Design & Build for Fit-out of Passenger Terminal Building North Extension At Macau International Airport (RFQ-221) Section 6 Bill of Quantities

Upload: phamhanh

Post on 01-May-2019

226 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design & Build for Fit-out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 –

Bill of Quantities

Page 2: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

NOTES :

(1) The work shall be done during day time

and night time according to CAM/ADA requirements.

(2) If CAM decides to cancel any items listed

in the Bills of Quantities, the Contractor

shall not claim any compensation related to

the works not executed. The amount for items cancelled

will be deducted from the final Contract Sum.

(3) Contractor shall provide the quantities

according to the design, international and

Macau regulations and site requirements,

and the unit prices for reference. The

contract is based on lump sum fixed price.

(4) The lump sum amount is the Contract

Price, in which the Contractor is deemed to have included

all costs, expenses and profit necessary for the Contractor's

proper execution and completion of all the designs, works,

services and others in accordance with the Contract.

(5) No Change in the quantities described in the Bills of

Quantities proposed in the Contractor's Proposal shall entitle

the Contractor to any additional payment, provided that such

change is found necessary for the Contractor's proper execution

and completion of all the designs, works, services and others in

accordance with the Contract.

(6) The above items (1) to (5) apply to the

whole Bills of Quantities

Section 6 - Bill of Quantities

Bill Nr. 1

Preliminaries

Description

Bill Nr. 1/1

TOTAL - Bill Nr. 1

Carried to Collection MOP$

PRELIMINARIES

- BQ.1/1 -

Page 3: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 1

Preliminaries

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A Provision of temporary hoardings and/or

covered walkway with temporary lighting

where necessary, to meet the requirements

of CAM and the Airport Operator; maintain

and remove away from site upon completion

of the works or as instructed by CAM.

Any existing hoarding should be

dismantled, kept in good conditions and

returned to CAM item

B Provision of project signboards item

C Environmental mitigation measures item

D Safety precautions item

E Site cleaning item

F Contractor's workshops, offices and storage sheds item

G Site survey item

H Extra care required to carry out works in the interception area

between Extension Building and Macau International Airport Terminal item

Bill Nr. 1/2

PRELIMINARIES

TOTAL - Bill Nr. 1

Carried to Collection MOP$

Description

- BQ.1/2 -

Page 4: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 1

Preliminaries

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A Contractor's all Risks insurance item

B Employees' compensation insurance item

C Professional indemnity insurance for

professional suppliers and sub-contractors

to meet the requirements of CAM item

D Professional indemnity insurance for

designers and/or design checkers to meet

the requirements of CAM item

E Plant and tools item

F Temporary water supply item

G Temporary lighting and power item

H Temporary site services item

J Temporary site office including all necessary equipments and facilities item

K Application for permit(s) as required by CAM or any other

Macau statutory bodies/government department(s) item

L Working platform and scaffolding item

M O&M manual, as-built documents, T&C report, labeling item

N Site security item

O Site project management item

P Site debris clearance item

Q BIM model item

R Traffic and passengers diversion works item

Any other items (to be inserted by the Bidder):-

Description

Bill Nr. 1/3

TOTAL - Bill Nr. 1

PRELIMINARIES

Carried to Collection MOP$

- BQ.1/3 -

Page 5: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 1

Preliminaries

Amount (MOP$)

Page Nr. BQ.1/1

Page Nr. BQ.1/2

Page Nr. BQ.1/3

TOTAL - Bill Nr. 1

Carried to General Summary MOP$

PRELIMINARIES

Bill Nr. 1

Description

......................

......................

COLLECTION

......................

- BQ.1/4 -

Page 6: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

NOTES :

The Contractor's Designer shall prepare

all design in full compliance with all

relevant statuory requirements and the

specifications, Design Requirement Brief and

the tender document and drawings. He shall

prepare and submit all relevant design

reports, calculation and drawings as

necessary in good quality to the client for consent.

A Design of Demolition works item

B Design of Architectural works item

C Design of Plumbing & Drainage system item

D Design of Fire Services system item

E Design of Electrical Services system item

F Design of MVAC System item

G Design of ELV Systems and Airport Systems item

Any other items (to be inserted by the Bidder):-

Section 6 - Bill of Quantities

Bill Nr. 2

Design of the Works

Description

Bill Nr. 2/1

DESIGN OF THE WORKS

TOTAL - Bill Nr. 2

Carried to Collection MOP$

- BQ.2/1 -

Page 7: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 2

Design of the Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A Contractor's Other Costs

Contractor's other costs for any item

of work or obligation which is

necessary for the completion of the

Design of the Works as required by the

Contract, but not separately itemised

elsewhere in this Bill Nr. 2

(Bidder to provide detailed breakdown of

the Contractor's Other Costs below) item

Any other items (to be inserted by the Bidder):-

TOTAL - Bill Nr. 2

Carried to Collection MOP$

Description

Bill Nr. 2/2

DESIGN OF THE WORKS

- BQ.2/2 -

Page 8: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 2

Design of the Works

Amount (MOP$)

Page Nr. BQ.2/1

Page Nr. BQ.2/2

TOTAL - Bill Nr. 2

Carried to General Summary MOP$

Description

Bill Nr. 2

DESIGN OF THE WORKS

COLLECTION

......................

......................

- BQ.2/3 -

Page 9: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

Demolition of existing part of Passenger

Terminal Building adjacent to the new

extension. The cut-off line of the demolition

work shall suit the existing site conditions and

the necessary alterations of existing PTB for

integrating the new extension and the existing PTB.

The Contractor shall provide temporary finish linings,

covers, flashing plate, etc. for the cut-off line to

match the existing finishes of the PTB to the

satisfaction of CAM. Provide a temporary

weather proof external enclosure during

the construction work. Demolition

of existing E&M services to suit

existing site conditions and the design

of the extension shall be carried out

without interruption to the normal

operation of the passenger terminal.

Disposal of all construction

waste and debris.

A Room 11065 (Departure Level Canteen) item

Including all necessary demolition works and making good,

builder's works for construction of service corridor,

additional access door and access control system,

and all necessary modifications to building services works.

B Room 12061 (Mezzanine Level Access Card Office) item

Including all necessary demolition works and making good,

builder's works for modification and extension of office and counter,

additional building services for extension of office,

and all necessary modifications to building services works.

C Diversion of existing E&M services for carrying out

demolition works and reinstatement if necessary item

D Necessary reinstatment works item

Any other items (to be inserted by the Bidder):-

TOTAL - Bill Nr. 3

Carried to General Summary MOP$

Section 6 - Bill of Quantities

Bill Nr. 3

Demolition and A&A Works

Description

Bill Nr. 3

DEMOLITION AND A&A WORKS

- BQ.3/1 -

Page 10: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

According to the approved drawings, furnish and

install all building materials for the following area,

including all partition brick walls shown in the drawings.

No matter mentioned or not, the corresponding

items and the necessary materials, fittings, accessories,

works, etc., should also be included to completely

execute the detailed works:

A Room No.G-001 area and the corresponding items are as follows:

Floor:Carpet(F4), 30mm thk. marble(F6);

Skirting:500mm(H) x 1.2mm #316 s.s. plate skirting

(same as existing PTB)(S3);Wall:Stone paint

up to false ceiling(W4);Ceiling:Baffle ceiling(C9);Remarks:

Dia. 50mm s.s. bumper rail fix on the skirting

/ floor (same as existing PTB)(R3);

Provide Seating system(R12);

Design layout and provide planters (Qty. refer to existing PTB)

(refer to appendix 2)(R13);

Design layout and provide Trash bin (Qty. refer to existing PTB)

(R14);Design layout and provide Boarding gate counter

(refer to appendix 3)(R15);Provide carpet (refer to appendix 7)

(R27); Revise / updated existing ceiling hung signage at

NEW PTB public area(R28);Design and provise all rooms

signage(R29)。 (refer to appendix 8) lot

B Room No.G-002 area and the corresponding items are as follows:

Floor: 30mm thk. marble(F6);Skirting:

500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB)

(S3);Wall:Stone paint up to false ceiling(W4);

Ceiling:Baffle ceiling(C9);Remarks:Dia. 50mm s.s. bumper

rail fix on the skirting / floor (same as existing PTB)(R3);

Provide immigration counter include divide s.s. handrail

(same as existing)(R16);Revise / updated existing ceiling

hung signage at NEW PTB public area(R28);Design and

provise all rooms signage(R29)。 lot

C Room No.G-003 area and the corresponding items are as follows:

Floor:Cement mortar leveling(F8);Wall:Emulsion paint on

6mm thk. internal plaster up to false ceiling / full height (W3);

Ceiling:Emulsion paint on 6mm thk. Internal plaster ceiling

(C2); Remarks:Design and provise all rooms signage

(R29)。 lot

TOTAL - Bill Nr. 4

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Description

Bill Nr. 4/1

ARCHITECTURAL WORKS

Carried to Collection MOP$

- BQ.4 /1 -

Page 11: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A Room No.G-004 area and the corresponding items are as follows:

Floor: 30mm thk. marble(F6),Wall:20mm thk marble

on wall plaster with tile adhesive up to false ceiling(W2)

,Ceiling: Aluminium ceiling strip(C5);Remarks:

Design refer to arrival landside north washroom

(refer to appendix 4)(R17);Design and provise all

rooms signage(R29)。 lot

B Room No.G-005 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on

6mm thk. internal lime up to false ceiling / full height(W3)

,Ceiling: 600x600mm acoustic ceiling tile with exposed grid

(C1);Remarks: Interior design and provide all furniture

(R11);Design and provise all rooms signage(R29)。 lot

C Room No.G-006 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on

6mm thk. internal lime up to false ceiling / full height(W3)

,Ceiling: 600x600mm acoustic ceiling tile with exposed

grid(C1),Remarks:Design and provise

all rooms signage(R29)。 lot

D Room No.G-007 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3)

,Ceiling: 600x600mm acoustic ceiling tile with exposed grid

(C1), Remarks:Design and provise all rooms signage(R29)。 lot

E Room No.G-008 area and the corresponding items are as follows:

Floor:300x300x8mm non-slip homogeneous tile on floor screed(F2)

;Wall:Ceramic tile on wall plaster with tile adhesive up to

false ceiling (overall 25mm thk.)(W1),Ceiling:

Aluminium ceiling strip(C5),Remarks:Design and provise all

rooms signage(R29);Design layout and provide all sanitary ware

(Refer to BOH washroom at existing PTB )(R30)。 lot

TOTAL - Bill Nr. 4

Description

Bill Nr. 4/2

ARCHITECTURAL WORKS

Carried to Collection MOP$

- BQ.4 /2 -

Page 12: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A Room No.G-009 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3),

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks: Design and provise all rooms signage(R29)。 lot

B Room No.G-010 area and the corresponding items are as follows:

Floor:300x300x8mm non-slip homogeneous tile on floor screed

(F2),Skirting:300mmx100mm(H) homogeneous tile skirting(S2)

,Wall:Emulsion paint on 6mm thk. internal plaster up to flase

ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling

tile with exposed grid(C1),Remarks:Interior design and

provide all furniture(R11);Design and provise all rooms signage lot

(R29)。

C Room No.M-001area and the corresponding items are as follows:

Floor:Carpet(F4);Wall:Wood veneer finsih with acrylic

letter with back LED and LED light strip(W7),

Ceiling:Wood ceiling strip(C6),Remarks:Interior design

refer to sterile corridor design proposal (refer to appendix 5)(R19)

,Design and provide the carpet at the loading bridge(R24)

;Revise / updated existing ceiling hung signage at NEW PTB

public area(R28);Design and provise all rooms

signage(R29)。 lot

TOTAL - Bill Nr. 4

ARCHITECTURAL WORKS

Description

Bill Nr. 4/3

Carried to Collection MOP$

- BQ.4 /3 -

Page 13: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A Room No.1-001 area and the corresponding items are as follows:

Floor:Carpet(F4), 30mm thk. marble(F6);Skirting:

500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB)

(S3);Wall:Stone paint up to false ceiling(W4);Ceiling:

Baffle ceiling(C9);Remarks: Dia. 50mm s.s. bumper rail fix on

the skirting / floor (same as existing PTB)(R3);

Provide Seating system (R12);

Design layout and provide planters (Qty. refer to existing PTB)

(refer to appendix 2)(R13);Design layout and provide

Trash bin (Qty. refer to existing PTB)(R14);

Design layout and provide Boarding gate counter

(refer to appendix 3)(R15);Design and provide filming wall

artwork on curtain wall(Option) (refer to appendix 6)(R23);

Provide s.s. bumper rail at escalator (same as existing PTB)(R25)

;Design and provide marble floor in lift car (lift no. S1, P13, P14)

(R26);Provide carpet (refer to appendix 7)(R27);

Revise / updated existing ceiling hung signage at NEW PTB

public area(R28);Design and provise all rooms

signage(R29)。 (refer to appendix 8) lot

B Room No.1-002 area and the corresponding items are as follows:

Floor:Cement mortar leveling(F8);Wall: Emulsion paint on

6mm thk. internal plaster up to false ceiling / full height(W3);

Ceiling:Emulsion paint on 6mm thk. internal plaster(C2),

Remarks:Design and provise all rooms signage(R29)。 lot

C Room No.1-003 area and the corresponding items are as follows:

Floor: 30mm thk. marble(F6),Wall:20mm thk marble on

wall plaster with tile adhesive up to false ceiling(W2),

Ceiling: Aluminium ceiling strip(C5);Remarks:High level

interior design, include 2 person sofa, console, mirror and wash

basin(R21);Design and provise all rooms signage(R29)。 lot

D Room No.1-004 area and the corresponding items are as follows:

Floor: 30mm thk. marble(F6),Wall:20mm thk marble on wall

plaster with tile adhesive up to false ceiling(W2),Ceiling:

Aluminium ceiling strip(C5);Remarks:Design refer to arrival

landside north washroom (refer to appendix 4)(R17);Design

and provise all rooms signage(R29)。 lot

TOTAL - Bill Nr. 4

Description

Bill Nr. 4/4

ARCHITECTURAL WORKS

Carried to Collection MOP$

- BQ.4 /4 -

Page 14: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A Room No.1-005 area and the corresponding items are as follows:

Floor:Carpet(F4),30mm thk. marble(F6);Skirting:

500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB)

(S3);Wall:Stone paint up to false ceiling(W4);Ceiling:

Baffle ceiling(C9);Remarks:Dia. 50mm s.s. bumper rail fix

on the skirting / floor (same as existing PTB)(R3);

Design layout and provide planters (Qty. refer to existing PTB)

(refer to appendix 2)(R13);Design layout and provide

Trash bin (Qty. refer to existing PTB)(R14);Design and

provide marble floor in lift car (lift no. S1, P13, P14)(R26);

Revise / updated existing ceiling hung signage at NEW PTB

public area(R28);Design and provise all rooms signage

(R29)。 lot

B Room No.1-006 area and the corresponding items are as follows:

Floor: 30mm thk. marble(F6),Wall:Stone paint up to false

ceiling(W4);Ceiling:Emulsion paint on 6mm thk. internal plaster

(C2),Remarks:Design and provise all rooms signage lot

(R29)。

C Room No.1-007 area and the corresponding items are as follows:

Floor:300x300x8mm non-slip homogeneous tile on floor

screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive

up to false ceiling (overall 25mm thk.)(W1),Ceiling:

Existing ceiling(C4),Remarks:Design and provise all rooms

signage(R29),Design layout and provide all sanitary ware

(Refer to BOH washroom at existing PTB )(R30)。 lot

D Room No.1-008 area and the corresponding items are as follows:

Floor:300x300x8mm non-slip homogeneous tile on floor screed

(F2),Wall:Ceramic tile on wall plaster with tile adhesive up to

false ceiling (overall 25mm thk.)(W1),Ceiling:Alminium

ceiling strip(C5),Remarks:Design and provise all rooms

signage(R29),Design layout and provide all sanitary ware

(Refer to BOH washroom at existing PTB )(R30)。

lot

E Room No.1-009 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),

Skirting:100mm (H) vinyl skirting(S1),

Wall:Emulsion paint on 6mm thk. internal lime up to false

ceiling / full height(W3),Ceiling: 200x200mm hanging

aluminium grid ceiling(C8),Remarks:Dia. 50mm s.s. bumper

rail fix on the skirting / floor (same as existing PTB)(R3);

Design and provise all rooms signage(R29)。 lot

TOTAL - Bill Nr. 4

Description

Bill Nr. 4/5

Carried to Collection MOP$

ARCHITECTURAL WORKS

- BQ.4 /5 -

Page 15: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A Room No.1-010 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3),

Ceiling: 200x200mm hanging aluminium grid ceiling(C8),

Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor

(same as existing PTB)(R3);Design and provise all

rooms signage(R29)。 lot

B Room No.1-011 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on

6mm thk. internal lime up to false ceiling / full height(W3),

Ceiling: 200x200mm hanging aluminium grid ceiling(C8),

Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor

(same as existing PTB)(R3);Design and

provise all rooms signage(R29)。 lot

C Room No.1-012 area and the corresponding items are as follows:

Floor:Cement mortar leveling(F8),Skirting: Existing finish

(S5),Wall: Existing finish(W5),Ceiling:Existing ceiling

(C4),Remarks:Design and provise all rooms signage(R29)。 lot

D Room No.1-013 area and the corresponding items are as follows:

Floor:Cement mortar leveling(F8),Skirting: Existing finish

(S5),Wall: Existing finish(W5),Ceiling:Existing ceiling

(C4),Remarks:Design and provise all rooms signage(R29)。 lot

E Room No.1-014 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),

Skirting:100mm (H) vinyl skirting(S1),

Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling

/ full height(W3),Ceiling: 600x600mm acoustic ceiling tile

with exposed grid(C1),Remarks:Design loose furniture

layout only(R9);Design layout and provide reception counter

(R18);Design and provise all rooms signage(R29)。 lot

F Room No.1-015 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),

Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion

paint on 6mm thk. internal lime up to false ceiling / full height

(W3),Ceiling: 600x600mm acoustic ceiling tile with

exposed grid(C1),Remarks:Design loose furniture layout

only(R9);Design layout and provide reception counter

(R18);Design and provise all rooms signage(R29)。 lot

TOTAL - Bill Nr. 4

Carried to Collection MOP$

Description

Bill Nr. 4/6

ARCHITECTURAL WORKS

- BQ.4 /6 -

Page 16: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A Room No.1-017 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),

Skirting:100mm (H) vinyl skirting(S1),

Wall:Emulsion paint on 6mm thk. internal lime up to false

ceiling / full height(W3),Ceiling: 600x600mm acoustic

ceiling tile with exposed grid(C1),Remarks:Design

loose furniture layout only(R9);Design and provise all rooms

signage(R29)。 lot

B Room No.1-018 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),

Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion paint

on 6mm thk. internal lime up to false ceiling / full height(W3)

,Ceiling: 600x600mm acoustic ceiling tile with exposed grid

(C1),Remarks:Design loose furniture layout only(R9)

;Design and provise all rooms signage(R29)。 lot

C Room No.1-019 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),

Skirting:100mm (H) vinyl skirting(S1),Wall:

Emulsion paint on 6mm thk. internal lime up to false ceiling /

full height(W3),Ceiling: 600x600mm acoustic ceiling tile

with exposed grid(C1),Remarks:Design loose furniture

layout only(R9),Design layout and provide reception counter

(R18),Design and provise all rooms signage(R29)。 lot

D Room No.1-020 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on

6mm thk. internal lime up to false ceiling / full height(W3),

Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1)

,Remarks:Design loose furniture layout only(R9)

,Design layout and provide reception counter(R18)

,Design and provise all rooms signage(R29)。 lot

E Room No.1-021 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),

Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling

/ full height(W3),Ceiling: 600x600mm acoustic ceiling tile

with exposed grid(C1),Remarks:Design loose

furniture layout only(R9),Design and provise

all rooms signage(R29)。 lot

TOTAL - Bill Nr. 4

Carried to Collection MOP$

Description

Bill Nr. 4/7

ARCHITECTURAL WORKS

- BQ.4 /7 -

Page 17: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A Room No.1-022 area and the corresponding items are as follows:

Floor: 30mm thk. marble(F6),

Skirting:100mm (H) x 15mm thk. painted hardwood skirting

(S6),Wall:Stone paint up to false ceiling(W4),

Ceiling: Baffle ceiling(C9),Remarks:Interior

design and provide all furniture(R11);Design layout and

provide reception counter(R18);Design and provise

all rooms signage(R29)。 lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

ARCHITECTURAL WORKS

Description

Room No.1-023 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Acoustic panels combines the

natural appearance of wood with unique features for high quality

acoustics(W8),Ceiling:Emulsion paint on gypsum board

false ceiling(C3),Remarks:Interior design and provide all

furniture(R11);Design and provise all rooms signage(

R29)。

Carried to Collection MOP$

Room No.1-024 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3),

Ceiling: 600x600mm acoustic ceiling tile with exposed grid(

C1),Remarks:Design loose furniture layout only(R9);

Design and provise all rooms signage(R29)。

Bill Nr. 4/8

Room No.1-026 area and the corresponding items are as follows:

Floor: Epoxy paint on power floated concrete surface(F7),

Skirting:300mmx100mm(H) homogeneous tile skirting(S2),

Wall: Emulsion paint on 6mm thk. internal plaster up to false

ceiling / full height(W3),Ceiling: 600x600mm acoustic

ceiling tile with exposed grid(C1),Remarks:Design and

provise all rooms signage(R29)。

Room No.1-025 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3),

Ceiling: 600x600mm acoustic ceiling tile with exposed grid(

C1),Remarks:Design loose furniture layout only(R9);

Design and provise all rooms signage(R29)。

- BQ.4 /8 -

Page 18: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B Room No.1-028 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),

Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion

paint on 6mm thk. internal lime up to false ceiling / full height

(W3),Ceiling: 600x600mm acoustic ceiling tile with

exposed grid(C1),Remarks:Design loose furniture layout

only(R9);Design and provise all rooms signage(R29)。 lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.2-003 area and the corresponding items are as follows:

Floor:Cement mortar leveling(F8);Wall:Emulsion paint on

6mm thk. internal plaster up to false ceiling / full height(W3);

Ceiling:Emulsion paint on 6mm thk. internal plaster(C2),

Remarks:Design and provise all rooms signage(R29)。

Room No.2-002 area and the corresponding items are as follows:

Floor:Carpet(F4),30mm thk. marble(F6),Skirting:

500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing

PTB)(S3);Wall:Stone paint up to false ceiling(W4);Ceiling:

Baffle ceiling(C9);Remarks: Dia. 50mm s.s. bumper rail fix on the

skirting / floor (same as existing PTB)(R3);Provide Seating

system(R12);Design layout and provide planters (Qty. refer to

existing PTB) (refer to appendix 2)(R13);Design layout and

provide Trash bin (Qty. refer to existing PTB)(R14);Design

layout and provide Boarding gate counter (refer to appendix 3)(

R15);Design and provide filming wall artwork on curtain

wall(Option) (refer to appendix 6)(R23);Provide s.s. bumper rail

at escalator (same as existing PTB)(R25);Provide carpet (refer to

appendix 7)(R27);Revise / updated existing ceiling hung signage

at NEW PTB public area (R28);Design and provise all rooms

signage(R29)。 (refer to appendix 8)

Room No.1-027 area and the corresponding items are as follows:

Floor:600x600mm high pressure laminated raised floor(F5),

Wall:Emulsion paint on 6mm thk. internal lime up to false

ceiling / full height(W3),Ceiling:Emulsion paint on 6mm

thk. internal plaster(C2),Remarks:Design and provise all

rooms signage(R29)。

Description

Room No.2-001 area and the corresponding items are as follows:

Floor:Cement mortar leveling(F8),Wall: Existing finish(

W5),Ceiling:Existing ceiling(C4),Remarks:Design and

provise all rooms signage(R29)。

Bill Nr. 4/9

ARCHITECTURAL WORKS

Carried to Collection MOP$

- BQ.4 /9 -

Page 19: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

TOTAL - Bill Nr. 4

Room No.2-005 area and the corresponding items are as follows:

Floor: 30mm thk. marble(F6),Wall:Stone paint up to false

ceiling(W4);Ceiling:Emulsion paint on 6mm thk. internal plaster

(C2),Remarks:Design and provise all rooms signage(R29)。

ARCHITECTURAL WORKS

Description

Room No.2-004 area and the corresponding items are as follows:

Floor:Carpet(F4),30mm thk. marble(F6);Skirting:

500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing

PTB)(S3);Wall:Stone paint up to false ceiling(W4);Ceiling:

Baffle ceiling(C9);Remarks:Dia. 50mm s.s. bumper rail fix on

the skirting / floor (same as existing PTB)(R3);Design layout

and provide planters (Qty. refer to existing PTB) (refer to appendix

2)(R13);Design layout and provide Trash bin (Qty. refer to

existing PTB)(R14);Design and provide marble floor in lift

car (lift no. S1, P13,P14)(R26);Revise / updated existing

ceiling hung signage at NEW PTB public area(R28);Design

and provise all rooms signage(R29)。

Carried to Collection MOP$

Room No.2-007 area and the corresponding items are as follows:

Floor:30mm thk. marble(F6);Skirting:500mm(H) x 1.2mm

#316 s.s. plate skirting (same as existing PTB)(S3);Wall:Stone

paint up to false ceiling(W4);Ceiling:Aluminium ceiling strip

(C5);Remarks:Interior design and provide all furniture(

R11);Design layout and provide Trash bin (Qty. refer to

existing PTB)(R14);Design and provise all rooms signage(

R29)。

Bill Nr. 4/10

Room No.2-006 area and the corresponding items are as follows:

Floor: 30mm thk. marble(F6),Wall:20mm thk marble on

wall plaster with tile adhesive up to false ceiling(W2),

Ceiling: Aluminium ceiling strip(C5);Remarks:Design

refer to arrival landside north washroom (refer to appendix 4)(

R17);Design and provise all rooms signage(R29)。

- BQ.4 /10 -

Page 20: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.2-008 area and the corresponding items are as

follows:Floor:300x300x8mm non-slip homogeneous tile on

floor screed(F2),Wall:Ceramic tile on wall plaster with tile

adhesive up to false ceiling (overall 25mm thk.)(W1),

Ceiling:Aluminium ceiling strip(C5),Remarks:Design and

provise all rooms signage(R29);Design layout and provide all

sanitary ware (Refer to BOH washroom at existing PTB )(

R30)。

Room No.2-009 area and the corresponding items are as

follows:Floor:300x300x8mm non-slip homogeneous tile on

floor screed(F2),Wall:Ceramic tile on wall plaster with tile

adhesive up to false ceiling (overall 25mm thk.)(W1),

Ceiling:Aluminium ceiling strip(C5),Remarks:Design and

provise all rooms signage(R29);Design layout and provide all

sanitary ware (Refer to BOH washroom at existing PTB )(

R30)。

Carried to Collection MOP$

Description

ARCHITECTURAL WORKS

Bill Nr. 4/11

Room No.2-012 area and the corresponding items are as follows:

Floor: 600x600mm high pressure laminated raised floor(

F5);Wall:Emulsion paint on 6mm thk. internal lime up to

false ceiling / full height(W3);Ceiling: 600x600mm

acoustic ceiling tile with exposed grid(C1),Remarks:Design

loose furniture layout only(R9);Design and provise all rooms

signage(R29)。

Room No.2-010 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3),

Ceiling: 200x200mm hanging aluminium grid ceiling(C8),

Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor

(same as existing PTB)(R3);Design and provise all rooms

signage(R29)。

Room No.2-011 area and the corresponding items are as

follows:Floor:3.0mm thk, vinyl tile on floor screed(F1),

Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion

paint on 6mm thk. internal lime up to false ceiling / full height(

W3),Ceiling: 200x200mm hanging aluminium grid ceiling(

C8),Remarks:Dia. 50mm s.s. bumper rail fix on the skirting /

floor (same as existing PTB)(R3);Design and provise all

rooms signage(R29)。

- BQ.4 /11 -

Page 21: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.2-016 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3),

Ceiling: 600x600mm acoustic ceiling tile with exposed grid(

C1)Remarks:Design loose furniture layout only(R9);

Design and provise all rooms signage(R29)。

Description

Bill Nr. 4/12

ARCHITECTURAL WORKS

Room No.2-017 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3),

Ceiling: 600x600mm acoustic ceiling tile with exposed grid(

C1),Remarks: Interior design and provide all furniture(

R11);Interior design layout(R22);Design and provise all

rooms signage(R29)。

Carried to Collection MOP$

Room No.2-014 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3),

Ceiling: 600x600mm acoustic ceiling tile with exposed grid(

C1),Remarks:Design loose furniture layout only(R9);

Design and provise all rooms signage(R29)。

Room No.2-015 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3),

Ceiling: 600x600mm acoustic ceiling tile with exposed grid(

C1),Remarks:Design loose furniture layout only(R9);

Design and provise all rooms signage(R29)。

Room No.2-013 area and the corresponding items are as follows:

Floor: 600x600mm high pressure laminated raised floor(

F5);Wall:Emulsion paint on 6mm thk. internal lime up to

false ceiling / full height(W3);Ceiling: 600x600mm

acoustic ceiling tile with exposed grid(C1),Remarks:Design

loose furniture layout only(R9);Design and provise all rooms

signage(R29)。

- BQ.4 /12 -

Page 22: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.2-023 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall: Acoustic panels combines the

natural appearance of wood with unique features for high quality

acoustics(W8),Ceiling:Emulsion paint on gypsum board

false ceiling(C3);Remarks:Interior design and provide all

furniture(R11);Design and provise all rooms signage(

R29)。

Room No.2-019 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3),

Ceiling: 600x600mm acoustic ceiling tile with exposed grid(

C1),Remarks:Design loose furniture layout only(R9);

Design and provise all rooms signage(R29)。

Room No.2-020 area and the corresponding items are as

follows:Floor:3.0mm thk, vinyl tile on floor screed(F1),

Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion

paint on 6mm thk. internal lime up to false ceiling / full height(

W3),Ceiling: 600x600mm acoustic ceiling tile with exposed

grid(C1),Remarks:Design loose furniture layout only(

R9),Design and provise all rooms signage(R29)。

Room No.2-021 area and the corresponding items are as

follows:Floor:3.0mm thk, vinyl tile on floor screed(F1),

Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion

paint on 6mm thk. internal lime up to false ceiling / full height(

W3),Ceiling: 600x600mm acoustic ceiling tile with exposed

grid(C1),Remarks:Design loose furniture layout only(

R9),Design and provise all rooms signage(R29)。

Description

Bill Nr. 4/13

Room No.2-018 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3),

Ceiling: 600x600mm acoustic ceiling tile with exposed grid(

C1),Remarks:Design loose furniture layout only(R9);

Design and provise all rooms signage(R29)。

Carried to Collection MOP$

ARCHITECTURAL WORKS

- BQ.4 /13 -

Page 23: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

lot

E

lot

F

lot

TOTAL - Bill Nr. 4

Room No.3-004 area and the corresponding items are as follows:

Floor:300x300x8mm non-slip homogeneous tile on floor

screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive

up to false ceiling (overall 25mm thk.)(W1),Ceiling:

Aluminium ceiling strip(C5),Remarks:Design and provise

all rooms signage(R29);Design layout and provide all sanitary

ware (Refer to BOH washroom at existing PTB )(R30)。

Room No.3-001 area and the corresponding items are as follows:

Floor:Cement mortar leveling(F8),Wall: Existing finish(

W5),Ceiling:Existing ceiling(C4),Remarks:Design and

provise all rooms signage(R29)。

Room No.3-002 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15 mm thk. painted

hardword skirting (S6);Wall:Wood veneer finish (W6);

Ceiling:Emulsion paint on gypsum board false ceiling (C3);

Remarks:Interior design and provide all furniture(R11);

Design layout and provide reception counter(R18);Design

and provise all rooms signage(R29)。 (refer to appendix 8)

Room No.2-025 area and the corresponding items are as follows:Floor:3.0mm thk,

vinyl tile on floor screed(F1),Skirting:100mm (H) vinyl skirting(S1),Wall:

Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),

Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:

Design loose furniture layout only(R9);Design and provise all rooms signage(

R29)。

Room No.2-024 area and the corresponding items are as follows:

Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:

100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm

thk. internal lime up to false ceiling / full height(W3),

Ceiling: 600x600mm acoustic ceiling tile with exposed grid(

C1),Remarks:Design loose furniture layout only(R9);

Design and provise all rooms signage(R29)。

Room No.3-003 area and the corresponding items are as follows:

Floor: 30mm thk. marble(F6),Wall:Stone paint up to false

ceiling(W4);Ceiling:Emulsion paint on 6mm thk. internal

plaster(C2),Remarks:Design and provise all rooms signage

(R29)。

Carried to Collection MOP$

Description

Bill Nr. 4/14

ARCHITECTURAL WORKS

- BQ.4 /14 -

Page 24: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.3-006 area and the corresponding items are as follows:

Floor:300x300x8mm non-slip homogeneous tile on floor

screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive

up to false ceiling (overall 25mm thk.)(W1),Ceiling:

Aluminium ceiling strip(C5),Remarks:Design and provise

all rooms signage(R29);Design layout and provide all sanitary

ware (Refer to BOH washroom at existing PTB )(R30)。

Room No.3-007 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design and provise all rooms signage(R29)。

Bill Nr. 4/15

ARCHITECTURAL WORKS

Room No.3-005 and the corresponding items are as follows:

Floor:300x300x8mm non-slip homogeneous tile on floor

screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive

up to false ceiling (overall 25mm thk.)(W1),Ceiling:

Aluminium ceiling strip(C5),Remarks:Design and provise

all rooms signage(R29);Design layout and provide all sanitary

ware (Refer to BOH washroom at existing PTB )(R30)。

Room No.3-009 area and the corresponding items are as

follows:Floor:Carpet(F4),Skirting:100 mm (H) x 15mm thk.

painted hardwood skirting (S6);Wall:Wood veneer

finish(W6);Ceiling:Emulsion paint on gypsum board false

ceiling(C3);Remarks:Interior design and provide all furniture

(R11),Design layout and provide reception counter(

R18);Design and provise all rooms signage(R29)。

Room No.3-008 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design and provise all rooms signage(R29)。

Description

Carried to Collection MOP$

- BQ.4 /15 -

Page 25: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.3-013 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Wood veneer finish(W6),

Ceiling:Emulsion paint on gypsum board false ceiling(C3);

Remarks:Interior design and provide all furniture(R11),

Design and provise all rooms signage(R29)。(refer to appendix

9)

Room No.3-014 area and the corresponding items are as

follows:Floor:300x300x8mm non-slip homogeneous tile on

floor screed(F2),Skirting:300mmx100mm(H) homogeneous tile

skirting(S2),Wall:Emulsion paint on 6mm thk. internal lime

up to false ceiling / full height(W3),Ceiling: 600x600mm

acoustic ceiling tile with exposed grid(C1),Remarks:Design

layout and provide cabinet with wash basin(R7),Design and

provise all rooms signage(R29)。

Bill Nr. 4/16

ARCHITECTURAL WORKS

Room No.3-010 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted

hardwood skirting (S6);Wall:Emulsion paint on 6mm thk.

internal plaster up to false ceiling / full height (W3);Ceiling:

600x600mm acoustic ceiling tile with exposed grid (C1);

Remarks:Design loose furniture layout only(R9);Design and

provise all rooms signage(R29)。

Room No.3-012 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Wood veneer finish(W6),

Ceiling:Emulsion paint on gypsum board false ceiling(C3);

Remarks:Interior design and provide all furniture(R11),

Design and provise all rooms signage(R29)。(refer to appendix

9)

Room No.3-011 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Wood veneer finish(W6),

Ceiling:Emulsion paint on gypsum board false ceiling(C3);

Remarks:Interior design and provide all furniture(R11);

Design and provise all rooms signage(R29)。(refer to appendix

9)

Description

Carried to Collection MOP$

- BQ.4 /16 -

Page 26: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.3-019 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Wood veneer finish(W6),

Ceiling:Emulsion paint on gypsum board false ceiling(C3);

Remarks:Interior design and provide all furniture(R11),

Design and provise all rooms signage(R29)。(refer to appendix

9)

Room No.3-017 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1);

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-018 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

ARCHITECTURAL WORKS

Room No.3-015 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Wood veneer finish(W6),

Ceiling:Emulsion paint on gypsum board false ceiling(C3);

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-016 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Wood veneer finish(W6),

Ceiling:Emulsion paint on gypsum board false ceiling(C3);

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Description

Bill Nr. 4/17

Carried to Collection MOP$

- BQ.4 /17 -

Page 27: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.3-020 area and the corresponding items are as follows:

Floor:Carpet (F4),Skirting:100 mm (H) x 15mm thk. painted

hardwood skirting(S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-021 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-024 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Description

Bill Nr. 4/18

ARCHITECTURAL WORKS

Room No.3-023 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-022 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Carried to Collection MOP$

- BQ.4 /18 -

Page 28: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.3-026 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-027 area and the corresponding items are as follows:

Floor:Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk.

painted hardwood skirting (S6),Wall:Wood veneer finish(

W6),Ceiling:Emulsion paint on gypsum board false ceiling(

C3);Remarks:Design loose furniture layout only(R9),

Design and provise all rooms signage(R29)。

Description

Bill Nr. 4/19

ARCHITECTURAL WORKS

Room No.3-025 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-028 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-029 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Carried to Collection MOP$

- BQ.4 /19 -

Page 29: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.3-032 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9);Sound

isolation requirement(R20),Design and provise all rooms

signage(R29)。

Description

Bill Nr. 4/20

ARCHITECTURAL WORKS

Room No.3-034 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9);Sound

isolation requirement(R20),Design and provise all rooms

signage(R29)。

Room No.3-030 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9);Sound

isolation requirement(R20),Design and provise all rooms

signage(R29)。

Room No.3-031 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9);Sound

isolation requirement(R20),Design and provise all rooms

signage(R29)。

Room No.3-033 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9);Sound

isolation requirement(R20),Design and provise all rooms

signage(R29)。

Carried to Collection MOP$

- BQ.4 /20 -

Page 30: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.3-037 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Description

Bill Nr. 4/21

ARCHITECTURAL WORKS

Room No.3-038 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-039 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-036 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-035 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Carried to Collection MOP$

- BQ.4 /21 -

Page 31: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.3-042 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Description

Bill Nr. 4/22

Room No.3-044 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-043 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-040 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-041 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

ARCHITECTURAL WORKS

Carried to Collection MOP$

- BQ.4 /22 -

Page 32: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

C

lot

D

lot

E

lot

TOTAL - Bill Nr. 4

Room No.3-048 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-049 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-045 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-047 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-046 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

ARCHITECTURAL WORKS

Description

Bill Nr. 4/23

Carried to Collection MOP$

- BQ.4 /23 -

Page 33: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A

lot

B

lot

Construction of corridor

Construction of a corridor within the existing room 11568

on departure level using the same material and form of

construction as the existing wall item

Maintaining stability of the remaining parts of the existing wall

during and after construction item

Sealing any building services passing through the new

corridor wall in the same manner as the existing

building services item

Any other items (to be inserted by the Contractor):-

TOTAL - Bill Nr. 4

Room No.3-050 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Room No.3-051 area and the corresponding items are as follows:

Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted

hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.

internal lime up to false ceiling / full height(W3),Ceiling:

600x600mm acoustic ceiling tile with exposed grid(C1),

Remarks:Design loose furniture layout only(R9),Design and

provise all rooms signage(R29)。

Bill Nr. 4/24

ARCHITECTURAL WORKS

Description

Carried to Collection MOP$

- BQ.4 /24 -

Page 34: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Page Nr. BQ.4/1

Page Nr. BQ.4/2

Page Nr. BQ.4/3

Page Nr. BQ.4/4

Page Nr. BQ.4/5

Page Nr. BQ.4/6

Page Nr. BQ.4/7

Page Nr. BQ.4/8

Page Nr. BQ.4/9

Page Nr. BQ.4/10

Page Nr. BQ.4/11

Page Nr. BQ.4/12

Page Nr. BQ.4/13

Page Nr. BQ.4/14

Page Nr. BQ.4/15

Page Nr. BQ.4/16

Page Nr. BQ.4/17

Page Nr. BQ.4/18

Page Nr. BQ.4/19

Page Nr. BQ.4/20

TOTAL - Bill Nr. 4

Carried to General Summary MOP$

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

COLLECTION

......................

......................

......................

......................

Bill Nr. 4

ARCHITECTURAL WORKS

- BQ.4 /25 -

Page 35: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 4

Architectural Works

Page Nr. BQ.4/21 ......................

Page Nr. BQ.4/22 ......................

Page Nr. BQ.4/23 ......................

Page Nr. BQ.4/24

TOTAL - Bill Nr. 4

Carried to General Summary MOP$

Bill Nr. 4

ARCHITECTURAL WORKS

COLLECTION

......................

- BQ.4 /26 -

Page 36: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

Plumbing & Drainage System

A Supply and install the Plumbing System item

B Supply and install the Drainage System item

C Spare parts item

D Material and drawing preparation and submission item

E Statutory submission item

F Sample boards item

G Interfacing with other E&M system item

H Paint works for materials and equipment item

J Provision of 24-month operation maintenance and

breakdown service item

K Connection and interfacing with existing

system of the Passenger Terminal Building

where necessary; allow for all cost

associated with liaison with existing

maintenance contractors and the airport

operator item

L Testing and commissioning, including testing

and commissioning together with existing

system where necessary; allow for all cost

for liaison with existing maintenance

contractors and the airport operator item

M All necessary modification and configuration item

for interface with the existing system item

Any other items (to be inserted by the Bidder):-

TOTAL - Bill Nr. 5

Carried to General Summary MOP$

Description

Bill Nr. 5

PLUMBING & DRAINAGE SYSTEM

Section 6 - Bill of Quantities

Bill Nr. 5

Plumbing & Drainage System

- BQ.5/1 -

Page 37: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

Fire Services System

A Supply and install the Sprinkler System item

B Supply and install the Hose Reel and Fire Hydrant System item

C Supply and install the Fire Alarm and Detection System item

D Supply and install the Fire Extinguishing System item

E Spare parts item

F Material and drawing preparation and submission item

G Statutory submission item

H Sample boards item

J Interfacing with other E&M system item

K Paint works for materials and equipment item

L Provision of 24-month operation maintenance and

breakdown service item

M Connection and interfacing with existing

system of the Passenger Terminal Building

where necessary; allow for all cost

associated with liaison with existing

maintenance contractors and the airport

operator item

N Testing and commissioning, including testing

and commissioning together with existing

system where necessary; allow for all cost

for liaison with existing maintenance

contractors and the airport operator item

O All necessary modification and configuration item

for interface with the existing system item

Any other items (to be inserted by the Bidder):-

TOTAL - Bill Nr. 6

Carried to General Summary MOP$

Section 6 - Bill of Quantities

Bill Nr. 6

Fire Services System

Description

Bill Nr. 6

FIRE SERVICES SYSTEM

- BQ.6/1 -

Page 38: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

Electrical Services System

Power Supply and Distribution System

A Approved cables item

B KLPE/SWAL/LSOH cables item

C Trunkings item

D LV Switchboard item

E Termination glands item

F MCB distribution boards item

G Busbar chamber item

H Insulated switches item

J Miniature circuit breakers item

K Combined MCB/RCBO units item

L Moulded case circuit breakers item

M Automatic change-over switches item

N Changeover switch item

O Isolating-switches item

P Motion sensors item

Q Daylight sensors item

TOTAL - Bill Nr. 7

Section 6 - Bill of Quantities

Bill Nr. 7

Electrical Services System

Description

Bill Nr. 7/1

ELECTRICAL SERVICES SYSTEM

Carried to Collection MOP$

- BQ.7/1 -

Page 39: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 7

Electrical Services System

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

Provide General Lighting and Essential

Lighting System

A Final circuits item

B Luminaries item

C Lighting control item

D Wiring accessories item

E Provide Essential and Emergency Lighting System item

F Provide Electrical Loading Estimate item

G UPS System Installation item

H Provide the complete Electrical

Earthing and Clean Earthing System Facilities item

Provide Earthing and Lightning Protection System

J Tinned copper tapes item

K Earth terminals item

L Test links item

M Earth rod electrodes item

N Spare parts item

O Material and drawing preparation and submission item

P Statutory submission item

Q Sample boards item

R Interfacing with other E&M system item

S Paint works for materials and equipment item

T Provision of 24-month operation maintenance and

breakdown service item

TOTAL - Bill Nr. 7

Carried to Collection MOP$

Description

Bill Nr. 7/2

ELECTRICAL SERVICES SYSTEM

- BQ.7/2 -

Page 40: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 7

Electrical Services System

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A An 11kV/LV transformer unit with at least 1600kVA and associated

distribution electrical system item

B Electrical calculations item

C Connection and interfacing with existing

systems of the Passenger Terminal Building

where necessary; allow for all cost

associated with liaison with existing

maintenance contractors and the airport operator item

D Testing and commissioning, including testing

and commissioning together with existing

system where necessary; allow for all cost

for liaison with existing maintenance

contractors and the airport operator item

E All necessary modification and configuration item

for interface with the existing system item

Any other items (to be inserted by the Bidder):-

TOTAL - Bill Nr. 7

Description

Carried to Collection MOP$

Bill Nr. 7/3

ELECTRICAL SERVICES SYSTEM

- BQ.7/3 -

Page 41: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 7

Electrical Services System

Amount (MOP$)

Page Nr. BQ.7/1

Page Nr. BQ.7/2

Page Nr. BQ.7/3

TOTAL - Bill Nr. 7

Carried to General Summary MOP$

......................

Bill Nr. 7

ELECTRICAL SERVICES SYSTEM

COLLECTION

......................

......................

Description

- BQ.7/4 -

Page 42: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

MVAC System

A Supply and install the MVAC System item

B Provide Temperature and Humidity Sensors item

C Provide CO2 Sensors item

D Provide dry contact from the ventilation RI/O or I/O modules item

E Provide mechanical exhaust system item

F Provide air purifier item

G Spare parts item

H Material and drawing preparation and submission item

J Statutory submission item

K Sample boards item

L Interfacing with other E&M system item

M Paint works for materials and equipment item

N Provision of 24-month operation maintenance and

breakdown service item

O Connection and interfacing with existing

system of the Passenger Terminal Building

where necessary; allow for all cost

associated with liaison with existing

maintenance contractors and the airport

operator item

P Testing and commissioning, including testing

and commissioning together with existing

system where necessary; allow for all cost

for liaison with existing maintenance

contractors and the airport operator item

TOTAL - Bill Nr. 8

Carried to Collection MOP$

Section 6 - Bill of Quantities

Bill Nr. 8

MVAC System

Description

Bill Nr. 8/1

MVAC SYSTEM

- BQ.8/1 -

Page 43: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 8

MVAC System

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A All necessary modification and configuration item

for interface with the existing system item

Any other items (to be inserted by theBidder):-

TOTAL - Bill Nr. 8

Description

Bill Nr. 8/2

MVAC SYSTEM

Carried to Collection MOP$

- BQ.8/2 -

Page 44: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 8

MVAC System

Amount (MOP$)

Page Nr. BQ.8/1

Page Nr. BQ.8/2

TOTAL - Bill Nr. 8

Carried to General Summary MOP$

Bill Nr. 8

MVAC SYSTEM

COLLECTION

......................

......................

Description

- BQ.8/3 -

Page 45: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

ELV Systems and Airport Systems

A Closed Circuit Television (CCTV) System item

B Public Address (PA) System item

C Private Automated Branch Exchange (PABX) System item

D Access Control System (ACS) item

E Wireless Network (WLAN) System item

F Radio Communication System item

Flight Information Display System (FIDS)

G Displays item

H Remote reboot units item

J Voice and Data Cabling (VDC) System item

Master Antenna Television (MATV) System

K Allow for set top boxes item

L Televisions item

M Final circuit in coax cables item

N MATV distribution frames item

O Building Management System (BMS) item

TOTAL - Bill Nr. 9

Carried to Collection MOP$

Section 6 - Bill of Quantities

Bill Nr. 9

ELV Systems and Airport Systems

Description

Bill Nr. 9/1

ELV SYSTEMS AND AIRPORT SYSTEMS

- BQ.9/1 -

Page 46: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 9

ELV Systems and Airport Systems

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A Spare parts item

B Material and drawing preparation and submission item

C Sample boards item

D Paint works for materials and equipment item

E Provision of 24-month operation maintenance and

breakdown service item

F Connection and interfacing with existing

system of the Passenger Terminal Building

where necessary; allow for all cost

associated with liaison with existing

maintenance contractors and the airport

operator item

G Testing and commissioning, including testing

and commissioning together with existing

system where necessary; allow for all cost

for liaison with existing maintenance

contractors and the airport operator item

H All necessary modification and configuration item

for interface with the existing system item

Any other items (to be inserted by the Bidder):-

TOTAL - Bill Nr. 9

Carried to Collection MOP$

Description

Bill Nr. 9/2

ELV SYSTEMS AND AIRPORT SYSTEMS

- BQ.9/2 -

Page 47: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 9

ELV Systems and Airport Systems

Amount (MOP$)

Page Nr. BQ.9/1

Page Nr. BQ.9/2

TOTAL - Bill Nr. 9

Carried to General Summary MOP$

......................

......................

Description

Bill Nr. 9

ELV SYSTEMS AND AIRPORT SYSTEMS

COLLECTION

- BQ.9/3 -

Page 48: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

BUILDING SERVICES

Allow for Builder's works in connection with building services

A Diversion of existing utility services item

B Equipment Room item

C Communication and IT Room item

Any other items (to be inserted by the Bidder):-

TOTAL - Bill Nr. 10

Carried to General Summary MOP$

Section 6 - Bill of Quantities

Bill Nr. 10

Builder's works in connection with Building Services

Description

Bill Nr. 10

BUILDER'S WORKS IN CONNECTION WITH

- BQ.10/1 -

Page 49: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

Signage

A Design and install necessary signage

and take down unnecessary signage

for existing PTB and North Extension to suit new layout design. item

Any other items (to be inserted by the Bidder):-

Carried to General Summary MOP$

TOTAL - Bill Nr. 11

Section 6 - Bill of Quantities

Bill Nr. 11

Miscellaneous

Description

Bill Nr. 11

MISCELLANEOUS

- BQ.11/1 -

Page 50: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A Topographic, utility and geotechnical surveys item

B Site clearance and demolition of existing pavement item

C Subgrade preparation for Bus Staging Area pavement item

D Block paving on sand bedding and lean concrete base

for Bus Staging Area item

E Block paving and kerb for footpath island item

F Pedestrian canopy for footpath item

G Surface water drainage gullies and pipework item

H Surface water drainage manholes or manhole alterations item

J Line markings item

K Perimeter fence item

Any other items (to be inserted by the Bidder):-

Carried to General Summary MOP$

TOTAL - Bill Nr. 12

Section 6 - Bill of Quantities

Bill Nr. 12

Civil Works

Description

Bill Nr. 12

CIVIL WORKS

- BQ.12/1 -

Page 51: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

HALL

Decorative solar film

A Ascertain the correctness of application area item

B Supply of 3M ScotchcalTM Perforated Window Graphic Film

7725-R314 or equivalent subject to CAM’s approval prior

to actual application item

C Printing on the decorative solar film using the design

provided by CAM item

D Application of the printed decorative solar film to

the glass facade item

Any other items (to be inserted by the Bidder):-

Carried to General Summary MOP$

DECORATIVE SOLAR FILM REPLACEMENT ON UPPER

PART OF GLASS FACADE IN THE AIRSIDE DEPARTURE

TOTAL - Bill Nr. 13

Section 6 - Bill of Quantities

Bill Nr. 13

Decorative solar film replacement on Upper Part of

Glass Façade in the Airside Departure Hall

Description

Bill Nr. 13

- BQ.13/1 -

Page 52: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

Preliminaries

A Insurance item

B Site survey report item

C Hoarding item

D Notice board & signage item

E Site mobilization item

F Safety precautions item

G Safety precautions item

H Material submission item

J Shop drawings item

K Detailed design drawings item

L As-built document item

M O & M manual item

N T & C report item

O Access card item

P Provision of 24-month operation maintenance and item

breakdown service

Design work

Q Remote boarding gate item

TOTAL - Bill Nr. 14

Carried to Collection MOP$

Section 6 - Bill of Quantities

Bill Nr. 14

Remote Boarding Gate (OPTIONAL)

Description

Bill Nr. 14/1

REMOTE BOARDING GATE (OPTIONAL)

- BQ.14/1 -

Page 53: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 14

Remote Boarding Gate (OPTIONAL)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

Fabrication and Site Construction

Works

A Remote boarding gate item

Any other items (to be inserted by the Bidder):-

TOTAL - Bill Nr. 14

Description

Carried to Collection MOP$

Bill Nr. 14/2

REMOTE BOARDING GATE (OPTIONAL)

- BQ.14/2 -

Page 54: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Section 6 - Bill of Quantities

Bill Nr. 14

Remote Boarding Gate (OPTIONAL)

Amount (MOP$)

Page Nr. BQ.14/1

Page Nr. BQ.14/2

TOTAL - Bill Nr. 14

Carried to General Summary MOP$

......................

......................

Description

Bill Nr. 14

REMOTE BOARDING GATE (OPTIONAL)

COLLECTION

- BQ.14/3 -

Page 55: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Quantity UnitRate

(MOP$)

Amount

(MOP$)

A AVDGS display units; weatherproof; consisting of

various LCD or LED modules for Distance-to-

Run Indicator, Azimuth Guidance Indicators,

sensor units, Main Display Panels, optical transceivers/ receivers,

surge arrestors and mountings and fixings item

B AVDGS operator control panels with emergency

stop buttons, housings, mountings, surge arrestor and

fixings; including interconnecting cables and conduits

to AVDGS display unit item

C Control cables; cable containiment including

trunkings, conduits, flexible conduits, all

necessary earthing and bonding, fixing and all

necessary accessories; power provision to above equipment item

D All necessary modification and configuration item

for interface with the existing system item

Any other items (to be inserted by the Bidder):-

Carried to General Summary MOP$

TOTAL - Bill Nr. 15

Section 6 - Bill of Quantities

Bill Nr. 15

AVDGS System (OPTIONAL)

Description

Bill Nr. 15

AVDGS SYSTEM (OPTIONAL)

- BQ.15/1 -

Page 56: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Amount (MOP$)

1 Preliminaries

2 Design of the Works

3 Demolition

4 Architectural Works

5 Plumbing & Drainage System

6 Fire Services System

7 Electrical Services System

8 MVAC System

9 ELV Systems and Airport Systems

10 Builder's Works in connection with Building Services

11 Miscellaneous

12 Civil Works

13 Decorative Solar Film Replacement On Upper Part Of Glass Facade In The Airside Departure Hall

TOTAL (MOP$)

Bill Nr.

Section 6 - Bill of Quantities

General Summary (CORE ITEMS)

Description

GENERAL SUMMARY (CORE ITEMS)

- GS(CORE)/1 -

Page 57: Section 6 Bill of Quantities - camacau.com · Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Item Quantity Unit Rate (MOP$) Amount (MOP$) A Provision of temporary hoardings

Design and Build for Fit-Out of

Passenger Terminal Building North Extension

At Macau International Airport (RFQ-221)

Item Amount (MOP$)

14 Remote Boarding Gate (Optional)

15 AVDGS system (Optional)

TOTAL (MOP$)

Bill Nr.

Section 6 - Bill of Quantities

General Summary (OPTIONAL ITEMS)

Description

GENERAL SUMMARY (OPTIONAL ITEMS)

- GS (OPTIONAL)/1 -