ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING RESULTS
FALL 2017
SECTION C
SITE PH041-1: HWY 986:01, DAISHOWA EAST HILL
(STATION 12+000 SITE 5 GULLY AND DITCH) 1. OBSERVATIONS
1.1 Field Program and Instrumentation Status
Two slope inclinometers (SI-1 and SI-2) were read at the Hwy 986:01 Daishowa East Hill site on September 28, 2017 by Mr. Niraj Regmi, G.I.T. and Mr. Aldrin Pascua, both of Thurber Engineering Ltd.
The SIs were read using two RST Digital Inclinometer probes with 2 ft. wheelbases and RST Pocket PC readouts. Inclinometer reading depths were defined as per cable markings with respect to the top of the inclinometer casing.
2. INTERPRETATION
2.1 General
SI plots with A and B directions are presented in Section D and are summarized below. Where movement has been recorded, the resultant plot (X direction, if applicable) and a rate of movement have also been provided.
4127 Roper Road, Edmonton, AB T6B 3S5 T: 780 438 1460 F: 780 437 7125 thurber.ca
Client: Alberta Transportation Date: December 7, 2017 File: 13351 e-file: \\H\13351 rpt PH041-1 -Edm Page 2 of 3
2.2 Zones of Movement
A potential zone of movement was observed in SI-1 over 4.9 m to 7.4 m depth since the spring of 2017 readings. This zone is included in Table PN041-1-1 below. A movement rate plot has also been included in section D.
The zone of movement that was previously reported in SI-2 over 0.1 m to 2.5 m depth has not shown a consistent trend of movement over the past ten years and will not be included in future reports.
Zones of movement are summarized in Table PH041-1-1 at the end of this report. This table also provides a historical account of the total movement, the depth of movement and the maximum rate of movement that has occurred at this site since the initialization of the slope inclinometers.
2.3 Interpretation of Monitoring Results
Slope inclinometer SI-1 showed current rates of movement of 1.3 mm/yr over 0.1 m to 1.9 m depth, 0.3 mm/yr over 1.9 m to 4.9 m depth, no discernible movement over 4.9 m to 7.4 m depth and 0.4 mm/yr over 7.4 m to 8.6 m depth.
Slope inclinometer SI-2 registered no discernible movement over 0.1 m to 2.5 m depth and a rate of movement 0.9 mm/yr over 13.5 m to 14.7 m depth.
3. RECOMMENDATIONS
3.1 Future Work
The SIs should be read again during the spring of 2018 program.
3.2 Instrumentation Repairs
No instrumentation repairs are required at this time.
Client: Alberta Transportation Date: December 7, 2017 File: 13351 e-file: \\H\13351 rpt PH041-1 - Edm Page 3 of 3
TABLE PH041-1-1 FALL 2017 – DAISHOWA EAST HILL (12+000)
SLOPE INCLINOMETER INSTRUMENTATION READING SUMMARY
Date Monitored: September 28, 2017
INSTRUMENT #
DATE INITIALIZED
TOTAL CUMULATIVE RESULTANT
MOVEMENT AT NOTED DEPTH SINCE INITIAL
READING (MM)
MAXIMUM RATE OF
MOVEMENT (mm/yr)
CURRENT STATUS
DATE OF
PREVIOUS READING
INCREMENTAL MOVEMENT
SINCE PREVIOUS READING
(mm)
CURRENT RATE OF
MOVEMENT (mm/yr)
CHANGE IN RATE OF MOVEMENT
SINCE PREVIOUS READING (mm/yr)
SI1 Dec. 1, 1995
50.2 mm over 0.1 m to 1.9 m depth in 12° direction
16.5 mm/yr between
May 1997 and May 1998
Operational June 6, 2017
0.4 1.3 3.2
29.1 mm over 1.9 m to 4.9 m depth in 12° direction
4.6 mm/yr between
May 1997 and May 1998
0.1 0.3 -1.5
12.5 mm over 4.9 m to 7.4 m depth in 37° direction
3.3 mm/yr between May and
September 2014
No discernible movement N/A -1.7
6.2 mm over 7.4 m to 8.6 m depth in
12° direction
1.3 mm/yr Between July and December 1996
0.1 0.4 -0.1
SI2 Apr. 9, 1996
55.4 mm over 0.1 m to 2.5 m depth in 18° direction
27.4 mm/yr in September 2011
Operational June 6, 2017
No discernible movement N/A -13.4
11.4 mm over 13.5 m to 14.7 m
depth in 18° direction
1.2 mm/yr In May 2009 0.3 0.9 0.4
Drawing 13351-PH041-1-1 in Section D provides a sketch of the approximate location of the monitoring instrumentation for this site.
ALBERTA TRANSPORTATION PEACE REGION (PEACE RIVER / HIGH LEVEL) INSTRUMENTATION MONITORING RESULTS
FALL 2017
SECTION D
DATA PRESENTATION
SITE PH041-1: HWY 986:01, DAISHOWA EAST HILL (STATION 12+000 SITE 5 GULLY AND DITCH)
Location: Daishowa Ditch Erosion (HWY 986:1 C1 31.916) Readout: RST Set 5R and 8RFile Number: 13351 Extension: 3.34" Ø
Probe: RST Set 5R and 8R Temp: 5Cable: RST Set 5R and 8R Read by: NKR/AMP
SLOPE INCLINOMETER (SI) READINGSSI# Date Stickup Depth from top Magn. North Current Bottom
(m) of casing (ft) A+ Groove Depth ReadingsEasting (m) Northing (m) A+ A- B+ B-
SI-1 489840.40 6246239.73 28-Sep-17 1.15 50 to 2 355 905 -891 -46 48SI-2 489845.57 6246254.52 28-Sep-17 0.53 56 to 2 6 -848 860 -385 376
INSPECTOR REPORT
(UTM 11)
ALBERTA TRANSPORTATIONPEACE REGION (PEACE RIVER / HIGH LEVEL)
INSTRUMENTATION MONITORING FIELD SUMMARY (PH041-1)FALL 2017
GPS Location Remarks
Dunvegan
Hines
Creek
Fairview
Peace
River
S
N
W E
PH041-1
SI-3
DISHOW 01-01
1
3
+
8
2
0
1
1
+
9
6
0
B
R
ID
G
E
(S
T
A
1
1
+
0
0
0
)
DISHOW 01-02
SI-2
SI-1
SI-16
SI-15
SI-11
SI-13
SI-12
SI-14
SI-9
SI-8
SI-7
H
W
Y
9
8
6
J
C
T
H
W
Y
6
8
8
(S
T
A
1
7
+
1
3
0
)
SI-10
SI03-7
SI-6
SI-4
SI-5
BH03-12
BH03-11
BH03-10
BH03-9
BH03-8
TA
N
G
EN
T
PIL
E W
ALL
SI03-4
SI03-3
SI03-2
SI03-1
SI03-5
SI03-6
SI04-02
SI04-03
SI04-01
1
3
+
5
4
0
13+
400
13+250
12+
500
D
A
IS
H
O
W
A
13+300
13+
350
SI04-4A
SI03-3A
PILE WALL SITE
PN03-1
PN03-2
SI03-6
SI-10
S
N
W E
VW09-4
SI09-4
VW09-3
SI09-3
VW09-2
SI09-2
VW09-1
SI09-1
PH041-1
PH042-1
PH043-1
PH043-2
SITE MAP
NOT TO SCALE
SITE PLAN
LEGEND :
NOTES :
1. BASE PLAN COPIED FROM "GAEA ENGINEERING" DRAWING
(DATED MAY. 1997)
SLOPE INCLINOMETERS
NOT TO SCALE
(currently using)
(Installed in 2001, not in use)
SLOPE INCLINOMETERS
SLOPE INCLINOMETER
(not in use)
2. LOCATIONS OF 2003 SLOPE INDICATORS OBTAINED
FROM AMEC DRAWING NO. : EG08628.37-002.dwg
DATED MARCH 2004.
DOWN SLOPE
UP SLOPE
PNEUMATIC PIEZOMETERPN
SCALE
DESIGNED BY
DRAWN BY
DATE
APPROVED BY
FILE No.
ML
BWN
DWP
N.T.S.
NOVEMBER 2017
13351
PH041-1: HWY 986:01 - DAISHOWA EAST HILL
(STA. 12+000 SITE 5 GULLY & DITCH EROSION)
INSTRUMENT LOCATIONS
H:\13000\13351 G
eohazard A
ssessm
ent - P
eace R
iverH
igh Level (C
ON
0017602)\D
rafting\2017\IN
ST
F
ALL\13351-P
H041-1-1.dw
g - A
T - N
ov. 23, 2017
PEACE REGION (PEACE RIVER / HIGH LEVEL) 2017
DWG No. 13351-PH041-1-1
14
12
10
8
6
4
2
0
Depth
(m)
-150 -75 0 75 150
14
12
10
8
6
4
2
0
-150 -75 0 75 150
14
12
10
8
6
4
2
0
Depth
(m)
-25 -12.5 0 12.5 25
14
12
10
8
6
4
2
0
-25 -12.5 0 12.5 25
LEGEND
Initial 1 Dec 1995
13 Oct 2006
19 May 2007
4 Oct 2007
25 May 2008
10 Oct 2008
29 May 2009
24 Sep 2009
14 May 2010
23 Sep 2010
2 Jun 2011
22 Sep 2011
9 Jun 2012
30 Sep 2012
30 May 2013
25 Sep 2013
31 May 2014
16 Sep 2014
21 May 2015
15 Sep 2015
3 Jun 2016
15 Sep 2016
6 Jun 2017
28 Sep 2017
Cumulative Deflection
Direction A
Deflection (mm)
Incremental Deflection
Direction A
Deflection (mm)
Ref. Elevation m
H:\13000\13351 Geohazard Assessment - Peace RiverHigh Level (CON0017602)\Instruments\Fall 2017\SI Readings\PH 41\SI-1.GTL
HWY 986:01 - STA. 11+960, Inclinometer SI1
Alberta Transportation
Thurber Engineering Ltd
14
12
10
8
6
4
2
0
Depth
(m)
-50 -25 0 25 50
14
12
10
8
6
4
2
0
-50 -25 0 25 50
14
12
10
8
6
4
2
0
Depth
(m)
-25 -12.5 0 12.5 25
14
12
10
8
6
4
2
0
-25 -12.5 0 12.5 25
LEGEND
Initial 1 Dec 1995
13 Oct 2006
19 May 2007
4 Oct 2007
25 May 2008
10 Oct 2008
29 May 2009
24 Sep 2009
14 May 2010
23 Sep 2010
2 Jun 2011
22 Sep 2011
9 Jun 2012
30 Sep 2012
30 May 2013
25 Sep 2013
31 May 2014
16 Sep 2014
21 May 2015
15 Sep 2015
3 Jun 2016
15 Sep 2016
6 Jun 2017
28 Sep 2017
Cumulative Deflection
Direction B
Deflection (mm)
Incremental Deflection
Direction B
Deflection (mm)
Ref. Elevation m
H:\13000\13351 Geohazard Assessment - Peace RiverHigh Level (CON0017602)\Instruments\Fall 2017\SI Readings\PH 41\SI-1.GTL
HWY 986:01 - STA. 11+960, Inclinometer SI1
Alberta Transportation
Thurber Engineering Ltd
70
60
50
40
30
20
10
0
Displ.
(mm)
70
60
50
40
30
20
10
0
1 Jan 1997 1 Jan 2001 1 Jan 2005 1 Jan 2009 1 Jan 2013 1 Jan 2017
1 Jan 1997 1 Jan 2001 1 Jan 2005 1 Jan 2009 1 Jan 2013 1 Jan 2017
.1/1.9 m
1.9/4.9 m
7.4/8.6 m
Displacements shown are in the A Direction
HWY 986:01 - STA. 11+960, Inclinometer SI1
Alberta Transportation
Thurber Engineering Ltd
14
12
10
8
6
4
2
0
Depth
(m)
-150 -75 0 75 150
14
12
10
8
6
4
2
0
-150 -75 0 75 150
14
12
10
8
6
4
2
0
Depth
(m)
-25 -12.5 0 12.5 25
14
12
10
8
6
4
2
0
-25 -12.5 0 12.5 25
LEGEND
Initial 1 Dec 1995
13 Oct 2006
19 May 2007
4 Oct 2007
25 May 2008
10 Oct 2008
29 May 2009
24 Sep 2009
14 May 2010
23 Sep 2010
2 Jun 2011
22 Sep 2011
9 Jun 2012
30 Sep 2012
30 May 2013
25 Sep 2013
31 May 2014
16 Sep 2014
21 May 2015
15 Sep 2015
3 Jun 2016
15 Sep 2016
6 Jun 2017
28 Sep 2017
Cumulative Deflection
Direction X
Deflection (mm)
Incremental Deflection
Direction X
Deflection (mm)
Ref. Elevation m
skew = 25deg
H:\13000\13351 Geohazard Assessment - Peace RiverHigh Level (CON0017602)\Instruments\Fall 2017\SI Readings\PH 41\SI-1.GTL
HWY 986:01 - STA. 11+960, Inclinometer SI1
Alberta Transportation
Thurber Engineering Ltd
70
60
50
40
30
20
10
0
Displ.
(mm)
70
60
50
40
30
20
10
0
1 Jan 1997 1 Jan 2001 1 Jan 2005 1 Jan 2009 1 Jan 2013 1 Jan 2017
1 Jan 1997 1 Jan 2001 1 Jan 2005 1 Jan 2009 1 Jan 2013 1 Jan 2017
4.9/7.4 m
Displacements shown are in the X Direction
(skew = 25 degrees)
HWY 986:01 - STA. 11+960, Inclinometer SI1
Alberta Transportation
Thurber Engineering Ltd
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-100 -50 0 50 100
18
16
14
12
10
8
6
4
2
0
-100 -50 0 50 100
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-50 -25 0 25 50
18
16
14
12
10
8
6
4
2
0
-50 -25 0 25 50
LEGEND
Initial 9 Apr 1996
13 Oct 2006
19 May 2007
4 Oct 2007
25 May 2008
10 Oct 2008
29 May 2009
24 Sep 2009
14 May 2010
23 Sep 2010
1 Jun 2011
22 Sep 2011
9 Jun 2012
30 Sep 2012
30 May 2013
25 Sep 2013
31 May 2014
16 Sep 2014
21 May 2015
15 Sep 2015
3 Jun 2016
15 Sep 2016
6 Jun 2017
28 Sep 2017
Cumulative Deflection
Direction A
Deflection (mm)
Incremental Deflection
Direction A
Deflection (mm)
Ref. Elevation m
H:\13000\13351 Geohazard Assessment - Peace RiverHigh Level (CON0017602)\Instruments\Fall 2017\SI Readings\PH 41\SI-2.GTL
HWY 986:01 - STA. 11+960, Inclinometer SI-2
Alberta Transportation
Thurber Engineering Ltd
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-100 -50 0 50 100
18
16
14
12
10
8
6
4
2
0
-100 -50 0 50 100
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-50 -25 0 25 50
18
16
14
12
10
8
6
4
2
0
-50 -25 0 25 50
LEGEND
Initial 9 Apr 1996
13 Oct 2006
19 May 2007
4 Oct 2007
25 May 2008
10 Oct 2008
29 May 2009
24 Sep 2009
14 May 2010
23 Sep 2010
1 Jun 2011
22 Sep 2011
9 Jun 2012
30 Sep 2012
30 May 2013
25 Sep 2013
31 May 2014
16 Sep 2014
21 May 2015
15 Sep 2015
3 Jun 2016
15 Sep 2016
6 Jun 2017
28 Sep 2017
Cumulative Deflection
Direction B
Deflection (mm)
Incremental Deflection
Direction B
Deflection (mm)
Ref. Elevation m
H:\13000\13351 Geohazard Assessment - Peace RiverHigh Level (CON0017602)\Instruments\Fall 2017\SI Readings\PH 41\SI-2.GTL
HWY 986:01 - STA. 11+960, Inclinometer SI-2
Alberta Transportation
Thurber Engineering Ltd
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-100 -50 0 50 100
18
16
14
12
10
8
6
4
2
0
-100 -50 0 50 100
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-50 -25 0 25 50
18
16
14
12
10
8
6
4
2
0
-50 -25 0 25 50
LEGEND
Initial 9 Apr 1996
13 Oct 2006
19 May 2007
4 Oct 2007
25 May 2008
10 Oct 2008
29 May 2009
24 Sep 2009
14 May 2010
23 Sep 2010
1 Jun 2011
22 Sep 2011
9 Jun 2012
30 Sep 2012
30 May 2013
25 Sep 2013
31 May 2014
16 Sep 2014
21 May 2015
15 Sep 2015
3 Jun 2016
15 Sep 2016
6 Jun 2017
28 Sep 2017
Cumulative Deflection
Direction X
Deflection (mm)
Incremental Deflection
Direction X
Deflection (mm)
Ref. Elevation m
skew = 355deg
H:\13000\13351 Geohazard Assessment - Peace RiverHigh Level (CON0017602)\Instruments\Fall 2017\SI Readings\PH 41\SI-2.GTL
HWY 986:01 - STA. 11+960, Inclinometer SI-2
Alberta Transportation
Thurber Engineering Ltd
70
60
50
40
30
20
10
0
Displ.
(mm)
70
60
50
40
30
20
10
0
1 Jan 1998 1 Jan 2002 1 Jan 2006 1 Jan 2010 1 Jan 2014 1 Jan 2018
1 Jan 1998 1 Jan 2002 1 Jan 2006 1 Jan 2010 1 Jan 2014 1 Jan 2018
.1/2.5 m
13.5/14.7 m
Displacements shown are in the X Direction
(skew = 355 degrees)
HWY 986:01 - STA. 11+960, Inclinometer SI-2
Alberta Transportation
Thurber Engineering Ltd