    Overview

    The Undo Mining command is used to remove material from the schedule, and allows you to 'step back' to an earlierpoint in the schedule. It allows you to undo mining on all blocks or currently-selected blocks, and provides a choice ofperiod options. You can run this command at any point in the schedule to return to an earlier stage.

    Exercise: Undo Mining

    Scheduling a Selected Block

    1. In the Design window, select block 1, highlighted below (click on one of the open boundaries to select it):

    2. In the Reserves control bar, confirm that '354005' is shown in the Total row for the Tonnes column.

    3. In the ISTS Task Pane , select Scheduling | Manual Scheduling | Schedule Selected Blocks .. ..

    4. In the Schedule Activities dialog, Loading (manual) row, click Schedule... .5. In the Schedule Selected Bl ocks dialog, Period: group, select [Period 1 - [date]] from the drop-down list.

    6. In the Total row, Loader column, select [LDR2] from the Set All drop-down list.

    7. In the Total row, Percent column, type '50', and click OK .

    8. In the next 3 Studio 3 dialogs, click Yes .

    9. In the Studio 3 dialog, click OK to dismiss the final warning.

    10. In the Schedule Activities dialog, click Done .

    11. In the ISTS Task Pane , select Scheduling | Manual Scheduling | Acti vity Schedule .

    12. In the Ac tivi ty Schedu le dialog, Machine Class: group, select [LDR2] from the drop-down list.

    13. In the Ac tivi ty Schedu le dialog, Activity column, confirm that "Loading" is shown:

    Undo MiningUsing the Undo Mining command

    Prerequisites

    Complete the following exercises:

    Loading Files and Configuring Legends

    Configuring Project Settings

    Schedule Selected Blocks

    Complete the Destinations and Stockpiles section.

    Pgina 1 de 2Undo Mining

    09/01/2 014mk:@MSITStore:C:\Program%20Files%20(x86)\CAE\Studio\Help\ISTS_ Tutorial.ch ...You cre ated this PDF from an application that is not licensed to print to novaPDF printer ( http://www.novapdf.com )

    http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...
  • 8/13/2019 ISTS Tutorial 3ra Parte

    2/15

  • 8/13/2019 ISTS Tutorial 3ra Parte

    3/15

    Home > ISTS Tutorial > Scheduling > Manual Scheduling > Reviewing the Schedule

    Overview

    In this exercise, you will review the schedule settings you have specified, and modify them where necessary.

    Exercise: Reviewing the Schedule

    Schedule Control Bar

    1. Turn on the display of these control bars by selecting them in the main menu, as follows. Only show control barsthat are not already displayed:

    View | Customization | Control Bars | ISTS Results .

    View | Customization | Control Bars | ISTS Schedule .

    View | Customization | Control Bars | ISTS Machines .

    View | Customization | Control Bars | ISTS Stockpiles .

    View | Customization | Control Bars | ISTS Targets .

    2. Each of the new control bars will be shown as a tab at the bottom of the Reserves table view. Select theSchedule - Period 1 - [date] control bar.

    3. In the Schedul e - Period 1 - [date] control bar, right-click and select Grid Format... :

    4. In the Grid Format dialog, left-hand pane, select all columns using the key.5. In the Formatting group, select Hide column and click OK. All columns are removed from the Schedule table other

    than the Destination column.

    6. Right-click and select Grid Format... again

    7. In the left-hand pane, select ONLY the following columns using the key:Tonnes

    Density

    Capacity

    AU

    CU2

    CU

    8. In the Grid Format dialog, Formatting group, deselect Hide column , and click OK .

    9. In the ISTS Schedule control bar, confirm that only columns for the fields listed above are displayed, and that the"Plant" row is displayed in red:

    Reviewing the ScheduleReviewing the scheduled tonnages to meet production requirements

    Prerequisites

    Complete the following exercises:

    Loading Files and Configuring Legends

    Configuring Project Settings

    Schedule Selected Blocks

    Complete the Destinations and Stockpiles section.

    Pgina 1 de 3Adjust Schedule

    09/01/2 014mk:@MSITStore:C:\Program%20Files%20(x86)\CAE\Studio\Help\ISTS_ Tutorial.ch ...You cre ated this PDF from an application that is not licensed to print to novaPDF printer ( http://www.novapdf.com )

    http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...
  • 8/13/2019 ISTS Tutorial 3ra Parte

    4/15

    10. In the ISTS Task Pane , select Check | Check Schedule .

    11. In the Check Schedule dialog, left-hand pane, select Period Capacity .

    12. In the Check Schedule dialog, confirm that one or more rows are displayed for periods '1','2','4','5','6','7', and '8',for the destination "Plant".

    13. In the ISTS Task Pane , select Scheduling | Manual Scheduling | Schedule from Stockpi les... .

    14. In the Schedule from Stockpiles dialog, Period group, confirm that [Period 1 - [date]] is selected.

    15. In the Loader column, select [LDR2] from the Set All drop-down list.

    16. In the "STOCKPILE 1" row, Tonnes column, type '2000', and click OK .

    17. In the Studio 3 dialog, click No .

    18. In the Schedule from Stockpiles dialog, click OK .

    19. In the Check Schedule dialog, confirm that period 1 is no longer listed for any of the rows in the table.20. Close the Check Schedule dialog (use the top-right 'x')

    Targets Contro l Bar

    1. Select the Targets control bar.

    2. In the Targets control bar, right-click and ensure that Show All Periods is selected - the target results for allperiods will be shown.

    Machines Control Bar

    1. Select the Machines control bar.

    2. In the Machines control bar, right-click and deselect Show Fleet if it is selected.

    3. Confirm that the values displayed refer to units, rather than multiple machines.

    4. Right-click and select Show Fleet

    5. Confirm that the values now displayed refer to machine units, rather than multiple machines.

    Stockpiles Control Bar

    The "Plant" row is displayed in red to indicate that there is a scheduling problem affecting the Plant desti

    This indicates that the tonnage constraint which you added for the Plant destination has not been met. Tby which this constraint has not been met is displayed in the Difference column.

    This exceeds the value displayed in the Check Schedule dialog, Difference column, for period 1.

    For the PLANT FEED target for all 11 periods, text is displayed in red. This indicates that the Plant Feed targethas not been met for the destination "PLANT". The amount by which this target has been missed is shown in thDifference column - this value is taken from the mid point of the target.

    This is indicated by the title "Machines (by unit)" being displayed in the title bar of the Machines controlwell as the suffix "/Unit" being displayed in relevant columns.

    This is indicated by the title "Machines (by fleet)" being displayed in the title bar of the Machines controlwell as the suffix "/Fleet" being displayed in relevant columns.

    Pgina 2 de 3Adjust Schedule

    09/01/2 014mk:@MSITStore:C:\Program%20Files%20(x86)\CAE\Studio\Help\ISTS_ Tutorial.ch ...You cre ated this PDF from an application that is not licensed to print to novaPDF printer ( http://www.novapdf.com )

    http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...
  • 8/13/2019 ISTS Tutorial 3ra Parte

    5/15

  • 8/13/2019 ISTS Tutorial 3ra Parte

    6/15

    Home > ISTS Tutorial > Scheduling > Updating the Schedule > Updating the Manual Schedule

    Updating the ScheduleIn the following exercises, you are going to make use of the Update Schedule function.

    This is a powerful facility that allows you to adjust your scheduling settings in the case of changes in production parameters.

    For example you may wish to do this if a maintenance calendar is no longer valid (say, machinery maintenance downtime has been revised downwards due to a previous over-estimate of machinery failure), or you need to perform a revised schedule based on changes in the actual reserves measured from previous operations.

    There are restrictions to updating your schedule, but this function allows you to perform a wide range of edits that will accommodate your real-world findings at any point in the existingschedule. Full control is granted over how existing periods are managed, allowing you to make the 'forward timeline' more accurate than simply proceeding with the original values. Youcan update your schedule by editing any (or all) of the following information categories:

    Reserves : where new/updated reserve information exists, you can use this to drive the schedule moving forward in time.

    Outlines : where geophysical boundaries are no longer in line with the original (baseline) shapes, you can update your schedule with new outline information. Note that theoutlines are a visual representation of the blocks being mined and edits to this file will not affect the reported scheduling values.

    Calendars : update your schedule where calendar reporting structures have changed, or downtime is revised.

    Destinations : you can change the capacity of the destinations in question (but note, you cannot change other 'rules' of the destination, such as material type)

    Machines : you can continue your schedule based on edited machine settings and/or new fleet configurations

    Trucks : New haulage parameters can be used to dictate the on-going schedule

    Targets : Where new grade/tonnage targets are realised, you can use these to drive the schedule into the future

    Scheduling parameters can change quickly and often, and the Update Schedule function makes it easy to perform an update at any time, allowing you to review the effect of thechanges on subsequent activities and undo (and re-do with new parameters) as often as you like.

    In this exercise, you are going to update the schedule generated in the previous exercise by adjusting the maintenance calendar originally created in the Calendars exercise so that itreports in a different way (a different configuration of days, weeks and months). You will also change the capacity of the STOCKPILE 1 destination and review the impact of this on theon-going schedule before undoing it to continue the tutorial.

    For more information on this facility, you can also consult your Studio 3 online help.

    Links to exercises

    The following exercises are available on this page:

    Updating the Calendar Updating the STOCKPILE Destination and updating the schedule

    Reviewing the Updated Schedule

    Undoing the Schedule Updates

    Updating the Calendar

    Following on from the previous exercise, you are going to use the Update Schedule function to change the currently reported date configuration to a new arrangement. As set up inCalendars exercise, you are reporting against the following calendar:

    You are going to change this to report against the following calendar:

    1 . In the ISTS Task Pane , select Schedule Management | Update Schedule...

    2. The Update Schedule dialog is displayed. In the Update group, enable the Calendars check box and click the associated ellipsis (...) button.3. The current calendar Time Periods are displayed as shown in the image above.

    4. In this exercise, you are going to create a new calendar configuration (although you can simply update the original calendar if required for your needs). Click Clear to remove allcalendar entries from the table.

    5. Change the schedule start date to begin 1 week from the current date (your new schedule will come into effect in 1 week's time). You do this by selecting the Start Date drop-down list to reveal a mini-calendar, e.g.:

    Update Schedule TutorialSelectively updating the schedule with new information

    Prerequisites

    You have completed the previous exercises Schedule Selected Blocks , Undo Mining and Reviewing the Schedule .

    You are using Studio version 3.22 or later (The Update Schedule function was introduced in Studio 3 Maintenance Release MR22).

    Pgina 1 de 3Updating the Manual Schedule

    09/01/2 014mk:@MSITStore:C:\Program%20Files%20(x86)\CAE\Studio\Help\ISTS_ Tutorial.ch ...You cre ated this PDF from an application that is not licensed to print to novaPDF printer ( http://www.novapdf.com )

    http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...
  • 8/13/2019 ISTS Tutorial 3ra Parte

    7/15

    6. Change the Number of Periods to '2' and click Generate . This will add two dates (schedule start date and schedule start date + 1) to the table below, e.g.:

    7 . Change the Period Length TYPE (the drop-down list to the right of the Period Length field) and select [Week(s)], and click Generate .

    8. Two more entries are added to the table representing two weeks additional scheduling:

    9. Finally, two more time periods will be added, this time months. Change the Period Length TYPE to select [Month(s)] and click Generate .

    1 0. C lick OK .

    Updating the STOCKPILE Destination Capacity

    As this update also includes changes to the STOCKPILE 1 destination, the following exercise shows you how to update the Destinations information category prior to running anupdate.

    1 . In the Update Schedule dialog, enable the Destinations check box and click the corresponding browse button.2 . In the Destinations dialog select the [STOCKPILE 1] destination and click Edit .

    3. The Destinations: STOCKPILE 1 dialog is displayed - note that some of the settings here are not editable (when updating a schedule, you are restricted in how you can adjustdestinations. Click the Stockpile Settings button.

    4 . In the Destinations: STOCKPILE 1: Stockpile Settings dialog, click the Supply tab. You are going to edit the settings to adjust the period in which material is scheduled to thestockpile (this is to accommodate the changes made to the calendar in the previous section).

    5. Change the [Period 6 - #date#] entry using the drop-down list to change it to [Period 3 - #date#] - this ensures material will be delivered to the stockpile in Period 3, not 6, inorder to meet the specified targets. Click OK .

    6 . In the Destinations: STOCKPILE 1 dialog , click OK.

    7 . In the Destinations dialog, click OK.

    8 . In the Clipping group, select the Keep All Activities option.

    9 . Select the Schedule at earliest time option . The two settings above will ensure that all activities currently scheduled are pushed forward to meet the new timeline. For moreinformation on the other options, including how to clip activities in progress, consult your Studio 3 online help.

    1 0. C lick Update . A CSV file will be generated and displayed containing a summary of the changes that have been made to the schedule - note that items that have not beenaltered by the new settings are not shown; only changed items are reported.

    11. Close the CSV file.

    Reviewing the Updated ScheduleThe schedule has now been updated; from the date specified, a new calendar will be used to determine the schedule and a new supply period has been set for the STOCKPILE 1destination. To see how this has impacted the previous schedule report, go through the following exercise:

    1 . Leave the Update Schedule dialog displayed.

    2 . Using the ISTS Task Pane , select Manual Scheduling | Act ivity Schedule .

    3 . In the Act iv ity Sched ule dialog, select [Period 3 - #date#] using the Period drop-down list, if not already shown.

    4. Select [LDR1] from the Machine Class drop-down list if not already selected. This will display the schedule activities for each period in their updated state. The values forPercent, Volume and Tonnes for activities 1-5 will be seen as follows (central section of table removed to reduce width):

    Pgina 2 de 3Updating the Manual Schedule

    09/01/2 014mk:@MSITStore:C:\Program%20Files%20(x86)\CAE\Studio\Help\ISTS_ Tutorial.ch ...You cre ated this PDF from an application that is not licensed to print to novaPDF printer ( http://www.novapdf.com )

    http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...
  • 8/13/2019 ISTS Tutorial 3ra Parte

    8/15

    Undoing t he Schedule Updates

    After all that hard work, you're going to undo your update. The Undo function gives you a chance to 'test' new schedule parameters prior to an update, then revert the schedule back toits original state.

    1 . In the Update Schedule dialog, click Undo .

    2. The Act ivi ty Sc hedu le dialog will automatically update to revert your schedule to the pre-undo state, ready to continue this tutorial.

    3 . Close the Act ivi ty Sch edul e dialog.4 . Close the Update Schedule dialog.

    Note that any changes made since selecting Update will also be restored when the dialog is next used.

    Top of page

    Move onto the next exercise Copyright CAE IncMIN 20037_00_EN

    Pgina 3 de 3Updating the Manual Schedule

    09/01/2 014mk:@MSITStore:C:\Program%20Files%20(x86)\CAE\Studio\Help\ISTS_ Tutorial.ch ...You cre ated this PDF from an application that is not licensed to print to novaPDF printer ( http://www.novapdf.com )

    http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...
  • 8/13/2019 ISTS Tutorial 3ra Parte

    9/15

    Home > ISTS Tutorial > Scheduling > Automatic Scheduling > Dependencies

    Overview

    Creating dependencies between mining blocks by manually selecting blocks, and using strings.

    Exercise: Creating Dependencies Between Mining Blocks

    Configuring the Project

    1. In the ISTS Task Pane , select Scheduling | Manual Scheduling | Undo Mining...

    2. In the Undo Mining dialog,select [All] in each drop-down list, and click OK .

    3. In the View Control toolbar, select Zoom Extents .

    4. In the Design window, confirm that the following view is displayed ('za' to auto-zoom if required):

    Creating Dependenci es Manually

    1. Click the Dependencies icon on either the ISTS Contro l toolbar or the Constraints panel of theISTS Task Pane - Setup control bar.

    2. In the Dependencies dialog, select Add .

    3. In the Design window, select the first leader (L1) by clicking the right-hand string segment in the blockmarked L1, below.

    4. Select the first follower by clicking the right-hand string segment in the block marked F1, below.

    5. Select the second leader by clicking the right-hand string segment in the block marked L2, below.

    6. Select the second follower by clicking the right-hand string segment in the block marked F2, below.

    7. Select the third leader by clicking the right-hand string segment in the block marked L3, below.

    8. Select the third follower by clicking the right-hand string segment in the block marked F3, below.

    DependenciesUsing two methods to set up dependencies between mining blocks

    Prerequisites

    Files required for the exercise:

    _vb_2benches.dm

    Pgina 1 de 3Dependencies

    09/01/2 014mk:@MSITStore:C:\Program%20Files%20(x86)\CAE\Studio\Help\ISTS_ Tutorial.ch ...You cre ated this PDF from an application that is not licensed to print to novaPDF printer ( http://www.novapdf.com )

    http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...
  • 8/13/2019 ISTS Tutorial 3ra Parte

    10/15

    9. Select the fourth leader by clicking the right-hand string segment in the block marked L4, below.

    10. Select the fourth follower by clicking the right-hand string segment in the block marked F4, below.

    11. Select the fifth leader by clicking the right-hand string segment in the block marked L5, below.

    12. Select the fifth follower by clicking the right-hand string segment in the block marked F5, below.

    13. In the Pick Leader dialog, click Finished .

    14. In the Design window, confirm that the following dependencies have been created:

    15. In the Dependencies dialog, confirm that the dependencies are listed- see below:

    Creating Dependencies Using Strings

    Pgina 2 de 3Dependencies

    09/01/2 014mk:@MSITStore:C:\Program%20Files%20(x86)\CAE\Studio\Help\ISTS_ Tutorial.ch ...You cre ated this PDF from an application that is not licensed to print to novaPDF printer ( http://www.novapdf.com )

    http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...
  • 8/13/2019 ISTS Tutorial 3ra Parte

    11/15

    1. In the Design window, type "cns" to create a new string object.

    2. Type "ns" to create a string over the left-hand column of blocks.

    3. Type "ns" to create a string over the middle column of blocks, and click Cancel .

    4. In the Design window, confirm that the strings have been created in the positions indicated below:

    5. In the Dependencies dialog, click From String , and click the left-hand string in the Design window.

    6. In the Dependencies dialog, click From String , and click the right-hand string in the Design window.

    7. In the Design window, confirm that dependencies have been created in the positions indicated below:

    8. In the Dependencies dialog, confirm that all dependencies are listed, and click Close .

    9. In the Sheets control bar, deselect New Strings .

    10. In the Design window, type "rd" to refresh the view.

    Top of page

    Copyright CAE IncMIN 20037_00_EN

    Pgina 3 de 3Dependencies

    09/01/2 014mk:@MSITStore:C:\Program%20Files%20(x86)\CAE\Studio\Help\ISTS_ Tutorial.ch ...You cre ated this PDF from an application that is not licensed to print to novaPDF printer ( http://www.novapdf.com )

    http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...
  • 8/13/2019 ISTS Tutorial 3ra Parte

    12/15

    Home > ISTS Tutorial > Scheduling > Automatic Scheduling > Solve (Automatic Blending)

    Overview

    Blending automatically from the blocks selected in the previous exercise to meet tonnage and grade targets.

    Exercise: Solve (Automatic Blending)

    Adjust ing Pit Tonnage Targets

    1. In the Design window, select all blocks by dragging the cursor over them.

    2. In the ISTS Task Pane - Scheduling control bar, select Manual Scheduling | Schedule SelectedBlocks .

    3. In the Schedule Act ivities dialog, Loading (blending) row, click Schedule... .

    4. In the Blend dialog, Time Periods group, select Blend until reserve finished .

    5. In the Blend dialog, click Check Targets... .

    6. In the Targets dialog, Destination Grade/Quality Targets group, select the Pit Tonnage row.

    7. In the Target Bounds group, End Period column, select [Period 7 - [date]].8. In the Target Bounds group, Period 7 - [date] row, type '17500' in the Maximum column.

    9. In the Target Bounds group, Period 7 - [date] row, type '15000' in the Minimum column.

    10. In the Target Bounds group, End Period column, select [Period 11 - [date]].

    11. In the Target Bounds group, Period 11 - [date] row, type '25000' in the Minimum column, and click Apply .

    Adjust ing Recl aim Tonn age Targets

    1. In the Global Mass Targets group, select the Reclaim Tonnage row.2. In the Target Bounds group, End Period column, select [Period 7 - [date]].

    3. In the Target Bounds group, Period 7 - [date] row, type '2500' in the Minimum column.

    4. In the Target Bounds group, Period 7 - [date] row, type '3500' in the Maximum column.

    5. In the Target Bounds group, End Period column, select [Period 11 - [date]].

    6. In the Target Bounds group, Period 11 - [date] row, type '3500' in the Minimum column.

    7. In the Target Bounds group, Period 11 - [date] row, type '10000' in the Maximum column.

    8. In the Targets dialog, click Apply .

    9. In the Global Mass Targets group, Stock/Pit Ratio row, deselect the check-box in the Use column, and

    click OK .

    Solve (Automatic Blending)Meeting target tonnage and grade by blending from selected blocks

    Prerequisites

    Completed the Dependencies exercise.

    Files required for the exercise:

    _vb_2benches.dm

    Pgina 1 de 2Solve

    09/01/2 014mk:@MSITStore:C:\Program%20Files%20(x86)\CAE\Studio\Help\ISTS_ Tutorial.ch ...You cre ated this PDF from an application that is not licensed to print to novaPDF printer ( http://www.novapdf.com )

    http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...
  • 8/13/2019 ISTS Tutorial 3ra Parte

    13/15

    Blending

    1. In the Blend dialog, Stockpile Selection group, confirm that STOCKPILE 1 is selected, and clickBlend .

    2. In the Blending Results dialog, review the blending results and click OK .

    3. In the Sheets control bar, expand the VR and Wireframes folders, and select ISTS_VR_blocks .

    4. In the ISTS Task Pane - Review control bar, select Visualize| Start Animation .

    5. In the Start A nimation dialog, click Yes .

    6. In the VR window, view the animation showing blocks being removed in the order created by theblender:

    Top of page

    Copyright CAE IncMIN 20037_00_EN

    Pgina 2 de 2Solve

    09/01/2 014mk:@MSITStore:C:\Program%20Files%20(x86)\CAE\Studio\Help\ISTS_ Tutorial.ch ...You cre ated this PDF from an application that is not licensed to print to novaPDF printer ( http://www.novapdf.com )

    http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...
  • 8/13/2019 ISTS Tutorial 3ra Parte

    14/15

    Home > ISTS Tutorial > Export > Exporting from ISTS

    Overview

    The Export section in the ISTS Task Pane allows you to export the current schedule to the Excel, EPS and CSVformats.

    Links to exercises

    The following exercises are available on this page:

    Export to Excel

    Export to EPS

    Export to CSV

    Exercise: View schedu le in Excel

    At any stage in your scheduling you can view the schedule in Excel by selecting Review | Export | Export t o Excel inthe ISTS Task Pane . This exports all fields in the current schedule to Excel, where they can be viewed and formatted, asrequired:

    Exercise: Export to EPS

    1. In the ISTS Task Pane , select Review| Export |Export to EPS.. ..

    2. In the Export to EPS dialog, Save As: box, confirm that the exported file ists_schedule.exf will be saved to theproject folder.

    3. In the Export to EPS dialog, deselect Launch EPS .

    4. In the Export to EPS dialog, confirm that Synchronize Selection is selected, and click OK .

    5. In the Export to EPS dialog, click OK to create the .exf file.

    6. If EPS is installed, you can open the exported file to view the schedule.

    Exercise: Export to CSV

    1. In the ISTS Task Pane , select Review| Export |Export to CSV.. ..

    Exporting from ISTSExporting the current schedule to Excel, EPS and CSV

    Prerequisites

    You must have scheduled at least one period.

    Selecting Use Template allows you to update a pivot table, for example, by specifying it as an export loc

    Pgina 1 de 2View Schedule in Excel

    09/01/2 014mk:@MSITStore:C:\Program%20Files%20(x86)\CAE\Studio\Help\ISTS_ Tutorial.ch ...You cre ated this PDF from an application that is not licensed to print to novaPDF printer ( http://www.novapdf.com )

    http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...http://www.novapdf.com/http://localhost/var/www/apps/conversion/tmp/scratch_1/09/01/2014mk:@MSITStore:C:/Program%20Files%20(x86)/CAE/Studio/Help/ISTS_Tutorial.ch...
  • 8/13/2019 ISTS Tutorial 3ra Parte

    15/15