23. MARTS 2017 UKRAINE 2017 DECEMBER 4 1 Shangri-La District Heating Project funded by Danida Business Finance Søren K. Christensen

Upload: others

Post on 06-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

23. MARTS 2017

UKRAINE 2017 DECEMBER 41

Shangri-La District Heating Projectfunded by Danida Business Finance

Søren K. Christensen

Page 2: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

DECEMBER 2017

COWI POWERPOINT PRESENTATION2

Shangri-LaSituated in Yunnan Province Attitude: 3300 AMSLInhabitants: 130,000

Page 3: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

Plan Drawing showing the 5 ZonesBoiler House located in each Zone (Green Zones)

DECEMBER 2017

COWI POWERPOINT PRESENTATION3

Page 4: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

Shangri-La District Heating ProjectKey Information

DECEMBER 2017

COWI POWERPOINT PRESENTATION4

› Funded by "Danida Business Finance"

› Project Site: Shangri-La is located in the north-western part of the mountainous Yunnan province in the south-western part of China

› Project Value, For Items Supported by DBF App.: EUR 20.000.000

› Contractor: ABB A/S Denmark

Page 5: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

Key Data

DECEMBER 2017

COWI POWERPOINT PRESENTATION5

Shangri-La District Heating Project

› Energy Source: Hydro Power

› Capacity: 140 MW divided between 5 new Boiler Houses

› Energy Production: Heat Pumps and Electrical boilers

› Network: Complete new Network

Page 6: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

Focus Points

DECEMBER 2017

COWI POWERPOINT PRESENTATION6

› Improved Energy Efficiency

› Heat Pumps (COP 2-3)

› Improved Lifetime for Equipment

› Improve Water Quality

› Reduce leakages

› New Technologies

› SCADA system

› Mixing Loops at consumer Level

Page 7: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

Shangri-La District Heating Project – Zero CO₂

DECEMBER 2017

COWI POWERPOINT PRESENTATION7

Justification for DBF Support, Emission Reduction

› 110 tons NOx per Year

› 28 tons SOx per Year

› 2477 tons dust/particles per Year

› 256,657 tons CO₂ per Year

Page 8: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

Scope of SupplyMain Components

DECEMBER 2017

COWI POWERPOINT PRESENTATION8

› Air-Water Heat Pumps: 264, each with a capacity of 66 kW heat

› SCADA system: SCADA system per Boiler House incl. Master Control Room

› Water Treatment Facilities, Part flow filters, Water Softener, Ph Control

› Steam-Water Heat Exchangers: 13 Pieces a 8 MW

› Circulation Pump incl. Frequency Converters: 22 sets

› Pre-insulated Pipes etc. 15 Km. DN32-DN250 incl. Fittings

› Valves. Pre insulated Ball valves, DN80 – DN250

› Mixing Loops: 88 Pieces, 100 kW to 1,000 kW

› Energy Meters and Instruments

Page 9: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

9

Photos from Project Site

DECEMBER 2017

COWI POWERPOINT PRESENTATION

Page 10: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

Boiler House 7 and 11

DECEMBER 2017

COWI POWERPOINT PRESENTATION10

Page 11: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

Heat Pumps at Boiler House 5

DECEMBER 2017

COWI POWERPOINT PRESENTATION11

Page 12: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

SCADA System

DECEMBER 2017

COWI POWERPOINT PRESENTATION12

Page 13: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

Speed Controlled Pumps with FC, Part Flow Filters

DECEMBER 2017

COWI POWERPOINT PRESENTATION13

Page 14: Shangri-La District Heating Projectdbdh.dk/wp-content/uploads/5.-COWI.pdf · Shangri-La District Heating Project Key Information DECEMBER 2017 4 COWI POWERPOINT PRESENTATION ›Funded

Mixing Loops

DECEMBER 2017

COWI POWERPOINT PRESENTATION14