Design & Build for Fit-out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 –
Bill of Quantities
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
NOTES :
(1) The work shall be done during day time
and night time according to CAM/ADA requirements.
(2) If CAM decides to cancel any items listed
in the Bills of Quantities, the Contractor
shall not claim any compensation related to
the works not executed. The amount for items cancelled
will be deducted from the final Contract Sum.
(3) Contractor shall provide the quantities
according to the design, international and
Macau regulations and site requirements,
and the unit prices for reference. The
contract is based on lump sum fixed price.
(4) The lump sum amount is the Contract
Price, in which the Contractor is deemed to have included
all costs, expenses and profit necessary for the Contractor's
proper execution and completion of all the designs, works,
services and others in accordance with the Contract.
(5) No Change in the quantities described in the Bills of
Quantities proposed in the Contractor's Proposal shall entitle
the Contractor to any additional payment, provided that such
change is found necessary for the Contractor's proper execution
and completion of all the designs, works, services and others in
accordance with the Contract.
(6) The above items (1) to (5) apply to the
whole Bills of Quantities
Section 6 - Bill of Quantities
Bill Nr. 1
Preliminaries
Description
Bill Nr. 1/1
TOTAL - Bill Nr. 1
Carried to Collection MOP$
PRELIMINARIES
- BQ.1/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 1
Preliminaries
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A Provision of temporary hoardings and/or
covered walkway with temporary lighting
where necessary, to meet the requirements
of CAM and the Airport Operator; maintain
and remove away from site upon completion
of the works or as instructed by CAM.
Any existing hoarding should be
dismantled, kept in good conditions and
returned to CAM item
B Provision of project signboards item
C Environmental mitigation measures item
D Safety precautions item
E Site cleaning item
F Contractor's workshops, offices and storage sheds item
G Site survey item
H Extra care required to carry out works in the interception area
between Extension Building and Macau International Airport Terminal item
Bill Nr. 1/2
PRELIMINARIES
TOTAL - Bill Nr. 1
Carried to Collection MOP$
Description
- BQ.1/2 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 1
Preliminaries
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A Contractor's all Risks insurance item
B Employees' compensation insurance item
C Professional indemnity insurance for
professional suppliers and sub-contractors
to meet the requirements of CAM item
D Professional indemnity insurance for
designers and/or design checkers to meet
the requirements of CAM item
E Plant and tools item
F Temporary water supply item
G Temporary lighting and power item
H Temporary site services item
J Temporary site office including all necessary equipments and facilities item
K Application for permit(s) as required by CAM or any other
Macau statutory bodies/government department(s) item
L Working platform and scaffolding item
M O&M manual, as-built documents, T&C report, labeling item
N Site security item
O Site project management item
P Site debris clearance item
Q BIM model item
R Traffic and passengers diversion works item
Any other items (to be inserted by the Bidder):-
Description
Bill Nr. 1/3
TOTAL - Bill Nr. 1
PRELIMINARIES
Carried to Collection MOP$
- BQ.1/3 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 1
Preliminaries
Amount (MOP$)
Page Nr. BQ.1/1
Page Nr. BQ.1/2
Page Nr. BQ.1/3
TOTAL - Bill Nr. 1
Carried to General Summary MOP$
PRELIMINARIES
Bill Nr. 1
Description
......................
......................
COLLECTION
......................
- BQ.1/4 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
NOTES :
The Contractor's Designer shall prepare
all design in full compliance with all
relevant statuory requirements and the
specifications, Design Requirement Brief and
the tender document and drawings. He shall
prepare and submit all relevant design
reports, calculation and drawings as
necessary in good quality to the client for consent.
A Design of Demolition works item
B Design of Architectural works item
C Design of Plumbing & Drainage system item
D Design of Fire Services system item
E Design of Electrical Services system item
F Design of MVAC System item
G Design of ELV Systems and Airport Systems item
Any other items (to be inserted by the Bidder):-
Section 6 - Bill of Quantities
Bill Nr. 2
Design of the Works
Description
Bill Nr. 2/1
DESIGN OF THE WORKS
TOTAL - Bill Nr. 2
Carried to Collection MOP$
- BQ.2/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 2
Design of the Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A Contractor's Other Costs
Contractor's other costs for any item
of work or obligation which is
necessary for the completion of the
Design of the Works as required by the
Contract, but not separately itemised
elsewhere in this Bill Nr. 2
(Bidder to provide detailed breakdown of
the Contractor's Other Costs below) item
Any other items (to be inserted by the Bidder):-
TOTAL - Bill Nr. 2
Carried to Collection MOP$
Description
Bill Nr. 2/2
DESIGN OF THE WORKS
- BQ.2/2 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 2
Design of the Works
Amount (MOP$)
Page Nr. BQ.2/1
Page Nr. BQ.2/2
TOTAL - Bill Nr. 2
Carried to General Summary MOP$
Description
Bill Nr. 2
DESIGN OF THE WORKS
COLLECTION
......................
......................
- BQ.2/3 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
Demolition of existing part of Passenger
Terminal Building adjacent to the new
extension. The cut-off line of the demolition
work shall suit the existing site conditions and
the necessary alterations of existing PTB for
integrating the new extension and the existing PTB.
The Contractor shall provide temporary finish linings,
covers, flashing plate, etc. for the cut-off line to
match the existing finishes of the PTB to the
satisfaction of CAM. Provide a temporary
weather proof external enclosure during
the construction work. Demolition
of existing E&M services to suit
existing site conditions and the design
of the extension shall be carried out
without interruption to the normal
operation of the passenger terminal.
Disposal of all construction
waste and debris.
A Room 11065 (Departure Level Canteen) item
Including all necessary demolition works and making good,
builder's works for construction of service corridor,
additional access door and access control system,
and all necessary modifications to building services works.
B Room 12061 (Mezzanine Level Access Card Office) item
Including all necessary demolition works and making good,
builder's works for modification and extension of office and counter,
additional building services for extension of office,
and all necessary modifications to building services works.
C Diversion of existing E&M services for carrying out
demolition works and reinstatement if necessary item
D Necessary reinstatment works item
Any other items (to be inserted by the Bidder):-
TOTAL - Bill Nr. 3
Carried to General Summary MOP$
Section 6 - Bill of Quantities
Bill Nr. 3
Demolition and A&A Works
Description
Bill Nr. 3
DEMOLITION AND A&A WORKS
- BQ.3/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
According to the approved drawings, furnish and
install all building materials for the following area,
including all partition brick walls shown in the drawings.
No matter mentioned or not, the corresponding
items and the necessary materials, fittings, accessories,
works, etc., should also be included to completely
execute the detailed works:
A Room No.G-001 area and the corresponding items are as follows:
Floor:Carpet(F4), 30mm thk. marble(F6);
Skirting:500mm(H) x 1.2mm #316 s.s. plate skirting
(same as existing PTB)(S3);Wall:Stone paint
up to false ceiling(W4);Ceiling:Baffle ceiling(C9);Remarks:
Dia. 50mm s.s. bumper rail fix on the skirting
/ floor (same as existing PTB)(R3);
Provide Seating system(R12);
Design layout and provide planters (Qty. refer to existing PTB)
(refer to appendix 2)(R13);
Design layout and provide Trash bin (Qty. refer to existing PTB)
(R14);Design layout and provide Boarding gate counter
(refer to appendix 3)(R15);Provide carpet (refer to appendix 7)
(R27); Revise / updated existing ceiling hung signage at
NEW PTB public area(R28);Design and provise all rooms
signage(R29)。 (refer to appendix 8) lot
B Room No.G-002 area and the corresponding items are as follows:
Floor: 30mm thk. marble(F6);Skirting:
500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB)
(S3);Wall:Stone paint up to false ceiling(W4);
Ceiling:Baffle ceiling(C9);Remarks:Dia. 50mm s.s. bumper
rail fix on the skirting / floor (same as existing PTB)(R3);
Provide immigration counter include divide s.s. handrail
(same as existing)(R16);Revise / updated existing ceiling
hung signage at NEW PTB public area(R28);Design and
provise all rooms signage(R29)。 lot
C Room No.G-003 area and the corresponding items are as follows:
Floor:Cement mortar leveling(F8);Wall:Emulsion paint on
6mm thk. internal plaster up to false ceiling / full height (W3);
Ceiling:Emulsion paint on 6mm thk. Internal plaster ceiling
(C2); Remarks:Design and provise all rooms signage
(R29)。 lot
TOTAL - Bill Nr. 4
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Description
Bill Nr. 4/1
ARCHITECTURAL WORKS
Carried to Collection MOP$
- BQ.4 /1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A Room No.G-004 area and the corresponding items are as follows:
Floor: 30mm thk. marble(F6),Wall:20mm thk marble
on wall plaster with tile adhesive up to false ceiling(W2)
,Ceiling: Aluminium ceiling strip(C5);Remarks:
Design refer to arrival landside north washroom
(refer to appendix 4)(R17);Design and provise all
rooms signage(R29)。 lot
B Room No.G-005 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on
6mm thk. internal lime up to false ceiling / full height(W3)
,Ceiling: 600x600mm acoustic ceiling tile with exposed grid
(C1);Remarks: Interior design and provide all furniture
(R11);Design and provise all rooms signage(R29)。 lot
C Room No.G-006 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on
6mm thk. internal lime up to false ceiling / full height(W3)
,Ceiling: 600x600mm acoustic ceiling tile with exposed
grid(C1),Remarks:Design and provise
all rooms signage(R29)。 lot
D Room No.G-007 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3)
,Ceiling: 600x600mm acoustic ceiling tile with exposed grid
(C1), Remarks:Design and provise all rooms signage(R29)。 lot
E Room No.G-008 area and the corresponding items are as follows:
Floor:300x300x8mm non-slip homogeneous tile on floor screed(F2)
;Wall:Ceramic tile on wall plaster with tile adhesive up to
false ceiling (overall 25mm thk.)(W1),Ceiling:
Aluminium ceiling strip(C5),Remarks:Design and provise all
rooms signage(R29);Design layout and provide all sanitary ware
(Refer to BOH washroom at existing PTB )(R30)。 lot
TOTAL - Bill Nr. 4
Description
Bill Nr. 4/2
ARCHITECTURAL WORKS
Carried to Collection MOP$
- BQ.4 /2 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A Room No.G-009 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3),
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks: Design and provise all rooms signage(R29)。 lot
B Room No.G-010 area and the corresponding items are as follows:
Floor:300x300x8mm non-slip homogeneous tile on floor screed
(F2),Skirting:300mmx100mm(H) homogeneous tile skirting(S2)
,Wall:Emulsion paint on 6mm thk. internal plaster up to flase
ceiling / full height(W3),Ceiling: 600x600mm acoustic ceiling
tile with exposed grid(C1),Remarks:Interior design and
provide all furniture(R11);Design and provise all rooms signage lot
(R29)。
C Room No.M-001area and the corresponding items are as follows:
Floor:Carpet(F4);Wall:Wood veneer finsih with acrylic
letter with back LED and LED light strip(W7),
Ceiling:Wood ceiling strip(C6),Remarks:Interior design
refer to sterile corridor design proposal (refer to appendix 5)(R19)
,Design and provide the carpet at the loading bridge(R24)
;Revise / updated existing ceiling hung signage at NEW PTB
public area(R28);Design and provise all rooms
signage(R29)。 lot
TOTAL - Bill Nr. 4
ARCHITECTURAL WORKS
Description
Bill Nr. 4/3
Carried to Collection MOP$
- BQ.4 /3 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A Room No.1-001 area and the corresponding items are as follows:
Floor:Carpet(F4), 30mm thk. marble(F6);Skirting:
500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB)
(S3);Wall:Stone paint up to false ceiling(W4);Ceiling:
Baffle ceiling(C9);Remarks: Dia. 50mm s.s. bumper rail fix on
the skirting / floor (same as existing PTB)(R3);
Provide Seating system (R12);
Design layout and provide planters (Qty. refer to existing PTB)
(refer to appendix 2)(R13);Design layout and provide
Trash bin (Qty. refer to existing PTB)(R14);
Design layout and provide Boarding gate counter
(refer to appendix 3)(R15);Design and provide filming wall
artwork on curtain wall(Option) (refer to appendix 6)(R23);
Provide s.s. bumper rail at escalator (same as existing PTB)(R25)
;Design and provide marble floor in lift car (lift no. S1, P13, P14)
(R26);Provide carpet (refer to appendix 7)(R27);
Revise / updated existing ceiling hung signage at NEW PTB
public area(R28);Design and provise all rooms
signage(R29)。 (refer to appendix 8) lot
B Room No.1-002 area and the corresponding items are as follows:
Floor:Cement mortar leveling(F8);Wall: Emulsion paint on
6mm thk. internal plaster up to false ceiling / full height(W3);
Ceiling:Emulsion paint on 6mm thk. internal plaster(C2),
Remarks:Design and provise all rooms signage(R29)。 lot
C Room No.1-003 area and the corresponding items are as follows:
Floor: 30mm thk. marble(F6),Wall:20mm thk marble on
wall plaster with tile adhesive up to false ceiling(W2),
Ceiling: Aluminium ceiling strip(C5);Remarks:High level
interior design, include 2 person sofa, console, mirror and wash
basin(R21);Design and provise all rooms signage(R29)。 lot
D Room No.1-004 area and the corresponding items are as follows:
Floor: 30mm thk. marble(F6),Wall:20mm thk marble on wall
plaster with tile adhesive up to false ceiling(W2),Ceiling:
Aluminium ceiling strip(C5);Remarks:Design refer to arrival
landside north washroom (refer to appendix 4)(R17);Design
and provise all rooms signage(R29)。 lot
TOTAL - Bill Nr. 4
Description
Bill Nr. 4/4
ARCHITECTURAL WORKS
Carried to Collection MOP$
- BQ.4 /4 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A Room No.1-005 area and the corresponding items are as follows:
Floor:Carpet(F4),30mm thk. marble(F6);Skirting:
500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing PTB)
(S3);Wall:Stone paint up to false ceiling(W4);Ceiling:
Baffle ceiling(C9);Remarks:Dia. 50mm s.s. bumper rail fix
on the skirting / floor (same as existing PTB)(R3);
Design layout and provide planters (Qty. refer to existing PTB)
(refer to appendix 2)(R13);Design layout and provide
Trash bin (Qty. refer to existing PTB)(R14);Design and
provide marble floor in lift car (lift no. S1, P13, P14)(R26);
Revise / updated existing ceiling hung signage at NEW PTB
public area(R28);Design and provise all rooms signage
(R29)。 lot
B Room No.1-006 area and the corresponding items are as follows:
Floor: 30mm thk. marble(F6),Wall:Stone paint up to false
ceiling(W4);Ceiling:Emulsion paint on 6mm thk. internal plaster
(C2),Remarks:Design and provise all rooms signage lot
(R29)。
C Room No.1-007 area and the corresponding items are as follows:
Floor:300x300x8mm non-slip homogeneous tile on floor
screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive
up to false ceiling (overall 25mm thk.)(W1),Ceiling:
Existing ceiling(C4),Remarks:Design and provise all rooms
signage(R29),Design layout and provide all sanitary ware
(Refer to BOH washroom at existing PTB )(R30)。 lot
D Room No.1-008 area and the corresponding items are as follows:
Floor:300x300x8mm non-slip homogeneous tile on floor screed
(F2),Wall:Ceramic tile on wall plaster with tile adhesive up to
false ceiling (overall 25mm thk.)(W1),Ceiling:Alminium
ceiling strip(C5),Remarks:Design and provise all rooms
signage(R29),Design layout and provide all sanitary ware
(Refer to BOH washroom at existing PTB )(R30)。
lot
E Room No.1-009 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),
Skirting:100mm (H) vinyl skirting(S1),
Wall:Emulsion paint on 6mm thk. internal lime up to false
ceiling / full height(W3),Ceiling: 200x200mm hanging
aluminium grid ceiling(C8),Remarks:Dia. 50mm s.s. bumper
rail fix on the skirting / floor (same as existing PTB)(R3);
Design and provise all rooms signage(R29)。 lot
TOTAL - Bill Nr. 4
Description
Bill Nr. 4/5
Carried to Collection MOP$
ARCHITECTURAL WORKS
- BQ.4 /5 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A Room No.1-010 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3),
Ceiling: 200x200mm hanging aluminium grid ceiling(C8),
Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor
(same as existing PTB)(R3);Design and provise all
rooms signage(R29)。 lot
B Room No.1-011 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on
6mm thk. internal lime up to false ceiling / full height(W3),
Ceiling: 200x200mm hanging aluminium grid ceiling(C8),
Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor
(same as existing PTB)(R3);Design and
provise all rooms signage(R29)。 lot
C Room No.1-012 area and the corresponding items are as follows:
Floor:Cement mortar leveling(F8),Skirting: Existing finish
(S5),Wall: Existing finish(W5),Ceiling:Existing ceiling
(C4),Remarks:Design and provise all rooms signage(R29)。 lot
D Room No.1-013 area and the corresponding items are as follows:
Floor:Cement mortar leveling(F8),Skirting: Existing finish
(S5),Wall: Existing finish(W5),Ceiling:Existing ceiling
(C4),Remarks:Design and provise all rooms signage(R29)。 lot
E Room No.1-014 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),
Skirting:100mm (H) vinyl skirting(S1),
Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling
/ full height(W3),Ceiling: 600x600mm acoustic ceiling tile
with exposed grid(C1),Remarks:Design loose furniture
layout only(R9);Design layout and provide reception counter
(R18);Design and provise all rooms signage(R29)。 lot
F Room No.1-015 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),
Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion
paint on 6mm thk. internal lime up to false ceiling / full height
(W3),Ceiling: 600x600mm acoustic ceiling tile with
exposed grid(C1),Remarks:Design loose furniture layout
only(R9);Design layout and provide reception counter
(R18);Design and provise all rooms signage(R29)。 lot
TOTAL - Bill Nr. 4
Carried to Collection MOP$
Description
Bill Nr. 4/6
ARCHITECTURAL WORKS
- BQ.4 /6 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A Room No.1-017 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),
Skirting:100mm (H) vinyl skirting(S1),
Wall:Emulsion paint on 6mm thk. internal lime up to false
ceiling / full height(W3),Ceiling: 600x600mm acoustic
ceiling tile with exposed grid(C1),Remarks:Design
loose furniture layout only(R9);Design and provise all rooms
signage(R29)。 lot
B Room No.1-018 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),
Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion paint
on 6mm thk. internal lime up to false ceiling / full height(W3)
,Ceiling: 600x600mm acoustic ceiling tile with exposed grid
(C1),Remarks:Design loose furniture layout only(R9)
;Design and provise all rooms signage(R29)。 lot
C Room No.1-019 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),
Skirting:100mm (H) vinyl skirting(S1),Wall:
Emulsion paint on 6mm thk. internal lime up to false ceiling /
full height(W3),Ceiling: 600x600mm acoustic ceiling tile
with exposed grid(C1),Remarks:Design loose furniture
layout only(R9),Design layout and provide reception counter
(R18),Design and provise all rooms signage(R29)。 lot
D Room No.1-020 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on
6mm thk. internal lime up to false ceiling / full height(W3),
Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1)
,Remarks:Design loose furniture layout only(R9)
,Design layout and provide reception counter(R18)
,Design and provise all rooms signage(R29)。 lot
E Room No.1-021 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),
Wall:Emulsion paint on 6mm thk. internal lime up to false ceiling
/ full height(W3),Ceiling: 600x600mm acoustic ceiling tile
with exposed grid(C1),Remarks:Design loose
furniture layout only(R9),Design and provise
all rooms signage(R29)。 lot
TOTAL - Bill Nr. 4
Carried to Collection MOP$
Description
Bill Nr. 4/7
ARCHITECTURAL WORKS
- BQ.4 /7 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A Room No.1-022 area and the corresponding items are as follows:
Floor: 30mm thk. marble(F6),
Skirting:100mm (H) x 15mm thk. painted hardwood skirting
(S6),Wall:Stone paint up to false ceiling(W4),
Ceiling: Baffle ceiling(C9),Remarks:Interior
design and provide all furniture(R11);Design layout and
provide reception counter(R18);Design and provise
all rooms signage(R29)。 lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
ARCHITECTURAL WORKS
Description
Room No.1-023 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Acoustic panels combines the
natural appearance of wood with unique features for high quality
acoustics(W8),Ceiling:Emulsion paint on gypsum board
false ceiling(C3),Remarks:Interior design and provide all
furniture(R11);Design and provise all rooms signage(
R29)。
Carried to Collection MOP$
Room No.1-024 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3),
Ceiling: 600x600mm acoustic ceiling tile with exposed grid(
C1),Remarks:Design loose furniture layout only(R9);
Design and provise all rooms signage(R29)。
Bill Nr. 4/8
Room No.1-026 area and the corresponding items are as follows:
Floor: Epoxy paint on power floated concrete surface(F7),
Skirting:300mmx100mm(H) homogeneous tile skirting(S2),
Wall: Emulsion paint on 6mm thk. internal plaster up to false
ceiling / full height(W3),Ceiling: 600x600mm acoustic
ceiling tile with exposed grid(C1),Remarks:Design and
provise all rooms signage(R29)。
Room No.1-025 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3),
Ceiling: 600x600mm acoustic ceiling tile with exposed grid(
C1),Remarks:Design loose furniture layout only(R9);
Design and provise all rooms signage(R29)。
- BQ.4 /8 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B Room No.1-028 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),
Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion
paint on 6mm thk. internal lime up to false ceiling / full height
(W3),Ceiling: 600x600mm acoustic ceiling tile with
exposed grid(C1),Remarks:Design loose furniture layout
only(R9);Design and provise all rooms signage(R29)。 lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.2-003 area and the corresponding items are as follows:
Floor:Cement mortar leveling(F8);Wall:Emulsion paint on
6mm thk. internal plaster up to false ceiling / full height(W3);
Ceiling:Emulsion paint on 6mm thk. internal plaster(C2),
Remarks:Design and provise all rooms signage(R29)。
Room No.2-002 area and the corresponding items are as follows:
Floor:Carpet(F4),30mm thk. marble(F6),Skirting:
500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing
PTB)(S3);Wall:Stone paint up to false ceiling(W4);Ceiling:
Baffle ceiling(C9);Remarks: Dia. 50mm s.s. bumper rail fix on the
skirting / floor (same as existing PTB)(R3);Provide Seating
system(R12);Design layout and provide planters (Qty. refer to
existing PTB) (refer to appendix 2)(R13);Design layout and
provide Trash bin (Qty. refer to existing PTB)(R14);Design
layout and provide Boarding gate counter (refer to appendix 3)(
R15);Design and provide filming wall artwork on curtain
wall(Option) (refer to appendix 6)(R23);Provide s.s. bumper rail
at escalator (same as existing PTB)(R25);Provide carpet (refer to
appendix 7)(R27);Revise / updated existing ceiling hung signage
at NEW PTB public area (R28);Design and provise all rooms
signage(R29)。 (refer to appendix 8)
Room No.1-027 area and the corresponding items are as follows:
Floor:600x600mm high pressure laminated raised floor(F5),
Wall:Emulsion paint on 6mm thk. internal lime up to false
ceiling / full height(W3),Ceiling:Emulsion paint on 6mm
thk. internal plaster(C2),Remarks:Design and provise all
rooms signage(R29)。
Description
Room No.2-001 area and the corresponding items are as follows:
Floor:Cement mortar leveling(F8),Wall: Existing finish(
W5),Ceiling:Existing ceiling(C4),Remarks:Design and
provise all rooms signage(R29)。
Bill Nr. 4/9
ARCHITECTURAL WORKS
Carried to Collection MOP$
- BQ.4 /9 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
TOTAL - Bill Nr. 4
Room No.2-005 area and the corresponding items are as follows:
Floor: 30mm thk. marble(F6),Wall:Stone paint up to false
ceiling(W4);Ceiling:Emulsion paint on 6mm thk. internal plaster
(C2),Remarks:Design and provise all rooms signage(R29)。
ARCHITECTURAL WORKS
Description
Room No.2-004 area and the corresponding items are as follows:
Floor:Carpet(F4),30mm thk. marble(F6);Skirting:
500mm(H) x 1.2mm #316 s.s. plate skirting (same as existing
PTB)(S3);Wall:Stone paint up to false ceiling(W4);Ceiling:
Baffle ceiling(C9);Remarks:Dia. 50mm s.s. bumper rail fix on
the skirting / floor (same as existing PTB)(R3);Design layout
and provide planters (Qty. refer to existing PTB) (refer to appendix
2)(R13);Design layout and provide Trash bin (Qty. refer to
existing PTB)(R14);Design and provide marble floor in lift
car (lift no. S1, P13,P14)(R26);Revise / updated existing
ceiling hung signage at NEW PTB public area(R28);Design
and provise all rooms signage(R29)。
Carried to Collection MOP$
Room No.2-007 area and the corresponding items are as follows:
Floor:30mm thk. marble(F6);Skirting:500mm(H) x 1.2mm
#316 s.s. plate skirting (same as existing PTB)(S3);Wall:Stone
paint up to false ceiling(W4);Ceiling:Aluminium ceiling strip
(C5);Remarks:Interior design and provide all furniture(
R11);Design layout and provide Trash bin (Qty. refer to
existing PTB)(R14);Design and provise all rooms signage(
R29)。
Bill Nr. 4/10
Room No.2-006 area and the corresponding items are as follows:
Floor: 30mm thk. marble(F6),Wall:20mm thk marble on
wall plaster with tile adhesive up to false ceiling(W2),
Ceiling: Aluminium ceiling strip(C5);Remarks:Design
refer to arrival landside north washroom (refer to appendix 4)(
R17);Design and provise all rooms signage(R29)。
- BQ.4 /10 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.2-008 area and the corresponding items are as
follows:Floor:300x300x8mm non-slip homogeneous tile on
floor screed(F2),Wall:Ceramic tile on wall plaster with tile
adhesive up to false ceiling (overall 25mm thk.)(W1),
Ceiling:Aluminium ceiling strip(C5),Remarks:Design and
provise all rooms signage(R29);Design layout and provide all
sanitary ware (Refer to BOH washroom at existing PTB )(
R30)。
Room No.2-009 area and the corresponding items are as
follows:Floor:300x300x8mm non-slip homogeneous tile on
floor screed(F2),Wall:Ceramic tile on wall plaster with tile
adhesive up to false ceiling (overall 25mm thk.)(W1),
Ceiling:Aluminium ceiling strip(C5),Remarks:Design and
provise all rooms signage(R29);Design layout and provide all
sanitary ware (Refer to BOH washroom at existing PTB )(
R30)。
Carried to Collection MOP$
Description
ARCHITECTURAL WORKS
Bill Nr. 4/11
Room No.2-012 area and the corresponding items are as follows:
Floor: 600x600mm high pressure laminated raised floor(
F5);Wall:Emulsion paint on 6mm thk. internal lime up to
false ceiling / full height(W3);Ceiling: 600x600mm
acoustic ceiling tile with exposed grid(C1),Remarks:Design
loose furniture layout only(R9);Design and provise all rooms
signage(R29)。
Room No.2-010 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3),
Ceiling: 200x200mm hanging aluminium grid ceiling(C8),
Remarks:Dia. 50mm s.s. bumper rail fix on the skirting / floor
(same as existing PTB)(R3);Design and provise all rooms
signage(R29)。
Room No.2-011 area and the corresponding items are as
follows:Floor:3.0mm thk, vinyl tile on floor screed(F1),
Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion
paint on 6mm thk. internal lime up to false ceiling / full height(
W3),Ceiling: 200x200mm hanging aluminium grid ceiling(
C8),Remarks:Dia. 50mm s.s. bumper rail fix on the skirting /
floor (same as existing PTB)(R3);Design and provise all
rooms signage(R29)。
- BQ.4 /11 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.2-016 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3),
Ceiling: 600x600mm acoustic ceiling tile with exposed grid(
C1)Remarks:Design loose furniture layout only(R9);
Design and provise all rooms signage(R29)。
Description
Bill Nr. 4/12
ARCHITECTURAL WORKS
Room No.2-017 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3),
Ceiling: 600x600mm acoustic ceiling tile with exposed grid(
C1),Remarks: Interior design and provide all furniture(
R11);Interior design layout(R22);Design and provise all
rooms signage(R29)。
Carried to Collection MOP$
Room No.2-014 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3),
Ceiling: 600x600mm acoustic ceiling tile with exposed grid(
C1),Remarks:Design loose furniture layout only(R9);
Design and provise all rooms signage(R29)。
Room No.2-015 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3),
Ceiling: 600x600mm acoustic ceiling tile with exposed grid(
C1),Remarks:Design loose furniture layout only(R9);
Design and provise all rooms signage(R29)。
Room No.2-013 area and the corresponding items are as follows:
Floor: 600x600mm high pressure laminated raised floor(
F5);Wall:Emulsion paint on 6mm thk. internal lime up to
false ceiling / full height(W3);Ceiling: 600x600mm
acoustic ceiling tile with exposed grid(C1),Remarks:Design
loose furniture layout only(R9);Design and provise all rooms
signage(R29)。
- BQ.4 /12 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.2-023 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall: Acoustic panels combines the
natural appearance of wood with unique features for high quality
acoustics(W8),Ceiling:Emulsion paint on gypsum board
false ceiling(C3);Remarks:Interior design and provide all
furniture(R11);Design and provise all rooms signage(
R29)。
Room No.2-019 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3),
Ceiling: 600x600mm acoustic ceiling tile with exposed grid(
C1),Remarks:Design loose furniture layout only(R9);
Design and provise all rooms signage(R29)。
Room No.2-020 area and the corresponding items are as
follows:Floor:3.0mm thk, vinyl tile on floor screed(F1),
Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion
paint on 6mm thk. internal lime up to false ceiling / full height(
W3),Ceiling: 600x600mm acoustic ceiling tile with exposed
grid(C1),Remarks:Design loose furniture layout only(
R9),Design and provise all rooms signage(R29)。
Room No.2-021 area and the corresponding items are as
follows:Floor:3.0mm thk, vinyl tile on floor screed(F1),
Skirting:100mm (H) vinyl skirting(S1),Wall:Emulsion
paint on 6mm thk. internal lime up to false ceiling / full height(
W3),Ceiling: 600x600mm acoustic ceiling tile with exposed
grid(C1),Remarks:Design loose furniture layout only(
R9),Design and provise all rooms signage(R29)。
Description
Bill Nr. 4/13
Room No.2-018 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3),
Ceiling: 600x600mm acoustic ceiling tile with exposed grid(
C1),Remarks:Design loose furniture layout only(R9);
Design and provise all rooms signage(R29)。
Carried to Collection MOP$
ARCHITECTURAL WORKS
- BQ.4 /13 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
lot
E
lot
F
lot
TOTAL - Bill Nr. 4
Room No.3-004 area and the corresponding items are as follows:
Floor:300x300x8mm non-slip homogeneous tile on floor
screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive
up to false ceiling (overall 25mm thk.)(W1),Ceiling:
Aluminium ceiling strip(C5),Remarks:Design and provise
all rooms signage(R29);Design layout and provide all sanitary
ware (Refer to BOH washroom at existing PTB )(R30)。
Room No.3-001 area and the corresponding items are as follows:
Floor:Cement mortar leveling(F8),Wall: Existing finish(
W5),Ceiling:Existing ceiling(C4),Remarks:Design and
provise all rooms signage(R29)。
Room No.3-002 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15 mm thk. painted
hardword skirting (S6);Wall:Wood veneer finish (W6);
Ceiling:Emulsion paint on gypsum board false ceiling (C3);
Remarks:Interior design and provide all furniture(R11);
Design layout and provide reception counter(R18);Design
and provise all rooms signage(R29)。 (refer to appendix 8)
Room No.2-025 area and the corresponding items are as follows:Floor:3.0mm thk,
vinyl tile on floor screed(F1),Skirting:100mm (H) vinyl skirting(S1),Wall:
Emulsion paint on 6mm thk. internal lime up to false ceiling / full height(W3),
Ceiling: 600x600mm acoustic ceiling tile with exposed grid(C1),Remarks:
Design loose furniture layout only(R9);Design and provise all rooms signage(
R29)。
Room No.2-024 area and the corresponding items are as follows:
Floor:3.0mm thk, vinyl tile on floor screed(F1),Skirting:
100mm (H) vinyl skirting(S1),Wall:Emulsion paint on 6mm
thk. internal lime up to false ceiling / full height(W3),
Ceiling: 600x600mm acoustic ceiling tile with exposed grid(
C1),Remarks:Design loose furniture layout only(R9);
Design and provise all rooms signage(R29)。
Room No.3-003 area and the corresponding items are as follows:
Floor: 30mm thk. marble(F6),Wall:Stone paint up to false
ceiling(W4);Ceiling:Emulsion paint on 6mm thk. internal
plaster(C2),Remarks:Design and provise all rooms signage
(R29)。
Carried to Collection MOP$
Description
Bill Nr. 4/14
ARCHITECTURAL WORKS
- BQ.4 /14 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.3-006 area and the corresponding items are as follows:
Floor:300x300x8mm non-slip homogeneous tile on floor
screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive
up to false ceiling (overall 25mm thk.)(W1),Ceiling:
Aluminium ceiling strip(C5),Remarks:Design and provise
all rooms signage(R29);Design layout and provide all sanitary
ware (Refer to BOH washroom at existing PTB )(R30)。
Room No.3-007 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design and provise all rooms signage(R29)。
Bill Nr. 4/15
ARCHITECTURAL WORKS
Room No.3-005 and the corresponding items are as follows:
Floor:300x300x8mm non-slip homogeneous tile on floor
screed(F2),Wall:Ceramic tile on wall plaster with tile adhesive
up to false ceiling (overall 25mm thk.)(W1),Ceiling:
Aluminium ceiling strip(C5),Remarks:Design and provise
all rooms signage(R29);Design layout and provide all sanitary
ware (Refer to BOH washroom at existing PTB )(R30)。
Room No.3-009 area and the corresponding items are as
follows:Floor:Carpet(F4),Skirting:100 mm (H) x 15mm thk.
painted hardwood skirting (S6);Wall:Wood veneer
finish(W6);Ceiling:Emulsion paint on gypsum board false
ceiling(C3);Remarks:Interior design and provide all furniture
(R11),Design layout and provide reception counter(
R18);Design and provise all rooms signage(R29)。
Room No.3-008 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design and provise all rooms signage(R29)。
Description
Carried to Collection MOP$
- BQ.4 /15 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.3-013 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Wood veneer finish(W6),
Ceiling:Emulsion paint on gypsum board false ceiling(C3);
Remarks:Interior design and provide all furniture(R11),
Design and provise all rooms signage(R29)。(refer to appendix
9)
Room No.3-014 area and the corresponding items are as
follows:Floor:300x300x8mm non-slip homogeneous tile on
floor screed(F2),Skirting:300mmx100mm(H) homogeneous tile
skirting(S2),Wall:Emulsion paint on 6mm thk. internal lime
up to false ceiling / full height(W3),Ceiling: 600x600mm
acoustic ceiling tile with exposed grid(C1),Remarks:Design
layout and provide cabinet with wash basin(R7),Design and
provise all rooms signage(R29)。
Bill Nr. 4/16
ARCHITECTURAL WORKS
Room No.3-010 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted
hardwood skirting (S6);Wall:Emulsion paint on 6mm thk.
internal plaster up to false ceiling / full height (W3);Ceiling:
600x600mm acoustic ceiling tile with exposed grid (C1);
Remarks:Design loose furniture layout only(R9);Design and
provise all rooms signage(R29)。
Room No.3-012 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Wood veneer finish(W6),
Ceiling:Emulsion paint on gypsum board false ceiling(C3);
Remarks:Interior design and provide all furniture(R11),
Design and provise all rooms signage(R29)。(refer to appendix
9)
Room No.3-011 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Wood veneer finish(W6),
Ceiling:Emulsion paint on gypsum board false ceiling(C3);
Remarks:Interior design and provide all furniture(R11);
Design and provise all rooms signage(R29)。(refer to appendix
9)
Description
Carried to Collection MOP$
- BQ.4 /16 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.3-019 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Wood veneer finish(W6),
Ceiling:Emulsion paint on gypsum board false ceiling(C3);
Remarks:Interior design and provide all furniture(R11),
Design and provise all rooms signage(R29)。(refer to appendix
9)
Room No.3-017 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1);
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-018 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
ARCHITECTURAL WORKS
Room No.3-015 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Wood veneer finish(W6),
Ceiling:Emulsion paint on gypsum board false ceiling(C3);
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-016 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting:100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Wood veneer finish(W6),
Ceiling:Emulsion paint on gypsum board false ceiling(C3);
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Description
Bill Nr. 4/17
Carried to Collection MOP$
- BQ.4 /17 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.3-020 area and the corresponding items are as follows:
Floor:Carpet (F4),Skirting:100 mm (H) x 15mm thk. painted
hardwood skirting(S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-021 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-024 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Description
Bill Nr. 4/18
ARCHITECTURAL WORKS
Room No.3-023 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-022 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Carried to Collection MOP$
- BQ.4 /18 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.3-026 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-027 area and the corresponding items are as follows:
Floor:Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk.
painted hardwood skirting (S6),Wall:Wood veneer finish(
W6),Ceiling:Emulsion paint on gypsum board false ceiling(
C3);Remarks:Design loose furniture layout only(R9),
Design and provise all rooms signage(R29)。
Description
Bill Nr. 4/19
ARCHITECTURAL WORKS
Room No.3-025 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-028 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-029 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Carried to Collection MOP$
- BQ.4 /19 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.3-032 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9);Sound
isolation requirement(R20),Design and provise all rooms
signage(R29)。
Description
Bill Nr. 4/20
ARCHITECTURAL WORKS
Room No.3-034 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9);Sound
isolation requirement(R20),Design and provise all rooms
signage(R29)。
Room No.3-030 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9);Sound
isolation requirement(R20),Design and provise all rooms
signage(R29)。
Room No.3-031 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9);Sound
isolation requirement(R20),Design and provise all rooms
signage(R29)。
Room No.3-033 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9);Sound
isolation requirement(R20),Design and provise all rooms
signage(R29)。
Carried to Collection MOP$
- BQ.4 /20 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.3-037 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Description
Bill Nr. 4/21
ARCHITECTURAL WORKS
Room No.3-038 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-039 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-036 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-035 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Carried to Collection MOP$
- BQ.4 /21 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.3-042 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Description
Bill Nr. 4/22
Room No.3-044 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-043 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-040 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-041 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
ARCHITECTURAL WORKS
Carried to Collection MOP$
- BQ.4 /22 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
C
lot
D
lot
E
lot
TOTAL - Bill Nr. 4
Room No.3-048 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-049 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-045 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-047 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-046 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
ARCHITECTURAL WORKS
Description
Bill Nr. 4/23
Carried to Collection MOP$
- BQ.4 /23 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A
lot
B
lot
Construction of corridor
Construction of a corridor within the existing room 11568
on departure level using the same material and form of
construction as the existing wall item
Maintaining stability of the remaining parts of the existing wall
during and after construction item
Sealing any building services passing through the new
corridor wall in the same manner as the existing
building services item
Any other items (to be inserted by the Contractor):-
TOTAL - Bill Nr. 4
Room No.3-050 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Room No.3-051 area and the corresponding items are as follows:
Floor:Carpet(F4),Skirting: 100mm (H) x 15mm thk. painted
hardwood skirting (S6),Wall:Emulsion paint on 6mm thk.
internal lime up to false ceiling / full height(W3),Ceiling:
600x600mm acoustic ceiling tile with exposed grid(C1),
Remarks:Design loose furniture layout only(R9),Design and
provise all rooms signage(R29)。
Bill Nr. 4/24
ARCHITECTURAL WORKS
Description
Carried to Collection MOP$
- BQ.4 /24 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Page Nr. BQ.4/1
Page Nr. BQ.4/2
Page Nr. BQ.4/3
Page Nr. BQ.4/4
Page Nr. BQ.4/5
Page Nr. BQ.4/6
Page Nr. BQ.4/7
Page Nr. BQ.4/8
Page Nr. BQ.4/9
Page Nr. BQ.4/10
Page Nr. BQ.4/11
Page Nr. BQ.4/12
Page Nr. BQ.4/13
Page Nr. BQ.4/14
Page Nr. BQ.4/15
Page Nr. BQ.4/16
Page Nr. BQ.4/17
Page Nr. BQ.4/18
Page Nr. BQ.4/19
Page Nr. BQ.4/20
TOTAL - Bill Nr. 4
Carried to General Summary MOP$
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
......................
COLLECTION
......................
......................
......................
......................
Bill Nr. 4
ARCHITECTURAL WORKS
- BQ.4 /25 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 4
Architectural Works
Page Nr. BQ.4/21 ......................
Page Nr. BQ.4/22 ......................
Page Nr. BQ.4/23 ......................
Page Nr. BQ.4/24
TOTAL - Bill Nr. 4
Carried to General Summary MOP$
Bill Nr. 4
ARCHITECTURAL WORKS
COLLECTION
......................
- BQ.4 /26 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
Plumbing & Drainage System
A Supply and install the Plumbing System item
B Supply and install the Drainage System item
C Spare parts item
D Material and drawing preparation and submission item
E Statutory submission item
F Sample boards item
G Interfacing with other E&M system item
H Paint works for materials and equipment item
J Provision of 24-month operation maintenance and
breakdown service item
K Connection and interfacing with existing
system of the Passenger Terminal Building
where necessary; allow for all cost
associated with liaison with existing
maintenance contractors and the airport
operator item
L Testing and commissioning, including testing
and commissioning together with existing
system where necessary; allow for all cost
for liaison with existing maintenance
contractors and the airport operator item
M All necessary modification and configuration item
for interface with the existing system item
Any other items (to be inserted by the Bidder):-
TOTAL - Bill Nr. 5
Carried to General Summary MOP$
Description
Bill Nr. 5
PLUMBING & DRAINAGE SYSTEM
Section 6 - Bill of Quantities
Bill Nr. 5
Plumbing & Drainage System
- BQ.5/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
Fire Services System
A Supply and install the Sprinkler System item
B Supply and install the Hose Reel and Fire Hydrant System item
C Supply and install the Fire Alarm and Detection System item
D Supply and install the Fire Extinguishing System item
E Spare parts item
F Material and drawing preparation and submission item
G Statutory submission item
H Sample boards item
J Interfacing with other E&M system item
K Paint works for materials and equipment item
L Provision of 24-month operation maintenance and
breakdown service item
M Connection and interfacing with existing
system of the Passenger Terminal Building
where necessary; allow for all cost
associated with liaison with existing
maintenance contractors and the airport
operator item
N Testing and commissioning, including testing
and commissioning together with existing
system where necessary; allow for all cost
for liaison with existing maintenance
contractors and the airport operator item
O All necessary modification and configuration item
for interface with the existing system item
Any other items (to be inserted by the Bidder):-
TOTAL - Bill Nr. 6
Carried to General Summary MOP$
Section 6 - Bill of Quantities
Bill Nr. 6
Fire Services System
Description
Bill Nr. 6
FIRE SERVICES SYSTEM
- BQ.6/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
Electrical Services System
Power Supply and Distribution System
A Approved cables item
B KLPE/SWAL/LSOH cables item
C Trunkings item
D LV Switchboard item
E Termination glands item
F MCB distribution boards item
G Busbar chamber item
H Insulated switches item
J Miniature circuit breakers item
K Combined MCB/RCBO units item
L Moulded case circuit breakers item
M Automatic change-over switches item
N Changeover switch item
O Isolating-switches item
P Motion sensors item
Q Daylight sensors item
TOTAL - Bill Nr. 7
Section 6 - Bill of Quantities
Bill Nr. 7
Electrical Services System
Description
Bill Nr. 7/1
ELECTRICAL SERVICES SYSTEM
Carried to Collection MOP$
- BQ.7/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 7
Electrical Services System
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
Provide General Lighting and Essential
Lighting System
A Final circuits item
B Luminaries item
C Lighting control item
D Wiring accessories item
E Provide Essential and Emergency Lighting System item
F Provide Electrical Loading Estimate item
G UPS System Installation item
H Provide the complete Electrical
Earthing and Clean Earthing System Facilities item
Provide Earthing and Lightning Protection System
J Tinned copper tapes item
K Earth terminals item
L Test links item
M Earth rod electrodes item
N Spare parts item
O Material and drawing preparation and submission item
P Statutory submission item
Q Sample boards item
R Interfacing with other E&M system item
S Paint works for materials and equipment item
T Provision of 24-month operation maintenance and
breakdown service item
TOTAL - Bill Nr. 7
Carried to Collection MOP$
Description
Bill Nr. 7/2
ELECTRICAL SERVICES SYSTEM
- BQ.7/2 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 7
Electrical Services System
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A An 11kV/LV transformer unit with at least 1600kVA and associated
distribution electrical system item
B Electrical calculations item
C Connection and interfacing with existing
systems of the Passenger Terminal Building
where necessary; allow for all cost
associated with liaison with existing
maintenance contractors and the airport operator item
D Testing and commissioning, including testing
and commissioning together with existing
system where necessary; allow for all cost
for liaison with existing maintenance
contractors and the airport operator item
E All necessary modification and configuration item
for interface with the existing system item
Any other items (to be inserted by the Bidder):-
TOTAL - Bill Nr. 7
Description
Carried to Collection MOP$
Bill Nr. 7/3
ELECTRICAL SERVICES SYSTEM
- BQ.7/3 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 7
Electrical Services System
Amount (MOP$)
Page Nr. BQ.7/1
Page Nr. BQ.7/2
Page Nr. BQ.7/3
TOTAL - Bill Nr. 7
Carried to General Summary MOP$
......................
Bill Nr. 7
ELECTRICAL SERVICES SYSTEM
COLLECTION
......................
......................
Description
- BQ.7/4 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
MVAC System
A Supply and install the MVAC System item
B Provide Temperature and Humidity Sensors item
C Provide CO2 Sensors item
D Provide dry contact from the ventilation RI/O or I/O modules item
E Provide mechanical exhaust system item
F Provide air purifier item
G Spare parts item
H Material and drawing preparation and submission item
J Statutory submission item
K Sample boards item
L Interfacing with other E&M system item
M Paint works for materials and equipment item
N Provision of 24-month operation maintenance and
breakdown service item
O Connection and interfacing with existing
system of the Passenger Terminal Building
where necessary; allow for all cost
associated with liaison with existing
maintenance contractors and the airport
operator item
P Testing and commissioning, including testing
and commissioning together with existing
system where necessary; allow for all cost
for liaison with existing maintenance
contractors and the airport operator item
TOTAL - Bill Nr. 8
Carried to Collection MOP$
Section 6 - Bill of Quantities
Bill Nr. 8
MVAC System
Description
Bill Nr. 8/1
MVAC SYSTEM
- BQ.8/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 8
MVAC System
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A All necessary modification and configuration item
for interface with the existing system item
Any other items (to be inserted by theBidder):-
TOTAL - Bill Nr. 8
Description
Bill Nr. 8/2
MVAC SYSTEM
Carried to Collection MOP$
- BQ.8/2 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 8
MVAC System
Amount (MOP$)
Page Nr. BQ.8/1
Page Nr. BQ.8/2
TOTAL - Bill Nr. 8
Carried to General Summary MOP$
Bill Nr. 8
MVAC SYSTEM
COLLECTION
......................
......................
Description
- BQ.8/3 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
ELV Systems and Airport Systems
A Closed Circuit Television (CCTV) System item
B Public Address (PA) System item
C Private Automated Branch Exchange (PABX) System item
D Access Control System (ACS) item
E Wireless Network (WLAN) System item
F Radio Communication System item
Flight Information Display System (FIDS)
G Displays item
H Remote reboot units item
J Voice and Data Cabling (VDC) System item
Master Antenna Television (MATV) System
K Allow for set top boxes item
L Televisions item
M Final circuit in coax cables item
N MATV distribution frames item
O Building Management System (BMS) item
TOTAL - Bill Nr. 9
Carried to Collection MOP$
Section 6 - Bill of Quantities
Bill Nr. 9
ELV Systems and Airport Systems
Description
Bill Nr. 9/1
ELV SYSTEMS AND AIRPORT SYSTEMS
- BQ.9/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 9
ELV Systems and Airport Systems
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A Spare parts item
B Material and drawing preparation and submission item
C Sample boards item
D Paint works for materials and equipment item
E Provision of 24-month operation maintenance and
breakdown service item
F Connection and interfacing with existing
system of the Passenger Terminal Building
where necessary; allow for all cost
associated with liaison with existing
maintenance contractors and the airport
operator item
G Testing and commissioning, including testing
and commissioning together with existing
system where necessary; allow for all cost
for liaison with existing maintenance
contractors and the airport operator item
H All necessary modification and configuration item
for interface with the existing system item
Any other items (to be inserted by the Bidder):-
TOTAL - Bill Nr. 9
Carried to Collection MOP$
Description
Bill Nr. 9/2
ELV SYSTEMS AND AIRPORT SYSTEMS
- BQ.9/2 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 9
ELV Systems and Airport Systems
Amount (MOP$)
Page Nr. BQ.9/1
Page Nr. BQ.9/2
TOTAL - Bill Nr. 9
Carried to General Summary MOP$
......................
......................
Description
Bill Nr. 9
ELV SYSTEMS AND AIRPORT SYSTEMS
COLLECTION
- BQ.9/3 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
BUILDING SERVICES
Allow for Builder's works in connection with building services
A Diversion of existing utility services item
B Equipment Room item
C Communication and IT Room item
Any other items (to be inserted by the Bidder):-
TOTAL - Bill Nr. 10
Carried to General Summary MOP$
Section 6 - Bill of Quantities
Bill Nr. 10
Builder's works in connection with Building Services
Description
Bill Nr. 10
BUILDER'S WORKS IN CONNECTION WITH
- BQ.10/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
Signage
A Design and install necessary signage
and take down unnecessary signage
for existing PTB and North Extension to suit new layout design. item
Any other items (to be inserted by the Bidder):-
Carried to General Summary MOP$
TOTAL - Bill Nr. 11
Section 6 - Bill of Quantities
Bill Nr. 11
Miscellaneous
Description
Bill Nr. 11
MISCELLANEOUS
- BQ.11/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A Topographic, utility and geotechnical surveys item
B Site clearance and demolition of existing pavement item
C Subgrade preparation for Bus Staging Area pavement item
D Block paving on sand bedding and lean concrete base
for Bus Staging Area item
E Block paving and kerb for footpath island item
F Pedestrian canopy for footpath item
G Surface water drainage gullies and pipework item
H Surface water drainage manholes or manhole alterations item
J Line markings item
K Perimeter fence item
Any other items (to be inserted by the Bidder):-
Carried to General Summary MOP$
TOTAL - Bill Nr. 12
Section 6 - Bill of Quantities
Bill Nr. 12
Civil Works
Description
Bill Nr. 12
CIVIL WORKS
- BQ.12/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
HALL
Decorative solar film
A Ascertain the correctness of application area item
B Supply of 3M ScotchcalTM Perforated Window Graphic Film
7725-R314 or equivalent subject to CAM’s approval prior
to actual application item
C Printing on the decorative solar film using the design
provided by CAM item
D Application of the printed decorative solar film to
the glass facade item
Any other items (to be inserted by the Bidder):-
Carried to General Summary MOP$
DECORATIVE SOLAR FILM REPLACEMENT ON UPPER
PART OF GLASS FACADE IN THE AIRSIDE DEPARTURE
TOTAL - Bill Nr. 13
Section 6 - Bill of Quantities
Bill Nr. 13
Decorative solar film replacement on Upper Part of
Glass Façade in the Airside Departure Hall
Description
Bill Nr. 13
- BQ.13/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
Preliminaries
A Insurance item
B Site survey report item
C Hoarding item
D Notice board & signage item
E Site mobilization item
F Safety precautions item
G Safety precautions item
H Material submission item
J Shop drawings item
K Detailed design drawings item
L As-built document item
M O & M manual item
N T & C report item
O Access card item
P Provision of 24-month operation maintenance and item
breakdown service
Design work
Q Remote boarding gate item
TOTAL - Bill Nr. 14
Carried to Collection MOP$
Section 6 - Bill of Quantities
Bill Nr. 14
Remote Boarding Gate (OPTIONAL)
Description
Bill Nr. 14/1
REMOTE BOARDING GATE (OPTIONAL)
- BQ.14/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 14
Remote Boarding Gate (OPTIONAL)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
Fabrication and Site Construction
Works
A Remote boarding gate item
Any other items (to be inserted by the Bidder):-
TOTAL - Bill Nr. 14
Description
Carried to Collection MOP$
Bill Nr. 14/2
REMOTE BOARDING GATE (OPTIONAL)
- BQ.14/2 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Section 6 - Bill of Quantities
Bill Nr. 14
Remote Boarding Gate (OPTIONAL)
Amount (MOP$)
Page Nr. BQ.14/1
Page Nr. BQ.14/2
TOTAL - Bill Nr. 14
Carried to General Summary MOP$
......................
......................
Description
Bill Nr. 14
REMOTE BOARDING GATE (OPTIONAL)
COLLECTION
- BQ.14/3 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Quantity UnitRate
(MOP$)
Amount
(MOP$)
A AVDGS display units; weatherproof; consisting of
various LCD or LED modules for Distance-to-
Run Indicator, Azimuth Guidance Indicators,
sensor units, Main Display Panels, optical transceivers/ receivers,
surge arrestors and mountings and fixings item
B AVDGS operator control panels with emergency
stop buttons, housings, mountings, surge arrestor and
fixings; including interconnecting cables and conduits
to AVDGS display unit item
C Control cables; cable containiment including
trunkings, conduits, flexible conduits, all
necessary earthing and bonding, fixing and all
necessary accessories; power provision to above equipment item
D All necessary modification and configuration item
for interface with the existing system item
Any other items (to be inserted by the Bidder):-
Carried to General Summary MOP$
TOTAL - Bill Nr. 15
Section 6 - Bill of Quantities
Bill Nr. 15
AVDGS System (OPTIONAL)
Description
Bill Nr. 15
AVDGS SYSTEM (OPTIONAL)
- BQ.15/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Amount (MOP$)
1 Preliminaries
2 Design of the Works
3 Demolition
4 Architectural Works
5 Plumbing & Drainage System
6 Fire Services System
7 Electrical Services System
8 MVAC System
9 ELV Systems and Airport Systems
10 Builder's Works in connection with Building Services
11 Miscellaneous
12 Civil Works
13 Decorative Solar Film Replacement On Upper Part Of Glass Facade In The Airside Departure Hall
TOTAL (MOP$)
Bill Nr.
Section 6 - Bill of Quantities
General Summary (CORE ITEMS)
Description
GENERAL SUMMARY (CORE ITEMS)
- GS(CORE)/1 -
Design and Build for Fit-Out of
Passenger Terminal Building North Extension
At Macau International Airport (RFQ-221)
Item Amount (MOP$)
14 Remote Boarding Gate (Optional)
15 AVDGS system (Optional)
TOTAL (MOP$)
Bill Nr.
Section 6 - Bill of Quantities
General Summary (OPTIONAL ITEMS)
Description
GENERAL SUMMARY (OPTIONAL ITEMS)
- GS (OPTIONAL)/1 -