saic-l-2074 rev 0
TRANSCRIPT
7/27/2019 SAIC-L-2074 Rev 0
http://slidepdf.com/reader/full/saic-l-2074-rev-0 1/1
1. SAES-H-200, Storage, Handling and Installation o f Externally Coated Pipe, 31 July, 2004
2. 01-SAMSS-024, Pipe Handling and Nesting, 29 October, 2003
3. SAES-L-350, Construction of Plant Piping , 30 September, 2003
4. SAES-H-100, Coating Materials & Appli cation Requirements for Industrial Facili ties, 31 July, 2004
5. AWWA C205, Cement-Mortar Lining..., 11 June 2000
6. Saudi Aramco Form 175-012500, Concrete-Mortar Lining, March 1998
REMARKS:
REFERENCE DOCUMENTS:
A9Handling, Loading & Stacking, Plastic End Cap requirements as per
Final Inspection & Testing Requirements, is observed.
SA Form 175-
012500
A8
The maximum number of rows in a stack of pipe is limited by the
maximum allowable static load stress in the wall of the most heavily
loaded pipe in the bottom row of the stack. For stacks in the pipe yard:0.6 times the SMYS of the pipe material.
01-SAMSS-024
Para. 7.1
A7
Plastic end caps are securely fastened to ends of completed pipe for
protection of the cement-mortar lining. End caps are maintained in place
until time of installation.
AWWA C205
Sec. 6.2
A6 Fittings are stored in shipping crates or on racks.SAES-L-350
Para. 7.3
A5
Filler material used at construction sites is covered with appropriate
canvas, tarpaulins, or equivalent for a temporary storage period not to
exceed 14 days.
SAES-H-100
Para. 6.2
A4Filler material is stored in well-ventilated buildings at storage
temperatures as recommended in the Manufacturer's data sheet
SAES-H-100
Para. 6.1
A3
Lined pipes and fittings are lifted with wide fabric or rubber-covered
slings and padding is used to prevent damage to lining, in accordance
with SAES-H-200.
SAES-L-350
Para. 8.2
A2Internally coated or lined pipes are handled from the outside diameter
(OD) only.
01-SAMSS-024
Para. 5.1.6
RE-INSP DA
A1Internally coated or lined pipe is handled at all times in a manner that
prevents damage.
SAES-H-200
Para. 5.1.1
REFERENCE PASS FAIL N/A
Y = YES N = NO F = FA*Person Responsible for Completion of Quality Work / Test
QC Supervisor Proponent and Others
Contractor / Third-Party Saudi Aramco
Name, Sign and Date:
Quality Record Approved: Work Verified
Performed Inspection Work / Rework May Proceed
Work is Complete and Ready for Inspection:
Name, Initials and Date:
Name, Initials and Date:
QC Inspector PID Representative
QC Record Reviewed
Construction Representative* PMT RepresentativeWork VerifiedT&I Witnessed
Name, Initials and Date:
Name, Initials and Date:
T&I Wi tnessed QC Record Reviewed
Name, Organization,
Initials and Date:
T&I Wi tnessed QC Record Reviewed
Work Verified
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAUDI ARAMCO INSPECTION CHECKLISSAIC NUMBER DATE APPROVED QR NUMBER
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Storage, Handling and Preservation of Cement Lined Pipe/Fittings and
Joint Filler MaterialsSAIC-L-2074 25-May-05 PIPE-
PLANT NO.EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
TRAVEL TIMSAUDI ARAMCO USE ONLY
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUI
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
ITEM
No. ACCEPTANCE CRITERIA
Page 1 of 1