generic presentation eeis

Post on 12-Jun-2015

147 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Energy Efficiency Information System (EEIS)

Prepared forCadmus College

March 23, 2010

2

How EEIS Began• 2006 - Aquila engages Quantec to fix their

excel-based tracking system after it freezes…

• Tracking system for utilities:– Multiple implementers– Web-based interface

• Participants – refreshed regularly from utility db.• Equipment – one db alone has over 200k entries• Program rules – very complex; frequent tweaks.

• 2 utilities running programs across 7 territories

3

Market Evolution

• Excel spreadsheets for tracking single programs, to…

• Multi-state, multi-portfolio, multi-program implementations

• Integration of external databases, Treasury functions, project management and sophisticated real time analytics.

4

System Structure

5

Integrated Tracking Perspective

EEIS tracks: Participant data

Baseline energy data

Customer calls

Energy audit &

education

Contract work

completed

Work approved

Energy Auditor

completes check

Revised energy data

Customer Satisfaction

survey completed

Implementer tracks deployment stages, not performance.

Piedmont CIS data

Equipment efficiency

data

Codes & Standards

EEIS tracks only data relevant to program performance from implementer and external databases.

7

How do we deploy EEIS?

Kickoff meeting: Program structure, rules & input pages.

EEIS configuration, and set-up including minor

customization Data maintenance & user support.

Documentation, training & user

acceptance

Major customization

Standard deployment: 1 1/2 to 2 monthsIncluding major customization approx. 2-3 months

Design phase InstallationTraining &

acceptanceFurther Customization & ongoing support

8

Tracking Basics

Goals and Rules

9

Tracking Basics

Goals and Rules

Data Entry

10

Tracking Basics

Quality Control

Goals and Rules

Data Entry

11

Tracking Basics

EvaluationQuality Control

Goals and Rules

Data Entry

12

Reporting

• Evaluation through reporting• Reports give access to

– Goals and expectations– Participation data– Comparison of participation against

goals

EvaluationQuality Control

Goals and Rules

Data Entry

13

Reporting

Portfolio/Program Status Reports– Executive Summary– Expenditures– Installations– Participation– Savings Impacts

EvaluationQuality Control

Goals and Rules

Data Entry

14

Reporting

Ad Hoc Reports– Data Entry Summaries– Program Summaries

EvaluationQuality Control

Goals and Rules

Data Entry

15

Data Integration

EvaluationQuality Control

Goals and Rules

Data Entry

EEIS

CIS Equipment

Treasury

ProgramRules

Participation

Imports

Exports

16

Data Validation

EvaluationQuality Control

Goals and Rules

Data Entry

• Uses data integration to validate– CIS– Equipment– Participation– Program Rules– Treasury

17

Data Entry

• Participation can be hand entered• Step-by-step process• Usually done by implementers

Quality Control

Data Entry

EvaluationGoals and

Rules

18

Rules

• Program rules defined in program planning (e.g. Portfolio Pro)

• Rules include– Eligible participant base– Eligible equipment or measures– Efficiency requirements

Quality Control

Data Entry

EvaluationGoals and

Rules

19

Goals

• Program goals defined in program planning (e.g. Portfolio Pro)

• Goals include– Participation targets– Savings targets– Budget targets

Quality Control

Data Entry

EvaluationGoals and

Rules

22

What Sets EEIS Apart• Capture, report and export of data required by utilities for

assessing the effectiveness of programs

• Real-time validation of both participants and equipment – this reduces errors and confusion for customers and the utility

• Sophisticated analytics to assess net energy savings, program costs - tracks programs against the utilities' key performance goals

• Flexible software allows accurate tracking for extremely complex programs

• Ad Hoc Reporting allows DSM program managers to design targeted queries that arrange data from unique perspectives

23

Contact Information

Business Contacts Technical Contacts

Jim ThayerSenior AssociateThe Cadmus GroupTel: (503) 467-7137jim.thayer@cadmusgroup.com

Ryan KilkennyApplication Development LeadThe Cadmus GroupTel: (503) 467-7135ryan.kilkenny@cadmusgroup.com

Ken SeidenPrincipleThe Cadmus GroupTel: (503) 467-7124ken.seiden@cadmusgroup.com

Spencer LittleApplication DeveloperThe Cadmus GroupTel: (503) 467-4558Spencer.little@cadmusgroup.com

24

Questions?

top related