ESTIMATION
Messrs : Sankyu - Thai Co.,Ltd.
Wellgrow Industrial Estate Ph III
90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong
Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287
Attn. : Mr. Surathep Lertsara
Manager
CC. :
Project: New Injection Machine Installation
Locatio: Wellgrow Industial Estate
Title of works : New Injection11 Machine Install
Job No.: SKT 080921
Revisio: 1
EIR ENGINEERING CO.,LTD.
228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270
Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com
228/94 5 . . . . 10270
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
2/16
Revision Date:10/05/2008
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
3/16
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
4/16
Revision Date:10/05/2008
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
5/16Page 5 of 16 EIR Engineering Co.,Ltd.
EIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 102
Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .co
QUOTATION
Quotation: SKT 080921
Messrs. : Sankyu - Thai Co.,Ltd. Date : 25 August 2008
: Wellgrow Industrial Estate Ph III Validity of Quotation :
: 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,Preparing Period :
: .A.Bangpakong Chachoengsao 24180 Delivery :
Tel. : Tel 038-522280 - 7 Fax. 038-522288 Revised : 1
Attn. : Mr. Surathep LertsaraP/O No.
:
: Manager
1) Price ( Baht ### Excluded Vat 7%
2) Project New Injection Machine Installation
3) Title of work New Injection11 Machine Install
4) Term of Payment Within 30 days
Item Description uantitUnit Amount
1 DIRECT COST 1 LOT 258,550.00
2 INDIRECT COST 1 LOT 7,500.00
3 EXPENSE & PROFIT 1 LOT 39,907.50
TOTAL 305,957.50VAT 7% 21,417.03
FINAL AMOUNT 327,374.53
We hope that our confirmation will meet with your requirement and look forward to receiving your val
Your Faithfully,
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
6/16Page 6 of 16 EIR Engineering Co.,Ltd.
Sukhon Thewaran
Manager
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
7/16Page 7 of 16 EIR Engineering Co.,Ltd.
0
uable order in due course
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
8/16Page 8 of 16 EIR Engineering Co.,Ltd.
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
9/16
EIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakar
Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @
SUMMARY OF QUOTATION
Bidder : EIR ENGINEERING CO.,LTD. Quotation No. : SKT 080921
Client : Sankyu - Thai Co.,Ltd. Date : ###
Project : New Injection Machine InstallationRevision No. : 1
Title of : New Injection11 Machine Install
ItemDescription Q'ty UnitUnit Cost Total Amount
1 Direct Cost
A NEW INJECTION M/C NO.11 INSTALL WORK 1 lot ### 258,550.00
Subtotal 1 ###
2 Indirect Cost
2.1 Site Staff and Supervisor 1 lot
2.2 Transportation 1 lot 5,000.00
2.3 Tool and consumption 1 lot 2,500.00
2.4 Site Expense 1 lot
1 Temporary Facilities
2 Small Construction Supplies
3 Utility Supply Costs
Subtotal 2 7,500.00
3 Expense & Profit 39,907.50
GRAND TOTAL ###
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
10/16
10270
gmail .com
COST Different
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
11/16
8453278.xlsBOQ Page 11 of16 EIR Engineering Co.,Ltd.
Estimation SheetClient Sankyu - Thai Co.,Ltd. Date : ###
Project New Injection Machine Installation Job Number : SKT 080921
Location Wellgrow Industial Estate Revision : 1
Title Of W New Injection11 Machine Install
No. Description Q'ty Unit nit Pric Total Cost Remark
1 DIRECT COST
A NEW INJECTION M/C NO.11 INSTALL WORK
A1 NEW INJECTION M/C INSTALL WORK
- PM11 MDB PANEL 1 SET Existing
-Sub-Panel 250 A. 1 SET Existing
-NEW INJECTION MACHINE 700 A. 1 SET Existing
-CHILLER MACHINE 100 A. 1 SET Existing
-MOLD TEMP MACHINE 1 SET Existing
-HOPPER DRYER MACHINE 1 SET Existing
- JET LOADER 1 SET Existing
-CRUSHER 1 SET Existing
-WIRE AND CABLE CV 1 C - 185x3 (x2) sq. R,S,T 230 M 750.00 172,500.00 Inj. M/C No.11
- WIRE AND CABLE THW 1C - 50 sq. G 40 M 207.00 8,280.00 Inj. M/C No.11
-WIRE AND CABLE CV 4 C - 25 sq. 10 M Supply By Owner Chiller
-WIRE AND CABLE CV 4 C - 16 sq. 15 M Supply By Owner Mold Temp
-WIRE AND CABLE CV 4 C - 10 sq. 15 M Supply By Owner Dryer
-WIRE AND CABLE CV 4 C - 6 sq. 15 M Supply By Owner Jet Loader
-WIRE AND CABLE CV 4 C - 2.5 sq. 20 M Supply By Owner Crusher
-WIRING CONNECT ACCESSORIES 1 LOT 2,000.00 2,000.00
-FLEXIBLE CONDUI 3 " 3 M 400.00 1,200.00
-FLEXIBLE CONDUI 1 1/2 " 3 M 170.00 510.00
-FLEXIBLE CONDUI 1 1/4 " 3 M 140.00 420.00
-FLEXIBLE CONDUI 1 " 3 M 90.00 270.00
-FLEXIBLE CONDUI 3/4 " 3 M 65.00 195.00
-FLEXIBLE CONDUI 1/2 " 3 M 45.00 135.00
-FLEX CONDUIT ACCESSORIES 1 LOT 2,000.00 2,000.00
-CABLE RACK W:300 L:3000 5 SET 1,340.00 6,700.00
-CABLE RACK W:200 L:3000 6 SET 1,230.00 7,380.00
-CABLE RACK TEE REDUCE W:300/200 2 SET 820.00 1,640.00
-CABLE RACK HORIZONTAL W:200 2 SET 570.00 1,140.00
-CABLE RACK VER-IN W:200 1 SET 500.00 500.00
-CABLE RACK VER-OUT W:200 1 SET 500.00 500.00
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
12/16
8453278.xlsBOQ Page 12 of16 EIR Engineering Co.,Ltd.
-CABLE RACK COVER W:200 8 SET 930.00 7,440.00
- CABLE RACK COVER HORIZONTAL W:200 2 SET 430.00 860.00
-CABLE RACK COVER VER-IN W:200 1 SET 350.00 350.00
-CABLE RACK COVER VER-OUT W:200 1 SET 350.00 350.00
-CABLE RACK ACCESSORIES 1 LOT 2,000.00 2,000.00
-WIREWAY W:300 2 SET 1,670.00 3,340.00
-WIREWAY VER-OUT W:300 2 SET 670.00 1,340.00
- STEEL SUPPORT C:75 800X660X400 10 SET 1,600.00 16,000.00
- STEEL SUPPORT C:75 1500X300X1500 1 SET 2,000.00 2,000.00
-MISCELENEOUS 1 LOT 3,000.00 3,000.00
-PAINTING WORK 1 LOT 1,500.00 1,500.00
- LABOR CHARGE 1 LOT ### 15,000.00
TOTAL A1 ###
TOTAL A ###
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
13/16
8453278.xlsBOQ Page 13 of16 EIR Engineering Co.,Ltd.
MD Ratio
Materials 1.10
install 1.000 350.00 400.00
Material Cost Labour Cost
Q'ty Unit Unit Price Total Cost nit M/D otal M/D Unit Price labour cost
230 M 609.00 140,070.00
40 M 159.00 6,360.00
- M 450.00 -
- M 280.00 -
- M 190.00 -
- M 130.00 -
20 M 73.00 1,460.00
1 LOT ### 2,000.00
3 M 400.00 1,200.00
3 M 170.00 510.00
3 M 140.00 420.00
3 M 90.00 270.00
3 M 65.00 195.00
3 M 45.00 135.00
1 LOT ### 1,000.00
- SET ### -
6 SET ### 7,326.00
2 SET 759.00 1,518.00
2 SET 528.00 1,056.00
1 SET 440.00 440.00
1 SET 440.00 440.00
Cost /m Offer /md
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
14/16
8453278.xlsBOQ Page 14 of16 EIR Engineering Co.,Ltd.
6 SET 756.00 4,536.00
2 SET 336.00 672.00
1 SET 300.00 300.00
1 SET 300.00 300.00
1 LOT ### 2,000.00
2 SET ### 2,806.00
2 SET 616.00 1,232.00
10 SET ### 15,000.00
1 SET ### 2,000.00
1 LOT ### 2,500.00
- LOT ### -
1 LOT ### 30,000.00
225,746.00
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
15/16
8453278.xlsBOQ Page 15 of16 EIR Engineering Co.,Ltd.
Amount Different
Total Cost Cost
-
8/14/2019 Den So 080921 Revise1 New Inj11 Install
16/16