACTOR INSPECTION LEVELSAUDI ARAMCO INSPECTION LEVEL
ITEM
No.ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DA
MH's SPENT TRAVEL TIMQUANTITY INSP.
WORK PERMIT REQUI
SCHEDULED INSPECTION DATE & TIME
LAYOUT DRAWING NUMBER
PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Reciprocating Compressor Suction and Discharge Process
Piping InstallationSAIC-K-2026 25-May-05 MECH-
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER
A11
A single internally damped non-slam piston type check valve, specifically
designed for pulsating flow, is installed in the common discharge header
downstream of all compressors
SAES-K-403
Para 6.12
A permanent spool-mounted stainless steel conical strainer 920 micron
(20 mesh) of adequate strength shall be installed in all compressor
cylinder inlet lines..
Note:Strainers in accordance with Standard Drawing AB-036764 may be
used.
SAES-K-403
Para 6.10
A1
A General Requi remen ts
SAES-K-403,
Para. 6.3
SAES-K-403
Para 6.9
A2
The knock out drum shall include the following:
1. An all stainless steel demister pad designed to limit liquid
droplets at the outlet to 10 microns.
2. The knock out drum have automatic liquid drains and separate
high and high-high level sensing instruments for alarm and
shutdown.
(NOTE: The automatic and manual liquid drains shall incorporate
stainless steel internals. )
SAES-K-403,
Para. 6.3
6.3 All reciprocating compressor cylinders operating at or within 5C of
the saturated gas conditions at the compressor cylinder suction pressure
shall take suction from a suction knock out drum.
A3Pressure relief valves shall be installed on al l knock out drums in
accordance with SAES-J-600.
SAES-K-403,
Para. 6.5
A5
Suction piping downstream of the suction drums and pulsation
suppression devices of compressors operating at or within 5C of the gas
saturation temperature shall be heat traced, either with steam,
electrically or a heat transfer fluid, and insulated to ensure that
condensation of liquids does not occur.
SAES-K-403,
Para. 6.6
A4
The extension piping (inlet pipe) of the relief valve shall be kept to the
minimum length possible, and provided with welded gussets at the
attachment to the vessel.
SAES-K-403,
Para. 6.5
A6
A8
A7
A9
All piping, piping components and pulsation suppression equipment
between the compressor cylinder suction flange up to and including the
cylinder suction block valve shall be rated for the compressor discharge
pressure.
SAES-K-403,
Para. 6.7
All process gas compressors shall be provided with vent piping on the
suction and discharge sides of pulsation suppression devices, as close
as practical to the cylinder nozzle connections.
Vents (As described in item A2 above) shall be permanently connected
to the flare header and shall include a check valve.
Page 1 of 2
-
7/28/2019 SAIC-K-2026 Rev 0
2/2
A16
All suction piping between each compressor cylinder pulsation
suppression device and the first upstream vessel shall be chemically
cleaned.Note: Cleaning procedures shall be conducted after hydrotesting .
SAES-K-403
Para 6.17
QC Record Reviewed
Work Verified
Name, Sign and Date:
Quality Record Approved:Name, Organization,
Initials and Date:
T&I Witnessed
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FA
A17All vent lines to flare shall include a check valve to prevent the possibility
of reverse flow from the flare header.
SAES-K-403
Para 6.19
T&I Witnessed
A12
A spectacle blind shall be installed in each compressor cylinder suction
and discharge line at a location adjacent to and on the cylinder side of
the cylinder isolation valves.
SAES-K-403Para 6.13
A13SAES-K-403
Para 6.14
QC Supervisor Proponent and Others
Contractor / Third-Party
REFERENCE DOCUMENTS:
QC Inspector PID Representative
Construction Representative*
QC Record Reviewed
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Reciprocating Compressor Suction and Discharge Process
PipingSAIC-K-2026 25-May-05 MECH-
Work Verified
PASS FAIL N/A RE-INSP DA
1. SAES-K-403 -- Reciprocating Compressors, (30 June, 2003)
ITEM
No.
A14For hydrogen service (molecular weight less than 12), all block valves
shall be of the double block arrangement
SAES-K-403
Para 6.15
ACCEPTANCE CRITERIA REFERENCE
REMARKS:
Each cylinder suction block valve shall be furnished with a inch bypass
line complete with a globe valve and spectacle blind to allow the
compressor to be pressurized slowly
Name, Initials and Date:
Performed Inspection Work / Rework May Proceed
Name, Initials and Date:
Work Verified
Saudi Aramco
PMT Representative T&I Wi tnessed QC Record ReviewedName, Initials and Date:
Work is Complete and Ready for Inspection:
Name, Initials and Date:
A15
For compressors in hydrogen service (molecular weight less than 12),
the suction and discharge piping serving each cylinder shall use double
block and bleed arrangements.
SAES-K-403
Para 6.15