overview of the pjm rto - united states energy association · pjm real-time energy market, oasis...

40
Overview of the PJM RTO John Gdowik Sr. Trainer State and Member Relations April 28,2009

Upload: others

Post on 11-Aug-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

Overview of the PJM RTO

John Gdowik

Sr. Trainer

State and Member Relations

April 28,2009

Page 2: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

2

Presentation Outline

• Geography and Statistics

• Roles and responsibilities of a Regional Transmission Organization (RTO)

• Governance

• Historical Background on PJM and US deregulation

Page 3: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

3

Key Statistics

PJM member companies 550

millions of people served 51

peak load in megawatts 144,796

MWs of generating capacity 165,303

miles of transmission lines 56,070

GWh of annual energy 728,000

generation sources 1,271

square miles of territory 164,260

area served 13 states + DC

26% of generation in

Eastern Interconnection

23% of load in

Eastern Interconnection

19% of transmission assets

in Eastern Interconnection

19% of U.S. GDP produced in PJM

6,038

substations

PJM as Part of the US Eastern Interconnection

Page 4: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

www.pjm.com

Number of PJM Members Members: 541

Ex-Officio Members: 9

Total: 550

Metered End Use Customers 21.3 million

Population of Territory 51 million

Square Miles of Territory 168,500

Annual Energy Delivered 758,832 GWh

Average Monthly Billing (2008)

($ billion)

$2.9

Cumulative Billing Since 1997

($ billion)

$137.5

PJM Statistics

Page 5: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

Coal6665040%

Nuclear3100019%

Natural Gas2649816%

Oil14671

9%

Gas / Other Secondary

1755810%Water

76945%

Other14761%

3

www.pjm.com

As of 12/31/08

Capacity By Fuel Type -- 165,547 MW installed capacity

Installed Capacity By Fuel Type

1

2

Page 6: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

6

2008 Generation By Fuel Type

55.6

34.9

6.8

0.30.4

1.4

0.7

Coal Nuclear Natural Gas Oil Wind Hydro Solid Waste

GAS

COAL

NUCLEAR

Page 7: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

www.pjm.com

The Transmission Owners within the PJM RTO

Page 8: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

8

PJM as an RTO

Page 9: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

9

PJM Functions

• Operate the bulk electric power grid for reliability

• Facilitate various electric markets

• Plan for transmission expansion

• Share best practices with neighboring and international system operators

Page 10: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

10

What is PJM?

Air Traffic Controllers for the

Transmission Grid….Operators of a Stock Exchange for

Energy…

Match Generation to Load

Page 11: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

11

Communicating Information

Giving Direction

PJM Control Center

TO

Gen

Gen

Gen

Gen

IPP

Market

Operation

Center

TO

TO

TO Gen

IPP

Voice & Data

TO = Transmission Owner

GEN = Generator

IPP = Independent Power Producer

Local Control Centers

Market

Operation

Center

GenGen

Page 12: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

©2003 PJM

Market Design Details

Page 13: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

13

Different Types of Markets in Wholesale Electricity

•Generation Capacity Markets

•Long-Term

• Energy Markets

•Forward (i.e. Day-Ahead)

•Real Time

•Financial Transmission Rights Market

•Ancillary Services Markets

•Regulation

•Spinning Reserve

Page 14: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

14

What is the Day-Ahead Energy Market?

• A day-ahead hourly forward market for energy

• It provides the option to ‘lock in’:

– scheduled MW quantities at day-ahead

prices

– scheduled energy deliveries at day-ahead

congestion prices

• Provides additional price certainty to Market

Participants by allowing them to commit to

prices in advance of real-time dispatch

Page 15: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

15

Two Energy Markets

• Day-Ahead Energy Market

– develop day-ahead schedule using least-cost

security constrained unit commitment and

dispatch

– calculate hourly LMPs for next operating day

using generation offers, demand bids and

bilateral transaction schedules

• Real-Time Energy Market

– calculate hourly LMPs based on actual

system operating conditions

Page 16: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

16

Day Ahead

Market

Real-time

Market

100 MW

Scheduled Demand Actual

Demand

105 MW

= (105 - 100)* 23.00 = $115.00

Real-time LMP = $23.00Day Ahead LMP = $20.00

= 100 * 20.00 = $2000.00

if Day-ahead Demand is 105MW = $2100.00

as bid = $2115.00

Liquidating Day-Ahead Position

Page 17: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

17

Options for Energy Supply

A Voluntary Market

Commercial

Bilateral

Transactions

PJM

Spot Market

Load serving entities

obtain energy

to serve customers

Self-scheduleown resources

ResidentialIndustrial

Page 18: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

18

Locational Marginal Price

Generation

Marginal

Price

Transmission

Congestion

Price

Cost of

Marginal

Losses

Price to serve the next MW of load at a specific location,

using the lowest production cost of all available generation,

while observing all transmission limits

Page 19: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

19

Investment Incentives in PJM Market

• Local Marginal Pricing (LMP) provides the real-time

pricing signals which indicate where to build new

generation or transmission

• Reliability Pricing Model (RPM) provides long term $

incentives to build new generating capacity in

congested areas, along with a benchmark for

bilateral contracts

Page 20: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

20

How Are LMP Values Calculated ?

• The following examples demonstrate how

LMP values are determined at all locations

• The LMP values are a result of security-

constrained economic dispatch actions

• LMP values are calculated based on

generation offer data and the power flow

characteristics of the Transmission

system.

Page 21: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

21

LMP Example - 2 Bus Transmission Grid

400 MWGen. Capacity

Economic Dispatch Ignoring Transmission Limitation

Area 1 Area 2

LMP$10

240 MWDeer Creek

($10/MW)250 MW

Actual Generation

240 MW

LMP$10

Wild Run

($20/MW)

200 MWGen. Capacity

0 MW

Key

LoadFlowGeneration

ThermalLimit200 MW

10 MW

Page 22: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

22

LMP Example - 2 Bus Transmission Grid

400 MWGen. Capacity

Security-Constrained Economic Dispatch

Area 1 Area 2

LMP$10

200 MWDeer Creek

($10/MW)210 MW

Actual Generation

240 MW

LMP$20

Wild Run

($20/MW)

200 MWGen. Capacity

40 MW

Key

LoadFlowGeneration

ThermalLimit200 MW

10 MW

Actual Generation

Page 23: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

23

LMP Example - Wholesale Market Settlements

Customer MW LMP Energy1

Settlement

Congestion

Credit

Area 1

Demand

10 $10 $100 -

Area 2

Demand

240 $20 $4800 $20002

Deer Creek 210 $10 ($2100) -

Wild Run 40 $20 ($800) -

Totals 0 $2000 $2000

1. Positive indicates charge, negative indicates credit

2. Congestion Credit is due to ownership of 200 MW Financial Transmission Right from

Area 1 to Area 2, FTR Settlement = 200 MW ($20 - $10)

Page 24: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

24

Fuel-Cost Adjusted LMP

Page 25: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

25

2005 vs. 2006 Summer Peak Load Comparison

Page 26: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

www.monitoringanalytics.com26

$0

$100

$200

$300

$400

$500

$600

$700

$800

$900

$1,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

100,000

110,000

120,000

130,000

140,000

150,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Rea

l-tim

e LM

P ($

/MW

h)

Dem

and

(MW

)

Hour ending (EPT)

08-Aug-07 PJM load

09-Jun-08 PJM load

08-Aug-07 PJM average real-time LMP

09-Jun-08 PJM average real-time LMP

08-Aug-07 1600 EPT - PJM 139,428 MW

09-Jun-08 1700 EPT - PJM 130,100 MW

2007 vs. 2008 Peak Load Comparison

Page 27: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

©2003 PJM

Governance

Page 28: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

28

The Members have the following limited roles and

authorities:

– Elect the PJM Board (9)

– Provide advice and recommendations to the PJM

Board

– Amend the Operating Agreement subject to FERC

approval

Members Committee – Role & Authority

Page 29: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

29

ElectricDistributors

Members Committee Sector Voting

GenerationOwners

TransmissionOwners

Other Suppliers

End-UseCustomers

PJM Independent Board

Governance

Page 30: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

30

PJM Committee Structure

Page 31: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

31

US Deregulation – Key Milestones

1996

FERC Order 888/889

1997

PJM Real-Time Energy

Market, OASIS

1999

PJM FTR Auction

Market

2000

FERC Order 2000

2000

PJM becomes an RTO

1998

PJM Locational Marginal

Pricing

2006

PJM Reliability Pricing

Model (RPM), Demand

Response (DR)

2002 - 2005

PJM grows from 60,000 MW to

166,000 MW Capacity*

* Total available generation capacity

1927

PJM Power Pool

Created

Page 32: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

32

Deregulation vs. Regulation

Regulating agencies:

– Federal Energy Regulatory Commission (FERC)

– State Public Utility Commissions (PUC)

– Transmission Citing approved at the State level, can be overridden

by FERC for DOE designated transmission corridors

Before Competition the Regulatory System:

• Guaranteed return on assets, once approved and costs built in the

rate

• Ultimately, rate payer (the customer) bears the risk

• No incentive to operate assets efficiently

Page 33: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

33

Economic Benefits

Page 34: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

4/27/2

009

34

Economic Benefits

Page 35: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

4/27/2

009

35

Economic Benefits

Page 36: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

Regional Transmission Expansion Planning Report

Highlights

www.pj

m.com

Page 37: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

www.pj

m.com

Regional Transmission Expansion Planning Process

Page 38: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

www.pj

m.com

$13.2 Billion in Approved UpgradesSince RTEPP inception in 1999 to December 2008

Page 39: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

PJM ©2007

RTEP Project Construction Status

Page 40: Overview of the PJM RTO - United States Energy Association · PJM Real-Time Energy Market, OASIS 1999 PJM FTR Auction Market 2000 FERC Order 2000 2000 PJM becomes an RTO 1998 PJM

©2003 PJM

Questions?

PJM Web site: www.pjm.com

or contact: [email protected]