Triangle Energy (Global) Limited (ASX Code: TEG)
2011 Annual General Mee�ng Thursday 24 November 2011 1
-
Agenda
1 Welcome
2 Chairman’s Address
3 Resolu�ons
4 Company update
2
-
Chairman’s Address -‐ John Towner
3
-
4
Chairman’s address
Financial highlights – Revenue of $16.8 million – Net profit of $0.39 million
Opera�onal highlights – 3 wells producing; A-‐1, A-‐5 and A-‐6 – Total annual gas produc�on of 1.97 billion cubic feet – 20 year PSC renewal con�nued through regulatory process
Future outlook
-
Formal Business
5
-
6
Vo�ng -‐ Resolu�ons
RESOLUTION 1 Elec�on of Mr Steve Hamer as a director
RESOLUTION 2 Elec�on of Mr Lewis Johnson as a director
-
7
Vo�ng -‐ Resolu�ons
RESOLUTION 3 Approval for the issue of up to 270,000,000 new fully paid ordinary shares
RESOLUTION 4 Adop�on of the remunera�on report (non-‐binding) For Against
Chairman's Discre�on Abstain
201,305,750 200,000 3,833,877 355,480,798
-
Company update -‐ Duncan Nu�all
8
-
9
Experienced team Management team
Robert Lemmey Country Manager -‐ Indonesia
Tony Anson Drilling Manager
Joseph Oravetz Explora�on Manager
Djakfar Husein Aceh government
rela�ons
Joe Abshire Civils Engineer
John Towner Execu�ve Chairman Duncan Nu�all Chief Execu�ve Officer
Charles Beales & Stuart Liddle Field Managers
-
10
>40 Acehnese employees & contractors
Excellent staff reten�on rates
§ Zero accident safety record
Local employer of choice
-
11
Corporate Social Responsibility
2010/11 programs: – Educa�on
School refurbishment School equipment Teacher housing
– Health Medical clinics Water wells
– Relief Humanitarian aid
-
12
Pase Loca�on
Malaysia
-
§ 3 wells successfully re-‐commissioned, A1, A5 and A6 (2009)
§ Acid s�mula�on of A1 successfully completed (early 2011)
§ Work-‐over program of A1 successfully completed to open up more reservoir interval (2011)
13
Pase produc�on ac�vi�es
§ Comple�on run in A2 (2011) and prepara�ons underway to commission this well (original DST rates >20 MMcf/d from two separate reservoirs)
-
14
Pase produc�on and prices
0
100
200
300
400
500
600
700
800
900
0
2
4
6
8
10
12
14
16
18
20
09Q3 09Q4 10Q1 10Q2 10Q3 10Q4 11Q1 11Q2 11Q3
Gas (MM cf)
US$/M
illion BTU
Quarter
Pase quarterly produc�on and prices
Pase produc�on
Pase average gas price
Henry Hub average gas price
Indonesian domes�c price
-
§ Significant explora�on upside
§ EM only interested in very significant gas culmina�ons (>1TCF)
§ Triangle Energy assembled very experienced subsurface team
§ Development of leads database
§ In-‐fill drilling loca�ons
§ Seismic data reprocessing
§ Near-‐field drilling targets
15
Explora�on upside
-
16
Pase exis�ng seismic coverage
-
17
Pase seismic re-‐processing
!"#$%&'()*+,%-./%.0"1"#23%4056$77"#1%829$%84%:2#1$%;=>%?9
7$6@A%
!"#$%&'()*+,%!"#$"%&'()(*+%,$-&."%/0&11(*2$,(--%./0$%.1%2/#3$% %451%.6/78%9:% .;%
-
18
Pase seismic re-‐processing
!"#$%&'(%
)*% +,%
-$./
0%12
/3%45
-++6
%
!"#$%&'7%
89:$%;
-
19
Pase field infill and near field opportuni�es
-
20
B90-‐451/BP-‐226 Arbitrary line TPI Brute stacks – Close to SLS-‐D field
Pase A-9 Pase A-3
Line B90-451 BP87-226
NW SE NE
Green line Previous Interpreta�on
-
21
SLS-‐D opportunity (Pase field)
Top Reservoir TWT Map SLS 3D Survey
§ A carbonate buildup lead has been identified in the Pase portion of the SLS-D area.
§ As of January 2011, ExxonMobil produced 430 BCF from SLS-D.
§ Preliminary 2D seismic re-processing suggests the SLS-D carbonate reservoir extends into the Pase block.
Peutu Carbonate
Lead
-
22
Aceh acquisi�on opportunity
#
#
SUM N OFF 02
SUM N B
SUM N B
PASE
PASE
NSO J
NSO A
ARUN
NSO R
KUALA LANGSA
ALUR SIWAH
NSO N
JULU RAYEU
JAMBU AYE UTARA
RAYEU
GURAME
TUALANG
SALEM
NSO K
SOUTH LHO SUKON APEUDAWA
PEULALU
NSO L
TERIPANG
LEMURU
PERLAK
PEUSANGAN B
BAGORAYEU B
ALUR CIMON SE
CUNDA
BATAIEE TABEUE
NSO U
PASE A
ARUN LNG PLANT
0
-100
-200
-300
-400-500
-1000
-100
-100
98°0'0"E
98°0'0"E
97°30'0"E
97°30'0"E
97°0'0"E
97°0'0"E
'0"N 6°0'0"N
'0"N 5°30'0"N
'0"N 5°0'0"N
97°0'0"E
5°0'0"N
97°0'0"E
5°30'0"N
97°0'0"E
6°0'0"N
97°30'0"E
5°0'0"N
97°30'0"E
5°30'0"N
97°30'0"E
6°0'0"N
98°0'0"E
5°0'0"N
98°0'0"E
5°30'0"N
98°0'0"E
6°0'0"N
Pase, Block-B, and NSO Blocks - North Sumatra
0 10 20 30 405Kilometers
4
LegendBATHY_L
TPI Pase PSC
ExxonMobil Block-B
ExxonMobil NSO
ExxonMobil planned sale of Aceh assets: NSO PSC NSO fields Block B PSC Arun field SLS field Arun LNG Plant 30% interest TEG currently conduc�ng due diligence on the assets
-
23
Target assets
NSO ‘A’ PLATFORM