Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB. Project Number: 36595 December 2008 PRC: Anhui Hefei Urban Environment Improvement Project Prepared by Hefei Municipal Government With the assistance of Coal Industry Hefei Design Institute PRC For Hefei Municipal Government Hefei Urban Construction Investment Company Hefei Chao Lake Ecological and Environmental Improvement Construction and Administration Bureau Hefei Xincheng State Assets Operating Co. Ltd.

Upload: others

Post on 25-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Resettlement Monitoring Report

This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB.

Project Number: 36595 December 2008

PRC: Anhui Hefei Urban Environment Improvement Project

Prepared by Hefei Municipal Government With the assistance of Coal Industry Hefei Design Institute PRC For Hefei Municipal Government Hefei Urban Construction Investment Company Hefei Chao Lake Ecological and Environmental Improvement Construction and Administration Bureau Hefei Xincheng State Assets Operating Co. Ltd.

Page 2: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

HEFEI URBAN ENVIRONMENT IMPROVEMENT PROJECT

ADB LOAN NO.: 2328-PRC

External Resettlement Monitoring and Evaluation Report

No. 2

Coal Industry Hefei Design Institute

January 2009

Page 3: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

1

Catalog

I INTRODUCTION ..............................................................................................................................1

1.1 PROJECT OVERVIEW.................................................................................................................1 1.1.1 Project Components ................................................................................................1 1.1.2 Project Content and Project Scale .............................................................................1

1.2 PROJECT PROGRESS................................................................................................................3 1.3 BRIEFING ON RESETTLEMENT ARRANGEMENT PLAN .........................................................4

1.3.1 Summary of project influences ....................................................................................4 1.3.2 Compensation Standard................................................................................................6 1.3.3 Organization Structure and Responsibilities ...........................................................7

1.4 EXTERNAL MONITORING.........................................................................................................10 1.4.1Monitoring Agency ..........................................................................................................10 1.4.3 Monitoring and evaluation measures ......................................................................10

II THE FIRST SURVEY ON BASELINE AND RESETTLEMENT..................................... 11

2.1 SURVEY TIME AND CONTENTS .............................................................................................. 11 2.2 CHANGES DURING THE IMPLEMENTATION OF THE PROJECT ...........................................17 2.3 CURRENT AFFECTED PEOPLE AND ENTERPRISE................................................................19

III MONITORING AND EVALUATION ................................................................................................20

3.1 PROGRESS OF LAND ACQUISITION AND DEMOLITION........................................................20 3.1.1 Progress of land acquisition .......................................................................................20

3.2 PROGRESS OF BUILDING DEMOLITION AND ARRANGEMENT ............................................22 3.2.1Progress of building demolition ..................................................................................22 3.2.2 Resettlement Arrangement Plan...............................................................................23 3.2.3 Infrastructure construction on affected area and assigned area ....................24

3.3 RESETTLEMENT FUND UTILIZATION .....................................................................................25 3.3.1 Resettlement Fund Utilization....................................................................................25

3.4 CHANGE OF LIVING CONDITION OF AFFECTED PEOPLE ....................................................26 3.4.1 Investigation on living condition of affected people ............................................26

3.5 PUBLIC PARTICIPATION ...........................................................................................................27 3.5.1 Survey on public opinions ...........................................................................................27

3.6 COMPLAINT DEAL PROCEDURE AND EFFICIENCY EVALUATION........................................29

IV CONCLUSIONS ON MONITORING AND EVALUATIONS...........................................30

4.1 PROBLEMS ENCOUNTERED DURING THE IMPLEMENTATION OF THE PROJECTS..........30

Page 4: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

1

I Introduction 1.1 Project Overview

1.1.1 Project Components Hefei Urban Environment Improvement Project (HUEIP) Utilizing ADB Loan

has eight sub-projects in implementation so far. They are: Banqiao River

Rehabilitation and Flood Control Improvement, Ershibu River Rehabilitation and

Flood Control Improvement, Sili River Rehabilitation and Flood Control

Improvement, Improvement of Hefei Municipal Sewers, Improvement of the Closed

Qingxi Road Landfill Site, Shiwuli River WWTP and associated pipeline networks,

Wangtang WWTP Phase II, and Improvement of Chao Lake Ecological Environment

and Flood Control Works。

1.1.2 Project Content and Project Scale In the past few years, along with the Great Construction in Hefei, the population

in the city has increased a lot and industrialization is speeded up, which resulted

serious surface water pollution. Except a few water courses, majority of other water

bodies has pollutant concentrations exceeding Hefei City Environmental Functional

Standard. Water quality in Chao Lake has exceeded National Surface Water

Environmental Quality Class III, while water in Nanfei River, Shiwuli River and

Ershibu River has exceeded Class V. At present, the wastewater treatment ratio is

only 66%. Associated with industrial wastewater, the treatment ratio is only 50%.

More than half of the wastewater is dumped into the water course directly, which will

join Chao Lake finally. Part of the water courses has lost its function, which greatly

threatens the Chao Lake water quality.

The HMG has be aware of the environmental degradation problem. To solve the

similar problems, and maintain the sustainability of Hefei City, a multi-organization

composed environmental protection plan was developed. Thus, HMG has made a list

of key projects, and requested ADB for funding, which is Hefei Urban Environmental

Improvement Project (HUMIP). The HUMIP is a key component to achieve the goals.

This project will improve the public wastewater treatment and flood control to

improve the environment. Meanwhile, through reduced poverty, new employment

opportunities, attracting investment and business activities, and reduce the possibility

to get diseases related to wastewater and air born, Hefei residents will earn a better

Page 5: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

2

living condition.

HUEIP project includes building up wastewater treatment plants, wastewater

sewers, closed landfill improvement, dredging and anti-flood infrastructure, and Chao

Lake Ecological Environmental Improvement. The summary of the project is listed in

Table 1.1.1.

Table 1.1.1: Project Content and project scale

Project Component Description

1 Build Shiwuli River WWTP

Construction contents (1) Design, land acquisition, equipment and vehicle purchase, employer 38 staffs. Construction contents (2) By 2010, wastewater treatment capacity shall reach 50,000 m3/day Construction contents(3) By 2010, build 73.3km serer mains (D300-D1200), and build up a pumping station.

2 Build Wangtang WWTP Phase II and associated pipeline networks

Construction contents (4) Design, land acquisition, equipment and vehicle purchase, employer staffs. Construction contents (5) By 2010, wastewater treatment capacity shall reach 100,000 m3/day Construction contents (6) By 2011, build 33km serer mains (D300-D1400), and build up a pumping station.

3 Improvement of the whole Hefei City Sewer

Construction contents (7) By 2010, install pipes with different diameters 206 km, to connect current Wangtang Phase I, Zhuzhuanjing, Caitianpu and Wangxiaoying WWTPs. Construction contents (8) By 2010, install a pumping station and a GIS system.

4 Improvement of the Closed Qingxi Road Landfill Site

Construction contents (9) By 2008, install a impermeable wall, capping, leachate collection and gas collection system, and do landscaping.

5 Ershibu River Rehabilitation and Flood Control Improvement

Construction contents (10) By 2012, finish river dredging, widening and reinforcing. Construction contents (11) By 2012, install rain water drainage pipeline of 12 km (D400-D1200), and two rain water pumping stations. Construction contents (12) By 2012, install sewer mains of 16km (D300-D800) and two wastewater pumping stations. Construction contents (13) By 2012, finish all accessory works.

6 Banqiao River Rehabilitation and Flood Control Improvement

Construction contents (14) By 2011, finish river dredging, widening and reinforcing. Construction contents (15) By 2011, build roads along the rivers and other accessory works. Construction contents (16) By 2011, build wastewater hold up net, and do necessary landscaping.

7 Sili River Rehabilitation Construction contents (17) By 2010, finish river dredging

Page 6: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

3

Project Component Description

and Flood Control Improvement

and widening of 3.14 km, and do reinforcing. Construction contents (18) By 2010, build rainwater drainage pipeline (D400-D1800), wastewater mains (D300-D800) and one rainwater pumping station. Construction contents (19) By 2010, finish necessary accessory works.

8 Chao Lake Ecological Environment and Flood Control Works

Construction contents (20) By 2010, improve the collapsed area of 20.62km. Reinforce anti-wave plat and protection line of 56.33km. Reinforce anti-wave wall of 23km. Construction contents (21) By 2010, finish round road of 49.39km. Construction contents (22) Finish necessary accessory works.

1.2 Project Progress So far, the Preliminary Design (PD) of all sub-projects has been approved by

Hefei Municipal Development and Reform Committee (HMDRC). The progress of

each sub-project is listed in the table 1.2.1.

Table 1.1.1: Project Progress

Sub-project Progress

1 Build Shiwuli River WWTP

Civil works and equipment installation of Phase I have been finished. Civil work of phase II has been basically completed,

2 Build Wangtang WWTP Phase II and associated pipeline networks

Construction of pipelines has been completed, Civil work of phase I has been basically completed, Civil works for phase II is in the bidding process, equipment installation has not commenced.

3 Improvement of the whole Hefei City Sewer

40% has been finished

4 Improvement of the Closed Qingxi Road Landfill Site

finished

5 Ershibu River Rehabilitation and Flood Control Improvement

PD was approved on July 8th 2008. The construction of 1st package has commenced.

6 Banqiao River Rehabilitation and Flood Control Improvement

70% workload has been finished

7 Sili River Rehabilitation and Flood Control Improvement

Construction has commenced, procedures on land acquisition and demolition have passed, with 90% finished.

8 Chao Lake Ecological Land measurement, relevant approval procedure and

Page 7: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

4

Sub-project Progress

Environment and Flood Control Works

resettlement compensation completed in Feixi county.

1.3 Briefing on Resettlement Arrangement Plan

1.3.1 Summary of project influences According to the established Resettlement Arrangement Plan (RAP), the

influences of the eight implemented sub-projects are listed below:

1. Improvement of the Closed Qingxi Road Landfill Site

The project covers an area of 534 mu, within which, 181 mu originally used by

landfill was assigned with no cost, 100 mu of sludge pond land by Water Supply

Corporation was provided by the Commission of Construction with no cost, and 253

mu was newly acquired. The land acquisition will influence the Qilitang group of

Qingxi road Shejuwei, without any demolition. Totally 32 household is affected, with

131 head in total.

2. Sili River Rehabilitation and Flood Control Improvement The permanent land acquisition will influence three farmer groups in Luyang

District community. Permanent land acquisition is 181 mu, with 37 household of 152

people influence. There is no temporary land acquisition. Demolition of houses will

be 11328m2, with direct influence on 22 household of 90 people. Three enterprises

have been affected due to the demolition of walls. There are 95 employees in this

enterprise, and their lives will not be affected.

The land acquisition and demolition works are expected to start on May 2007,

and terminated on November 2008, which lasts for 18 months. Before the

remuneration has been distributed, no civil work shall be started. To ensure the

successful implementation of the project, except internal monitoring, an external

monitoring agency shall be employed to do monitoring every six months. Land

acquisition remuneration and arrangement fee budget is about 32.2 million RMB,

including basic fee, related tax and preparation fee (10% of basic fee) on permanent

land acquisition and temporary acquisition. The arrangement fee shall take about

13% of the total budget of the project.

3. Ershibu River Rehabilitation and Flood Control Improvement

According to the FSR, 3 counties and 11 villages will be affected. Details are

Page 8: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

5

listed below:

a) 1922 people of 541 households will be affected by land acquisition;

b) 771 people of 209 households will be affected by demolition. The total

demolition area is 43870m2;

c) 10 enterprises and shops will be affected. Among those, 2 enterprises will be

affected on their walls, without income loss. Other eight are house changed shops.

In total, 2693 people of 750 households will be affected, within which 329

people of 96 households will be affected by both land acquisition and demolition. 4. Banqiao River Rehabilitation and Flood Control Improvement

736 mu (49 hectares) land shall be acquired permanently. RP is based on the FSR

of the project, and is subject to modification of future detailed design. IA shall try to

minimize the influence of the project on the community.

According to the FSR, six villages and communities within Xinzhan and Luyang

District will be affected. Details are listed below: 736 mu land will be acquired to

widen the river bank, with 470 households of 1412 people affected. Temporary land

shall take 70 mu thin farmland by the river, with no one to resettle. Demolition area is

180m2 , with one household of 8 people affected.

5. Shiwuli River WWTP and associated pipeline networks

WWTP will be located to the west of Xiaofan Village, and to the east of

Guchengyu. Totally 77.8 mu will be acquired, within which farmland will be 50.6 mu.

25 mu land will be acquired as temporary acquired land, which are mainly along city

road and a few farmland. 61 households in Dayu Town Luji village No.2 village group

will be affected, with farmland for 256 people. No resettlement or demolition.

Though sewer pipeline construction will take some temporary land, however, as

the constructions of mains will use pipe jacking technology, and the placement of

pipes will take place during same time as road construction and installation of other

infrastructure, thus the placement of those pipes will not involve land acquisition.

However, as the component of the road construction, according to ADB requirement,

due diligence shall be conducted.

6. Improvement of Hefei Municipal Sewers

1.5 mu land shall be permanently acquired. The land belongs to one household

of Caoshuwang Village in Yaohai District. 40 mu land shall be temporarily occupied

Page 9: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

6

during the construction of the pipeline to facilitate the construction of pipeline. As

there is no building or other infrastructure on this land, thus no one will be affected.

7. Wangtang WWTP Phase II and associated pipeline networks Wangtang WWTP Phase II is located in the area surrounded by Qianshan Road,

Qingxi Road, Qingyang Road, Gaoliu Road and Jinniu Road. The Phase I project 80

thousand m3/d was completed and trailly started on September 2003. In January 2004,

it was officially started. The land for Phase II project has already been acquired during

Phase I project, without any resettlement or demolition work. The pumping station

has also been finished, with the owner of Hefei Municipal Construction Commission.

The land was transferred with no charge.

Though sewer pipeline construction will take some temporary land, however, as

the constructions of mains will use pipe jacking technology, and the placement of

pipes will take place during same time as road construction and installation of other

infrastructure, thus the placement of those pipes will not involve land acquisition.

However, as the component of the road construction, according to ADB requirement,

due diligence shall be conducted.

8. Chao Lake Ecological Environment and Flood Control Works

The project will acquire land of 172 mu, within which water land of 139.6 mu,

dry land of 9.54mu, wild land of 15 mu, fish pond (water pond) of 7.6 mu. Permanent

land acquisition results the land loss of five towns and eight villages. Two of the

towns are located in Feixi County, one is in Baohe District, and two are located in

Feidong County. During the construction, 178.4 mu land is temporarily taken for one

year. It is estimated this temporary land acquisition will influence 210 household.

1.3.2 Compensation Standard According to relevant laws and regulations, and Hefei Group Owned Land

Acquisition Measure (HMG order No. 136, effective since May 1st, 2008), the

compensation rate is listed in Table 1.3.1. During the implementation of the

resettlement, May 1st 2008 will be a dividing time point. Before that date, Document

No 138 will be used as the guideline; while after that date, Document No. 136 will be

used as the guideline.

1.3.1 Compensation Standard for Land Acquisition and Demolition

Page 10: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

7

Items Unit Rate Note

I. Group Owned Land

1.1 Permanent Acquisition RMB/mu 21000

1.2

Resettlement

Compensation

(age under 16)

RMB/capita 12,000 Before May 1st, 2008, the rate is

10,000RMB/capita

1.3

Resettlement

Compensation

(age above 16)

RMB/capita 12,000

Before May 1st, 2008, the rate is

also 12000RMB/capita.

However, after May 1st, 2008, all

with age above 16 is acquired

into the land acquired farmer

annuity guarantee system.

1.4 Seeding Charge RMB/mu 700

II. Above ground

Affiliated

2.1 Tree RMB/piece 75

2.2 Tomb RMB/piece 650

2.3 Electric pole RMB/root 200

2.4 Wall RMB/meter 50

2.5 Concrete Road RMB/m2 100

2.6 Sand Road RMB/m2 50

III. House Resettlement

Compensation

3.1 Domicile Resettlement RMB/m2 1000

3.2 Move Compensation RMB/unit 400

3.3 Affiliated RMB/unit 5000

3.4 Enterprise Resettlement RMB/m2 144

3.5 Temporary housing

compensation RMB/m2 72

3.6

Temporary settlement

compensation for

enterprises

RMB/m2 90

1.3.3 Organization Structure and Responsibilities

At present, the eight being implemented projects are part of HUEIP funded by ADB loan. Hefei Municipal Government (EA) has set up the project leading group, which is ADB Project Management Office (PMO). The PMO is as the secretary agency for EA. Hefei Urban Construction Investment Corporation is the

Page 11: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

8

implementation agency (IA). Hefei Drainage Management Office (HDMO) is the executive agency. (Note, for Chao Lake project, the executive agency is Chao Lake Construction Management Bureau under Hefei Water Affair Bureau) Under HDMO, there is a ADB fund project construction office, under which there is a resettlement arrangement department. Figure 1.3.2 shows its structure.

Figure 1.3.2 Organization Structure for Resettlement

IA plays a very important role in the resettlement arrangement. Except IAs,

others organizations are also very important. Table 1.3.3 listed all relevant

organizations and staffs. Table 1.3.4 lists the responsibilities.

Table 1.3.3 Staffing

Organizations People

Hefei Project Management Office (HPMO) 1 Hefei Land Management Bureau (HLMB) 1~10 Hefei Planning Bureau (HPB) 3 Hefei Water Affaire Bureau (HWAB) 3 Hefei Drainage Management Office (HMDO-IA) 10

General Department

Hefei Drainage Management Office (HDMO)

Engineering Department

Resettlement Department

Planning and Finance

Department

ADB Project Construction Office

Resettlement Office of district/county

Affected communities and villages

Page 12: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

9

Hefei Demolition and Arrangement Management Office (HDAMO) 6 Xinzhan District, Yaohai District, Luyang District,, Feidong County and Changfeng County

5~10

Communities/villages 25 Law consulting service 1 Hefei Design Institute (DI) 3 External Monitoring Agencies 3

Table 1.3.4 Organization Responsibilities

Organization Responsibility

Prepare RAP and organize for implementation Monitoring the utilization of resettlement fund Coordinate and monitor the resettlement arrangement work Coordinate monitoring/management activities, including engaging external monitoring agencies. Submit profess report to ADB

Hefei project impelemntation agency-HPMO

Coordinate and deal with the conflict and questions raised. Contact consulting agency to evaluate the impacts of the project Organize social-economic survey Apply to HPB and HLMB for Land Use Permit Apply for Building Demolition Permit Responsible for municipal infrastructure demolition Draft RP schedule timeline Engage HLMB and HDAMO to sin the land acquisition and demolition contract. Pay the arrangement fee according to the contract.

Hefei Drainage Management Office (HMDO)

Monitor and evaluate

Establish related laws and regulations on land use Participate in evaluating remuneration and RP Process land acquisition Participate social-economic survey Participate in drafting RP and examine the RP Issue construction land use permit Lead, coordinate and monitor the land acquisition work Coordinate and deal with the conflice and problems during land acquisition and distribution. Register land acquisition and post for public review If necessary, organize the public participation and public hearing

Hefei Land Management Bureau (HLMB)

Deal with arrangement and remuneration distribution Confirm land (blue line) river way alignment control line Hefei Planning

Bureau (HPB) Assign land use certificate according to the plan Examine and approve the remuneration plan on demolition and arrangement. Issue house demolition permit. Register and manage house demolition documents

Hefei Demolition and Arrangement Management Office (HDAMO)

Manage relevant documents

Page 13: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

10

Organization Responsibility

Coordinate and arbitrate conflict during the land demolition Assist social-economic survey Assist to establish arrangement plan Monitor community/resident committee to arrange and recover the affected people’s lives.

District /county governments

Report the complaints and suggestion to upper level governments. Participate social-economic survey Participate in composing arrangement plan Assist in public consulting and communication on demolition policy Consulting land remuneration distribution and arrangement fund Organize the production and recover incomes. Report the complaints and suggestion to upper level governments.

Communities/village committees

Provide support to people in difficulty Optimize the plan to minimize the impact of RP. Suggest/clarify land acquisition and demolition influence scope Assist EA during the preparation of RP

Consulting and design agencies

Provide technical support on data collection and processing Provide technical support on land acquisition and arrangement External

Monitoring Agencies

As independent monitoring agency, monitor the implementation of the resettlement plan and report to EA and ADB.

1.4 External Monitoring

1.4.1Monitoring Agency Environmental Engineering Design & Research Institute in Coal Industry Hefei

Design Institute was engaged by HDMO and Chao Lake Construction Management

Bureau to provide external monitoring and evaluation for land acquisition and

resettlement.

1.4.2 Monitored and evaluated items and objectives According to RAP, external monitoring and evaluation shall provide

independent monitoring and evaluations. Through examination and interview, land

acquisition and resettlement arrangement fund distribution shall be monitored and

evaluated to analyze the living conditions of affected people. Information shall be

fully collected, problems shall be identified and suggestions shall be provided to

related governments to facilitate them to control the whole project.

1.4.3 Monitoring and evaluation measures

Through onsite interview, analysis and evaluation, whole survey and onsite survey shall be conducted on project progress, financing, organization, and management. Survey shall also be conducted by random sampling. For typical affected people, random sampling shall be conducted. The targets are 10% household

Page 14: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

11

whose housing was demolished or whose land was lost.

II The first survey on baseline and resettlement 2.1 Survey Time and Contents

Early at the beginning of the project in 2006, as the assistant unit for RAP preparation, Coal Industry Hefei Design Institute Environmental Engineering Institute (“the Institute”) made the preliminary baseline survey on resettlement. The Institute made the first baseline survey on resettlement during July 20th 2008 to July 27th 2008. Based on the previous accomplishment, guided by ADB specialist and assisted by each IAs, the Institute conducted the second survey during December 1st 2008 to January 20th 2009.

The survey includes: (1)Land acquisition influence survey: Changes of land before vs after; income

before vs after; (2)Social-economic survey: Including basic information (population, name,

professional, land, etc), living condition survey (education, employment, income, etc); (3)Public opinion survey; (4)Survey on affected households: housing condition before vs after, including area, structure, affiliate, etc; (5)Survey on affected enterprises: name of enterprise, nature, scale, production

value, number of employees, area, affected conditions, etc; ( 6 ) Survey on vulnerable groups: number of household, remuneration

distribution etc; (7)Organization condition: staffing and working conditions; (8)Communications: which communications channels shall be used, whether the

remuneration standards are known by large mass, etc; (9)Money distribution: divided by planned and actual, including to different

levels, achieving status shall be monitored, etc; (10)Collect photos, audio, video, real stuffs, etc.

The survey shall be conducted against the implementation schedule. For projects which have not been implemented yet, additional survey might be conducted during the next Phase survey.

The followings are photos during the investigation:

Page 15: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

12

Photo 1 Construction site of Sili River Project

Photo 2 Housing for resettlement under construction

Page 16: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

13

Photo 3 Improvement of the Closed Qingxi Road landfill Site

Photo 4 Residential areas in Yandian town before

relocation-Chao Lake Project

Page 17: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

14

Photo 5 Public Announcement on Resettlement at Feixi Road section

-Chao Lake Project

Photo 6 Public Announcement on Resettlement in Feixi section

-Chao Lake Project

Page 18: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

15

Photo 7 House built by peasants’ own in the resettlement of Feixi section

-Chao Lake Project

Photo 8 In-house investigation on resettlement at Feixi section

-Chao Lake Project

Page 19: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

16

Photo 9 In-house investigation on resettlement at Feixi section -Chao Lake

Project

Photo 10 Chao Lake Project construction site

Page 20: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

17

2.2 Changes during the implementation of the project Due to the long time gap between FSR and PD, especially due to the detailed

study in PD according to actual conditions, the confirmed land acquisition scope

might be different from original RAP. Meanwhile, RAP was composed on 2006, the

design changes and development of the city was not reflected, thus several changes on

land type, number of demolished house, affected household number were found in

this survey. Projects with changes are mainly Improvement of the Closed Qingxi Road

Landfill Site, Sili River Rehabilitation and Flood Control Improvement, Banqiao

River Rehabilitation and Flood Control Improvement, Ershibu River Rehabilitation

and Flood Control Improvement and Chao Lake Ecological Environment and Flood

Control Works. Others have few changes. Details are listed in Table 2.2.1.

Table 2.2.1 Actual status compared with RAP

Items Actual Condition RAP Note

Improvement of the Closed Qingxi Road Landfill Site

All acquired land is state owned. No group owned land will be acquired, so no resettlement work will be implemented.

The project covers an are of 534

mu, within which, 181 mu originally

used by landfill was assigned with no

cost, 100 mu of sludge pond land by

Water Supply Corporation was

provided by the Commission of

Construction with no cost, and 253

mu was newly acquired. The land

acquisition will influence the

Qilitang group of Qingxi road

Shejuwei, without any demolition.

Totally 32 household is affected, with

131 head in total.

PD was adjusted

with actual condition.

Sili River Rehabilitation and

Flood Control Improvement

Actual acquired land is 205.28mu, influencing Sili River, Taohua Garden and Wuli Guai communities. Totally 320 people shall be resettled. Others are the same as RAP.

The permanent land acquisition will influence three farmer groups in Luyang District community. Permanent land acquisition is 181 mu, with 37 households of 152 people influence. There is no temporary land acquisition. Demolition of houses will be 11328m2,with direct influence on 22 household of 90 people. Three enterprises have been affected due to

PD was adjusted

with actual condition

Page 21: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

18

the demolition of walls. There are 95 employees in this enterprise, and their lives will not be affected.

Banqiao River Rehabilitation and

Flood Control Improvement

Same as RAP

Six villages and communities within Xinzhan and Luyang District will be affected. Details are listed below: 736 mu land will be acquired to widen the river bank, with 470 households of 1412 people affected. Temporary land shall take 70 mu thin farmland by the river, with no one to resettle. Demolition area is 180m2 ,with one household of 8 people affected.

--

Ershibu River Rehabilitation and

Flood Control Improvement

PD was approved on July 8th, 2008, there are certain modifications against RAP. 40% of demolition finished, final data info remains to be prepared.

This project involves permanent land

acquisition of 1426.4 mu, of which

there are 1076.6 mu of group owned

land and 140 mu of state owned land;

578 household of 2060 people shall

be affected in land acquisition, no

temporary land acquisition involved;

demolition area is 43870 m2 which

shall affect 363 household of 1323

people; 96 household of 329 people

shall be affected in both land

acquisition and house relocation.

PD was adjusted

with actual condition

Shiwuli River WWTP and associated

pipeline networks

Same as RAP

Totally 77.8 mu will be

acquired. 61 households in Dayu

Town Luji village No.2 village group

will be affected, with farmland for

256 people. No resettlement or

demolition.

——

Wangtang WWTP Phase II and associated

pipeline networks

Same as RAP

Land has been acquired during

the Phase I WWTP project. No

further resettlement or demolition is

needed.

——

Improvement of the whole Hefei

City Sewer

5 mu land will be temporarily

acquired. Others are

1.5 mu land shall be permanently acquired. The land belongs to one

household of Caoshuwang Village in

Construction technology

was

Page 22: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

19

the same as RAP. Yaohai District. 40 mu land shall be temporarily occupied during the

construction of the pipeline.

improved

Chao Lake Ecological

Environment and Flood Control

Works

Permanent land acquisition actual measured is 301 mu, of which Feidong county accounts for 152 mu , Feixi county 38 mu and Baohe District 111 mu, Presently, Demolition and relocation in Feidong has been finished, actual demolished area 9156 m2 which is over the planned area by 1589 m2; Some demolition in Baohe District has been completed; there is no progress with Feidong county.

The project will acquire land of

172 mu, within which water land of

139.6mu, dry land of 9.54mu, wild

land of 15 mu, fish pond (water

pond) of 7.6mu. Permanent land

acquisition results the land loss of

five towns and eight villages. Two of

the towns are located in Feixi

County, one is in Baohe District, and

two are located in Feidong County.

During the construction, 178.4 mu

land is temporarily taken for one

year. It is estimated this temporary

land acquisition will influence 210

household.

The demolition area by PD is 49967

m2, of which Feixi county accounts

for 7567 m2, Feidong county 1400

m2 and Baohe District 41000 m2.

PD was adjusted

with actual condition

2.3 Current affected people and enterprise

According to the survey on the project progress and onsite investigation, so far, the land acquisition and demolition influences are listed below in Table 2.3.1.

Table 2.3.1 Current affected people and enterprise

Items Affected

Enterprises Affected Village Affected

People Note

Improvement of the Closed Qingxi Road Landfill Site

No No No No group owned

land to be

acquired Sili River Rehabilitation and Flood Control Improvement

No

Sili River, Taohua

Garden and

Wuliguai

communities.

292 people ——

Banqiao River Rehabilitation and Flood Control

No Wangchengdian

Community 8

8 people been

affected in

housing

demolition; for

Page 23: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

20

Improvement other

villages/towns

some land

acquisition on

the river bank

sides will be

involved, no

housing

demolition.

Ershibu River Rehabilitation and Flood Control Improvement

No - -

Process of

obtaining

approval on

land

acquisition was

completed in

Oct,2008, 40%

of workload has

been finished,

final data info

remains to be

prepared. Shiwuli River WWTP and associated pipeline networks

No Dayu Town Luji

village

61

households,

256 people

——

Wangtang WWTP Phase II and associated pipeline networks

No No No No permanent

land

acquisition

Improvement of the whole Hefei City Sewer

No No No

Land in Phase II

project has

been acquired

in Phase I

project

Chao Lake Ecological Environment and Flood Control Works

No Feixi County-Liuhe

town, Yandun town

and Sanhe town 301

Land

acquisition for

Feixi county

has been

completed; the

rest land

acquisition is

under going.

III Monitoring and Evaluation

3.1 Progress of land acquisition and demolition

3.1.1 Progress of land acquisition

The survey indicates that by January 20, 2009, the land acquisition and

Page 24: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

21

demolition is as below: (1)Improvement of the Closed Qingxi Road Landfill Site

According to the adjustment on Preliminary Design, permanent land acquisition

will be 281 mu (18.7 hectare), which are all state owned. Within those 281mu land,

181 mu was original landfill land 100mu (12 hectare) and sludge ponds of Water

Supply Corporation No. Plant 100mu, which are all assigned yet. Due to the

optimization of design, planned acquired group owned land in Wulidun Community

Qingxi road sub-community in Shushan District will not be acquired any more. The

project was completed in September 2008 and went through the project

implementation evaluation.

(2)Sili River Rehabilitation and Flood Control Improvement

So far, 60% of the resettlement work has been finished. HDMO has already signed

contracts with each community. Hefei Land Resource Bureau also distributed the

Claim Document on Land Acquisition Remuneration and Resettlement of Hefei Land

Resource Bureau. The documents are HLRLC 2008 No.4 HLRLC 2008 No.5 and

HLRLC 2008 No.6.

( 3 ) Banqiao River Rehabilitation and Flood Control

Improvement PD has been approved. Investigation on land has been finished. Applying for

approval on land acquisition has been through, 60% of land acquisition has been

finished, compensation for affected 180 m2. of housing demolition has been made.

(4)Ershibu River Rehabilitation and Flood Control Improvement

PD has been approved. Investigation on land has been finished. Applying for

approval on land acquisition has been through, 40% of land acquisition has been

completed.

(5)Shiwuli River WWTP and associated pipeline networks

So far, the resettlement work has been finished already. The project IA,HDMO,

has already signed land acquisition contract with each community. Hefei Bureau of

Land Resources also distributed the Letter about Land Acquisition Remuneration and

Resettlement Method to each community. Compensation has been made to the

affected Luji village, Dayu town for land acquisition.

(6)Improvement of Hefei Municipal Sewers

Page 25: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

22

This project doesn’t involve permanent land acquisition. (7)Wangtang WWTP Phase II and associated pipeline networks Land for Wangtang WWTP Phase II has already been acquired in Phase I project.

Thus, no more land acquisition is needed.

(8)Chao Lake Ecological Environment and Flood Control Works Land acquisition, demolition and relocation in Feixi country has been finished,

measurement and investigation on land acquisition in Feidong county and Baohe

District is in process.

3.2 Progress of building demolition and arrangement

3.2.1Progress of building demolition

According to the adjustment of each PD, through on site interview, the progress of building demolition is listed in Table 3.2.1.

Table 3.2.1 Demolition List Demolition

(m2) Items Planned Actual

Reason for changes Remarks

Improvement of the Closed Qingxi Road Landfill Site

0 0 No demolition ——

Sili River Rehabilitation and Flood Control Improvement

31000 20000

Too much time consumed on the document and approval application

——

Banqiao River Rehabilitation and Flood Control Improvement

180 180 In process of the

applying for approval

Reschedule the plan and coordinate related parties to accelerate the process

Ershibu River Rehabilitation and Flood Control Improvement

60000 28000 Approval procedure takes up too much

time

Reschedule the plan and coordinate related parties to accelerate the process

Shiwuli River WWTP 0 0 No demolition —— Improvement of Hefei Municipal Sewers

0 0 No demolition ——

Wangtang WWTP Phase II and associated pipeline networks

0 0 No demolition ——

Chao Lake 49967 9156 - Demolition planned is

Page 26: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

23

Ecological Environment and Flood Control Works

49967 m2, of which Feixi

7567 m2, Baohe District

41000 m2;

Land acquisition in

Feixi county has been

completed, actual

demolition area is 9156

m2 which exceeds the

planned area by 1589 m2;

There is no progress made

for Feidong county and

Baohe District. 3.2.2 Resettlement Arrangement Plan

According to the progress of each project, through onsite survey, the construction

of each arrangement house is listed below in Table3.2.2.

Table 3.2.2 Arrangement Status

Items Arrangement Status Note

Improvement of the Closed Qingxi Road Landfill Site

No demolition ——

Sili River Rehabilitation and Flood Control Improvement

Construction of the relocated houses have been completed, relocatees have moved in. ——

Banqiao River Rehabilitation and Flood Control Improvement

The demolished place was not dwelling houses, therefore there was no centralized

relocation as a result. ——

Ershibu River Rehabilitation and Flood Control Improvement

Relocated houses are under construction ——

Shiwuli River WWTP No demolition —— Improvement of Hefei Municipal Sewers No demolition —— Wangtang WWTP Phase II and associated pipeline networks

No demolition ——

Chao Lake Ecological Environment and Flood Control Works

Compensation in money form was made to the affected people for them to build houses by their own, therefore there was no centralized relocation arrangement. Some houses have been completed.

——

The arrangement house for Sili River project is Siquan Garden. This garden lies at the crossing of Feixi Road and Linquan Road, which was planned to finish in August 2008. The relocatees have moved in. Photo of this garden is below:

Page 27: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

24

Photo 1 Building for resettlement in construction-Aug.2008

Photo 2 The affected people moved in the new building-Dec.2008

3.2.3 Infrastructure construction on affected area and assigned area According to the progress of the project, through onsite investigation, the

Page 28: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

25

infrastructure construction on affected area and assigned area is presented in Table

3.2.3. Table 3.2.3 Infrastructure construction on affected area and assigned area

Items Infrastructure Construction Note

Improvement of the Closed Qingxi Road Landfill Site No demolition —— Sili River Rehabilitation and Flood Control Improvement Completed ——

Banqiao River Rehabilitation and Flood Control Improvement

No

Demolition area 180 m2, no centralized relocation

arrangement. Ershibu River Rehabilitation and Flood Control Improvement

Under construction ——

Shiwuli River WWTP and associated pipeline networks

No demolition ——

Improvement of Hefei Municipal Sewers No demolition —— Wangtang WWTP Phase II and associated pipeline networks

No demolition ——

Chao Lake Ecological Environment and Flood Control Works

Affected people build houses by their own ——

3.3 Resettlement Fund Utilization

3.3.1 Resettlement Fund Utilization According the progress, through onsite investigation, the resettlement fund

utilization condition is listed in Table 3.3.1.

Table 3.3.1 Resettlement Fund Distribution Table Investment

(10 thousand RMB)

Items Planne

d Accumul

ated

Whether the

remuneration has

been distribut

ed

Reason for advance or delay Actions

Improvement of the Closed Qingxi Road Landfill Site

0 0 —— —— No group owned land to be acquired

Sili River Rehabilitation and Flood Control

3223 1900 Yes Being public posted for land acquisition

remuneration

Accelerate the remuneration process

Page 29: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

26

Improvement Banqiao River Rehabilitation and Flood Control Improvement

8050 4200 Yes During the process to apply for land

acquisition

Accelerate the land acquisition procedure

Ershibu River Rehabilitation and Flood Control Improvement

19493 7800 Yes During the process to apply for land

acquisition

Accelerate the land acquisition procedure

Shiwuli River WWTP

772.9 772.9 Yes ____ The fund is in place

Improvement of Hefei Municipal Sewers

0 0 —— —— No group owned land to be acquired

Wangtang WWTP Phase II and associated pipeline networks

0 0 —— —— No group owned land to be acquired

Chao Lake Ecological Environment and Flood Control Works

1186.4 742.45 Yes Proceeding as scheduled

Need to speed up the next move

3.4 Change of living condition of affected people

3.4.1 Investigation on living condition of affected people

The survey is focused on Sili River project and Chao Lake Ecological Environment and Flood Control Works which have both finished the land acquisition process. Survey was conducted to affected people with random sampling and in-house interview. Totally, 50 households were interviewed. Questions on transport, medical condition, education condition, living condition change, people’s happiness in affected area and arrangement are were raised.

The result of the survey is summarized in Table 3.4.1 Table 3.4.1 Public Living Condition Survey

Items Choice I Improved no change worse

Transport 44 6 0 II Improved no change worse

Medical condition 45 5 0 III Improved no change worse

Education 45 5 0

Page 30: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

27

IV Improved no change worse Living condition 50 0 0

V Improved no change worse Employment 48 2 0

VI Satisfied Partially satisfied

Basically satisfied Not happy

Living happiness 20 28 2 0 The combination of those projects with the project in Great Construction, greatly

improve the city image and environment of Hefei. For example, arrangement house

and associated roads for Sili River project and roads in Shiwuli River project as well

as other associated roads built along the project construction all make very positive

contribution to the living condition of surrounding residents. The survey results

indicates that 90% of interviewees think the transport, medical, education conditions,

employment opportunity and living condition have been improved.

3.5 Public Participation

3.5.1 Survey on public opinions

To make the affected people arranged better, keep and maintain the legal rights of demolished people and enterprises, reduce the compliant and conflict, and achieve the resettlement arrangement objective, a random sampling questionnaire survey was conducted. This survey was conducted to affected people in Sili River project and Shiwuli River WWTP project, where land acquisition processes is finished.

Public opinion gathering includes:

(1) Do you know the resettlement remuneration policy?

(2) Are you content with the land acquisition and demolition remuneration

policy?

(3) Are you content with arrangement work?

(4) Any public services you have be offered during the land acquisition and

demolition?

(5) Is remuneration and arrangement received?

(6) Has your legal rights been offended?

(7) If you think your rights is offended, do you know the normal claim

channel?

(8) While your rights are being offended, whether your claim is dealt with in

Page 31: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

28

time?

(9) Are you content with the results of the claim?

(10) Results are summarized in Table 3.5.1 Table 3.5.1 Public Participation

Items Choice I known unknown

Do you know the resettlement

remuneration policy? 50 0

II Satisfied Partially satisfied

Bascially satisfied Not happy

Are you content with the land acquisition

and demolition remuneration policy?

10 31 9 0

III Satisfied Partially satisfied

Bascially satisfied Not happy

Are you content with arrangement work? 36 11 3 0

IV Professional Training

Improvement on

infrastructureOthers No

Any public services you have be offered

during the land acquisition and

demolition?

12 27 11 0

V All Partial No Is remuneration and

arrangement received? 40 10

VI Yes No don’t know

Has your legal rights been offended? 0 45 5

VII known unknown If you think your rights

is offended, do you know the normal

complaint channel?

50 0

VIII in time not in time While your rights is

being offended, 45 5

Page 32: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

29

whether your claim is dealt with in time?

IX Satisfied Partially satisfied

Bascially satisfied Not happy

Are you content with the results of the

claim? 35 12 3 0

The result indicates that 96% of interviewees know the remuneration standards;

78% of interviewees are content with the policy or basically content with the policy; and 94% are content with the resettlement arrangement work.

3.5.2 Public Participation

Onsite survey is specially emphasized. Public participation from related residents and communities is very important. They shall participate in the economic survey and the composition of resettlement plan. Public shall be consulted, and communicated with land acquisition policy, there shall be public announcement on resettlement compensation. People in the affected area themselves, shall be responsible for relocation of the rest land, organize production, submit opinions and suggestions to upper level government and provide proper help to people in difficulty.

Thus, during the demolition, the residents have the rights of known and participation. This will ensure the smooth moving of the project.

3.6 Complaint deal procedure and efficiency evaluation

Through information collection and onsite interview, land acquisition and demolition of each project is all assigned to the Demolition Office of each district/county. While the project IAs assisted the demolition offices, the staffing of organization will be improved, and the demolition efficiency shall be improved.

If affected people are not content with the remuneration, or think they are

treated unfairly during the arrangement, they can go through relevant procedures.

There are five main complaint channels in Hefei: (1) Project IA; (2) external

monitoring agency; (3) town committee/community and county land management

bureau and demolition arrangement office; (4) HMG; and (5) Law procedure.

It shall be emphasized that HMG has set up an independent external monitoring

agency, composing of 20 high level leaders from HMG. This agency is called Hefei

Land Acquisition and Resettlement Arrangement Supervization and Management

Committee. The main responsibility of this committee is to examine and supervise the

remuneration distribution. If the remuneration value and distribution time is different

from the Document, the Committee has the right to stop the construction. Thus, if

Page 33: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

30

affected has different opinions, he might complain at any time to the member of the

Committee while they are supervising on site.

According to Table 3.5.1, 90% of interviewees know the normal compliant channel, and are content with the complaint results.

IV Conclusions on monitoring and evaluations

4.1 Problems encountered during the implementation of the projects

There are totally eight sub-projects under Hefei ADB Loan. Those involving large amount of resettlement arrangement works are: Sili River Rehabilitation and Flood Control Improvement, Ershibu River Rehabilitation and Flood Control Improvement, Banqiao River Rehabilitation and Flood Control Improvement Chao Lake Ecological Environment and Flood Control Works and Shiwuli River WWTP. Projects of Improvement of Hefei Municipal Sewers,Wangtang WWTP Phase II and associated pipeline networks and Improvement of the Closed Qingxi Road Landfill Site involve few resettlement arrangement work. For the current five projects involving large amount of resettlement, Sili River project has already finished land measurement, resettlement contract has been concluded with the affected community committee, the compensation for partly completed demolition has been made; Shiwuli River project also finished land acquisition process, the compensation amount of RMB 1.758 million which was due to pay earlier back has been in place with the village committee; The project progress for Chao lake Ecological Environment and Flood Control Works is ongoing smoothly, demolition and relocation for Feixi county has been completed and compensation fund has been in place; Land measurement for Ershibu river project, Banqiao river project have been finished, some contracts have been concluded and compensation work has started, however the progress needs to speed up, for along with the time, the planned resettlement fund might be adjusted due to the elevated price and related laws, which will influence the budget and schedule of the project. Of the three projects involving a small amount of resettlement, Qingxi Road Landfill and Wangtang WWTP Phase II projects have finished land acquisition work. For the distribution of the remuneration fund, part of the interviewees thought the remuneration speed is relative slow, and hope related organizations might work together to accelerate the distribution speed.

4.2 Project influence At present, Wangtang WWTP Phase II and associated pipeline networks doesn’t

involve permanent land acquisition. Temporary land acquisition might occur during

Page 34: Resettlement Monitoring Report Cover€¦ · Resettlement Monitoring Report This report has been submitted to ADB by the Project Management Office of Hefei Municipal Government and

Hefei Urban Environment Improvement Project

31

the construction. Temporary in original RAP has been optimized in design and construction. Environmental minimization measures and road construction measures have been reduced greatly. There is no more direct affect to surrounding residents. For other items, through survey, 90% of the interviewees know the resettlement plan. For all items which have finished the process of land acquisition, affected people are generally content with the arrangement work.