Project Number: 47047-002 January 1 – June 30, 2017
PRC: Shandong Groundwater Protection Project
Prepared by the Shandong Provincial Project Management Office of the People’s Republic of
China for the Asian Development Bank.
This environmental monitoring report is a document of the borrower. The views expressed herein do not
necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in
nature. Your attention is directed to the terms of use section of this website. In preparing any country
program or strategy, financing any project, or by making any designation of or reference to a particular
territory or geographic area in this document, the Asian Development Bank does not intend to make any
judgments as to the legal or other status of any territory or area.
Ⅰ. INTRODUCTION
The municipalities of Weifang and Zibo are serous water scarce areas, where water per capita is about one-sixth of the average in the PRC, depend heavily on groundwater, especially for its intensive and high value agricultural production. The project area, part of the Northern China Plain (NCP), is a main vegetable production base for Beijing, Tianjin and other cities in NCP with a high concentration of vegetable greenhouses. In some downstream areas, agricultural production, in particular the vegetable cultivation already stopped due to lack of suitable water sources. Domestic and industrial water demands, although still less than agricultural water use, are also on the rise as a result of the rapid economic development and urbanization in the area.
The consequences of the current unsustainable groundwater utilization are serious: (i) pumping costs have increased, (ii) groundwater quality is deteriorating due to seawater intrusion and environmental pollution, (iii) domestic water supplies and agricultural production are at risk, and (iv) the area is suffering from significant financial and economic damages caused by land subsidence. Seawater intrusion in the north has extended 35 km inland from the coast, and some areas have already experienced subsidence of more than two meters. The process of land subsidence is irreversible, and urgent action is needed to avoid worsening.
Project Components of civil works
The project outputs include: (i) Output I - Groundwater Recharged and Conserved, (ii) Output II - Surface Water Allocation Improved and Monitored, and (iii) Output III - Project Implementation Support. The project components and their subcomponents are listed in Table III-1 below.
Output I - Groundwater recharged and conserved will support the introduction of groundwater recharge technologies in the project areas to increase shallow groundwater recharge and reduce usage of deep groundwater. Output I includes three sub-components: (i) rehabilitation and construction of wetland areas for the recharge of shallow groundwater resources; (ii) technological innovation for agricultural groundwater conservation; and (iii) development and implementation of innovative economic and regulatory instruments for groundwater conservation.
Output II - Surface water allocation improved and monitored will improve water allocations and monitoring to increase water availability in water scarce parts of the project area and indirectly reduce the pressure on groundwater resources. The output includes three sub-components: (i) surface water allocation improvement; (ii) retention of storm water; and (iii) establishment of modernized digital water flow and quality monitoring in Huantai County, including disclosure and dissemination of groundwater information. Through the improvement of water resources allocations, the exploitation of groundwater can be reduced.
Table 1, Physical Project Components and Subcomponents
Description of Components and Subcomponents
Output I - Groundwater Conserved and Recharged
1.1 Wetland Construction and Rehabilitation
Description of Components and Subcomponents
1.1.1 Judian Lake Wetland Rehabilitation – Shouguang
i) Wetland Embankment: 11 km long embankment with the height of 2.5 m. (the water storage capacity of wetland will be increased to 10.47 million m3);
ii) Water Environment Improvement: i) inflow channels within the wetland; ii) build a deep water zone in north of the wetland, the water level will rise 1.0 m in average; Channels in west wetland will connect to the existing network of rivers/channels; and
iii) Wetland geological improvement: micro geological improvement to create multi wetlands; and
iv) Wetland aquatic plants planting and re-vegetation.
1.1.2 Mata Lake Wetland Rehabilitation – Huantai
i) Rehabilitation of channels in the Mata Lake wetland (the water storage capacity will be increased to 9.0 million m3, and the annual utilizable water will be increased to18 million m3.
Output 2: Surface Water Allocation Improved and Monitored
2.1 Surface Water Allocation Improvement
2.1.1 Water diversion from Renhe Reservoir to Heihushan Reservoir and Qiyi Reservoir - Qingzhou:
i) The channel construction with the total length of 24.68 km (including repairing 11.49 km existing channel, and new pipeline of 13.2 km); ii) Pipeline laying of 20.6 km in total (including repairing existing pipe of 17.4 km and new pipeline of 3.2 km (DN1200 mm). the total annual water supply capacity is 11.21 million, and about 10.95 million m3 groundwater will be replaced.
2.1.2 Connection of Qiyi Reservoir and Yaowanghu Reservoir - Qingzhou
i) 2,683 m water transmission culvert (DN800 mm) from Yaowanghu Reservoir to the existing Beiyang River Culvert (the transmission capacity will be 1.0m3/s).
2.1.3 Beiyang River Rehabilitation- Qingzhou
i) 10.95km river rehabilitation including sediment dredging and ecological embankment with Gabion stone; and Xiazhuang and Zhaozhuang Reservoirs are involved; and Construction of 12 river gates (height of weir is 1.5 m with the width of 30-40 m)
2.1.4 Irrigation Channels works for water diversion from Mi River to Bagouzi Reservoir - Qingzhou
ii) 3.5 km Closed Channel converted from open channel; ii) Reconstruction of 10 km U-type channel; iii) Reconstruction and new construction of 44 culverts and 2 sluice gates;
2.1.5 River Rehabilitation - Shouguang
i) Six rivers connection (Yishouxin River, Ta River, Zhinv River, New zhinv river, Yang River and Wuyang River)
ii) 55.3 km river rehabilitation including river sediment dredging of 31.9 km.
iii) Construction of 13 facilities for Ta River, including 2 culvert gates, 5 box culverts and 6 pipe culverts.
Description of Components and Subcomponents
2.1.6 Water Diversion - Huantai
i) Water diversion work for Yellow River Diversion to Chengbei Reservoir including both north section (11.51 km long) and south section (16.84 km long). The designed flow is 10m3/s, and the flood control standard is once in 5 years
2.1.7 River rehabilitation works - Huantai
i) Dredging and connection of urban channels (Wu River, Dongzhulong River, Dazai Channel and Laonao River;
ii) Construction of 18 hydraulic structures (11 gates, 1 siphon, and 7 bridges).
2.1.9 Connection of Reservoirs of Wangwu, Chengnan and Juchenghe - Gaomi
i) Connection of Wangwu Reservoir and Juchenghe Reservoir: a) Upgrade 2.3 km water transmission pipe (DN2000mm) from Wangwu Reservoir to Daxin Village; b) Rehabilitation of 5.9 km west main channel with a design flow of 4.0 m3/s; (Figure III-3, 4)
ii) Juchenghe Reservoir Expansion: a) 2.3 km lake road and 3 bridges; b) 2.7 million m3 sediment dredging to increase the capacity from 3.06 million m3 to 4.7 million m3.
iii) Water transmission to Chengnan Reservoir from the Reservoirs of Wangwu and Juchenghe: a) 1.5 km (DN500 mm), with the design capacity of 15000 m3/d); and b) upgrade 2.9 km water supply pipe with the water supply capacity of 45000 m3/d.
2.2 Storm Water Retention
2.2.1 Expansion of Nanzhai Reservoir - Changle
Construction works for i) construction of 150 m long auxiliary dam with the height of 117.2 m and the width of 5.0 m (the flood control standard is once in 50 years after completion of the proposed project); ii) expansion of the reservoir from current 4.25 million m3 to 10.36 million m3; iii) constructions of spillway with the release capacity of 358.26 m3/s; iv) lining work for leakage protection; and v) construction of water discharge tunnel and pathway and rubber dam. (Figure III-1)
2.2.2 Water diversion pipeline from Xiashan Reservoir to Chengbei Reservoir - Gaomi
i) 23.5 km pipeline laying (DN 1400 mm), with the design flow of 1.16 m3/s by gravity without pumping, and the annual water diversion capacity is 33.44 million m3.
2.3.1 Water Flow and Quality Monitoring – Qingzhou
i) Groundwater Monitoring Center for Ground Subsidence Area (The collected information will be uploaded to monitor center through wireless network and cable. The data collection types include on-line collection and artificial collection. The monitoring parameters include water level, temperature and conductivity of the groundwater (Figure III-5, 6).
2.3.2 Groundwater Monitoring - Changle
i) Monitoring System for Rainfall and Rivers
2.3.3 Groundwater monitoring – Huantai (Figure III-5, 6)
i) The monitoring systems
ii) The business application systems
Source: PPTA Consultants
Ⅱ. ACTIVITIES CONDUCTED BY THE CONSULTANT
The technical assistance of Environmental safeguard consulting assignment is to
help the Shandong Province Government to conduct the environmental management on the
investment project for the Shandong Groundwater Allocation and Protection Project in
Shandong Province PRC (the Project). One objectives of the assignment is to assist the
Provincial Management Office (PPMO-located at Shandong Provincial Water Resources
Department) in the capacity development for the environmental management of the Project
implementation.
Loan Implementation Environment Consultant (LIEC). A LIEC have been hired under the loan implementation consultant services (LICS). The LIEC will advise the PMO, PIUs, contractors and construction supervision companies (CSCs) on all aspects of environmental management and monitoring for the project. The LIEC will (i) assist in updating the EMP and environmental monitoring program, as needed; (ii) supervise the implementation of the mitigation measures specified in the EMP; (iii) on behalf of the PIUs and PMO, prepare the annual EMP monitoring and progress reports in English and Chinese and submit it to ADB; (iv) provide training to the PMO, local PIUs, CSCs, on the PRC’s environmental laws, regulations and policies, ADB SPS 2009, EMP implementation, and GRM in accordance with the training plan defined in Table EMP-9; (v) identify any environment-related implementation issues, and propose necessary corrective actions; (vi) undertake site visits for EMP inspection as required.
Environmental safeguard consultant has read and reviewed the project CEIA, EMP,
and relevant documents both in Chinese and English, and tried to gain well understanding for
conducting the environmental management assignment for the project implementation. At this
stage, the environmental safeguard consultant prepared the training material in PPT form. The
environmental safeguard requirements in the implementation phase have been interpreted to
the participants from the five counties (PIAs). It has been emphasized that the agreed EMP
mitigation measures will be implemented and determine whether the measures effectively
minimize adverse environmental effects. The PIAs has been required to appoint the
corresponding environmental responsible officer, who will conduct internal-monitoring practice
and arrange the external-monitoring affairs, and prepare a semi-annual report reflecting the
project environmental performance, and submit it to the PPMO for review. The personnel
arrangement of the environmental responsible officer has been required to be submitted to
PPMO before the civil construction started. At the workshop, the environmental safeguard
consultant has explained the methodology to conduct the environmental internal and external
monitoring.
Ⅲ. ENVIRONMENTAL PROCEDURE REVIEW
Environmental Administrative Situation 环境管理情况
The project was assessed during the PPTA as environmental “category A”.A
summary of the environmental impact assessment was circulated to the Board of Directors of
the Asian Development Bank (ADB) along with the environmental management plan
The Chinese Environmental Impact Assessment (EIA) on the Project were conducted by
the certified EIA institutes, The environmental assessment were conducted in accordance with
relevant laws, regulations, and standards applicable in PRC and following ADB policy and
guidelines as indicated in Environmental Assessment guidelines, 2003; Safeguard Policy
Statement, 2009; and Environment Policy of the Asian Development Bank, November 2002,
All of the subprojects EIA have got the approval by the relative environmental administrative
authorities correspondingly.
Compliance with Environmental Management
To ensure that the relevant environmental Laws, Standards and Regulations are
implemented, PPMO have incorporated the environmental management affairs into its day-to-
day implementation of the Project. ADB mobilized the Loan Implementation Environmental
Consultant Specialist to assist the PPMO to conduct the activities on compliance with
environmental management. It is noted through documentation review in the early
implementation stage that the implementation of the Project has been in compliance with the
relevant environmental laws, regulations and standards. The environmental protection
measures or facilities are being designed.
This environmental monitoring report is first semi annually 2017 environmental
compliance monitoring” for ADB--- Shandong Groundwater Allocation and Protection Project
which focused on the first half annually environmental Management and monitoring. It is
prepared by the Project Management Office (PMO) with the assistance of the Loan
Implementation Environmental Consultant Specialist which has been providing consulting
services to PMO. In this Report, we briefly provide (i) a review of the environmental procedures
and compliance with environmental regulations, (ii) the environmental institutional structure
and responsibilities, (iii) mitigation measures undertaken to minimize adverse environmental
impacts arising from the construction of the Project facilities, (iv) environment monitoring
results and (v)conclusions and suggestions.
The purpose of “environmental compliance monitoring” is to ensure that all the sub-projects
and the project as a whole comply with the environmental and related safeguards policies and
requirements of the People’s Republic of China (PRC) and the Asian Development Bank
(ADB).
IV INSTITUTIONAL SETUP AND RESPONSIBILITIES FOR EMP IMPLEMENTATION AND
SUPERVISION
Institutional responsibilities for environmental management
The Shandong Provincial government is the EA and has established a project leading
group and a project management office (PMO). The PPMO has overall responsibility
delegated by the EA for supervising the implementation of mitigation measures and reporting
to ADB. The sub-project counties have also established their own SPMOs to coordinate and
monitor the implementation of the sub-projects and the relevant environmental management
for the construction activities.
In line with the requirements of the agreed EMP, the PMO and local PMOs has
established its environmental management units (EMU) to coordinate and supervise EMP
implementation, guide and coordinate the departmental and sub-projects' practices in
environmental dimensions, liaise with governmental authorities in charge of environmental
affairs, disclose relevant information, interact and communicate with communities on
construction activities implemented.
The PPMO, the IAs and the contractors have each nominated dedicated, trained, and
qualified staff to undertake environmental management activities and ensure effective EMP
implementation.
Construction contractors are responsible for implementing mitigation measures during
construction. The IAs are responsible for arranging environmental monitoring reviews and
responding to any adverse impact beyond that foreseen in the EIAs.
Incorporation of Environmental Requirements into Project Contractual Arrangements
The Project Environment Management Plan’s (EMP’s) primary purpose is to ensure the
environmental requirements, identified during and following the Planning/Design Phase, are
implemented and effectively managed during a project’s life cycle. In addition to the
incorporation of environmental requirements into the project specifications in the bidding
document, the environmental requirements are part of the contractual requirements for the
project. For example, the environmental requirements are specified in the special conditions
of the contract with contractors as follows:
The Contractors are conducting: (a) establish the operation system of environmental
impact management; (b) closely monitor the environmental impact during the construction and
take mitigation measures as needed; and (c) arrange the budget to ensure the implementation
of mitigation measures. The contractor will provide the internal semi-annual environmental
monitoring and mitigation measures report to the employer.
The Contractor are obeying relevant laws and regulations during construction on
environmental pollution control issued by the relevant government agencies (environmental
protection bureaus) or local authorities and shall adopt necessary measures to prevent air
pollution from dust and exhaust gases and to perform the construction activities in civilized
manner.
Legal Requirements
Review of the environmental procedures has been carried out throughout the project
processing. Table 1 provides a list of the applicable environmental laws and regulations of the
PRC and environmental policies and regulations of ADB with which the design, construction
and operation of all the SPWPP project facilities should be comply.
Table2 . Relevant environmental Laws, Standards and Regulations
CATEGORY ENVIRONMENTAL LAWS, STANDARDS AND REGULATIONS
National Environmental Protection Law of the PRC, 2015
Environmental Impact Assessment Law of PRC, 1 Sep 2003
Environmental protection Management Regulations for
Construction Projects, 1 Dec 2005
Notice to Strengthen the Environmental Impact Assessment and
Management of Construction Projects Financed by Loan from
International Financial Organizations, 21 Jun 1993
Water and
Wastewater
Water Law of the PRC, 1 Oct 2002
Water Pollution Prevention and Control Law of the PRC, 28 Feb
2008
Integrated Wastewater Discharge Standard (GB8978-1996)
Environmental Quality Standard for Surface water (GB3838-2002)
Quality Standard for groundwater (GB14848-93)
Land and Soil
Resources
Land Management Law of the PRC, 28 Aug 2004
Conservation of Water and Soil Law of the PRC, 29 Jun 1991
Solid Waste
Management
Solid Waste Environmental Pollution Prevention and control Law of
the PRC, 1 Apr 2005
Air Air Pollution Prevention and control Law of the PRC, Sep 2000
Integrated Emission standard of Air pollutions (GB14554-93)
Ambient Air Quality Standard (GB3095-1996)
Cultural Relic
Protection
Law of the PRC on Protection of Cultural Relics, 28 Oct 2002
Local Heilongjiang Provincial Wetlands protection Regulations, 2003
Heilongjiang Provincial Nature Reserve Management Regulations,
1996
ADB SPS , ADB, Manila, 2010
Environmental Considerations in ADB Operations, ADB, Manila,
Sep 2006
Environmental Assessment Guidelines, ADB, Manila, May 2003
Besides, some other relevant documents should also be complied with during project
implementation. These documents are summarized in Table 2.
Table3 . Other Applicable Documents
Category Document
Domestic Environmental Impact Assessment (EIA) Reports and EPB’s comments
Soil and Water Conservation Program
Preliminary and detailed design reports
Construction bidding documents
Construction contracts
ADB Report and Recommendation of the President to the Board of Directors
(RRP)
Loan Agreement (LA)
Project Agreement (PA)
Project Administration Memorandum (PAM)
Summary Environmental Impact Assessment (SEIA)
ENVIRONMENTAL RESPONSIBILITY
6. A PPMO has been established within Shandong Provincial Water Resources
Department (SPWRD) for the day-to-day implementation of the project. Composed of
professional and administrative staff assigned from government agencies for the project, the
PPMO has the capacity to carry out the project activities in coordination with other agencies.
In the environmental administrative aspects, the PPMO will take the responsibilities to
establish clear work processes and procedures or guidelines covering four main tasks of
management: Planning, Implementation, Monitoring, and Corrective Actions.
PPMO shall ensure that all subprojects will comply with applicable PRC environmental laws
and regulations at all times, and meet all relevant national and local environmental standards.
PPMO shall ensure that each subproject follows environmental health and safety
procedures consistent with internationally recognized practices and PRC labor laws and
regulations.
PPMO shall ensure that all subprojects will fully comply with the monitoring and
reporting requirements in compliance with applicable EMPs; a semi-annual or annual
monitoring report containing monitoring data, analyses, and incidents as related to the EMP
implementation will be submitted to regulatory agencies and ADB for review (this report);
PPMO shall make its best efforts in corrective actions to mitigate impacts of its
subprojects; and take remedial actions in the case of unanticipated environmental impacts,
unresolved environmental issues or grievances;
PPMO will supervise the Subproject IAs to engage in a continual and appropriate
public information program related to the company’s environmental management activities.
IMPLEMENTING AGENCIES AND THE ENVIRONMENTAL TASKS
The PIAs will retain the services of design institutes, specialist procurement agencies
and construction supervision companies to assist in the implementation activities. The PPMO
and PIAs will have a number of staff trained in project management and relevant ADB
procedures during implementation of the Project.
The sub-borrower and their supporting PIAs for each subcomponent is fully responsible
for complying with all environmental requirements, including implementation of environmental
mitigation measures specified in the CEIA and Chinese EIA report, so as to ensure that all
related national and provincial environmental regulations and standards are met. The IA for
each subcomponent will appoint an Environmental Responsible Officer (ERO), who will
conduct self-monitoring, and prepare a quarterly report reflecting the IA's environmental
performance, and submit it to the PMO for review. The personnel arrangement of EROs have
been decided and listed in Appendix.
V,ENVIRONMENTAL MANAGEMENT PERFORMANC
Environmental management system has been established at each of the
implementation agencies for enforcement of environmental management. . In designated
responsible person and construction contracts, the some measures of environmental
management system employed. At construction sites, waste-water emissions, noise control,
dust and exhaust control, and solid waste treatment are included. The Loan Implementation
Environmental Consultant Specialist assistance to ensure effective implementation of the
Environmental Management Plan (EMP) and requires the implementation of mitigation
measures.
Major construction activities have been started for five sub-projects. The environmental
management activities during project construction were satisfactory. During this reporting
period, The execution of the plan for this stage of the project implementation.
has been satisfactory.
PPMO and The Loan Implementation Environmental Consultant Specialist
confirmed that these subprojects have followed the environmental management plans. The
negative environmental impacts during construction phase have been minimized by the
mitigation measures. There is not major environmental complains being filed by the public in
this stage of the project implementation.
According to internal monitoring and verification of the construction site impact
mitigation measures in 2016, the environmental impact mitigation measures of each
subproject are summarized. The Loan Implementation Environmental Consultant Specialist
provides a summary of the environmental management status and mitigation implementations
for all the sub-projects for this stage of the project implementation.
Environmental Impacts and Related Mitigations
Predominant environmental impacts observed to be resulting from these works
include: solid waste production (demolition spoil and construction solids), noise, wastewater,
dust from earth excavation, exhaust from vehicles and equipment, and land clearance for
construction site establishment. In general, impacts were of similar scale at each site and
adherence to EMP requirements was of a similar standard at all
noise.
Land clearance. The areas where land clearance has been required, are well keep with
no excess vegetation disruption. Some areas have already been re-vegetated in accordance
with EMP requirements.
Construction noise control – to arrange the construction during 7:00 am to 21:00
pm.
Activities of greening in the site – Green plantation on time - benefit the site environmental
landscaping improvement and also benefit for noise control.
During this reporting period, the EMP has been executed for all the subprojects.
Environmental mitigation measures have been taken during construction while the
environmental compliance monitoring and reporting have been carried out since project
inception. Adverse impacts on the environment have been minimized.
No environmental incidents have been reported and there have been no complaints received
with respect to environmental impacts from potentially affected persons.
VI,. ENVIRONMENTAL MONITORING
Internal Environmental Monitoring
Internal environmental monitoring including routine or periodic inspection of
construction waste treatment and implementation of mitigation measures, and include
ensuring adequate environmental supervision. The Loan Implementation Environmental
Consultant Specialist provides training to ensure that contractors and construction supervision
company may conduct internal environmental monitoring and preparation of related reports.
The Loan Implementation Environmental Consultant Specialist provides detailed internal
environmental monitoring program and various reports formats and Data. The Loan
Implementation Environmental Consultant Specialist assist PPMO compiled and submit
semi-annual environmental reports to the Asian Development Bank.
External Environmental Monitoring
The project office has appointed Shandong Zhengzhe Test Technology Ltd (qualified
units) to conduct environmental external monitoring, In 2017, some sub projects have been
carried out civil engineering, and the external monitoring of the site for civil engineering
construction has been completed. Detailed external environmental monitoring will begin this
year between August and Nov of 2017. Results of external monitoring will be provided in this
year's Report
The monitoring results are used to evaluate the: (i) extent and severity of environmental impacts;
(ii) compliance with related rules and regulations; and(iii) overall effectiveness of the Project EMP.
Required actions will be taken based on the monitoring results.
Ⅶ . CONCLUSION AND RECOMMENDATION
At the time of project implementation stage, the Project has fulfilled the environmental
protection and management obligations required by both PRC and ADB. The contractors of
all the awarded contracts have largely fulfilled their obligations in protecting the environment
and allowed for mitigation measures in their construction contracts and schemes. Through the
implementation of these measures, the negative impacts on the environment can be reduced
to a minimum level possible during construction. However, to a certain extent there will be
avoidable impacts on the environment.
A series of environmental workshops and training have been carried out, with the
intention of strengthening the environmental management and monitoring capacity of all
project related parties.
Water and soil conservation monitoring exercises have been carried out with the results
showing that efforts on soil erosion control are still a little bit deficient and should to be
strengthened in the next stage. It is recommended that construction waste disposal sites be
better considered and strengthened to reduce soil erosion during rainy seasons.
Based on observations from site inspections, It can be found that the completed
construction activities have fulfilled the environmental protection and management obligations
required by both PRC and ADB.
At the time of this report, there has been no any environmental complaint from the local
communities and local EPBs.
Appendix 附件
Environmental Responsible Officers(ERO)
环境责任人
子项目Subproject
环保管理人员
姓 名 ERO
Person
Phone or Email
电话或电子邮箱
Phone or Email of Local EPB
地方环保局电
话或电子邮箱
负责处理环境投诉
人员的姓名
ERO Person forGrievanece Redress Mechanism (CRM)
省 项 目
办Provinvi
al PMO
蒋德平
Jiang Deping
0531-86974447
石伟南
Si
Weinan
15588896055
联 系 邮
箱: Email; xmb5
桓 台 县
子 项 目
办
Huantai county Sub-POM
周慧
Zhou Hui
13792153126 任连州
Ren lianzhou 13853314996
周慧 Zhou Hui
昌 乐 县
子 项 目
办
Changle county Sub-POM
丁 炳 学 Ding
Benxue
13721956059 [email protected]
昌乐县环保局Changle
County EPB:
高 春 平 Gao
Chenping 13586364560 [email protected]
丁 炳 学 Ding
Benxue
高 密 市
子 项 目
办
Gaomi city Sub-POM
马 春 艳 Ma
Chenyan
[email protected] 13864699528
管 虹 Guang
Hong [email protected] 0536-2505513
管虹 Guang Honh
[email protected] 0536-2505513
青 州 市
子 项 目
办
Qingzhou city Sub-POM
姚羽宸
Yao lvcheng
刘清军 Liu Qingjun
寿 光 市
子 项 目
办
Souguang city Sub-POM
马常照
Ma Changzhao
sggs5257011@16
3.com 电 话18253611398
王廷相
Wang Tingxian 15689188175
中石化胜利建设工
程有限公司:
Sinopec Shengli Construction Firm
缪 金 功 Liao
Jinggong 18605467498
中国水电建设集团
港航建设有限公司
:
China Hydropower Construction Group Harbour Construction Co., Ltd.
张 远 金 Zhang
Yuangjing 13516362157
Table Environmental Management Monitoring Officers
环境管理和环境监测单位
子 项 目Subproject
External Environmental Monitoring
环境外部监测单位
Construction environment supervision---
Internal environmental
monitoring 施工环境
监理单位
Soil and water conservation supervision
水土保持监理单位
桓台县子项
目办
Huantai county Sub-POM
山东正泽检测技术有
限公司 孙庆贺
Shandong Zhengzhe Test Technology Ltd Sun Qinghou
山东省科源工程建设
监理中心
张 杰
Shandong Keyuan engineering construction supervision center Zhang Jie
北京林丰源生态环境
规划设计有限公司
孙 平
Beijing linfengyuan ecological environment planning and Design Co. Ltd. Sun Ping
昌乐县子项
目办
Changle county Sub-POM
山东正泽检测技术有
限公司
刘天磊
Shandong Zhengzhe Test Technology Ltd Liu Tianlui
山东省科源工程建设
监理中心 王佑升
Shandong Keyuan engineering construction supervision center Wang Yousheng
北京林丰源生态环境
规划设计有限公司
逄波
Beijing linfengyuan ecological environment planning and Design Co. Ltd. Feng Bou
高密市子项
目办
Gaomi city Sub-POM
山东正泽检测技术有
限公司
孙庆贺
山东省水利工程建
设监理公司
张卫峰
Shandong water conservancy
北京林丰源生态环境
规划设计有限公司
李宜伟
Beijing linfengyuan ecological
Shandong Zhengzhe Test Technology Ltd Sun Qinghou
construction supervision company Zhang Weifeng
environment planning and Design Co. Ltd. Li Yiwei
青州市子项
目办
Qingzhou city Sub-POM
孙庆贺
山东正泽检测技术有
限公司
Shandong Tianzhe Test Technology Ltd Sun Qinghou
山东省科源工程建设
监理中心
孙平
Shandong Keyuan engineering construction supervision center Sun Ping
北京林丰源生态环境
规划设计院有限公司
张广通
Beijing linfengyuan ecological environment planning and Design Co. Ltd. Zhang Guantong
寿光市子项
目办
Souguang city Sub-POM
山东正泽检测技术有
限公司 孙庆贺
Shandong Zhengzhe Test Technology Ltd Sun Qinghou
山东省科源工程建设
监理中心
孙平
Shandong Keyuan engineering construction supervision center Sun Ping
北京林丰源生态环境
规划设计院有限公司
徐海青
Beijing linfengyuan ecological environment planning and Design Co. Ltd. Qu Haiqing
Appendix 1 internal environmental monitoring results
内部监测结果
Summary of Environmental Site Inspection Checklist--现场环境检查清单总结
Huantai County Subproject
桓台亚行贷款子项目
River rehabilitation works - Huantai 河流修复工程-桓台
Water Diversion - Huantai 桓台县水输送
检查日期Inspection Date:2017年4--6月
检查人 Inspected by:封涛
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
现场环境管理计划、申述机制和信息披露
Site EMP, GRM, information disclosure
工程承包商是否指定了环境监管员√该
环境监管员在现场吗√
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
Has contractor appointed an
environment supervisor and is the
supervisor on-site?
工程承包商制定现场环境管理计划了吗
√
Is Site EMP established?
√
与施工有关的信息在现场公布了吗(包
括工期、承包商信息等)√
Is information pertaining to construction disclosed at construction site (including construction period, contractor information, etc)?
√
申诉机制在现场公布了吗√
Is Grievance Redress Mechanism (GRM) disclosed at construction site?
√
土壤侵蚀和污染
Soil erosion and contamination
承包商制定了土壤侵蚀管理计划吗√
Has the contractor prepared a soil erosion management plan?
√
是否建有防止径流进入施工现场及将现
场径流引至现有排水设施的截水沟和
排水沟√
Are intercepting ditches and drains constructed to prevent runoff entering construction sites, and divert runoff from sites to existing drainage?
√
受干扰的地区在土方工程停止后是否稳
定√植被是否恢复√
Are disturbed areas stabilized after earthworks have ceased, and re-vegetated?
√
化学品、危险物品和废弃物是否存放在
防渗透的安全地带√是否有覆盖√
Are chemicals/hazardous products and waste stored on impermeable surfaces in secure, covered areas?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
是否有漏油迹象?
Is there evidence of oil spillage?
√
是否准备了堵漏工具、堵漏沙或锯屑吸
收泄露的化学物质√
Are spill kits / sand / saw dust used for absorbing chemical spillage readily accessible?
√
化学品是否妥善存放并标识?
11. Are chemicals stored and labelled properly?
√
空气质量控制
Air quality control
施工现场定期洒水吗√
Are construction sites regularly watered?
√
易产生灰尘的建筑材料是否有遮盖或洒
水√水泥袋解袋过程是否是在有遮蔽
的地方进行√
Are stockpiles of dusty materials covered or watered and cement debagging process undertaken in sheltered areas?
√
运送土石、沙料的卡车是否有油布或其
它遮盖物覆盖避免溢出√
Are trucks carrying earth, sand or stone covered with tarps or other suitable cover to avoid spilling?
√
设备是否得到良好的维护√(是否观察
到黑烟,如果有,请说明设备的名称
和位置)
Are plant and equipment well maintained? (any black smoke observed, please indicate the plant/equipment and location)
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
产生扬尘的主要施工活动是否有围栏√
Are there enclosures around the main dust-generating activities?
√
承包商是否定期与项目实施单位、村庄
社区及附近的居民交流,了解是否对
空气质量是否有任何不满√
Does contractor regularly consult with PIU, TVET administration, students as well as nearby residents to identify concerns?
√
上一次检查后是否进行过空气质量监测
√如果有,请列明监测结果;如果没
有,请标明下一次监测时间。
Was air quality monitoring conducted since the last inspection? If yes, present results. If no, indicate date of next monitoring campaign.
√
噪音
Noise
是否有噪音超标的迹象√如果有,请说
明噪音产生的地点和设备。
Is there evidence of excessive noise? If yes, describe location and equipment.
√
承包商是否对设备进行定期检修,保证
遵守 GB 12523-90?
Does the contractor undertake regular equipment maintenance, ensure compliance with PRC standard of GB 12523-90
√
混凝土搅拌等类似施工活动是否距离敏
感区至少 300 米√
Are sites for concrete-mixing and similar activities located at least 300 m from sensitive areas?
√
施工噪声许可在限制时段是否有效√ √
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
Is the CNP (Construction Noise Permit) valid for work during restricted hours?
空气压缩机和电机运行时房门是否关闭
√
Do air compressors and generators operate with doors closed?
√
不用的设备是否关闭或将油门调小,降
低速度√
Is idle plant/equipment turned off or throttled down?
√
是否采取了任何能够减弱噪音的活动
(如隔音罩、屏障等)√
adopted (e.g. use noise barrier / enclosure)?
√
上一次检查后是否进行过噪声监测√如
果有,请列明监测结果;如果没有,
请标明下一次监测时间。
Was noise monitoring conducted since the last inspection? If yes, present results. If no, indicate date of next monitoring campaign.
√
承包商是否定期与项目实施单位、学校
学生及附近的居民交流,了解是否对
声环境是否有任何不满√
27. Does contractor regularly consult with PIU, TVET administration, students as well as nearby residents to identify concerns related to noise?
√
地表水污染
Surface water pollution
承包商是否制定了汽油和其它危险物质
临时管理计划(泄露管理计划)
Did the contractor develop a contingency plan for control of oil and other dangerous substances (Spill
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
Management Plan)?
现在污水处理设施(沉砂池)维护是否
得当√
Are wastewater treatment systems being used and properly maintained on site? (e.g. desilting tank)
√
施工废水和施工现场的生活污水是否排
入污水管网或现场处理设施以确保达
标排放√
Is construction wastewater and domestic wastewater discharged to sewer systems (if possible), or are on-site treatment facilities provided to ensure compliance with effluent discharge standard?
√
是否有污水排入到雨水管√
Are there any wastewater discharged to the storm drains?
√
固体废弃物管理
Solid waste management
现场是否整洁√(是否有垃圾、清扫是
否及时)
Is the site kept clean and tidy? (e.g. litter free, good housekeeping)
√
腐蚀性和非腐蚀性废弃物是否分开√
Are separate chutes used for inert and non- inert wastes?
√
垃圾是否分类存放以促进回收利用√
Are separated labeled containers/ areas provided for facilitating recycling and waste segregation?
√
建筑垃圾、可循环利用的废弃物及一般
垃圾是否定期清运√
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
35. Are construction wastes / recyclable wastes and general refuse removed off site regularly?
化学品废弃物(如果有)是否由有资质
的单位收集并妥善处置√
Are chemical wastes, if any, collected and disposed of properly by licensed collectors?
√
健康和安全
Health and safety
承包商是否制定比提交了环境、健康和
安全管理计划√
Did the contractor prepare and submit an Environmental, Health and Safety Management Plan (HSMP)?
现场是否提供了安全的洁净水√是否为
工人提供了足够的厕所√
Is safe supply of clean water and an adequate number of latrines provided for workers?
√
施工现场是否有垃圾收集设施√
Are garbage receptacles provided at construction site?
√
是否按照健康和安全有关规定向工人提
供了个人防护设备√
Is personal protection equipment (PPE) provided for workers in accordance with relevant health and safety regulations?
承包商是否制定事故和紧急事件的应急
响应预案√
Does the contractor have emergency response plan to take actions on accidents and emergencies?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
在施工现场粘贴明显的标识,提醒师生
和公众可能出现的危险,如车辆、有
害物质、开挖等,提高安全意识;
Are clear signs placed at construction sites in view of the TVET students and staff as well as the public, warning people of potential dangers such as moving vehicles, hazardous materials, excavations etc, and raising awareness on safety issues?
√
是否有围栏等措施保证施工现场的安
全,防止随意进出√
Are all construction sites made secure, discouraging access through appropriate fencing?
√
是否采取了交通管理措施(限速、限行
等)√
Are traffic control measures (speed control, access control) applied?
√
灭火器、消防设施是否维护并在有效期
内√消防通道是否被阻断或堵塞√
Are fire extinguishers / fighting facilities properly maintained and not expired? Escape not blocked / obstructed?
√
植被
Vegetation
无施工活动的地区是否有过度破坏植被
的迹象√
Is there any evidence of excessive destruction of existing vegetation where no construction activity is occurring?
√
土建工程完工后是否恢复受干扰区的植
被√
47. Are disturbed areas properly re-vegetate after completion of civil works?
√
文物古迹
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
Physical cultural resources
是否有可能发现文物古迹√如果有,确
保采取合理的措施保护文物古迹。
Are they any chance found relics? If yes, ensure appropriate measures taken to preserve them.
√
其它
Others
其它问题或意见
Any other problems identified or observations made?
√
Date, Name and Signature of Site Inspector
_________封涛_______________________________
现场检查人员签字、日期
Appendix internal environmental monitoring results
I. 现场环境检查清单 Environmental Site Inspection Checklist
亚行贷款(3400-PRC)山东省地下水漏斗区域综合治理示范项目
Summary of Environmental Site Inspection Checklist--现场环境检查清单总结
Changle County Subproject
昌乐亚行贷款子项目
Expansion of Nanzhai Reservoir—Changle 南寨水库扩建工程
注意:本表格专为项目实施单位环境监督员现场工作设计,可能并不详尽。个别子项目可能需要修改和补充,以解决具体的环境问题,确保环境减缓措施得以实施。
子项名称Sub‐Project Name:南寨水库扩建工程
现场位置Site Location:昌乐县
施工分阶段Construction stage: _大坝及建筑物,泵站、生产桥施工____________
检查日期Inspection Date: __2016年4月—2017年6月____________________
检查人 Inspected by: ______丁炳学_______2017 年__________
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
现场环境管理计划、申述机制和信息披露
Site EMP, GRM, information disclosure
1. 工程承包商是否指定了环境监管员?
该环境监管员在现场吗?
Has contractor appointed an
environment supervisor and is the
supervisor on-site?
√
2. 工程承包商制定现场环境管理计划了
吗?
Is Site EMP established?
√
3. 与施工有关的信息在现场公布了吗
(包括工期、承包商信息等)?
Is information pertaining to construction disclosed at construction site (including construction period, contractor information, etc)?
√
4. 申诉机制在现场公布了吗?
Is Grievance Redress Mechanism (GRM) disclosed at construction site?
√
土壤侵蚀和污染
Soil erosion and contamination
5. 承包商制定了土壤侵蚀管理计划吗?
Has the contractor prepared a soil erosion management plan?
√
6. 是否建有防止径流进入施工现场及将
现场径流引至现有排水设施的截水沟
和排水沟?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
Are intercepting ditches and drains constructed to prevent runoff entering construction sites, and divert runoff from sites to existing drainage?
7. 受干扰的地区在土方工程停止后是否
稳定?植被是否恢复?
Are disturbed areas stabilized after earthworks have ceased, and re-vegetated?
√
8. 化学品、危险物品和废弃物是否存放
在防渗透的安全地带?是否有覆盖?
Are chemicals/hazardous products and waste stored on impermeable surfaces in secure, covered areas?
√
9. 是否有漏油迹象?
Is there evidence of oil spillage?
√
10. 是否准备了堵漏工具、堵漏沙或锯屑
吸收泄露的化学物质?
Are spill kits / sand / saw dust used for absorbing chemical spillage readily accessible?
√
11. 化学品是否妥善存放并标识?
11. Are chemicals stored and labelled properly?
√
空气质量控制
Air quality control
12. 施工现场定期洒水吗?
Are construction sites regularly watered?
√
13. 易产生灰尘的建筑材料是否有遮盖或
洒水?水泥袋解袋过程是否是在有遮
蔽的地方进行?
Are stockpiles of dusty materials covered or watered and cement
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
debagging process undertaken in sheltered areas?
14. 运送土石、沙料的卡车是否有油布
或其它遮盖物覆盖避免溢出?
Are trucks carrying earth, sand or stone covered with tarps or other suitable cover to avoid spilling?
√
√
15. 设备是否得到良好的维护?(是否观
察到黑烟,如果有,请说明设备的名
称和位置)
Are plant and equipment well maintained? (any black smoke observed, please indicate the plant/equipment and location)
√
16. 产生扬尘的主要施工活动是否有围
栏?
Are there enclosures around the main dust-generating activities?
√
17. 承包商是否定期与项目实施单位、村
庄社区及附近的居民交流,了解是否
对空气质量是否有任何不满?
Does contractor regularly consult with PIU, TVET administration, students as well as nearby residents to identify concerns?
√
18. 上一次检查后是否进行过空气质量监
测?如果有,请列明监测结果;如果
没有,请标明下一次监测时间。
Was air quality monitoring conducted since the last inspection? If yes, present results. If no, indicate date of next monitoring campaign.
√
噪音
Noise
19. 是否有噪音超标的迹象?如果有,请
说明噪音产生的地点和设备。
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
Is there evidence of excessive noise? If yes, describe location and equipment.
20. 承包商是否对设备进行定期检修,保
证遵守 GB 12523-90?
Does the contractor undertake regular equipment maintenance, ensure compliance with PRC standard of GB 12523-90
√
21. 混凝土搅拌等类似施工活动是否距离
敏感区至少 300 米?
Are sites for concrete-mixing and similar activities located at least 300 m from sensitive areas?
√
22. 施工噪声许可在限制时段是否有效?
Is the CNP (Construction Noise Permit) valid for work during restricted hours?
√
23. 空气压缩机和电机运行时房门是否关
闭?
Do air compressors and generators operate with doors closed?
√
24. 不用的设备是否关闭或将油门调小,
降低速度?
Is idle plant/equipment turned off or throttled down?
√
25. 是否采取了任何能够减弱噪音的活动
(如隔音罩、屏障等)?
adopted (e.g. use noise barrier / enclosure)?
√
26. 上一次检查后是否进行过噪声监测?
如果有,请列明监测结果;如果没
有,请标明下一次监测时间。
Was noise monitoring conducted since the last inspection? If yes, present results. If no, indicate date of next monitoring campaign.
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
27. 承包商是否定期与项目实施单位、学
校学生及附近的居民交流,了解是否
对声环境是否有任何不满?
27. Does contractor regularly consult with PIU, TVET administration, students as well as nearby residents to identify concerns related to noise?
√
地表水污染
Surface water pollution
28. 承包商是否制定了汽油和其它危险物
质临时管理计划(泄露管理计划)?
Did the contractor develop a contingency plan for control of oil and other dangerous substances (Spill Management Plan)?
√
29. 现在污水处理设施(沉砂池)维护是
否得当?
Are wastewater treatment systems being used and properly maintained on site? (e.g. desilting tank)
√
30. 施工废水和施工现场的生活污水是否
排入污水管网或现场处理设施以确保
达标排放?
Is construction wastewater and domestic wastewater discharged to sewer systems (if possible), or are on-site treatment facilities provided to ensure compliance with effluent discharge standard?
√
31. 是否有污水排入到雨水管?
Are there any wastewater discharged to the storm drains?
√
固体废弃物管理
Solid waste management
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
32. 现场是否整洁?(是否有垃圾、清扫
是否及时)
Is the site kept clean and tidy? (e.g. litter free, good housekeeping)
√
33. 腐蚀性和非腐蚀性废弃物是否分开?
Are separate chutes used for inert and non- inert wastes?
√
34. 垃圾是否分类存放以促进回收利用?
Are separated labeled containers/ areas provided for facilitating recycling and waste segregation?
√
35. 建筑垃圾、可循环利用的废弃物及一
般垃圾是否定期清运?
35. Are construction wastes / recyclable wastes and general refuse removed off site regularly?
√
36. 化学品废弃物(如果有)是否由有资
质的单位收集并妥善处置?
Are chemical wastes, if any, collected and disposed of properly by licensed collectors?
√
√
健康和安全
Health and safety
37. 承包商是否制定并提交了环境、健康
和安全管理计划?
Did the contractor prepare and submit an Environmental, Health and Safety Management Plan (HSMP)?
√
38. 现场是否提供了安全的洁净水?是否
为工人提供了足够的厕所?
Is safe supply of clean water and an adequate number of latrines provided for workers?
√
39. 施工现场是否有垃圾收集设施? √
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
Are garbage receptacles provided at construction site?
40. 是否按照健康和安全有关规定向工人
提供了个人防护设备?
Is personal protection equipment (PPE) provided for workers in accordance with relevant health and safety regulations?
√
41. 承包商是否制定事故和紧急事件的应
急响应预案?
Does the contractor have emergency response plan to take actions on accidents and emergencies?
√
42. 在施工现场粘贴明显的标识,提醒师
生和公众可能出现的危险,如车辆、
有害物质、开挖等,提高安全意识;
Are clear signs placed at construction sites in view of the TVET students and staff as well as the public, warning people of potential dangers such as moving vehicles, hazardous materials, excavations etc, and raising awareness on safety issues?
√
43. 是否有围栏等措施保证施工现场的安
全,防止随意进出?
Are all construction sites made secure, discouraging access through appropriate fencing?
√
44. 是否采取了交通管理措施(限速、限
行等)?
Are traffic control measures (speed control, access control) applied?
√
45. 灭火器、消防设施是否维护并在有效
期内?消防通道是否被阻断或堵塞?
Are fire extinguishers / fighting facilities properly maintained and not expired? Escape not blocked / obstructed?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
植被
Vegetation
46. 无施工活动的地区是否有过度破坏植
被的迹象?
Is there any evidence of excessive destruction of existing vegetation where no construction activity is occurring?
√
47. 土建工程完工后是否恢复受干扰区的
植被?
47. Are disturbed areas properly re-vegetate after completion of civil works?
√
文物古迹
Physical cultural resources
48. 是否有可能发现文物古迹?如果有,
确保采取合理的措施保护文物古迹。
Are they any chance found relics? If yes, ensure appropriate measures taken to preserve them.
√
其它
Others
49. 其它问题或意见
Any other problems identified or observations made?
√
Date, Name and Signature of Site Inspector
__丁炳学_______________________________________
现场检查人员签字、日期
Appendix internal environmental monitoring results
现场环境检查清单
Summary of Environmental Site Inspection Checklist
亚行贷款(2260-PRC)山东省环境改善项目
注意:本表格专为项目实施单位环境监督员现场工作设计,可能并不详尽。个别子项目可能需要修改和补充,以解决具体的环境问题,确保环境减缓措施得以实施。
子项名称Sub‐Project Name:Juchenghe Reservoir Expansion—Gaomi City
高密市拒城河水库增容工程
现场位置Site Location:高密市拒城河镇
施工分阶段Construction stage: 库区土方开挖
检查日期Inspection Date: __2017年3-6月__
检查人 Inspected by: _____耿继胜_______
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
现场环境管理计划、申述机制和信息披露
Site EMP, GRM, information disclosure
50. 工程承包商是否指定了环境监管员?
该环境监管员在现场吗?
Has contractor appointed an
environment supervisor and is the
supervisor on-site?
√
51. 工程承包商制定现场环境管理计划了
吗?
Is Site EMP established?
√
52. 与施工有关的信息在现场公布了吗
(包括工期、承包商信息等)?
Is information pertaining to construction
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
disclosed at construction site (including construction period, contractor information, etc)?
53. 申诉机制在现场公布了吗?
Is Grievance Redress Mechanism (GRM) disclosed at construction site?
√
土壤侵蚀和污染
Soil erosion and contamination
54. 承包商制定了土壤侵蚀管理计划吗?
Has the contractor prepared a soil erosion management plan?
√
55. 是否建有防止径流进入施工现场及将
现场径流引至现有排水设施的截水沟
和排水沟?
Are intercepting ditches and drains constructed to prevent runoff entering construction sites, and divert runoff from sites to existing drainage?
√
56. 受干扰的地区在土方工程停止后是否
稳定?植被是否恢复?
Are disturbed areas stabilized after earthworks have ceased, and re-vegetated?
√
57. 化学品、危险物品和废弃物是否存放
在防渗透的安全地带?是否有覆盖?
Are chemicals/hazardous products and waste stored on impermeable surfaces in secure, covered areas?
√
58. 是否有漏油迹象?
Is there evidence of oil spillage?
√
59. 是否准备了堵漏工具、堵漏沙或锯屑
吸收泄露的化学物质?
Are spill kits / sand / saw dust used for absorbing chemical spillage readily accessible?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
60. 化学品是否妥善存放并标识?
11. Are chemicals stored and labelled properly?
√
空气质量控制
Air quality control
61. 施工现场定期洒水吗?
Are construction sites regularly watered?
√
62. 易产生灰尘的建筑材料是否有遮盖或
洒水?水泥袋解袋过程是否是在有遮
蔽的地方进行?
Are stockpiles of dusty materials covered or watered and cement debagging process undertaken in sheltered areas?
√
63. 运送土石、沙料的卡车是否有油布
或其它遮盖物覆盖避免溢出?
Are trucks carrying earth, sand or stone covered with tarps or other suitable cover to avoid spilling?
√
64. 设备是否得到良好的维护?(是否观
察到黑烟,如果有,请说明设备的名
称和位置)
Are plant and equipment well maintained? (any black smoke observed, please indicate the plant/equipment and location)
√
65. 产生扬尘的主要施工活动是否有围
栏?
Are there enclosures around the main dust-generating activities?
√
66. 承包商是否定期与项目实施单位、村
庄社区及附近的居民交流,了解是否
对空气质量是否有任何不满?
Does contractor regularly consult with
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
PIU, TVET administration, students as well as nearby residents to identify concerns?
67. 上一次检查后是否进行过空气质量监
测?如果有,请列明监测结果;如果
没有,请标明下一次监测时间。
Was air quality monitoring conducted since the last inspection? If yes, present results. If no, indicate date of next monitoring campaign.
√
噪音
Noise
68. 是否有噪音超标的迹象?如果有,请
说明噪音产生的地点和设备。
Is there evidence of excessive noise? If yes, describe location and equipment.
√
69. 承包商是否对设备进行定期检修,保
证遵守 GB 12523-90?
Does the contractor undertake regular equipment maintenance, ensure compliance with PRC standard of GB 12523-90
√
70. 混凝土搅拌等类似施工活动是否距离
敏感区至少 300 米?
Are sites for concrete-mixing and similar activities located at least 300 m from sensitive areas?
√
71. 施工噪声许可在限制时段是否有效?
Is the CNP (Construction Noise Permit) valid for work during restricted hours?
√
72. 空气压缩机和电机运行时房门是否关
闭?
Do air compressors and generators operate with doors closed?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
73. 不用的设备是否关闭或将油门调小,
降低速度?
Is idle plant/equipment turned off or throttled down?
√
74. 是否采取了任何能够减弱噪音的活动
(如隔音罩、屏障等)?
adopted (e.g. use noise barrier / enclosure)?
√
75. 上一次检查后是否进行过噪声监测?
如果有,请列明监测结果;如果没
有,请标明下一次监测时间。
Was noise monitoring conducted since the last inspection? If yes, present results. If no, indicate date of next monitoring campaign.
√
76. 承包商是否定期与项目实施单位、学
校学生及附近的居民交流,了解是否
对声环境是否有任何不满?
27. Does contractor regularly consult with PIU, TVET administration, students as well as nearby residents to identify concerns related to noise?
√
地表水污染
Surface water pollution
77. 承包商是否制定了汽油和其它危险物
质临时管理计划(泄露管理计划)?
Did the contractor develop a contingency plan for control of oil and other dangerous substances (Spill Management Plan)?
√
78. 现在污水处理设施(沉砂池)维护是
否得当?
Are wastewater treatment systems being used and properly maintained on site? (e.g. desilting tank)
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
79. 施工废水和施工现场的生活污水是否
排入污水管网或现场处理设施以确保
达标排放?
Is construction wastewater and domestic wastewater discharged to sewer systems (if possible), or are on-site treatment facilities provided to ensure compliance with effluent discharge standard?
√
80. 是否有污水排入到雨水管?
Are there any wastewater discharged to the storm drains?
√
固体废弃物管理
Solid waste management
81. 现场是否整洁?(是否有垃圾、清扫
是否及时)
Is the site kept clean and tidy? (e.g. litter free, good housekeeping)
√
82. 腐蚀性和非腐蚀性废弃物是否分开?
Are separate chutes used for inert and non- inert wastes?
√
83. 垃圾是否分类存放以促进回收利用?
Are separated labeled containers/ areas provided for facilitating recycling and waste segregation?
√
84. 建筑垃圾、可循环利用的废弃物及一
般垃圾是否定期清运?
35. Are construction wastes / recyclable wastes and general refuse removed off site regularly?
√
85. 化学品废弃物(如果有)是否由有资
质的单位收集并妥善处置?
Are chemical wastes, if any, collected and disposed of properly by licensed collectors?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
健康和安全
Health and safety
86. 承包商是否制定并提交了环境、健康
和安全管理计划?
Did the contractor prepare and submit an Environmental, Health and Safety Management Plan (HSMP)?
√
87. 现场是否提供了安全的洁净水?是否
为工人提供了足够的厕所?
Is safe supply of clean water and an adequate number of latrines provided for workers?
√
88. 施工现场是否有垃圾收集设施?
Are garbage receptacles provided at construction site?
√
89. 是否按照健康和安全有关规定向工人
提供了个人防护设备?
Is personal protection equipment (PPE) provided for workers in accordance with relevant health and safety regulations?
√
90. 承包商是否制定事故和紧急事件的应
急响应预案?
Does the contractor have emergency response plan to take actions on accidents and emergencies?
√
91. 在施工现场粘贴明显的标识,提醒师
生和公众可能出现的危险,如车辆、
有害物质、开挖等,提高安全意识;
Are clear signs placed at construction sites in view of the TVET students and staff as well as the public, warning people of potential dangers such as moving vehicles, hazardous materials, excavations etc, and raising awareness on safety issues?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
92. 是否有围栏等措施保证施工现场的安
全,防止随意进出?
Are all construction sites made secure, discouraging access through appropriate fencing?
√
93. 是否采取了交通管理措施(限速、限
行等)?
Are traffic control measures (speed control, access control) applied?
√
94. 灭火器、消防设施是否维护并在有效
期内?消防通道是否被阻断或堵塞?
Are fire extinguishers / fighting facilities properly maintained and not expired? Escape not blocked / obstructed?
√
植被
Vegetation
95. 无施工活动的地区是否有过度破坏植
被的迹象?
Is there any evidence of excessive destruction of existing vegetation where no construction activity is occurring?
√
96. 土建工程完工后是否恢复受干扰区的
植被?
47. Are disturbed areas properly re-vegetate after completion of civil works?
√
文物古迹
Physical cultural resources
97. 是否有可能发现文物古迹?如果有,
确保采取合理的措施保护文物古迹。
Are they any chance found relics? If yes, ensure appropriate measures taken to preserve them.
√
其它
Others
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
98. 其它问题或意见
Any other problems identified or observations made?
√
Date, Name and Signature of Site Inspector
耿继胜__________2017年6月_____________
现场检查人员签字、日期
Appendix internal environmental monitoring results
现场环境检查清单
Summary of Environmental Site Inspection Checklist
亚行贷款(2260-PRC)山东省环境改善项目
子项名称Sub‐Project Name:Water diversion from Renhe Reservoir to Heihushan
Reservoir and Qiyi Reservoir - Qingzhou:
从仁和水库引水到黑虎山水库和七一水库-青州引水:青州市仁河、黑虎山、七一水库三库
串联向城区供水工程
现场位置Site Location:青州市庙子镇、王坟镇、王府街道办事处
施工分阶段Construction stage: 明渠、暗渠、隧洞加固施工
__________________________________
检查日期Inspection Date: __2017年3--6月
_________________________________
检查人 Inspected by:李光永
_____________________________________________
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
现场环境管理计划、申述机制和信息披露
Site EMP, GRM, information disclosure
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
99. 工程承包商是否指定了环境监管员?
该环境监管员在现场吗?
Has contractor appointed an
environment supervisor and is the
supervisor on-site?
√
100. 工程承包商制定现场环境管理计划
了吗?
Is Site EMP established?
√
101. 与施工有关的信息在现场公布了吗
(包括工期、承包商信息等)?
Is information pertaining to construction disclosed at construction site (including construction period, contractor information, etc)?
√
102. 申诉机制在现场公布了吗?
Is Grievance Redress Mechanism (GRM) disclosed at construction site?
√
土壤侵蚀和污染
Soil erosion and contamination
103. 承包商制定了土壤侵蚀管理计划
吗?
Has the contractor prepared a soil erosion management plan?
√
104. 是否建有防止径流进入施工现场及
将现场径流引至现有排水设施的截水
沟和排水沟?
Are intercepting ditches and drains constructed to prevent runoff entering construction sites, and divert runoff from sites to existing drainage?
√
105. 受干扰的地区在土方工程停止后是
否稳定?植被是否恢复?
Are disturbed areas stabilized after earthworks have ceased, and re-vegetated?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
106. 化学品、危险物品和废弃物是否存
放在防渗透的安全地带?是否有覆
盖?
Are chemicals/hazardous products and waste stored on impermeable surfaces in secure, covered areas?
√
107. 是否有漏油迹象?
Is there evidence of oil spillage?
√
108. 是否准备了堵漏工具、堵漏沙或锯
屑吸收泄露的化学物质?
Are spill kits / sand / saw dust used for absorbing chemical spillage readily accessible?
√
109. 化学品是否妥善存放并标识?
11. Are chemicals stored and labelled properly?
√
空气质量控制
Air quality control
110. 施工现场定期洒水吗?
Are construction sites regularly watered?
√
111. 易产生灰尘的建筑材料是否有遮盖
或洒水?水泥袋解袋过程是否是在有
遮蔽的地方进行?
Are stockpiles of dusty materials covered or watered and cement debagging process undertaken in sheltered areas?
√
112. 运送土石、沙料的卡车是否有油布
或其它遮盖物覆盖避免溢出?
Are trucks carrying earth, sand or stone covered with tarps or other suitable cover to avoid spilling?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
113. 设备是否得到良好的维护?(是否
观察到黑烟,如果有,请说明设备的
名称和位置)
Are plant and equipment well maintained? (any black smoke observed, please indicate the plant/equipment and location)
√
114. 产生扬尘的主要施工活动是否有围
栏?
Are there enclosures around the main dust-generating activities?
√
115. 承包商是否定期与项目实施单位、
村庄社区及附近的居民交流,了解是
否对空气质量是否有任何不满?
Does contractor regularly consult with PIU, TVET administration, students as well as nearby residents to identify concerns?
√
116. 上一次检查后是否进行过空气质量
监测?如果有,请列明监测结果;如
果没有,请标明下一次监测时间。
Was air quality monitoring conducted since the last inspection? If yes, present results. If no, indicate date of next monitoring campaign.
√
噪音
Noise
117. 是否有噪音超标的迹象?如果有,
请说明噪音产生的地点和设备。
Is there evidence of excessive noise? If yes, describe location and equipment.
√
118. 承包商是否对设备进行定期检修,
保证遵守 GB 12523-90?
Does the contractor undertake regular equipment maintenance, ensure compliance with PRC standard of GB 12523-90
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
119. 混凝土搅拌等类似施工活动是否距
离敏感区至少 300 米?
Are sites for concrete-mixing and similar activities located at least 300 m from sensitive areas?
√
120. 施工噪声许可在限制时段是否有
效?
Is the CNP (Construction Noise Permit) valid for work during restricted hours?
√
121. 空气压缩机和电机运行时房门是否
关闭?
Do air compressors and generators operate with doors closed?
√
122. 不用的设备是否关闭或将油门调
小,降低速度?
Is idle plant/equipment turned off or throttled down?
√
123. 是否采取了任何能够减弱噪音的活
动(如隔音罩、屏障等)?
adopted (e.g. use noise barrier / enclosure)?
√
124. 上一次检查后是否进行过噪声监
测?如果有,请列明监测结果;如果
没有,请标明下一次监测时间。
Was noise monitoring conducted since the last inspection? If yes, present results. If no, indicate date of next monitoring campaign.
√
125. 承包商是否定期与项目实施单位、
学校学生及附近的居民交流,了解是
否对声环境是否有任何不满?
27. Does contractor regularly consult with PIU, TVET administration, students as well as nearby residents to identify concerns related to noise?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
地表水污染
Surface water pollution
126. 承包商是否制定了汽油和其它危险
物质临时管理计划(泄露管理计
划)?
Did the contractor develop a contingency plan for control of oil and other dangerous substances (Spill Management Plan)?
√
127. 现在污水处理设施(沉砂池)维护
是否得当?
Are wastewater treatment systems being used and properly maintained on site? (e.g. desilting tank)
√
128. 施工废水和施工现场的生活污水是
否排入污水管网或现场处理设施以确
保达标排放?
Is construction wastewater and domestic wastewater discharged to sewer systems (if possible), or are on-site treatment facilities provided to ensure compliance with effluent discharge standard?
√
129. 是否有污水排入到雨水管?
Are there any wastewater discharged to the storm drains?
√
固体废弃物管理
Solid waste management
130. 现场是否整洁?(是否有垃圾、清
扫是否及时)
Is the site kept clean and tidy? (e.g. litter free, good housekeeping)
√
131. 腐蚀性和非腐蚀性废弃物是否分
开?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
Are separate chutes used for inert and non- inert wastes?
132. 垃圾是否分类存放以促进回收利
用?
Are separated labeled containers/ areas provided for facilitating recycling and waste segregation?
√
133. 建筑垃圾、可循环利用的废弃物及
一般垃圾是否定期清运?
35. Are construction wastes / recyclable wastes and general refuse removed off site regularly?
√
134. 化学品废弃物(如果有)是否由有
资质的单位收集并妥善处置?
Are chemical wastes, if any, collected and disposed of properly by licensed collectors?
√
健康和安全
Health and safety
135. 承包商是否制定比提交了环境、健
康和安全管理计划?
Did the contractor prepare and submit an Environmental, Health and Safety Management Plan (HSMP)?
√
136. 现场是否提供了安全的洁净水?是
否为工人提供了足够的厕所?
Is safe supply of clean water and an adequate number of latrines provided for workers?
√
137. 施工现场是否有垃圾收集设施?
Are garbage receptacles provided at construction site?
√
138. 是否按照健康和安全有关规定向工
人提供了个人防护设备?
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
Is personal protection equipment (PPE) provided for workers in accordance with relevant health and safety regulations?
√
139. 承包商是否制定事故和紧急事件的
应急响应预案?
Does the contractor have emergency response plan to take actions on accidents and emergencies?
√
140. 在施工现场粘贴明显的标识,提醒
师生和公众可能出现的危险,如车
辆、有害物质、开挖等,提高安全意
识;
Are clear signs placed at construction sites in view of the TVET students and staff as well as the public, warning people of potential dangers such as moving vehicles, hazardous materials, excavations etc, and raising awareness on safety issues?
√
141. 是否有围栏等措施保证施工现场的
安全,防止随意进出?
Are all construction sites made secure, discouraging access through appropriate fencing?
√
142. 是否采取了交通管理措施(限速、
限行等)?
Are traffic control measures (speed control, access control) applied?
√
143. 灭火器、消防设施是否维护并在有
效期内?消防通道是否被阻断或堵
塞?
Are fire extinguishers / fighting facilities properly maintained and not expired? Escape not blocked / obstructed?
√
植被
Vegetation
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
144. 无施工活动的地区是否有过度破坏
植被的迹象?
Is there any evidence of excessive destruction of existing vegetation where no construction activity is occurring?
√
145. 土建工程完工后是否恢复受干扰区
的植被?
47. Are disturbed areas properly re-vegetate after completion of civil works?
√
文物古迹
Physical cultural resources
146. 是否有可能发现文物古迹?如果
有,确保采取合理的措施保护文物古
迹。
Are they any chance found relics? If yes, ensure appropriate measures taken to preserve them.
√
其它
Others
147. 其它问题或意见
Any other problems identified or observations made?
√
Date, Name and Signature of Site Inspector
____李光永________2017年6月15日_____________________________
现场检查人员签字、日期
Appendix internal environmental monitoring results
现场环境检查清单
Summary of Environmental Site Inspection Checklist
亚行贷款(2260-PRC)山东省环境改善项目
子项名称 Sub‐Project Name:Irrigation Channels works for water diversion from Mi River
to Bagouzi Reservoir – Qingzhou
灌溉渠道引水从弥河到 bagouzi 水库-青州
青州市引弥干渠向坝沟子水库供水工程
现场位置Site Location:青州市弥河镇、黄楼街道办事处
施工分阶段Construction stage: 施工中
__________________________________
检查日期Inspection Date: __2017年6月
_________________________________
检查人 Inspected by:张伟
_____________________________________________
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
现场环境管理计划、申述机制和信息披露
Site EMP, GRM, information disclosure
148. 工程承包商是否指定了环境监管
员?该环境监管员在现场吗?
Has contractor appointed an
environment supervisor and is the
supervisor on-site?
√
149. 工程承包商制定现场环境管理计划
了吗?
Is Site EMP established?
√
150. 与施工有关的信息在现场公布了吗
(包括工期、承包商信息等)?
Is information pertaining to construction disclosed at construction site (including construction period, contractor information, etc)?
√
151. 申诉机制在现场公布了吗?
Is Grievance Redress Mechanism (GRM) disclosed at construction site?
√
土壤侵蚀和污染
Soil erosion and contamination
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
152. 承包商制定了土壤侵蚀管理计划
吗?
Has the contractor prepared a soil erosion management plan?
√
153. 是否建有防止径流进入施工现场及
将现场径流引至现有排水设施的截水
沟和排水沟?
Are intercepting ditches and drains constructed to prevent runoff entering construction sites, and divert runoff from sites to existing drainage?
√
154. 受干扰的地区在土方工程停止后是
否稳定?植被是否恢复?
Are disturbed areas stabilized after earthworks have ceased, and re-vegetated?
√
155. 化学品、危险物品和废弃物是否存
放在防渗透的安全地带?是否有覆
盖?
Are chemicals/hazardous products and waste stored on impermeable surfaces in secure, covered areas?
√
156. 是否有漏油迹象?
Is there evidence of oil spillage?
√
157. 是否准备了堵漏工具、堵漏沙或锯
屑吸收泄露的化学物质?
Are spill kits / sand / saw dust used for absorbing chemical spillage readily accessible?
√
158. 化学品是否妥善存放并标识?
11. Are chemicals stored and labelled properly?
√
空气质量控制
Air quality control
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
159. 施工现场定期洒水吗?
Are construction sites regularly watered?
√
160. 易产生灰尘的建筑材料是否有遮盖
或洒水?水泥袋解袋过程是否是在有
遮蔽的地方进行?
Are stockpiles of dusty materials covered or watered and cement debagging process undertaken in sheltered areas?
√
161. 运送土石、沙料的卡车是否有油布
或其它遮盖物覆盖避免溢出?
Are trucks carrying earth, sand or stone covered with tarps or other suitable cover to avoid spilling?
√
162. 设备是否得到良好的维护?(是否
观察到黑烟,如果有,请说明设备的
名称和位置)
Are plant and equipment well maintained? (any black smoke observed, please indicate the plant/equipment and location)
√
163. 产生扬尘的主要施工活动是否有围
栏?
Are there enclosures around the main dust-generating activities?
√
164. 承包商是否定期与项目实施单位、
村庄社区及附近的居民交流,了解是
否对空气质量是否有任何不满?
Does contractor regularly consult with PIU, TVET administration, students as well as nearby residents to identify concerns?
√
165. 上一次检查后是否进行过空气质量
监测?如果有,请列明监测结果;如
果没有,请标明下一次监测时间。
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
Was air quality monitoring conducted since the last inspection? If yes, present results. If no, indicate date of next monitoring campaign.
√
噪音
Noise
166. 是否有噪音超标的迹象?如果有,
请说明噪音产生的地点和设备。
Is there evidence of excessive noise? If yes, describe location and equipment.
√
167. 承包商是否对设备进行定期检修,
保证遵守 GB 12523-90?
Does the contractor undertake regular equipment maintenance, ensure compliance with PRC standard of GB 12523-90
√
168. 混凝土搅拌等类似施工活动是否距
离敏感区至少 300 米?
Are sites for concrete-mixing and similar activities located at least 300 m from sensitive areas?
√
169. 施工噪声许可在限制时段是否有
效?
Is the CNP (Construction Noise Permit) valid for work during restricted hours?
√
170. 空气压缩机和电机运行时房门是否
关闭?
Do air compressors and generators operate with doors closed?
√
171. 不用的设备是否关闭或将油门调
小,降低速度?
Is idle plant/equipment turned off or throttled down?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
172. 是否采取了任何能够减弱噪音的活
动(如隔音罩、屏障等)?
adopted (e.g. use noise barrier / enclosure)?
√
173. 上一次检查后是否进行过噪声监
测?如果有,请列明监测结果;如果
没有,请标明下一次监测时间。
Was noise monitoring conducted since the last inspection? If yes, present results. If no, indicate date of next monitoring campaign.
√
174. 承包商是否定期与项目实施单位、
学校学生及附近的居民交流,了解是
否对声环境是否有任何不满?
27. Does contractor regularly consult with PIU, TVET administration, students as well as nearby residents to identify concerns related to noise?
√
地表水污染
Surface water pollution
175. 承包商是否制定了汽油和其它危险
物质临时管理计划(泄露管理计
划)?
Did the contractor develop a contingency plan for control of oil and other dangerous substances (Spill Management Plan)?
√
176. 现在污水处理设施(沉砂池)维护
是否得当?
Are wastewater treatment systems being used and properly maintained on site? (e.g. desilting tank)
√
177. 施工废水和施工现场的生活污水是
否排入污水管网或现场处理设施以确
保达标排放?
Is construction wastewater and
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
domestic wastewater discharged to sewer systems (if possible), or are on-site treatment facilities provided to ensure compliance with effluent discharge standard?
√
178. 是否有污水排入到雨水管?
Are there any wastewater discharged to the storm drains?
√
固体废弃物管理
Solid waste management
179. 现场是否整洁?(是否有垃圾、清
扫是否及时)
Is the site kept clean and tidy? (e.g. litter free, good housekeeping)
√
180. 腐蚀性和非腐蚀性废弃物是否分
开?
Are separate chutes used for inert and non- inert wastes?
√
181. 垃圾是否分类存放以促进回收利
用?
Are separated labeled containers/ areas provided for facilitating recycling and waste segregation?
√
182. 建筑垃圾、可循环利用的废弃物及
一般垃圾是否定期清运?
35. Are construction wastes / recyclable wastes and general refuse removed off site regularly?
√
183. 化学品废弃物(如果有)是否由有
资质的单位收集并妥善处置?
Are chemical wastes, if any, collected and disposed of properly by licensed collectors?
√
健康和安全
Health and safety
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
184. 承包商是否制定比提交了环境、健
康和安全管理计划?
Did the contractor prepare and submit an Environmental, Health and Safety Management Plan (HSMP)?
√
185. 现场是否提供了安全的洁净水?是
否为工人提供了足够的厕所?
Is safe supply of clean water and an adequate number of latrines provided for workers?
√
186. 施工现场是否有垃圾收集设施?
Are garbage receptacles provided at construction site?
√
187. 是否按照健康和安全有关规定向工
人提供了个人防护设备?
Is personal protection equipment (PPE) provided for workers in accordance with relevant health and safety regulations?
√
188. 承包商是否制定事故和紧急事件的
应急响应预案?
Does the contractor have emergency response plan to take actions on accidents and emergencies?
√
189. 在施工现场粘贴明显的标识,提醒
师生和公众可能出现的危险,如车
辆、有害物质、开挖等,提高安全意
识;
Are clear signs placed at construction sites in view of the TVET students and staff as well as the public, warning people of potential dangers such as moving vehicles, hazardous materials, excavations etc, and raising awareness on safety issues?
√
190. 是否有围栏等措施保证施工现场的
安全,防止随意进出?
√
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
Are all construction sites made secure, discouraging access through appropriate fencing?
191. 是否采取了交通管理措施(限速、
限行等)?
Are traffic control measures (speed control, access control) applied?
√
192. 灭火器、消防设施是否维护并在有
效期内?消防通道是否被阻断或堵
塞?
Are fire extinguishers / fighting facilities properly maintained and not expired? Escape not blocked / obstructed?
√
植被
Vegetation
193. 无施工活动的地区是否有过度破坏
植被的迹象?
Is there any evidence of excessive destruction of existing vegetation where no construction activity is occurring?
√
194. 土建工程完工后是否恢复受干扰区
的植被?
47. Are disturbed areas properly re-vegetate after completion of civil works?
√
文物古迹
Physical cultural resources
195. 是否有可能发现文物古迹?如果
有,确保采取合理的措施保护文物古
迹。
Are they any chance found relics? If yes, ensure appropriate measures taken to preserve them.
√
其它
Others
196. 其它问题或意见
检查内容
Inspection Item
是
Yes
否
No
不适用
N.A.
或不存
在该问
题
备注(如发现的问题、可能的原因或
建议的纠正/预防措施)
Remarks (i.e. problem observed, possible cause of nonconformity and/or proposed corrective/ preventative actions)
Any other problems identified or observations made?
√
Date, Name and Signature of Site Inspector
____张伟________2017年6月16日_____________________________
现场检查人员签字、日期