an initiative of the city of pae · project is an initiative of pae during covid social distancing...

8
Paint Ya Pole an initiative of the City of PAE

Upload: others

Post on 18-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: an initiative of the City of PAE · Project is an initiative of PAE during COVID Social Distancing and will run from 11 May to 11 July 2020. The aim is to simplify some of the approval

Paint Ya Pole

an initiative of the City of PAE

Page 2: an initiative of the City of PAE · Project is an initiative of PAE during COVID Social Distancing and will run from 11 May to 11 July 2020. The aim is to simplify some of the approval

Interested in brightening up your street ?

The Paint Ya Pole Project is an initiative of PAE

during COVID Social Distancing and will run from 11 May to 11 July 2020.

The aim is to simplify some of the approval processes and supply paint, equipment and support to residents

who apply to place art work on the stobie pole in front of their house.

Stobie Poles are the property of SA Power Networks. During the timeframe of Paint Ya Pole, a PAE Placemaking

Officer will seek these permissions from SA Power Networks. If you would like further information and guidance please supply the following; Name, Phone, Email Address, Street

Address, and Location of Pole.Identifying and supplying the location of the pole is important (not all poles are available for artwork

– eg if it has a transformer attached)

Page 3: an initiative of the City of PAE · Project is an initiative of PAE during COVID Social Distancing and will run from 11 May to 11 July 2020. The aim is to simplify some of the approval

Interested in brightening up your street ? 7 easy Steps to get your pole painted!

STEP 2A PAE Placemaking Officer will get in touch to discuss

STEP 3LET YOUR

NEIGHBOURS KNOW

There is an example letter in the back of this booklet. If someone objects to the idea, it may not be possible to proceed.

STEP 1EXPRESS YOUR

INTEREST.

Provide name, phone, email, address and location of

the pole

Page 4: an initiative of the City of PAE · Project is an initiative of PAE during COVID Social Distancing and will run from 11 May to 11 July 2020. The aim is to simplify some of the approval

STEP 4DRAW UP YOUR DESIGN

• Your design dimensions are 200cm x 30cm

• The Internet is a great resource for images and we suggest you use Google on the subject

you would like to put on your pole for images to copy or to use to create your own original design.

• Stencils can be a really easy way to apply paint to a pole, please visit these 2 links to get

tips on stencilling. www.stencilrevolution.com • www.fernwoodnrg.ca/events-directory/fernwood-pole-painting-

projectSTEP 5

A Placemaking Officer will gain permission

from SA Power Networks

STEP 6ARRANGE PAINT AND

EQUIPMENT PICK UP OR DELIVERY

Placemaking Officers will provide: • 1. A quick clean with super

soap or detergent• 2. One coat of primer on the metal

and concrete• PLUS hi-vis vests, witches hats and signage to

keep you safe whilst painting your pole. • Alternatively, you are welcome to do the

prep work yourself (primer available from Council as well)

Page 5: an initiative of the City of PAE · Project is an initiative of PAE during COVID Social Distancing and will run from 11 May to 11 July 2020. The aim is to simplify some of the approval

STEP 7PAINT!

• Place a drop sheet around the area you are working so there is no paint splatter. Place the witches hats supplied by Council

around your work area, and put on your hi-vis vest (also supplied by Council)

• Once the undercoat is dry, you can then put your design on top.

• Don’t paint over any numbers or letters on the pole.• Please clean up after you have finished applying your

artwork and place a WET PAINT sign on the pole.

• Once you’re finished, we will apply an anti-graffiti coating and take photos

of your art!

Page 6: an initiative of the City of PAE · Project is an initiative of PAE during COVID Social Distancing and will run from 11 May to 11 July 2020. The aim is to simplify some of the approval
Page 7: an initiative of the City of PAE · Project is an initiative of PAE during COVID Social Distancing and will run from 11 May to 11 July 2020. The aim is to simplify some of the approval

I/We (name) ......................................................... have been informed of the ‘Paint Ya Pole’

project and agree to the stobie pole situated at (Address) ...................................................

..................................................................................................................................... being painted.

Signature(s) ........................................................................................................................................

Name ..................................................................... Address .............................................................

Phone ..................................................................... Email ..................................................................

Dated .....................................................................

Dear Neighbour,

I hope this letter finds you well and you’re keeping safe!

I/we, live at..................................................................................................... , (Address)

We are applying to the City of Port Adelaide Enfield to decorate the stobie pole outside

our house. I/we hope by doing so, we can add colour and vibrancy to our street!

City of Port Adelaide Enfield are providing support to successful applicants by providing

paint and seeking approval from SA Power Networks.

You can find further information here: (provide link)

Your support, in the form of signed consent below, is needed as part of the application

to the Council.

If you could please complete and return the below slip to ........................................................

.......................................................(Address) that would be much appreciated.

We will do the rest and keep you informed of progress. I/we are happy to have a further

conversation with you if you have concerns or would like more information.

Kind Regards

................................................................................................

Page 8: an initiative of the City of PAE · Project is an initiative of PAE during COVID Social Distancing and will run from 11 May to 11 July 2020. The aim is to simplify some of the approval