status report on beam position stability studies at...

21
Amor NADJI IWBS2004 December 6-10, 2004 1 STATUS REPORT ON BEAM POSITION STABILITY STUDIES AT SOLEIL Amor Nadji on behalf of the SOLEIL team Amor NADJI IWBS2004 December 6-10, 2004 2 q SOLEIL Project Overview q Stability Requirements q Storage Ring Slab q Measurements on the Magnet-Girder Assembly q Measurements on the HLS Prototype q Air Conditioning q Results on the BPM Electronics Prototype q Beam Position FeedBacks CONTENTS

Upload: vonhan

Post on 19-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Amor NADJI IWBS2004 December 6-10, 2004 1

STATUS REPORT ON BEAM POSITION

STABILITY STUDIES AT SOLEIL

Amor Nadjion behalf of the SOLEIL team

Amor NADJI IWBS2004 December 6-10, 2004 2

q SOLEIL Project Overview

q Stability Requirements

q Storage Ring Slab

q Measurements on the Magnet-Girder Assembly

q Measurements on the HLS Prototype

q Air Conditioning

q Results on the BPM Electronics Prototype

q Beam Position FeedBacks

CONTENTS

Amor NADJI IWBS2004 December 6-10, 2004 3

SOLEIL PROJECT : ACCELERATORS

2.75 GeV

STORAGE RING

2.75 GeVBOOSTER

100 MeV

LINAC

BOOSTER:

2 super periods

36 Dipoles : 0.67 T / 2.17 m

44 Qpoles:

10.3 T/m/0.4 m

Drifts: 3.17 m

Circumference:157 m

Emittance:

150 nm

Power supplies cycling at 3 Hz

(SLS concept)

LINAC specification :

• (500 mA in 416 bunches): Output LINAC charge 8 nC in

300 ns

• In temporal structure (100 mA in 8 bunches):

• Output LINAC charge 1.5 nC in 3 bunches

TOP UP Injection : injection every 2 min (for a beam lifetime as bas as 4h).

Amor NADJI IWBS2004 December 6-10, 2004 4

Energy: 2.75 GeV

Circumference: 354.097 m

Emittance H / V: 3.73 nm.rad / 37.3 pm.rad

Number of cells / super periods: 16 / 4

Straight sections: 12 m x 4 ; 7 m x 12 ; 3.8 m x 8

Betatron tunes, νx/νz: 18.19 / 10.29

Natural Chromat. ξx/ξ

z : -52.42 / -22.76

Momentum compaction: 4.49×10-4

Energy dispersion : 1.02 10-3

Revolution Frequency : 0.846 MHz

STORAGE RING MAIN PARAMETERS

Amor NADJI IWBS2004 December 6-10, 2004 5

0

5

10

15

20

25

30

0 10 20 30 40 50 60 70 80

s (m)

βx (m)

10*ηx(m)

βz (m)

OPTICAL FUNCTIONS FOR ONE SUPER PERIOD

Nominal Point : 18.19 / 10.29

Amor NADJI IWBS2004 December 6-10, 2004 6

��2500 users ������������������

• 10 beamlines

in spring 2006

• 24 beamlines in 2009

��43 possible beamlines,

21 on undulators

SOLEIL PROJECT : BEAMLINES

Amor NADJI IWBS2004 December 6-10, 2004 7

v Long term stability : 100 µm / 10 m / year

ü Building foundation, (Piles)ü Alignement, (Girder design)ü HLS survey

v Medium term stability : (24h) (reference BPM versus beamlines)

ü Storage ring tunnel (and water cooling) : 21 °C ± 0.1 °Cü Experimental hall : 21 °C ± 1 °Cü Slow Orbit FeedBackü Top-up

v Short term stability : σCOD < 0.1 σBeam and σ’COD < 0.1 σ’Beam

ü Girder designü Fast Orbit FeedBack

STABILITY CRITERIA

0.50.8Vertical

318Horizontal

σσσσ’COD

(µrad)σσσσ

COD

(µm)

(medium straight section)!Sub-micron tolerances!

Amor NADJI IWBS2004 December 6-10, 2004 8

BUILDING FOUNDATION

üSlab (0.8m thick) of the ring tunnel and experimental hall on simple bored piles (diameter 0.8and 0.6m respectively) with

connected slab.

üNo treatment of the soil.

Chosen solution : Bored Piles

Amor NADJI IWBS2004 December 6-10, 2004 9

Date : Oct 13th 2003 Length : 16 mWeight : 38 t

First Pile

Amor NADJI IWBS2004 December 6-10, 2004 10

128 under the ring tunnel

420 under the experimental hall (4*105)

64 under linac and booster with a slab unconnected

Bored Piles

Amor NADJI IWBS2004 December 6-10, 2004 11

163,230

163,235

163,240

163,245

163,250

163,255

163,260

163,265

163,270

0 50 100 150 200 250 300 350

S (m)

Z (

m)

BETON ANNEAU BETON LINAC BETON BOOSTER

DE

LT

A M

AX

I: 3.5

cm

Anneau de

stockage

Alt moy: 163.251

Booster

Alt moy: 163.246

Linac

Alt moy: 163.246

Profil altimétrique dalles Linac, Booster, anneau de stockage

(30 juillet 2004)

Tolerance : ± 5 mm

NewTolerance : +5/-12 mm

STORAGE RING SLAB PLANARITY

Amor NADJI IWBS2004 December 6-10, 2004 12

STORAGE RING CELLS

v 2 Configurations :

§2 adjacent girders supporting 1 dipole §3 adjacent girders supporting 2 dipoles

v 4 types of girders (a total of 56 girders)

v girder lengths between 3.5 m and 5 m

Amor NADJI IWBS2004 December 6-10, 2004 13

STORAGE RING SURVEYING

v Planimetric survey (s,x) by optical means : ü theodolite (long scale)

ü wire ecartometre (short scale ) designed especially for SOLEIL by afrench company, Symétrie :

rms measured accuracy ~ 5 µm with a 15 m long Kevlar wire

v Altimetry survey (z) : HLS (Hydrostatic Levelling System) network used inabsolute way

HLSFogale HLS (Nîmes, France)

(3 sensors per girder)

(5 m long girder : model view)

Amor NADJI IWBS2004 December 6-10, 2004 14

HLS : Requirements for storage ring

positioning

v In terms of bandwidth:

– Detection of the variations on an hour scale

– Maintenance of the system once a year (ex: slow drift elimination)

v The origin of the main physical parameters to be taken into consideration :

– Thermics : fluid & mechanics dilation,

– Mechanics : fluid movements, stability of the sensor

– Electronics : capacitive measurement & signal conditioning

Amor NADJI IWBS2004 December 6-10, 2004 15

QUALIFICATION TESTS OF THE HLS

(short term stability : 0.4 µm after 1 hour)

Réseau HLS 110m:

Effet du remplissage-vidage

(écart-type)

0.000

0.001

0.002

9:30 10:30 11:30 12:30 13:30 14:30 15:30 16:30 17:30

heure

sig

ma

(m

m)

20mn

55 mn

Re

mp

lissa

ge

Vid

ag

e

0,4 microns

HLS network (110m)Filling up / emptyingeffect (rms values)

Amor NADJI IWBS2004 December 6-10, 2004 16

QUALIFICATION TESTS OF THE HLS

(Long term stability)

Temperature

4 months

5µm

Amor NADJI IWBS2004 December 6-10, 2004 17

5 m LONG GIRDER : MODEL VIEW

(2 jacks)

(1 jack)

Amor NADJI IWBS2004 December 6-10, 2004 18

THE GIRDER STAND

X setting pushing screws

AIRLOC® jack

travel Z= +8/-6 mm

(no loss of the setting after clamping)

clamping on the 4 binding points (increases stiffness)

(one jack configuration)

Amor NADJI IWBS2004 December 6-10, 2004 19

5 m LONG GIRDER : PROTOTYPE REAL VIEW

(This central stand is suppressed in the final version)

Amor NADJI IWBS2004 December 6-10, 2004 20

v Deflexion with full load: ≈ 10µm

5m girder: flatness envelope

-20

-15

-10

-5

0

5

10

15

20

0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000

External side Internal side

15

m

STATIC GIRDER MEASUREMENTS

(with a Micro-Contrôle STR500 alignment laser and a Leica NIVEL20 clinometer)

(15 µm)

Amor NADJI IWBS2004 December 6-10, 2004 21

Q2

Q1

H1

Q3

H2

D-1 Q4-1

D-2

H3-1

Q5-1

H4Q5-2

Q3-2Q4-2

Q7

Q6

H5H6 Q8

180 W

180 W

180 W180 W

180 W180 W180 W

180 W

122 W

122 W

122 W

122 W

122 W

122 W

122 W

350 W

465 W

1000 W

1000 W465 W

465 W

465 W

Puissance dissipée dans l’air

Poutre moyenne

Poutre longue

Poutre courte

AIR CONDITIONING : CELL01 MODELING

Hypothesis : 15% of the power is dissipated in air (pessimistic)

Amor NADJI IWBS2004 December 6-10, 2004 22

STORAGE RING AIR CONDITIONING

Dipole

GirdersUTA

UTA(blowing unit)

Fluorescent Tubes 72W each

1,30m

1,20m

2,50 m

Beam Axis

UTA blowing temperature = 18°Chorizontal widening angle 5°

vertical deflection angle +10°

Amor NADJI IWBS2004 December 6-10, 2004 23

TEMPERATURE DISTRIBUTION :

Horizontal Plane

1 m

Jets froids

1,48 m (UTA axis)1.20 m (Beam axis)

v The achieved static (average) air temperature in the area of the girders is of 19.5 ± 0.3 °C in the longitudinal direction. UTA regulation should insure thetemporal stability within ± 0.1 °C.

(altimetry)

Amor NADJI IWBS2004 December 6-10, 2004 24

DYNAMIC MEASUREMENTS

TEST BENCH : MODEL VIEW

Magnet dummies

Girder prototype

Concrete block

Amor NADJI IWBS2004 December 6-10, 2004 25

TEST BENCH : REAL VIEW

Amor NADJI IWBS2004 December 6-10, 2004 26

LOADED GIRDER RESULTS

3 modes of the dipoleMode1 :12.7 Hz

Ground mode

39 Hz

mode 1

44 Hz

modes 2 & 3

47 & 48.5 Hz

mode 7

103 Hz

mode 6

81 Hz

modes 4 & 5

57 & 60.5 Hz

dipole/girder

contact :

« Line-point-plan »

support

Amor NADJI IWBS2004 December 6-10, 2004 27

NEW MODE OF DIPOLE SUPPORT

(MORE) RIGID FIXATION

Amor NADJI IWBS2004 December 6-10, 2004 28

mode 1 46 Hzmode 1 of the Dipole

shifted to 27Hz

LOADED GIRDER RESULTS WITH RIGID FIXATION

mode 2 55 Hz

Amor NADJI IWBS2004 December 6-10, 2004 29

≤ 1 µm≤ 1 µmbunch pattern

≤ 3 µm≤ 3 µm1-month drift

≤ 1 µm≤ 1 µm8-h drift

≤ 1 µm≤ 1 µmCurrent dependence

20 - 600 mA20 - 600 mADynamic range

≥ 8 kHz10 HzMeasurement rate

≤ 0.2 µm in

100 Hz BW

≤ 0.2 µm @ 10 Hz

rms Resolution @ rep. rate

≤ 20 µm≤ 20 µmAbsolute accuracy

FOFBSOFB

BPM Electronics Requirements

ü Instrumentation Technologies

+ SOLEIL developments

BPM Electronic Module :

Libera from Instrumentation

Technologies

Amor NADJI IWBS2004 December 6-10, 2004 30

Acceptance Tests of Prototype Unit

v Goal : validate the hardware design before series production

v Acceptance test measurements :

– Electronics offsets ≤ 180 µm (easily subtracted via software)

– Stability during one night 1.5 µm in 12 hours (∆T = 1.5 °C)

– Stability due to Temperature variation 10 µm from 10 to 35 °C

– Check first turn lowest measurable current (Booster and Storage ring)

– Bunch pattern dependence (416 B; 8 B; 1 B) ≤ 2.5 µm (to be suppressed by software subtraction, being developed by I -T)

– Beam Current Dependence ≤ 8 µm (not a problem if Top-up, to be suppressed by software subtraction )

– Resolution at 700 Hz rate

v There is no real issue, we have good confident that these requirements can be achieved.

v Tests on table (at SOLEIL, this month) and with beam (at ESRF) are foreseen at the beginning of next year.

Amor NADJI IWBS2004 December 6-10, 2004 31

GLOBAL BEAM POSITION FEEDBACKS

Slow Orbit FeedBack (SOFB) 0 to ~ 0.01 Hz : to be ready for the commissioning

Ø Secondary coils in sextupoles

Ø 120 BPM SVD algorithm 56 H correctors and 56 V correctors and ∆fRF

Ø Aluminium vacuum chamber (eddy current, fcut ~ few Hz)

Fast Orbit FeedBack (FOFB) 0.01 to ~100 Hz : few months after the commissioning

Ø Dedicated FOFB network provides position data to all BPM modules

Ø Each BPM module (in its FPGA) computes one line of the correction matrix and sends the results to the correctors (8 kHz rate in Horizontal and Vertical)

Ø Fast air correctors are installed over the bellows (stainless steel vacuum chamber, fcut ~ few kHz)

Ø 120 BPM SVD algorithm 46 H and 46 V fast correctors (20 bits)

Ö Interaction between both FBs :

§ no frequency dead zone (à la ALS)

§ To avoid FBs fighting : SOFB communicates with FOFB

Amor NADJI IWBS2004 December 6-10, 2004 32

Air coil

Bellows

Supporting post in steel

Stainless steel

(may be later built in invar

or thermally stabilized to a

few 0.01°C)

BPM

Straight Section BPM Support

Amor NADJI IWBS2004 December 6-10, 2004 33

Slow Orbit FeedBack

Control Room

Dserver Profibus

Dserver CH,CVDserver CH,CVDserver HC, VC

Synch. few ms

1.1.1.1. ∆∆∆∆X = Xread -Xref

2.2.2.2. ∆∆∆∆I = R-1 ∆∆∆∆X

3. I = I0 + ∆∆∆∆I

@ 0.1 Hz

Dserver BPM1 Dserver BPM2 Dserver BPM120

Dserver derived

parametersDserver SOFB

Dserver orbit

<x>, xrms, …

Amor NADJI IWBS2004 December 6-10, 2004 34

Fast Orbit FeedBack

Network redundancy

46 correctors 120 BPM

Redundancy for the control of the correctors

Machine dedicated

network

FFB

Gbit link dedicatednetwork

DAC

ADCQDR

Fee dback

Matrix

Coefs

Go lden

Orbit

FaisceauFaisceau

BP M

steerer

DAC

ADCQDR

Fee dback

Matrix

Coefs

Go lden

Orbit

FaisceauFaisceau

BP M

steererI∆I

IDe-

HC HC

BPM BPM

Amor NADJI IWBS2004 December 6-10, 2004 35

FOFB : Command Control Scheme

Dserver BPM Dserver SteererDserver FOFB

Dserver SOFB

?

?

? ?

Control room

FPGA

1 to 120

1 to 46

(preliminary optimization)

Amor NADJI IWBS2004 December 6-10, 2004 36

ACKNOWLEDMENTS

I would like to thank many of my colleagues for many valuableand helpful discussions especially :

ü Jean Claude DENARD : BPM systemü Xavier GLARDON : Air conditioningü Jean-Luc Giorgetta : Measurements on Girdersü Nicolas HUBERT : Fast Orbit FeedBackü Alain Lestrade : Alignment, HLS system

ü Marie-Paule Level and the Machine Physics Group for general discussion.

Amor NADJI IWBS2004 December 6-10, 2004 37

ANNEXE

Amor NADJI IWBS2004 December 6-10, 2004 38

INFLUENCE OF THE CLAMPING SYSTEM

Frequency response for 3 values of the clamping force

Amor NADJI IWBS2004 December 6-10, 2004 39

Key issue : beneficial occupancy of the synchrotron building

• LINAC installation 20 September 2004

• Commissioning: February 2005

• Booster installation 15 December 2004

• S.R. installation March 2005

• Booster commissioning: April 2005

• S.R. commissioning: September 2005

•Phase 1 beamlines (11) opened to Users : Spring 2006

MILESTONES

Amor NADJI IWBS2004 December 6-10, 2004 40

SOLEIL in July 2004

Amor NADJI IWBS2004 December 6-10, 2004 41

BPM in the Arcs

BPM

Support

Girder

Ground slab

Amor NADJI IWBS2004 December 6-10, 2004 42

CORRECTORS FOR THE SLOW ORBIT FEEDBACK