Shangri-LaSituated in Yunnan Province Attitude: 3300 AMSLInhabitants: 130,000
Plan Drawing showing the 5 ZonesBoiler House located in each Zone (Green Zones)
DECEMBER 2017
COWI POWERPOINT PRESENTATION3
Shangri-La District Heating ProjectKey Information
DECEMBER 2017
COWI POWERPOINT PRESENTATION4
› Funded by "Danida Business Finance"
› Project Site: Shangri-La is located in the north-western part of the mountainous Yunnan province in the south-western part of China
› Project Value, For Items Supported by DBF App.: EUR 20.000.000
› Contractor: ABB A/S Denmark
Key Data
DECEMBER 2017
COWI POWERPOINT PRESENTATION5
Shangri-La District Heating Project
› Energy Source: Hydro Power
› Capacity: 140 MW divided between 5 new Boiler Houses
› Energy Production: Heat Pumps and Electrical boilers
› Network: Complete new Network
Focus Points
DECEMBER 2017
COWI POWERPOINT PRESENTATION6
› Improved Energy Efficiency
› Heat Pumps (COP 2-3)
› Improved Lifetime for Equipment
› Improve Water Quality
› Reduce leakages
› New Technologies
› SCADA system
› Mixing Loops at consumer Level
Shangri-La District Heating Project – Zero CO₂
DECEMBER 2017
COWI POWERPOINT PRESENTATION7
Justification for DBF Support, Emission Reduction
› 110 tons NOx per Year
› 28 tons SOx per Year
› 2477 tons dust/particles per Year
› 256,657 tons CO₂ per Year
Scope of SupplyMain Components
DECEMBER 2017
COWI POWERPOINT PRESENTATION8
› Air-Water Heat Pumps: 264, each with a capacity of 66 kW heat
› SCADA system: SCADA system per Boiler House incl. Master Control Room
› Water Treatment Facilities, Part flow filters, Water Softener, Ph Control
› Steam-Water Heat Exchangers: 13 Pieces a 8 MW
› Circulation Pump incl. Frequency Converters: 22 sets
› Pre-insulated Pipes etc. 15 Km. DN32-DN250 incl. Fittings
› Valves. Pre insulated Ball valves, DN80 – DN250
› Mixing Loops: 88 Pieces, 100 kW to 1,000 kW
› Energy Meters and Instruments
9
Photos from Project Site
DECEMBER 2017
COWI POWERPOINT PRESENTATION
Boiler House 7 and 11
DECEMBER 2017
COWI POWERPOINT PRESENTATION10
Heat Pumps at Boiler House 5
DECEMBER 2017
COWI POWERPOINT PRESENTATION11
SCADA System
DECEMBER 2017
COWI POWERPOINT PRESENTATION12
Speed Controlled Pumps with FC, Part Flow Filters
DECEMBER 2017
COWI POWERPOINT PRESENTATION13
Mixing Loops
DECEMBER 2017
COWI POWERPOINT PRESENTATION14