19 Jan 2011 1

Lqnusujo

Fargo-Moorhead Metropolitan Flood Risk Management Project

US Army Corps of Engineers BUILDING STRONG®

Industry Day – Project Magnitude June 27, 2012

Design details are preliminary and may change. The information presented is provided for general

overview and discussion purposes only.

June 2012 2

June 2012 3

Project Overview

Structural features Outlet

Aqueducts

Diversion Inlet

Water Storage Area 1

Wild Rice River Structure

Red River Structure

Wolverton Creek Structure

Current Design Reaches Schedule

Outlet/Design Reach 1 Magnitudes of Quantities

Presentation Overview

June 2012 4

Plan components Diversion channel constructed in

North Dakota 20,000 cubic feet per second 50,000 acre feet storage area 150,000 acre feet staging area 35-mile diversion 12 miles of tie-back embankments Control structures on the Red & Wild

Rice rivers Aqueduct & spillway structures on

the Sheyenne & Maple rivers Rock ramp drop structures on the

Lower Rush & Rush rivers Meandering low-flow channel Non-structural mitigation for impacts

in the storage & staging areas

Federally Recommended Plan

June 2012 5

Outlet

6 June 2012

Outlet Structure

Maple River Sheyenne River

June 2012 7

Aqueducts -Maple & Sheyenne Rivers

8 June 2012

Tributary Aqueduct – Maple River

From Feasibility Report

9 June 2012

Tributary Aqueduct – Maple River

From Feasibility Report

10 June 2012

Tributary Aqueduct – Maple River

From Feasibility Report

11 June 2012

Tributary Aqueducts – Maple River

From Feasibility Report

12 June 2012

Tributary Aqueduct – Sheyenne River

From Feasibility Report

13 June 2012

Tributary Aqueduct – Sheyenne River

From Feasibility Report

June 2012 14

Diversion Inlet Water Storage Area 1 Wild Rice River Structure Red River Structure Wolverton Creek Structure

15 June 2012

Diversion Inlet

From Feasibility Report

16 June 2012

Diversion Inlet

From Feasibility Report

17 June 2012

Water Storage Area 1

From Feasibility Report

18 June 2012

Red River Structure 3 tainter gates Each tainter gate (50 feet

wide and 47 feet high)

Wild Rice River Structure 2 tainter gates Each tainter gate (30 feet wide

and 30 feet high)

Gated Control Structures

19 June 2012

Gated Control Structure – Wild Rice River

From Feasibility Report

20 June 2012

Gated Control Structure – Wild Rice River

From Feasibility Report

21 June 2012

Gated Control Structure – Wild Rice River

From Feasibility Report

22 June 2012

Gated Control Structure – Red River

23 June 2012

Gated Control Structure – Red River

From Feasibility Report

24 June 2012

Gated Control Structure – Red River

From Feasibility Report

25 June 2012

Gated Control Structure – Wolverton Creek

From Feasibility Report

26 June 2012

Gated Control Structure – Wolverton Creek

From Feasibility Report

June 2012 27

Approximately 28 design components The number of components could be

adjusted during the design process

Design Reaches

June 2012 28

Item Starting

Stationing Ending

Stationing Estimated Excavation

Quantity (cu. yds) Outlet/Design

Reach 1 0+00 225+00 5,200,000

Design Reach 2 225+00 300+00 1,900,000

Design Reach 3 300+00 325+00 Sponsor reach

Design Reach 4 325+00 521+00 4,500,000

Design Reach 5 521+00 656+00 3,000,000

Design Reach 6 656+00 683+00 Sponsor reach

Design Reach 7 683+00 725+00 1,300,000

Design Reach 8 725+00 834+00 2,600,000

Design Reach 9 834+00 870+00 390,000

Design Reach 10 870+00 901+00 Sponsor reach

Design Reach 11 901+00 1161+00 6,100,000

Design Reach 12 1161+00 1319+00 3,600,000

Design Reach 13 1319+00 1423+00 2,500,000

Design Reach 14 1423+00 1436+00 Sponsor reach

Design Reaches

June 2012 29

Item Starting Stationing

Ending Stationing

Estimated Excavation Quantity

(cu. yds) Design Reach 15 1436+00 1492+00 1,200,000 Design Reach 16 1492+00 1560+00 1,400,000 Design Reach 17 1560+00 1732+00 4,200,000 Design Reach 18 1732+00 1767+00 850,000 Design Reach 19 1767+00 1777+00 Sponsor reach Design Reach 20 1777+00 1847+00 1,700,000 Design Reach 21 1847+00 1920+00 1,500,000 Design Reach 22 n/a n/a n/a Design Reach 23 n/a n/a n/a Design Reach 24 n/a n/a n/a

Christine n/a n/a n/a Comstock n/a n/a n/a Mitigation n/a n/a n/a Recreation n/a n/a n/a

Design Reaches

Current Design Reaches Outlet/Design Reach 1

CR 31/4 Bridge (Local Sponsor)

Design Reach 2

Design Reach 3 – I-29/CR

81/Railroad Bridges (Local Sponsor)

Design Reach 4 – Includes Rush River Structure

CR 32 Bridge (Local Sponsor)

June 2012 30

Current Design Reaches Design Reach 5 – Includes Lower

Rush River Structure

CR 22 Bridge (Local Sponsor)

Design Reach 6 – CR 20/Rail Road Bridges (Local Sponsor)

Design Reach 7 – Maple River Aqueduct

June 2012 31

June 2012 32

Drayton Dam – Fish Passage

Wild Rice River – Fish Passage

Buffalo River – River Restoration

Mitigation

COE Designed Reaches-Current Schedule

June 2012 33

Outlet/Design Reach 1 April 2013 – Design completion

Design Reach 2 June 2013 – Design completion

Design Reach 4 – Includes Rush River Structure October 2013 – Design completion

Design Reach 5 – Includes Lower Rush River Structure October 2013 – Design completion

Design Reach 7 – Maple River Aqueduct Fall 2014 – Design completion

Outlet/Design Reach 1 Magnitude of Quantities

June 2012 34

Excavation to start at outlet structure (Sta 25+50) and extend upstream to Sta 225+00 Design reach length = 3.6 miles or 18,950’ Design reach length excludes CR 31 bridge reach which is 1,000’

Preliminary excavation quantity 5.2 million cubic yards 1.44 million cubic yards per mile of channel

Overall Project-Diversion Channel 35 miles of diversion channel Rough estimate of ~55 million cubic yards of channel excavation This estimate uses Design Reach 1 quantities to calculate rough estimate Volumes will change

June 2012 35

Typical Cross Section

June2012 36

Questions?