    A10A differential pressure gauge shall be installed to measure the

    differential pressure across the strainer

    SAES-K-403

    Para 6.10

    SAES-K-403

    Para 6.9

    ACTUAL INSPECTION DATE & TIME

    EC / PMCC / MCC NO.REV. NO. PURCHASE ORDER NUMBER

    SAUDI ARAMCO USE ONLYSAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER

    CONTRACTOR INSPECTION LEVELSAUDI ARAMCO INSPECTION LEVEL

    ITEM

    No.ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DA

    MH's SPENT TRAVEL TIMQUANTITY INSP.

    WORK PERMIT REQUI

    SCHEDULED INSPECTION DATE & TIME

    LAYOUT DRAWING NUMBER

    PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.

    PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

    Reciprocating Compressor Suction and Discharge Process

    Piping InstallationSAIC-K-2026 25-May-05 MECH-

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    A11

    A single internally damped non-slam piston type check valve, specifically

    designed for pulsating flow, is installed in the common discharge header

    downstream of all compressors

    SAES-K-403

    Para 6.12

    A permanent spool-mounted stainless steel conical strainer 920 micron

    (20 mesh) of adequate strength shall be installed in all compressor

    cylinder inlet lines..

    Note:Strainers in accordance with Standard Drawing AB-036764 may be

    used.

    SAES-K-403

    Para 6.10

    A1

    A General Requi remen ts

    SAES-K-403,

    Para. 6.3

    SAES-K-403

    Para 6.9

    A2

    The knock out drum shall include the following:

    1. An all stainless steel demister pad designed to limit liquid

    droplets at the outlet to 10 microns.

    2. The knock out drum have automatic liquid drains and separate

    high and high-high level sensing instruments for alarm and

    shutdown.

    (NOTE: The automatic and manual liquid drains shall incorporate

    stainless steel internals. )

    SAES-K-403,

    Para. 6.3

    6.3 All reciprocating compressor cylinders operating at or within 5C of

    the saturated gas conditions at the compressor cylinder suction pressure

    shall take suction from a suction knock out drum.

    A3Pressure relief valves shall be installed on al l knock out drums in

    accordance with SAES-J-600.

    SAES-K-403,

    Para. 6.5

    A5

    Suction piping downstream of the suction drums and pulsation

    suppression devices of compressors operating at or within 5C of the gas

    saturation temperature shall be heat traced, either with steam,

    electrically or a heat transfer fluid, and insulated to ensure that

    condensation of liquids does not occur.

    SAES-K-403,

    Para. 6.6

    A4

    The extension piping (inlet pipe) of the relief valve shall be kept to the

    minimum length possible, and provided with welded gussets at the

    attachment to the vessel.

    SAES-K-403,

    Para. 6.5

    A6

    A8

    A7

    A9

    All piping, piping components and pulsation suppression equipment

    between the compressor cylinder suction flange up to and including the

    cylinder suction block valve shall be rated for the compressor discharge

    pressure.

    SAES-K-403,

    Para. 6.7

    All process gas compressors shall be provided with vent piping on the

    suction and discharge sides of pulsation suppression devices, as close

    as practical to the cylinder nozzle connections.

    Vents (As described in item A2 above) shall be permanently connected

    to the flare header and shall include a check valve.

    Page 1 of 2

  • 7/28/2019 SAIC-K-2026 Rev 0

    2/2

    A16

    All suction piping between each compressor cylinder pulsation

    suppression device and the first upstream vessel shall be chemically

    cleaned.Note: Cleaning procedures shall be conducted after hydrotesting .

    SAES-K-403

    Para 6.17

    QC Record Reviewed

    Work Verified

    Name, Sign and Date:

    Quality Record Approved:Name, Organization,

    Initials and Date:

    T&I Witnessed

    *Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FA

    A17All vent lines to flare shall include a check valve to prevent the possibility

    of reverse flow from the flare header.

    SAES-K-403

    Para 6.19

    T&I Witnessed

    A12

    A spectacle blind shall be installed in each compressor cylinder suction

    and discharge line at a location adjacent to and on the cylinder side of

    the cylinder isolation valves.

    SAES-K-403Para 6.13

    A13SAES-K-403

    Para 6.14

    QC Supervisor Proponent and Others

    Contractor / Third-Party

    REFERENCE DOCUMENTS:

    QC Inspector PID Representative

    Construction Representative*

    QC Record Reviewed

    SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

    SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER

    PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

    Reciprocating Compressor Suction and Discharge Process

    PipingSAIC-K-2026 25-May-05 MECH-

    Work Verified

    PASS FAIL N/A RE-INSP DA

    1. SAES-K-403 -- Reciprocating Compressors, (30 June, 2003)

    ITEM

    No.

    A14For hydrogen service (molecular weight less than 12), all block valves

    shall be of the double block arrangement

    SAES-K-403

    Para 6.15

    ACCEPTANCE CRITERIA REFERENCE

    REMARKS:

    Each cylinder suction block valve shall be furnished with a inch bypass

    line complete with a globe valve and spectacle blind to allow the

    compressor to be pressurized slowly

    Name, Initials and Date:

    Performed Inspection Work / Rework May Proceed

    Name, Initials and Date:

    Work Verified

    Saudi Aramco

    PMT Representative T&I Wi tnessed QC Record ReviewedName, Initials and Date:

    Work is Complete and Ready for Inspection:

    Name, Initials and Date:

    A15

    For compressors in hydrogen service (molecular weight less than 12),

    the suction and discharge piping serving each cylinder shall use double

    block and bleed arrangements.

    SAES-K-403

    Para 6.15

    Page 2 of 2